Loading...
S/O B-19-120 & C/O, UNIT 6-UB2 Certificate Number: B-19-120 Permit Number: B-19-120 Commonwealth of Massachusetts City of Salem This is to Certify that the Single Family Condo Building located at Building Type 6-UB2 LORING HILLS AVENUE........................................................ in the .....................................CitY..of Salem............................................... ....................................................................... Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY 6-UB2 ANTON REPIN This Permit is granted in conformity with the Statutes and Ordinances relating thereto, and expires ...............................N.t Applicabk.................._.......... unless sooner suspended or revoked. Expiration Date Issued on: Friday, April 12, 2019 Commonwealth of Massachusetts , City of Salem 120 Washington St,3rd Floor Salem,AAA 01970(978)745-9595 x5841 Return card to Building Division for Certificate of occupancy Permit No. B-19-720 T BUILD FEE PAID: $168.00 PERMIT DATE ISSUED: 1131/201 9 This certifies that REPIN ANTON has permission to erect, alter, or demolish a,buildi ` " 6-UB2,LORING HILLS AVENUE Map/Lot: 210005-801 as follows: Other Building Permit R L TCWEN,;4>Ni SATK f '$ATHROOM, FLOORING PAINT. Contractor Name: SLAVA GLIKBERG DBA: ELITE REMODELING&CONSTRUCTI => r x„ C. Contractor License No: CS-108426 1/31/2019 Btting Date This permit shall be deemed abandoned and invalid ur We'the r4ksUIh0rtz6dby tt*.p�rmit key csltnmancedwV; ":stx nwnths after issuance.The Building Official may grant one or more extensions not to exceed six m0ft eadt'ttpart'vrMl so n4`. All work authorized by this permit shall conform to the approved ►and the approved construction docu ent9 fof V&WIhis permit has been granted. All construction,alterations and changes of use of any building and*u0tures shall be in compliance with the kx4xorftland codes. This permit shall be displayed in a location clearly visible from soon ,Weet or road and shall be maintained open for pL4*.k%p40.ftn for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until alter signoWres by the Building and Fire Officials tl d ri f Nrt t 8;permit. H IC#: 191721 ': s 'end'(as set forth in M131-042A). Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. Commonwealth of Massachusetts , Citv of Salem 120 Washington S 3rd Floor Salem MA 01970 978 745-9595 x5841 lip 9t t. � � ) Return card to Building Division for Certificate of Occupancy Structure CITY OF SALEM BUILDING PERMIT Excavation PERMIT TO BE POSTED IN THE WINDOW Footing INSPECTION RECORD Foundation Framing Mechanical tcst 4r a Insulation INSPECTION: r � � �� ����-.� �: DATE Chimney/Smoke Chamber ;x Final Plumbing/Gas II,, V, I ; Rough:Plumbing l' Rough:Gas19 Final- -l - Electrical Service . Rough Final ` Fire De artment Preliminary : Final i Health Department " Preliminary Final