FINAL CONSTRUCTION CONTROL DOCS b-18-254 05/2019 Final Construction Control Document
r To be submitted at completion of construction by a
W
1 Registered Design Professional
for work per the 91h edition of the
wM S;e�
Massachusetts State Building Code, 780 CMR, Section 107.6.4
Project Title: 120 Washington St Renovations Date: May 24, 2019 Permit No.
Property Address: 120 Washington Street, Salem Ma
Project: Check(x)one or both as applicable: New Construction X Existing Construction
Project description: :. Renovations to exsting building to build new apartments.
I, Robert E Dyson,MA Registration Number: 33026 Expiration date: June 30, 2020 , am a registered design
professional, and hereby certify that I have prepared or directly supervised the preparation of all design plans,
computations and specifications concerning':
Entire Project Architectural Structural X Mechanical
Fire Protection Electrical X Other: Plumbing
for the above named project. I certify that 1, or my designee,have performed the necessary professional services and was
present at the construction site on a regular and periodic basis to determine that the work proceeded in accordance with
the requirements of 780 CMR and the design documents prepared by me and approved as part of the building permit and
that I or my designee:
I. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.
�tiYH QFs
Enter in the space to the right a"wet"or
electronic signature and seal: OWRN tiN
o
U MEC IC
NO.3
/STE-
�'
Phone number: 617-429-8886
Building Official Use Only
Building Official Name: Permit No.: Date:
Final Construction Control Document
H r To be submitted at completion of construction by a
W
Registered Design Professional
y,M b`ev
for work per the 91h edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: 120 Washington St Renovations Date: May 24,2019 Permit No.
Property Address: 120 Washington Street, Salem Ma
Project: Check(x)one or both as applicable: New Construction X Existing Construction
Project description: : Renovations to exsting building to build new apartments
I, Frederick P. Goff,MA Registration Number: 33856 Expiration date: June 30,2020, am a registered design
professional, andI have prepared or directly supervised the preparation of all design plans, computations and
specifications concerning:
Architectural Structural Mechanical
Fire Protection X Electrical X Other: Fire Alarm
for the above named project. 1, or my designee,have performed the necessary professional services and was present at the
construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work
proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building
permit and that I or my designee:
1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar withthe
progress and quality of the work and to determine if the work was performed in a manner consistentwith the
construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
Enter in the space to the right a"wet"or Cil-1l1
electronic signature and seal:
• �`�t ry;N rl'
�f3�q'il►s,�`'�'��
Phone number: 617-429-8886
Building Official Use Only
Building Official Name: Permit No.: Date:
Version 06 11 2013
Final Construction C
� ontrol Document
To be submitted at completion of construction by a
1 W° Registered Design Professional
5�0
for work per the ninth edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: RCG Peabody Building(3rd floor South) Date:5-28-19 Permit No. B-18-254
Property Address: 120 Washington St. Salem, MA
Project: Check (x) one or both as applicable: X New construction X Existing Construction
Project description:3rd floor south consists of 5,797 s.f. so called 3rd floor south,renovated and converted
commercial space to 5 residential units,units#301,302,303,304&305. The total conversion units are 14 which
the 41hfloor 5 units are not completed yet. Included the Lobby/entry walkway,2nd &3rd floor corridors. The
building includes revised electrical,mechanical,plumbing,fire protection,fire alarm systems that are not
included in this final construction control document. They will be done by others.
I Peter Pitman MA Registration Number: 8749 Expiration date: August 2019 , am a registered design
professional, and I have prepared or directly supervised the preparation of all design plans, computations and
specifications concerning:
X Architectural Structural Mechanical
Fire Protection Electrical Other: Describe
for the above named project. 1, or my designee, have performed the necessary professional services and was
present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and
belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved
as part of the building permit and that I or my designee:
1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other
submittals by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with
the progress and quality of the work and to determine if the work was performed in a manner consistent
with the construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions MR 107.
Enter in the space to the right a"wet" or
electronic signature and seal:
Phone number:978-744-8982 Email:pfpitman@jumno-com
Building Official Use Only P
Building Official Name: Permit No.: Date:
Version 01 01 2018
Final Construction Control Document
u To be submitted at completion of construction by a
W
Registered Design Professional
rr for work per the 9th edition of the
Massachusetts State Building Code, 780 CMR, Section 107
May 28,2019
Project Title: 120 Washington Street, Salem,MA Permit No.
Property Address: 120 Washington Street, Salem, MA
Project: Check(x) one or both as applicable: New construction X Existing Construction
Project description: Renovations to the existing building
I , Amish Patel,MA Registration Number: 48856 Expiration date: 6/30/20 , am a registered design professional, and I
have prepared or directly supervised the preparation of all design plans, computations and specifications concerning:
Architectural Structural Mechanical
Fire Protection Electrical X Other: Fire Alarm
ror the above named project I, or my designee,have performed the necessary professional services and was present at the
construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work
proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building
permit and that I or my designee:
1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
Enter in the space to the right a"wet"or
electronic signature and seal:
t
Phone number:978-443-7888 Email: amishp@alliedconsulting.net