Loading...
331 LAFAYETTE STREET - BUILDING INSPECTION 331 LAFAYETTE STREET f, ,3 _ HudsonQ Design Groupac August 23, 2017 Ckw coif L1.0 3 Bud Way Unit 20 Nashua, NH 03063 RE: Lafayette Street Development Letter of Conformance in regards to Cold-Formed Steel Framing Modifications Mr. Pat Albert, Hudson Design Group LLC reviewed the site photos taken on August 13, 2017, of the current framing conditions. HDG was asked to confirm that the framing modifications were constructed in conformance with referenced HDG site inspection report, shop drawings, and design calculations. References: • Hudson Design Group LLC -Site Inspection Report (July 14, 2017) • Hudson Design Group LLC -Cold-Formed Steel Design Calculations (February 2, 2017, Rev 1) • Hudson Design Group LLC -Cold-Formed Steel Shop Drawings (March 21, 2017, Rev3) Based on our review of the current framing conditions HDG confirms that the framing as well as the required modifications were constructed in conformance with the above referenced documents in cornunction with all applicable codes TIBC 2009 Massachusetts State Building Code Latest Edition). This determination was based on the following limitations and assumptions: 1. HDG is not responsible for any modifications completed prior to and hereafter which HDG was not directly involved. -(N OF Please feel free to contact our office should you have any questions. a DANIEL P. cs� HAMM m Respectfully Submitted, cos CIVIL Hudson Design Group LLC No.40720 Michael Cabral Daniel P. Hamm Structural Dept. Head Principal p:978.557.5553 f:978.336.5586 a: 1600 Osgood Street,Building 20 North,Suite 2-101,N.Andover,MA 01845 PITMAN & WAIWLEY ASSOCIATES LLC CONSTRUCTION CONTROL AFFIDAVIT FOR SUSBTANTIAL COMPLETION October 27,2017 Lafayette Street Development 331 Lafayette Street Salem,Massachusetts 01970 1,Peter F.Pitman,submit that to the best of my knowledge this project is substantially complete and in accordance with 780 CMR,81'Edition Massachusetts State Building Code(2009 IBC with all Massachusetts Amendments),ready for occupancy,and a designated representative or consultants,performed the following professional services,as specified in 780 CMR,8"Edition,Massachusetts State Building Code,Section 107.3.4 1. We reviewed for conformance to the design concept,shop drawings,samples,and other submittals,which are submitted by the contractor in accordance with the requirements of the construction documents. 2. We review and approve the quality control procedures for all code-required controlled materials. 3. We were present at intervals appropriate to the stage of construction,and complexity of the project,to become generally familiar with the progress and quality of the work,and determine to the extent practical and possible the work is being performed in a manner consistent with the construction documents. Our observation during site visits does not relieve the Contractor or its Subcontractors of their responsibilities and obligations for quality control of the work,for any design work which is included in their scope of services(i.e.design delegation),and for full compliance with the requirements of the Construction Documents and applicable building codes.Furthermore,the detection of,or the failure to detect deficiencies or defects in the work during our site visits does not relieve the Contractor or their Subcontractors of their responsibility to correct all deficiencies or defects, whether detected or undetected,in all parts of the works,and to have complied with all requirements of the Construction Documents and all applicable codes. N rr°v r r-�4l vyF.V Peter F.Pitman,Architect Massachusetts Registration No.8749 32 CHURCH ST S A L E M b1ASS.ACHUSETTS 0 1 9 7 0 978.734 - 8982 F.AX 978-744-0400 Final Construction Control Document . F To be submitted at completion of construction by a ` II 1 Registered Design Professional for work per the 8"' edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: 331 Lafayette Sweet Development Date:IO/1/17 Permit No. Property Address: 331 Lafayette Street, Salem, MA 01970 Project: Check(x)otic or both as applicabl C New construction Existino Construction Project description: Mixed use Commercial Development I, Michael Perham, MA Registration Number: 41 143 Expiration (fate: 6/30/2018 , am a regisrere /design pro/essional. and 1 have prepared or directly supervised the preparation of all design plans,computations and specifications concerning*; Architectural `_X_ Strueturah) Mechanical Fire Protection — "M-ler ictal— Other: Describe for the above named project. 1.or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building Permit and that I or my designee: I. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves, the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a "wet"or electronic signature and seal: ` ` 4 al r, � e1 t¢rAt r. 6 re t ado Phone number: 978-646-0097 Email: mperhamC�z?,mebrie.com �t^ 7= Building Official Use Only Building Oficial Name: Permit No.: Date: Version 06 11 2013 8/23/2017 Unofficial Properly Record Card Unofficial Property Record Card - Salem, MA 1 General Property Data Parcel ID 32-0228-0 Account Number Prior Parcel ID 51 -- Property Owner DALY RICHARD E Property Location 321 LAFAYETTE STREET LOUISE B Property Use One Family Mailing Address 321 LAFAYETTE ST Most Recent Sale Date 1/1/1900 Legal Reference 4929-21 City SALEM Grantor Mailing State MA Zip 01970 Sale Price 0 ParcelZoning R Land Area 0.253 acres Current Property Assessment Card 1 Value Building Value 260,500 Xtra Features 4700 Land Value 133,900 Total Value 399,100 Value Building Description Building Style Old Style Foundation Type Brick/Stone Flooring Type Hardwood #of Living Units 1 Frame Type Wood