S/O B-19-120 & C/O, UNIT 6-UB2 Certificate Number: B-19-120 Permit Number: B-19-120
Commonwealth of Massachusetts
City of Salem
This is to Certify that the Single Family Condo Building located at
Building Type
6-UB2 LORING HILLS AVENUE........................................................ in the .....................................CitY..of Salem...............................................
.......................................................................
Address Town/City Name
IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY
6-UB2
ANTON REPIN
This Permit is granted in conformity with the Statutes and Ordinances relating thereto, and
expires ...............................N.t Applicabk.................._.......... unless sooner suspended or revoked.
Expiration Date
Issued on: Friday, April 12, 2019
Commonwealth of Massachusetts ,
City of Salem
120 Washington St,3rd Floor Salem,AAA 01970(978)745-9595 x5841
Return card to Building Division for Certificate of occupancy
Permit No. B-19-720 T BUILD
FEE PAID: $168.00 PERMIT
DATE ISSUED: 1131/201
9
This certifies that REPIN ANTON
has permission to erect, alter, or demolish a,buildi ` " 6-UB2,LORING HILLS AVENUE Map/Lot: 210005-801
as follows: Other Building Permit R L TCWEN,;4>Ni SATK f '$ATHROOM, FLOORING
PAINT.
Contractor Name: SLAVA GLIKBERG
DBA: ELITE REMODELING&CONSTRUCTI => r x„ C.
Contractor License No: CS-108426
1/31/2019
Btting Date
This permit shall be deemed abandoned and invalid ur We'the r4ksUIh0rtz6dby tt*.p�rmit key csltnmancedwV; ":stx nwnths after issuance.The Building Official
may grant one or more extensions not to exceed six m0ft eadt'ttpart'vrMl so n4`.
All work authorized by this permit shall conform to the approved ►and the approved construction docu ent9 fof V&WIhis permit has been granted.
All construction,alterations and changes of use of any building and*u0tures shall be in compliance with the kx4xorftland codes.
This permit shall be displayed in a location clearly visible from soon ,Weet or road and shall be maintained open for pL4*.k%p40.ftn for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until alter signoWres by the Building and Fire Officials tl d ri f Nrt t 8;permit.
H IC#: 191721 ': s 'end'(as set forth in M131-042A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
Commonwealth of Massachusetts ,
Citv of Salem
120 Washington S 3rd Floor Salem MA 01970 978 745-9595 x5841 lip
9t t. � � )
Return card to Building Division for Certificate of Occupancy
Structure CITY OF SALEM BUILDING PERMIT
Excavation PERMIT TO BE POSTED IN THE WINDOW
Footing INSPECTION RECORD
Foundation
Framing
Mechanical tcst 4r a
Insulation INSPECTION:
r � � �� ����-.� �: DATE
Chimney/Smoke Chamber ;x
Final
Plumbing/Gas II,,
V, I
;
Rough:Plumbing l'
Rough:Gas19
Final-
-l -
Electrical
Service .
Rough
Final `
Fire De artment
Preliminary :
Final i
Health Department "
Preliminary
Final