415 LAFAYETTE STREET - BUILDING INSPECTION r FORM 4
ORDER OF CONDITIONS
W E T L A N D S P R O T E C T I O N A C T
G.L. C. 131, s. 40
CITY/TOWN Salem, MA. FILE NUMBER 64-710 4;
T0: NAME Philip D. D"Oran ADDRESS 415 Lafayette Street
CERTIFIED MAIL NUMBER
PROJECT LOCATION:
Address 415 Lafayette Street, Salem, MA.
Recorded at Registry of South Essex Book 6699 , Page 648
Certificate (if registered)
CREGARDING:
Notice of Intent dated June 25, 1981
and plans titled and dated Installation of Floats for Docking
THIS ORDER IS ISSUED ON (date) July 23, 1981
------------------------------ ----------------------------------
Pursuant to the authority of C.L. c. 131, s. 40, the Conservation
Commission has reviewed your Notice of Intent -
and plans identified above, and has determined that the area on which
the proposed work is to be done is significant to one or more of the
interests listed in G.L. c. 131, s. 40. The Conservation Commission
hereby orders that the following conditions are necessary to protect
said interests and all' work shall be performed in strict accordance
with them and with the Notice of Intent and plans identified above
except where such plans are modified by said conditions.
--------------------------------------------------------------------
CONDITIONS
1. Failure to comply with all conditions stated herein, and with
all related statutes and other regulatory measures, shall be
deemed cause to revoke or modify this order.
-1-
FORM 4
ORDER OF CONDITIONS CONTINUED FrLE NUMBER 64-79
2. This order does not grant any property rights or any exclu-
sive privileges; it does not authorize any injury to private
property or invasion of private rights.
3. This order does not relieve the permittee or any other per-
son of the necessity of complying with all other applicable
federal, state or local statutes; ordinances, by-laws and/
or regulations. v
4. The work authorized hereunder shall be completed within one
(1) year from the date of this order unless it is for a
maintenance dredging project subject to Section 5(9). The
-- order may be extended by .the issuing authority for one or
more additional one-year periods upon application to the
said issuing authority at least thirty (30) days prior to
the expiration date of the order or its extension.
5. Any fill used in connection with this project shall be clean
fill, containing no trash, refuse, rubbish or debris, includ-
ing, without limiting the generality of the foregoing, lumber,
bricks, plaster, wire, lath, paper, cardboard, pipe, tires,
ashes, refrigerators, motor vehicles or parts of any of the
foregoing.
6. No work may be commenced untill all appeal periods have
elapsed from the order of thecConservation Commission or from i
a final order by the Department of Environmental Quality
Engineering.
7. No work shall be undertaken until the final order, with '
respect to 'the proposed project, has been recorded in the
Registry of Deeds for the district in which the land is
located within the chain of title of the affected property.
The Document number indicating such recording shall be sub-
mitted on the form at the end of this order to the issuer
of this order prior to commencement of work.
8. A sign shall be displayed at the site not less than two
square feet or more than three square feet bearing the
words, "Massachusetts Department of Environmental Quality
Engineering, Number 64=79 "
9. Where the Department of Environmental Quality Engineering
is requested to make a determination and to issue a super-
seding order, the Conservation Commission shall be a party
to all agency proceedings and hearings before the Depart-
went.
-2-
ORDER OF CONDITIONS CONTINUED FILE NO.- 64-79
10. Upon completion of the work described herein, the applicant
shall forthwith request, in writing, that a Certificate of
Compliance be issued stating that the work has been satis-
factorily completed.
11. The work shall conform to the following described plans and
additional- conditions.
Subject to cross sections being filed with the Department of
Environmental Quality Engineering, if determined by Department,
of Environmental Quality Engineering that such are necessary _
and subject to a further determination that an order of con-
ditions is necessary, then work shall be done in compliance
with plans submitted under File Number 64-79,
%. .,`,l.
i f'
-3-
ORDERS OF CONDITIONS -continued
The applicant, any person aggrieved by this order, any owner
of land abutting the land upon which the proposed work is to be
done, or any ten residents of the city or town in which such land
is located, are hereby notified of their right to appeal this order
to the Department of Environmental Quality Engineering provided the
request is made in writing and by certified mail to the Department
within ten (10) days from the issuance of this order.
ISSUED BY _ -CL( (
On this 9 I day of 1902//, before me personally
appeared
to me
knowq ;t&be the person described in, and who executed, the foregoing
ing�rvmknti',;and acknowledged that he executed the same as his free act
My Commission expires
DETACH ON DOTTED LINE AND SUBMIT TO THE ISSUER OF THIS ORDER PRIOR TO
COMMENCEMENT OF WORK.
TO (Issuing Authority)
PLEASE BE ADVISED THAT THE ORDER OF CONDITIONS FOR THE PROJECT AT
FILE NUMBER HAS BEEN RECORDED AT THE REGISTRY OF
ON (DATE)
If recorded land, the instrument number which identifies this trans-
action is _
If registered land, the document number which identifies this trans-
action is
Signed
Applicant
• —4—