Basement Floor Concrete Year Built 1890 Roof Structure Hip Heating Type Forced H/W Building Grade Good Roof Cover Asphalt Shgl Heating Fuel Oil Building Condition Average Siding Clapboard Air Conditioning 0% Finished Area(SF)2727 Interior Walls Plaster #of Bsmt Garages 0 Number Rooms 10 #of Bedrooms 7 #of Full Baths 2 #of 3/4 Baths 0 #of 1/2 Baths 0 #of Other Fixtures 0 Legal Description Narrative Description of Property This property contains 0.253 acres of land mainly classified as One Family with a(n)Old Style style building,built about 1890,having Clapboard exterior and Asphalt Shgl roof cover,with 1 unit(s),10 room(s),7 bedroom(s),2 bath(s),0 half bath(s). Property Images n wr J Disclaimer:This information is believed to be correct but is subject to change and is not warranteed. ( 1 i hftp://salem.patriotproperties.com/RecordCard.asp 1/1 City of Salem Sign Permit Application Worksheet 14-Sep-17 331 Lafayette Street Offices Zoning(reslnon-res) 81 1 Entrance Corridor(YIN) Y Lot frontage 190 feet Building frontage 182 feet #of businesses on site Biding dist from street center 36 Multiplier 1 WIN maximum area permitted 182.37 sq ft total proposed sign area 80.72 sq ft Sign 1(Blank)Lafayette St Left Side 18.30 length 119.75 inches �- I 1 $q 3 ✓ height 22.00 inches Sign 2(SSU)Center Sign Lafayette 18.30 length 119.75 inches U 1 I height 22.00 inches Sign 3(Blank)Lafayette St Right Side 18.30 I q�Gp length 119.75 inches 0 IS ✓ height 22.00 inches Sign 4(RN Esthetics)Rear Elevation Left 12.92 length 15.50 inches height 120.00 inches Sign 5(Blank)Rear Elevation Center 12.92 length 15.50 inches height 120.00 inches I ` 16 Sign 6(SSU)Rear Elevation Right 12.92 `' GP length 15.50 inches height 120.00 inches g'j ✓ Sign 7(Blank)West Avenue Right 12.92 length 15.50 inches height 120.00 inches maximum area permitted sq It(per side) maximum#of signs permitted signs maximum height permitted It tall sign 1 proposed sign area 0.00 sq ft length -0.00 inches height 0.00 inches proposed sign height 0.00 ft(approx) sign 2 proposed sign area 0.00 sq ft length 0.00 inches height 0.00 inches proposed sign height ft Application meets guidelines set forth in the Salem Sign Ordinance Yes Yes Recommend approval Yes Yes Seven aluminum signs with acryclic letters are proposed,the cumulative L-Vn Q-(� total is less than the maximum allowed.Three signs are for tenant spaces q. 2Z that will be occupied immediately.The remaining four signs will be installed blank.The applicant has been informed that a new sign permit will be required to reface each of the four blank signs.There will be a black awning below the center sign on the Lafayette side,the awning will have the address,no signage. Permit Number APPLICATION FOR PERMIT TO ERECT A SIG) �',r D a NOTE:BUILDING PERMIT MUST BE OBTAINED BEFORE SIGN Is ERECTED P`�,1 9 1 '; 2017 ' Location, Ownership and Detail Must Be Correct, Complete,and Legible v "' 7 J DEPT. OF Pi_A rylp,;; g Salem, Massg�q� To the Building Inspector: / ' a { The undersigned hereby applies for a permit to /Erect, o Alter, o Repair a sign on the following described buildings: • 3 3 / ����y�rr� s T 131o Urban Renewal Area ntrance Corridor ❑Historic District o None ' 331 4,46 ETfE G G C —Use of Building 7 Telephone Gj 7,C_g27_F-26 a 'i floor U . • L 3 3/ Gaff! ETT G.L � 2 floor V 6 Address SIUI'-Al PtMPfHXT_ ST 3 floor SS v L.Q Telephone -24- R27-IF76 a 4 floor E-mail f 6u R 2 q13-- - W CoryHow many businesses are in the building? ff a corporate body,name Frontage of res onsibfe officer 20 ex-r Q U R 2 82iRnr IfPh�u^ftkfMS,"GueQWu uL Building i .37 linear feet ConsWchon Sup's License No Cs- C l 6 vs- 11-9 .1 Applicant's Space(if multi-tenant) linear feet Address 7S/(�pfG� R� GNic0M&C 1'14o/y�0 Property Telephone c � -/1�Z� /`3z linear feet ail Sign Permit to E-mail �(p2Kj h� fr aeT ❑Sign Owner lgn Erector o Other. . . .. Si 1 Si 2 Si n urtace urtace urface o Right Angle to Building o Right Angle to Building o Right Angle to Building o Free Standing o Free Standing o Free Standing ❑Awning o Awning ❑Awning o Portable(A-Frame) ❑Portable(A-Frame) o Portable(A-Frame) o Other(specify) o Other(specify) o Other(specify) Sign Mate ' I Sign Materials�� Sign Materials vv�,�Un Acre c;c �G�n u�u,/ c,z l rreti✓ 1Lin,1/0 119CA G,' ceTrz i Sign Dirgensions Sign Dimensions Sign Dimensions .22- lox f/9.7sc x 4� O �aN>LIl9.?rc ,cV 'p 22"t�,C /11.WG 2(V"111 Sign Area IP, 3 s It Sign Area 1A 3 Sign Area /6,. s fl 3 s fl Sign Height(if free standing) Sign Height(if free standing) Sign Height(if free standing) Estimated Cost of Net Work $ 3-2 ,600 ' Existing Signs Signatures Type Csq To Be Removed? Sign Owner ❑Surface ❑yes ono 33l L�� TPtCC /CoOfcT (su><C o Right Angle to Building ❑yes ❑no ❑Free Standing ❑yes ❑no Si Owner' u orized Re re ntative nn'� o Awning o yes ono U 79r 1 q , A h 1 t , ❑Other(specify) ❑yes ❑no G �^ Property Owner �Lo.f j oo 09 Js ,JL- f S1 OCT4V 33/ LoF,ayerf2 tcc /Lo�JFs Planning CommurtitqVevelopmeht Department Historical Commission Approval Building Inspector - .,iAINTi ------- J�I�DI --- -' Ioo�ool�ol ID�IIw�001 (Cl O�I� ��� ..... '0�= • iuol'ooI I00�11_L�Jiui —vvuu oa ® oo'� .. .... mate mesa IDI �� IDI JIDIDI�IO I ®I �- 9. • 1 PITMAN& WARDLEY ASSOCIATES LLC 32C MCHSnR �WIMA iu s ✓ as ✓ s pa:i � r � ✓ s ✓ ss i ✓ � sf �� � �✓ es s� w ~ W � wW � w � s� �� �s ✓s s✓ �s s ss w0 w � WN i� ✓ � SiG AGE 4 y / � < If l p Q w a E 110�A REAR ELEVATION �O dq'NIiECi11Rd� PITMAN& WAMLEY ASsMMM LLC 33 mmcm STRELR ' SA9]BM1aaP9P1� III W Onn W W ~ I— W � N cnE Ni uI �_j �Lu C) a � } N W W Q— LLI LLQ m Q � N ' J wEST AVE ELEVATION A2.0 2.0 � 4RCMRECNRLL I' Tenant Signage Single faced Quantity:7 Total w b y R� *s K +r r � n�A, ivy t: ryti� n, ,ESTHETICS pk