Loading...
415 LAFAYETTE STREET - BUILDING INSPECTION r FORM 4 ORDER OF CONDITIONS W E T L A N D S P R O T E C T I O N A C T G.L. C. 131, s. 40 CITY/TOWN Salem, MA. FILE NUMBER 64-710 4; T0: NAME Philip D. D"Oran ADDRESS 415 Lafayette Street CERTIFIED MAIL NUMBER PROJECT LOCATION: Address 415 Lafayette Street, Salem, MA. Recorded at Registry of South Essex Book 6699 , Page 648 Certificate (if registered) CREGARDING: Notice of Intent dated June 25, 1981 and plans titled and dated Installation of Floats for Docking THIS ORDER IS ISSUED ON (date) July 23, 1981 ------------------------------ ---------------------------------- Pursuant to the authority of C.L. c. 131, s. 40, the Conservation Commission has reviewed your Notice of Intent - and plans identified above, and has determined that the area on which the proposed work is to be done is significant to one or more of the interests listed in G.L. c. 131, s. 40. The Conservation Commission hereby orders that the following conditions are necessary to protect said interests and all' work shall be performed in strict accordance with them and with the Notice of Intent and plans identified above except where such plans are modified by said conditions. -------------------------------------------------------------------- CONDITIONS 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this order. -1- FORM 4 ORDER OF CONDITIONS CONTINUED FrLE NUMBER 64-79 2. This order does not grant any property rights or any exclu- sive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This order does not relieve the permittee or any other per- son of the necessity of complying with all other applicable federal, state or local statutes; ordinances, by-laws and/ or regulations. v 4. The work authorized hereunder shall be completed within one (1) year from the date of this order unless it is for a maintenance dredging project subject to Section 5(9). The -- order may be extended by .the issuing authority for one or more additional one-year periods upon application to the said issuing authority at least thirty (30) days prior to the expiration date of the order or its extension. 5. Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris, includ- ing, without limiting the generality of the foregoing, lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of the foregoing. 6. No work may be commenced untill all appeal periods have elapsed from the order of thecConservation Commission or from i a final order by the Department of Environmental Quality Engineering. 7. No work shall be undertaken until the final order, with ' respect to 'the proposed project, has been recorded in the Registry of Deeds for the district in which the land is located within the chain of title of the affected property. The Document number indicating such recording shall be sub- mitted on the form at the end of this order to the issuer of this order prior to commencement of work. 8. A sign shall be displayed at the site not less than two square feet or more than three square feet bearing the words, "Massachusetts Department of Environmental Quality Engineering, Number 64=79 " 9. Where the Department of Environmental Quality Engineering is requested to make a determination and to issue a super- seding order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Depart- went. -2- ORDER OF CONDITIONS CONTINUED FILE NO.- 64-79 10. Upon completion of the work described herein, the applicant shall forthwith request, in writing, that a Certificate of Compliance be issued stating that the work has been satis- factorily completed. 11. The work shall conform to the following described plans and additional- conditions. Subject to cross sections being filed with the Department of Environmental Quality Engineering, if determined by Department, of Environmental Quality Engineering that such are necessary _ and subject to a further determination that an order of con- ditions is necessary, then work shall be done in compliance with plans submitted under File Number 64-79, %. .,`,l. i f' -3- ORDERS OF CONDITIONS -continued The applicant, any person aggrieved by this order, any owner of land abutting the land upon which the proposed work is to be done, or any ten residents of the city or town in which such land is located, are hereby notified of their right to appeal this order to the Department of Environmental Quality Engineering provided the request is made in writing and by certified mail to the Department within ten (10) days from the issuance of this order. ISSUED BY _ -CL( ( On this 9 I day of 1902//, before me personally appeared to me knowq ;t&be the person described in, and who executed, the foregoing ing�rvmknti',;and acknowledged that he executed the same as his free act My Commission expires DETACH ON DOTTED LINE AND SUBMIT TO THE ISSUER OF THIS ORDER PRIOR TO COMMENCEMENT OF WORK. TO (Issuing Authority) PLEASE BE ADVISED THAT THE ORDER OF CONDITIONS FOR THE PROJECT AT FILE NUMBER HAS BEEN RECORDED AT THE REGISTRY OF ON (DATE) If recorded land, the instrument number which identifies this trans- action is _ If registered land, the document number which identifies this trans- action is Signed Applicant • —4—