Loading...
FIRE INSPECTION REPORT I: YNCO FIRE PROTLCT:I['iN INC. cOVI'tACIaus-I'MAN't"E S-i\Sl'ALA'Fl0V5 Styl c-Repairs--1nspectios Grant Avenue,Burlington,MA 01803 Telephone(7$1)221-0111 fax(781)229-8323 S/29/19 RE: 120 Washington St Salem, Ma To whom it may concern, We have completed the fire sprinkler installation at the above caption location. All work conforms to National Fire Protection Association standard 13 as required by Massachusetts State Building Code. Glenn Iozzo Lynco Fire Protection, Inc. LYNC O FIRE PROTECTION, INC . 19 Grant Avenue, Burlington,MA 01803 781-221-0111 Contractor's Material and Test Certificate for Aboveground Piping PROCEDURE Upon completion of work,inspection and tests shall be made by the contractor's representative and witnessed by the property owner or their authorized agent.All defects shall be corrected and system left in service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives, Copies shall be prepared for approving authorities,owners,and contractor. It is understood the owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor workmanship,or failure to comply with approving authority's requirements or local ordinances. Property name 120 Washington St Date 5/29/19 Property address 120 Washington St Salem, Ma Accepted by approving authorities(names) Salem Fire Dept Address Plans Installation conforms to accepted plans 0 Yes ❑No Equipment used is approved ®Yes Q No If no,state deviations Has person in charge of fire equipment been instructed as to location of ®Yes ❑No control valves and care and maintenance of this new equipment? If no,explain Have copies of the following been left on the premises? Instructions 1.System components instructions ®Yes Q No 2.Care and maintenance instructions 0 Yes Q No 3.NFPA 25 ®Yes ❑No 4.With whom have the copies been left? Location of Supplies buildings system Year of Make Model manufacture Orifice size Quantity Temperature rating Globe QR pendant 2018 1/2 18 155 Sprinklers Viking coin 2018 1/2 183 175 Globe Res pendant 2018 1/2 160 155 Pipes and Type of pipe steel fittings Type of fittings east Iron Maximum time to operate through test Alarm device connection Alarm valve or flow Type Make Model Minutes Seconds indicator vain flow Potter VSR-F 0 35 For individual use.No other reproduction or transmission in any form permitted. i of 3' LVNCO FIRE P RO`I'EC HON, INC:". 19 Gi-ant Avenue, Burlington, MA 01803 781-221-0111 Dry valve Q,O.D Make Model Serial No. Make Model Serial No. N/A Time to trip through Water Air Trip point air Time water reached Alarm operated Dry pipe test connection a.b pressure pressure pressure test outleta,b properly operating Minutes Seconds si test p psi psi Minutes Seconds Yes No Without Q.O.D. With Q.O.D. If no,explain Operation ❑Pneumatic ❑Electric ❑Hydraulics Piping supervised El Yes ❑No I Detecting media supervised ❑Yes [I No Does valve operate from the manual trip,remote,or both control stations? Q Yes Q No Deluge and Is there an accessible facility in each circuit If no,explain for testing? preaction valves ❑Yes ❑No Does each circuit operate Does each circuit operate Maximum time to operate Make Model supervision loss alarm? valve release? release Yes No Yes No Minutes Seconds N/A Location and Make and Pressure- floor model Setting Static ssure Residual pressure(flowing) Flow rate reducing Flow valve test Inlet(psi) Outlet(psi) Inlet(psi) Outlet(psi) m N/A Hydrostatic: Hydrostatic tests shall be made at not less than 200 psi(13.6 bar)for 2 hours or 50 psi(3.4 bar) above static pressure in excess of 150 psi(10.2 bar)for 2 hours.Differential dry pipe valve clappers shall be left Test open during the test to prevent damage. All aboveground piping leakage shall be stopped. description Pneumatic: Establish 40 psi(2.7 bar)air pressure and measure drop,which shall not exceed 1'/2 psi(0.1 bar)in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop,which shall not exceed 1'/�psi 0,1 bar in 24 hours. All piping hydrostatically tested at N/A psi( bar)for hours If no,state reason Dry piping pneumatically tested ❑Yes ❑No per NFPA 25.2.1.6 Equipment o erates property ®Yes ❑No Do you certify as the sprinkler contractor that additives and corrosive chemicals,sodium silicate or derivatives of sodium silicate,brine, or other corrosive chemicals were not used for testing systems or stopping leaks? E Yes ❑No Drain Reading of gauge located near water supply Residual pressure with valve in test connection Tests test I test connection: 78psi( bar open wide: 80psi( bar Underground mains and lead-in connections to system risers flushed before connection made to sprinkler piping Verified by copy of the Contractor's Material and Test C1 Yes ❑No Other Explain Certificate for Underground Piping. existing service Flushed by installer of under ound sprinkler piping ❑Yes ❑No If powder-driven fasteners are used in concrete,has ❑Yes ❑No If no,explain representative sample testing been satisfactorily completed? N/A a Measured from time inspector's test connection is opened, b NFPA 13 only requires the 60-second limitation in specific sections. For individual use.No other reproduction or transmission in any form permitted. 2 of 3 I. YNCO FIRE PROTECTION, INC. 19 (_grant Avenue.Burlington, MA 01803 781-221-0111 Blank testing Number used Locations Number removed gaskets Welding piping ❑Yes C@ No If es... Do you certify as the sprinkler contractor that welding procedures used complied with the ❑Yes ❑No minimum requirements of AWS 82.1,ASME Section IX Welding and Brazing Qualifications, or other applicable qualification standard as required by the AHJ? Do you certify that all welding was performed by welders or welding operators qualified in ❑Yes ❑No accordance with the minimum requirements of AWS 82.1,ASME Section IX Welding and Welding Brazing Qualifications,or other applicable qualification standard as required by the AHJ? Do you certify that the welding was conducted in compliance with a documented quality ❑Yes ❑No control procedure to ensure that(1)all discs are retrieved;(2)that openings in piping are smooth,that slag and other welding residue are removed;(3)the internal diameters of piping are not penetrated;(4)completed welds are free from cracks,incomplete fusion,surface porosity greater than IAA in.diameter,undercut deeper than the lesser of 25%of the wall thickness Or'/32 in.;and(5)completed circumferential butt weld reinforcement does not exceed 3132 in.? Cutouts (discs) Da you certify that you have a control feature to ensure that all cutouts discs are retrieved? Yes ❑No Hydraulic Nameplate provided If no,explain data nameplate I ®Yes ❑No Sprinkler contractor removed all caps and straps? Z Yes ❑No Date leftin service with all control valves open Remarks turned on daily Name of sprinkler contractor LYNCO FIRE PROTECTION Tests witnessed Signatures The property owner or their authorized agent(signed) Title Date For spri ontractor ed) Title Date PM 5/29/19 Additional explanation and notes For individual use.No other reproduction or transmission in any form permitted. 3 of 3