Evs"; x"&�pfi�e!:x:111 I- ts7 ;Yi � ` Fsa-1,em 8 TATEa U-N,1 �l e ra u1:. {„e'�- Mvn <1F k% Release to I Job: W0 Older. C03393 CUSTOMUMOB LOCATION: DWG.DATE:].24.1] MODIFIED:Au 9uet9,a01)t0i9FAM_ Burr Investments '<, ].z].n Y,wly.mmotilunopionma-.iw p.k Approval•OOApprpv¢4 SAYS AFP: OESI4N: pM6R.:: 331 Lafayette Street• Salem,MA _ Approved Asflpl¢C K Adam Brodeur MM T °'"' ""°°^°'^"'^'°°•=°W^< .,., 1..l d' ,n FltE9ARE Burt lnvestments_lafayette Building_Budding It tenant signage Salem PA 9AAWI86p-p6: REO GR 17.18783-3 1 Commonwealth of Massachusetts .0-\ . o City of Salem 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595x5641 Return card to Building Division for Certificate of Occupancy Permit No. B-17-893 FEE PAID: $0.00 PERMIT TO BUILD DATE ISSUED: 9/22/2017 This certifies that 331 LAFAYETTE, LLC has permission to erect, alter, or demolish a building 331 LAFAYETTE STREET Map/Lot: 320231-0 as follows: Signs SIGN PERMIT AS APPROVED FOR: Contractor Name: BRIAN A. CHIPMAN DBA: METRO SIGN &AWNING Contractor License No: CS-089645 9/22/2017 Building Official Date This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. All work authorized by this perrnifshall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. HIC M "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A). Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. Commonwealth of Massachusetts bf a City of Salem ; o * 120 Washington St,3rd Floor Salem,AAA 01970(978)745-9595 25641 Return card to Building Division for Certificate of Occupancy Structure CITY OF SALEM BUILDING PERMIT ° Excavation PERMIT TO BE POSTED IN THE WINDOW ' t a Footing INSPECTION RECORD Foundation Framing Mechanical Insulation INSPECTION: BY DATE Chimney/Smoke Chamber Final :t Plumbing/Gas Rough:Plumbing Rough:Gas Final US Electrical Service Rough Final Fire Department Preliminary Final PrL-19 T� Health Department eliminary Final OONO[pr� Commonwealth of Massachusetts 6 Citv of Salem - 120 Washington St,3rd Floor Salem,rsn 01970(978)745-9595 x5641 Return card to Building Division for Certificate of Occupancy Permit No. B-17-895 PERMIT TO BUILD FEE PAID: $0.00 DATE ISSUED: 9/22/2017 This certifies that 331 LAFAYETTE, LLC has permission to erect, alter, or demolish a building 331 LAFAYETTE STREET Map/Lot: 320231-0 as follows: Signs SIGN PERMIT AS APPROVED FOR: Contractor Name: BRIAN A. CHIPMAN DBA: METRO SIGN &AWNING Contractor License No: CS-089645 9/22/2017 Building Official Date This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. HIC#: "Persons contracting with unregistered contractors do not have access to the guarantyfund"(as set forth in MGL c.142A). Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. Commonwealth of Massachusetts Y ` Citv of Salem 3 q 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 Return card to Building Division for Certificate of Occupancy Structure CITY OF SALEM BUILDING PERMIT PERMIT TO BE POSTED IN THE WINDOW ` Excavation Footing INSPECTION RECORD Foundation Framing Mechanical Insulation INSPECTION: BY DATE Chimney/Smoke Chamber Final Plumbing/Gas Rough:Plumbing Rough:Gas Final Electrical Service Rough Final toFire Department Preliminary Final Health Department Preliminary Final Commonwealth of Massachusetts JL\ ( i City of Salem 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595x5641 Return card to Building Division for Certificate of Occupancy Permit No. B-"-$g' FEE PAID: $0.00 PERMIT TO BUILD DATE ISSUED: 9/22/2017 This certifies that 331 LAFAYETTE, LLC has permission to erect, alter, or demolish a building 331 LAFAYETTE STREET Map/Lot: 320231-0 as follows: Signs SIGN PERMIT AS APPROVED FOR: Contractor Name: BRIAN A. CHIPMAN DBA: METRO SIGN &AWNING Contractor License No: CS-089645 9/22/2017 Building Official Date This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. HIC #: "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A). Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. Commonwealth of Massachusetts r 3 a Citv of Salem w 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 X5641 Return card to Building Division for Certificate of Occupancy Structure CITY OF SALEM BUILDING PERMIT ° Excavation PERMIT TO BE POSTED IN THE WINDOW ' Footing INSPECTION RECORD Foundation Framing Mechanical Insulation INSPECTION: BY DATE Chimney/Smoke Chamber Final 01 Plumbing/Gas ItA Rough:Plumbing Rough:Gas Final Electrical Service Rough Final 40 Fire Department Preliminary Final Health Department Preliminary Final �ONOIT,, Commonwealth of Massachusetts 0 ' City of Salem m 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 Return card to Building Division for Certificate of Occupancy Permit No. 6-17-899 PERMIT TO BUILD FEE PAID: $0.00 DATE ISSUED: 9/22/2017 This certifies that 331 LAFAYETTE, LLC has permission to erect, alter, or demolish a building 331 LAFAYETTE STREET Map/Lot: 320231-0 as follows: Signs SIGN PERMIT AS APPROVED FOR: Contractor Name: BRIAN A. CHIPMAN DBA: METRO SIGN &AWNING Contractor License No: CS-089645 9/22/2017 Building Official Date This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. HIC#: "Persons contracting with unregistered contractors do not have access to the guarantyfund"(as set forth in MGL 042A). Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. Commonwealth of Massachusetts r ` City of Salem a 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595x5641 Return card to Building Division for Certificate of Occupancy Structure CITY OF SALEM BUILDING PERMIT 3 Excavation PERMIT TO BE POSTED IN THE WINDOW R Footing INSPECTION RECORD Foundation Framing Mechanical Insulation INSPECTION: BY DATE Chimney/Smoke Chamber Final Plumbing/Gas Rough:Plumbing Rough:Gas Final Electrical La Service Rough Final soFire Department Preliminary Final 0 Health Department Preliminary Final OON➢rA� Commonwealth of Massachusetts 3 Citv of Salem , < 120 Washington SL 3rd Floor Salem,MA 01970(978)745-9595 x5641 Return card to Building Division for Certificate of Occupancy Permit No. B-16-1362 PERMIT TO BUILD FEE PAID: $33,000.00 DATE ISSUED: 11/25/2016 This certifies that 331 LAFAYETTE, LLC has permission to erect, alter, or demolish a building:331_LAFAY_ETTE,STREET Map/Lot: 320231-0 as follows: Other Building Permit i NEW GROUND UP BUILDING CONSISTING OF STRUCTURAL STEEL, METAL DECK & LIGHT GAGE FRAMING Contractor Name: ALLEN S. FAULKNER — — — DBA: GROOM CONSTRUCTION I 1 Contractor License No: CS-065440 I 11/25/2016 Building Official `,� Date �, This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. ' \ l All construction,alterations and changes of use of any�building and structures shall be in compliance with the local zoning by-laws and codes. I � I This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. I f /I I The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. i r H I C#: 104999 "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A). I Restrictions: ' Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. Commonwealth of Massachusetts City of Salem 120 Washington St,3rd Floor Salem,MAO 1970(978)745-9595x5641 Return card to Building Division for Certificate of Occupancy Structure CITY OF SALEM BUILDING PERMIT PERMIT TO BE POSTED IN THE WINDOW Excavation Footing INSPECTION RECORD Foundation Framing Mechanical i Insulation INSPECTION: BY 4 DATE Chimney/Smoke Chamber 41l Final Plumbing/Gas 1 i x 1 Rough:Plumbing Ff I � f Rough:Gas Final _ Electrical i Service .� .._., Rough ' Final A � Fire Department , Preliminary Final Health Department Preliminary Final Dc M0 �- a The Commonwealth of Massachusetts o -t C Department of Public Safety N Massachusetts State Budding Code(780 CMR) N Building Permit Application for any Building other than a One-or Two-Family Dwellin VA t* (This Section For Official Use Only) IV 1 Building Permit Number: Date Applied: Building Officiate r �y SECTION 1:L CATION(Please indicate Block#and Lot#for locations for which a street address is not availab-331 L4,6 ST Sol mA IM No.and Street City/Town Zip Code Name of Building(if applicable) SECTION 2:PROPOSED WORK Edition of MA State Code used If New Construction check here or check all that apply in the two rows below Existing Building❑ Repair❑ I Alteration ❑ Addition❑ Diemolition ❑ (Please fill out and sub it Appendix 1) _Change of Use ❑ Change of Occupancy ❑ Other ❑ Specify: w V n Are building plans and/or construction documents being supplied as part of this permit application? Yes X No ❑ Is an Independent Structural Engineering Peer Review required? - -1 - - 11Yes ❑ No Brief Descriptio r of Proposed WV&�(i :�,•_ ,n�f 1_J G Jit 11, vd ( ci��tS'rl n t. o� ,ST1r v i lln e 0 u rt1P Jf � nw V1 - - - SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR CHANGE IN USE OR OCCUPANCY Check here if an Existing Building Investigation and Evaluation is enclosed(See 780 CMR 34) ❑ Existing Use Group(s): Proposed Use Group(s): SECTION 4:BUILDING HEIGHT AND AREA Existing Proposed No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft.) Total Area(sq.ft.)and Total Height(ft.) �q L SECTION 5:USE GROUP(Check as applicable) n Lt . A: Assembly A-1 ❑ A-2❑ Nightclub ❑ A-3 ❑ A-4❑ A-5❑ I B: Business X E: Educational ❑ F: Facto F-1❑ F2❑ H: High Hazard H-1 ❑ H-2❑ H-3 ❑ H-4❑ H-5❑ I: Institutional 1-1❑ I-2❑ I-3❑ I-4❑ M: Mercantile l$ R: Residential R-113 R-2❑ R-3❑ R-4❑ S: Storage S-1❑ S-2❑ U: Utility❑ Special Use❑and please describe below: Special Use: SECTION 6:CONSTRUCTION TYPE(Check as applicable) TA IB ❑ IIA ❑ IIB 0 IIIA ❑ IIIB ❑ 1 IV ❑ 1 VA El VB ❑ SECTION 7:SITE INFORMATION(refer to 780 CMA 111.0 for details on each item) Water Supply: Flood Zone Information: Debris Removal: �/ Sewage Disposal: Trench Permit: Licensed Dispos I Sit KPublic Check if outside Flood Zone`� Indicate municipal A trench will not be N. C v�I^t Private❑ or indentify Zone: or on site system❑ permit is enclosed❑required❑or trench or spectfy:µ p Railroad right-of-way: Hazards to Air Navigation: MA Historic Commission Review Proccss: Not Applicable q Is Structure within airport approach area? Is their review completed? or Consent to Build enclosed❑ Yes❑ or Nox Yes❑ No ❑ SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY Edition of Codec M Use Group(s): 13 Type of Construction:-103 Occupant Load per Floor: Does the building contain an Sprinkler System?:� S�Special Stipulations: SECTION 9: PROPERTY OWNER AUTHORIZATION Name and Address dress of Pro erty Own L �� �/ j1 1 _ /, 3 .77 l/..U L � / ��✓�°e 1/til Shf'IMQt W 4Y44P Name(Print) No.and Street City/Town Zip Property Owner Contact Information: I J 13 3111 yv Title Telephone No.(business) Telephone No. (cell) e-mail aclress �� If applicable,the proper ow er hereby authorizes sU �C4t, g� sw� � 5<� & PfW Name Street Ad ress City/Town State Zip to act on the property owner's behalf,in all matters relative to work authorized by this building permit application. SECTION 10:CONSTRUCTION CONTROL(Please fill out Appendix 2) If building is less than 35,000 cu.ft.of enclosed s ace and/or not under Construction Control then check here 0 and skip Section 10.1 10.1 Registered Professional Responsible for Construction Control gitnnuv (�IWb(ll�y ��� _7 y $ {�IkhGnWGv��'C4� Ub� r mA. 7Lt 9 Name(Reg strant) —� Tele h ne No. e-mail add ess RegistC tion Number Street Address City/Town State Zip Discipline Expiration Date 10.2 General Contractor r7p4-a Coany L,)H- l I'z C �_— 645_ge40 Name of Perso esponsible forConstruction License No. and Type if Applicable Wrn �I e + cm � ► Street Address —�y C1 /Town State Zip Telephone No. business Telephone No. cell e-mail address SECTION 11:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6)) A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Is a signed Affidavit submitted with this application? Yes 0 No 0 SECTION 12:CONSTRUCTION COSTS AND PERMIT FEE Item Estimated Costs:(Labor and Materials) Total Construction Cost(from Item 6)_$ 1.Building $„ 5-q6 QQ /�' (]1 -f Building Permit Fee=Total Construction Cost x (Insert here 2.Electrical $ N appropriate municipal factor)_$ 3.Plumbing $ 000 4.Mechanical (HVAC) $ ,0 _ _OU0 Note:Minimum fee=$ (contact municipality) 5.Mechanical (Other) $ 00 Enclose check payable to 6.Total Cost $ 0 Q 0D (contact municipality)and write check number here SECTI(5N 13:SIGNATURE OF B ILDING PERMIT APPLICANT By entering my name below,I hereby attest and r the pains an nalties of perjury that all of the information contained in this appli ation is true and accurate to e best of m)�1 ovule ge. d derstanding. Please print and sign q me ^ 5 r- itle& _ , Telephone No. Date Street Address J Ci /Town State Zip ` Municipal Inspector to fill out this section upon application approval: Name Date 1 PITMAN & WAPDLEY ASSOCIATES LLC CONSTRUCTION CONTROL AFFIDAVIT October 28,2016 Lafayette Street Development 331 Lafayette Street Salem, Ma 01970 1, Peter F. Pitman, affiliated with Pitman & Wardley,Associates LLC submit that 1, or a designated representative,will perform the following professional services,as specified in the 2009 International Building Code(including all Massachusetts Amendments)Section 107.3.4: 1. Review for conformance to the design concept, shop drawings, samples, and other submittals, which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Review and approve the quality control procedures for all code-required controlled materials. 3. To be present at intervals appropriate to the stage of construction, and complexity of the project,to become generally familiar with the progress and quality of the work,and determine to the extent practical and possible the work is being performed in a manner consistent with the construction documents. Our observation during site visits will not relieve the Contractor or its Subcontractors of their responsibilities and obligations for quality control of the work, for any design work which is included in their scope of services(i.e. design delegation), and for full compliance with the requirements of the Construction Documents,applicable rules, regulations and building codes.Furthermore,the detection of, or the failure to detect deficiencies or defects in the work during our site visits does not relieve the Contractor or their Subcontractors of their responsibility to correct all deficiencies or defects, whether detected or undetected, in all parts of the work,and to otherwise c tj quirements of the Construction Documents. y� ` � n 2 >EIOF Peter F. Pitman, Architect Massachusetts Registration No. 8749 32 CHURCH ST S A L E M MASSACHUSETTS 0 1 9 7 0 978-744 - 8982 FAX 978-744--0400 Initial Construction Control Document To be submitted with the building permit application by a R a Registered Design Professional for work per the 8di edition of the J Massachusetts State Building Code, 780 CMR, Section 107 Project Title: 331 Lafayette Street Development Date: 11-02-16 Property Address: 331 Lafayette Street, Salem, MAO 1970 Project: Check (x)one or both as applicable: New construction Existing Construction ------------ Project description: Mixed use Commercial Development I, Michael Perham, MA Registration Number: 41143 Expiration date: 6/30/2018, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concern ingi: Architectural X Structural _Mechanical Fire Protection lectrical Other: Describe for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work,and to determine if the work is being performed in a manner consistent with the approved construction docufnants and this code. Nothing in this document-relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Construction Control Documen '. OF Enter in the space to the right a"wet"or �s cyG electronic signature and seal: M CTURAL m N0.411430 Phone number: 978-646-0097 Email: mperham@mcbrie.com 10 9pF$�l Building Official Use Only Building Official Name: Permit No.: Date: Note I. Indicate with an `x'project design plans,computations and specifications that you prepared or directly supervised. If'other' is chosen, provide a description. Version 06 11 2013 Client#: 237796 GROOMCONST ACORD, CERTIFICATE OF LIABILITY INSURANCE DATE(MM31071201011YYYYI6 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT:If the certificate holder is an ADDITIONAL INSURED,the policy(les)must be endorsed.If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER NAME: HUB Int'I New England, LLC NAME: 978 392.4567 978 392-9696 AIC No Ely: AIC,No 275 Great Road E-MAIL Acton,MA 01720-4739 ADDRESS: INSURER(S)AFFORDING COVERAGE NAICM INSURER A:Massachusetts Bay Insurance Co 22306 INSURED INSURERS:Hanover Insurance Company 22292 Groom Construction Co„Inc. INSURER c:Navigators Specialty Insurance 36056 96 Swampscott Road,Suite 6 -- Salem,MA 01970-7004 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR rypE OF INSURANCE ADDL SUB POLICY EFF POLICY EXP LTR INSR MD POLICY NUMBER MWODNYYYI (MWDQNYYYJ LIMITS A GENERALLIAINUTY ZDNA570457 0311012016031101201 EACH HnG�OCCURRENCE $1000000 X COMMERCIAL GENERAL LIABILITY PREMISES EeENTE.D ESOOOOO CLAIMS-MADE a OCCUR MED EXP(Any one parson) $10,000 PERSONAL&ADV INJURY S1000000 GENERAL AGGREGATE 62,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMPIOP AGO 52,000,000 PoLICY X jEa X LOC $ A AUTOMOBILE LUIBIUry ADNASS3076 3/10/2016 03/10/201 COMBINEDSINGLE LIMIT Ea accident $1,000,000 IX ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED AUTOS AUTOSBODILY INJURY(Per accident) E HIRED AUTOS X NON-OWNED PROPERTY DAMAGE $ AUTOS Per accident E B X UMBRELLA UAB X OCCUR UHNA570452 0311012016 03/1012017 FACHOCCURRENCE $5,000,000 C X EXCESS LIAR X CLAIMS-MADE IS16EXC724671[V 031101201610311012017 AGGREGATE $5,000,000 DED I I RETENTIONS 1 $ B WORKERS COMPENSATION WHNA552476 3/1012016 03/101201 X I WCSTATU- OTH- ANDEMPLOYERS'UABIUTY ANY PROPRIETORIPARTNER/ ECUTIVE YIN EXE.L.EACH ACCIDENT $600000 OFFICER/MEMSER EXCLUDED? F—N] NIA (Mandatary In NH) E.L.DISESE-EA EMPLOYEE s6000OO N yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $500,000 B Lease/Rented IHNA570980 3/10/2016 03/10/201 Limit:$100,000 Equipment Per item: $50,000 Ded:$1,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(Attach ACORD 101,Additional Remarks Schedule,ff more space Is required) "Excess Liability Information" C IS16EXC724671IV Eff Date:03/10/2016 Exp Date: 0311012017 Excess Liability Each COO Limit:$5,000,000 Excess Liability Aggregate Limit:$5,000,000 (See Attached Descriptions) CERTIFICATE HOLDER CANCELLATION Evidence of insurance SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Groom Construction Co., Inc. ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ©1988.2010 ACORD CORPORATION.All rights reserved. ACORD 25(2010/05) 1 of 2 The ACORD name and logo are registered marks of ACORD #S1569604/M1569254 TA002 \ The Commonwealth of Massachusetts Department of Industrial Accidents I Congress Street,Suite 100 Boston,MA 0211 4-2 01 7 ' www mass.gov/dia Workers'Compensation Insurance Affidavit:General Businesses. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information —1- Please Print Legibly Business/Organization Name:�6 lM S CO Address: q W tA Vi., S-0 City/State/Zip:—y �174Phone#: Are you an employer?Check the appropriate box: Business Type(required): 1.60 t I am a employer with Q Q employees(full and/ 5. ElRetail or part-time).* 6. ❑RestaurantBar/EatingEstablishment 2.❑ I am a sole proprietor or partnership and have no q, ❑Office and/or Sales(incl.real estate,auto,etc.) employees working for me in any capacity. [No workers' comp. insurance required] 8• ❑Non-profit 3.❑ We are a corporation and its officers have exercised 9. ❑Entertainment their right of exemption per c. 152,§1(4),and we have 10.❑ Manufacturing no employees. [No workers'comp. insurance required]* HE Health Care 4.E] We are a non-profit organization,staffed by volunteers, with no employees. [No workers' comp. insurance req.] 1213 Other *Any applicant that checks box 01 must also fill out the section below showing their workers'compensation policy information. **If the corporate officers have exempted themselves,but the corporation has other employees,a workers'compensation policy is required and such an organization should check box#I. I ane an employer that is providing orke�r7ss'compensation insurance jor employees. Below is the policy information. Insurance Company Name: ') T/A V A 0ticvt Insurer's Address: Cl �-75_ 67—R /Ci - City/State/Zip: 1i �7 — / Policy#or Self-ins.Lic.# 7 b Expiration Date: / U l Attach a copy of the workers'compensation policy declaration page(showing the policy number d expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year i prisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the viol tor. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insuran coverage verification. I do hereby cer ' der the sins d nalties of perjury that the information provided above is true and correct. Si nature: r Date: —/ Phone#: ) ) Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2.Building Department 3.Cityrrown Clerk 4.Licensing Board 5.Selectmen's Office 6.Other Contact Person: Phone#: www.mass.gov/dia Information and Instructions Massachusetts General Laws chapter 152 requires all employers to provide workers' compensation for their employees. Pursuant to this statute,an employee is defined as"...every person in the service of another under any contract of hire, express or implied,oral or written." An employer is defined as"an individual,partnership,association,corporation or other legal entity,or any two or more of the foregoing engaged in a joint enterprise,and including the legal representatives of a deceased employer,or the receiver or trustee of an individual,partnership,association or other legal entity,employing employees. However,the owner of a dwelling house having not more than three apartments and who resides therein,or the occupant of the dwelling house of another who employs persons to do maintenance,construction or repair work on such dwelling house or on the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer." MGL chapter.152, §25C(6)also states that"every state or local licensing agency shall withhold the issuance or renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any applicant who has not produced acceptable evidence of compliance with the insurance coverage required." Additionally,MGL chapter 152,§25C(7)states`Neither the commonwealth nor any of its political subdivisions shall enter into any contract for the performance of public work until acceptable evidence of compliance with the insurance requirements of this chapter have been presented to the contracting authority." Applicants Please fill out the workers' compensation affidavit completely,by checking the boxes that apply to your situation and,if necessary, supply your insurance company's name,address and phone number along with a certificate of insurance. Limited Liability Companies(LLC)or Limited Liability Partnerships(LLP)with no employees other than the members or partners,are not required to carry workers'compensation insurance. If an LLC or LLP does have employees,a policy is required.Be advised that this affidavit may be submitted to the Department of Industrial Accidents for confirmation of insurance coverage. Also be sure to sign and date the affidavit. The affidavit should be returned to the city or town that the application for the permit or license is being requested,not the Department of Industrial Accidents. Should you have any questions regarding the law or if you are required to obtain a workers' compensation policy,please call the Department at the number listed below. Self-insured companies should enter their self-insurance license number on the appropriate line. City or Town Officials Please be sure that the affidavit is complete and printed legibly. The Department has provided a space at the bottom of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant. Please be sure to fill in the permit/license number which will be used as a reference number.In addition,an applicant that must submit multiple permit/license applications in any given year,need only submit one affidavit indicating current policy information(if necessary). A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the applicant as proof that a valid affidavit is on file for future permits or licenses. A new affidavit must be filled out each year.Where a home owner or citizen is obtaining a license or permit not related to any business or commercial venture(i.e.a dog license or permit to burn leaves etc.)said person is NOT required to complete this affidavit. The Department's address,telephone and fax number: The Commonwealth of Massachusetts Department of Industrial Accidents 1 Congress Street Boston, MA 02114-2017 Tel. # 617-727-4900 ext. 7406 or 1-877-MASSAFE Fax# 617-727-7749 www.mass.gov/dia Fenn Revised 02-23-15 REMITTANCE ADVICE GROOM CONSTRUCTION 53-7012-2110 96 SWAMPSCOT AD. SALEM,MA 01970 1082 CHECK ^ c PAY jd' �Jp -f- DOLLARS AMOUNT n _„ 3 DATE TO THE ORDER PF DESCRIPTION CHEC,KJ NO. ry7-�� 4 Z�z Ci b k g I(b Q��Z `P o .00 O w f f 1 East BostonSavings Bank s EgSf BOSTON,MA 02128 -_.:_.... ......... .:::__ 11'001082111 1: 211070120 07 41007032n1 O ENDORSE HERE 'W t ;DO NOT VED FOR STAMP OR SIGN BELOW THIS LINE ' ASSERVED FOO f1NANCIAL. INSTITUTION USE < RS d.5P1I The recur(tryy Rr'I es throe not �, ,e Bsted 1f Y d exn.d lntlushy below... guf&.aaas. Security Featurew R...,o+eacumant agerrtmR: ' IlMicfDPrimL'te w Wars 1 Che—cdlly Sensi iw Paper ewer v:rn' I)Security Screen or�_u o ume P SII n.1 11 61 lc.k rhack I � 4 b-kuyr✓i Mil. _meMd F,..x,...Y. Aaxwti'_JJ *FLDERAL:R ESERVEBOAR¢ OF uOVnNNOY6 REG.cc T T r OLS u I� IF �r N O i f No U- C a � N \1," i> © 1 1 C $y LQ&yC_� S17 SA-OeM PEMo LlrlON 3"- 7 wys�Agl�- S TpL (C,h lolv o/\1Q' The Commonwealth of Massachusetts ® Department of Public Safety Massachusetts State Building Code(780 CMR) Building Permit Application for any Building other than a One-or Two-Family Dwelling (This Section For Official Use Only) e :n Building Permit Number: Date Applied: Building Official: o- r*t SECTION 1:LOCATION(Please indicate Block#and Lot#for locations for which a street address is nrSvail lj OVA e* 4 OI01-70 cttnd tT--7 psi- AJvE _SS I No.and Street City/Town Zip Code Name of Building(if apt 'cablzm SECTION 2:PROPOSED WORK - Edition of MA State Code used If New Construction check here❑or check all that apply in the two rows l elow Existing Building❑ Repair❑ Alteration ❑ Addition❑ Demolitio (Please fill out and submit Append&1) Change of Use ❑ Change of Occupancy ❑ 1 Other ❑ Specify: Are building plans and/or construction documents being supplied as part of this permit application? Yes ❑ No ❑ Is an Independent Structural Engineering Peer Review required? Yes ❑ No ❑ BrichDescj�3tion of Proposed Work: - _ o Qjul S d'4byG. f wV' �T��e p� . r., q a e, c:itCTIO 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR ` Mm CHANGE IN USE OR OCCUPANCY Cheg herefan Existing Building Investigation and Evaluation is enclosed(See 780 CMR 34) ❑ Exiing Uroup(s): A Proposed Use Group(s): SECTION 4:BUILDING HEIGHT AND AREA ' Existing Proposed No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft.) 61d S Total Area(sq.ft.)and Total Height(ft.) a 3,OJu _ SECTION 5:USE GROUP(Check as applicable) A: Assembly A-1❑ A-2❑ Nightclub ❑ A-3 ❑ A4 ❑ A-5❑ B: Business ❑ E: Educational ❑ F: Facto F-1❑ F2❑ H: High Hazard H-1 ❑ H-2❑ H-3 ❑ H-4❑ H-5❑ I: Institutional 1-1❑ 1-2 El1-3❑ 1-4❑ M: Mercantile❑ R: Residential R-10 R-2❑ R-3❑ R4❑ S: Storage S-1 ❑ S-2❑ U: Utility❑ Special Use❑and please describe below: Special Use: SECTION 6:CONSTRUCTION TYPE(Check as applicable) IA [3 Ill IIA ❑ IIB ❑ IIIA ❑ IIIB ❑ 1 IV ❑ VA ❑ VB ❑ SECTION 7:SITE INFORMATION(refer to 780 CMR 111.0 for details on each item) n Water Supply. Flood Zone Information: Sewage Disposal: Trench Permit: Debris Removal: A trench will not be Licensed Disposal Site Public Check if outside Flood Zone Indicate municipal required❑or trench or specify: Ge Private❑ or indentify Zone: or on site system 11 permit is enclosed ❑ Railroad right-of-way. Hazards to Air Navigation: MA Historic Commission Review Process: Not Applicable Is Structure within airport appropkharea? Is their review completed? or Consent to Build enclosed 13Yes b of No Yes❑ No ❑ SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY Edition of Code: Use Group(s): Type of Construction: Occupant Load per Floor: Does the building contain an Sprinkler System?: Special Stipulations: O The Commonwealth of Massachusetts �i Department of Public Safety w axil , ice, cp, Massachusetts State Building Code (780 CMR) Building Permit Application to Construct, Repair, Renovate or Demolish any Building other than a One- or Two-Family Dwelling Code and Other Requirements for Building Permits Tlie Department of Public Safety has issued these building permit application forms so that municipalities across the- state can move toward use of a single permit form and consistent permit application process. The MA State Building Code specifies the requirements of building permits and the applicant is advised to review and be familiar with these requirements in order to avoid some of the common permit application problems. Likewise the applicant should be aware that some municipalities require that the owner confirm, even prior to acceptance of the building permit application, that no outstanding property taxes, water fees, etc. exist. Filing Instructions 1.Please contact the city or town where the work will be done to ensure that the city or town will accept this application form and if any additional information is required, and obtain the gorrecGtt.ailing address. After doing so, print the application, fill in completely and then submit to the local city or town where the work will be done. 2.All applications shall be considered complete and will be reviewed if construction documents, specifications, fee, and other materials that may be required as indicated in the Building Permit Application are included with the application. 3.Please include a check for the Building Permit fee. The fee may be calculated using the information to be supplied in section 12 of the Building Permit Application. The check is to be made payable to the local city or town where the work will be done. 5 --7 Weil" ��e end SECTION 9: PROPERTY OWNER AUTHORIZATION Name and Address of Property Owner 7ho� c�s T( uai��a ��I '��s ( �fi�Hei�e sl . Sz(fr� MA Name(Print) No.and Street City/Town Zip Property Owner Contact Information: amN12(L 11 1Z �� _ _ r�urr@bur�lnyesfinen S. wP1 Title Telephone No. (business) Telephone No. (cell) e-mail address If applicable,the property owner hereby authorizes \0-6rt F")(r x, 31 L61 Name Street Address City/Town State Zip to act on the property owner's behalf,in all matters relative to work authorized by this building permit application. SECTION 10:CONSTRUCTION CONTROL(Please fill out Appendix 2) If building is less than 35,000 cu.ft.of enclosed space and/or not under Construction Control then check here 0 and skip Section 10.1 10.1 Registered Professional Responsible for Construction Control n f I'fs� Name(Registr nt) Telephone No. e-mail address Registration Number Street Address City/Town State Zip Discipline Expiration Date 10.2 General Contractor Groom Company Name ( �Cip 1... J �• �� Cj -1 "l l7 C Gi,t�4 Name of Person Responsible for Construe ion License No. and Type if Applicable Street Address own State Zip 181 _5q2_ X135 l�(� _21ti_ SSS( �S 5�pj(kkler@eonn Telephone No. business Telephone No. cell e-mail address SECTION 11:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6) A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the yss mce of the building permit. Is a signed Affidavit submitted with this application? Yes; ' No !] SECTION 12:CONSTRUCTION COSTS AND PERMIT FEE Item Estimated Costs:(Labor lj'cM0 N L, Il and Materials) Total Construction Cost(from Item 6) _$ 1.Building $ Building Permit Fee=Total Construction Cost x (Insert here 2.Electrical $ appropriate municipal factor)_$ 3.Plumbing $ 4.Mechanical (HVAC) $ Note:Minimum fee=$ (contact municipality) 5.Mechanical Other $ G 4M ��Sz�M -4� 0 Enclose check payable to 6.Total Cost $ (contact municipality)and write check number here I D R eti SECTION 13:SIGNATURE OF BUILDING PERMIT APPLICANT By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my, now dg and understa lAl� fwryG;��TiKt / M 217— 818 Please print and sign name - Title Telephone o.� eNo. '',, Date (21 4 IN �\ Street Address City/Town State Zip Municipal Inspector to fill out this section upon application approval•" Name Date 1 ani aoo too Appendix 1 For the demolition of structures the building permit applicant shall attest that utility and other service connections are properly addressed to ensure for public safety. Please fill in the information below and submit this appendix with the building permit application. The building permit applicant attests under the pains and penalties of perjury that the following is true and accurate. Property Location (Please indicate Block # and Lot # for locations for which a street address is not available) ;'SI -3-,55 LA ek A- SaLeM MIs c�l�l�o sm d No. and Street City /TownZip Name of Building(if applicable) For the above described property the following action was taken: Water Shut Off? Yes ❑ No �/ Provider notified and Release obtained? Yes ❑ No ❑ Gas Shut Off? Yes ❑ No Gd Provider notified and Release obtained? Yes ❑ No ❑ Electricity Shut Off? Yes ❑ No �/ Provider notified and Release obtained? Yes ❑ No ❑ Yes ❑ No Gd Provider notified and Release obtained? Yes ❑ No ❑ Other (if applicable) Yes ❑ No Provider notified and Release obtained? Yes ❑ No ❑ Other (if applicable) bCG Cell — Zi2-8S1 8" Appendix 2 ^1 I Construction Documents are required for structures that must comply with 780 CMR 107.The checklist below is a compilation of the documents that may be required for this. The applicant shall fill out the checklist and provide the contact information of the registered professionals responsible for the documents. This appendix is to be submitted with the building permit application. Checklist for Construction Documents* Mark"x"where applicable No. Item - Submitted Incomplete Not Required 1 Architectural 2 Foundation 3 Structural 4 Fire Suppression 5 Fire Alarm(may require repeaters) 6 HVAC 7 Electrical 8 Plumbing include local connections 9 Gas Natural,Propane,Medical or other 10 Surveyed Site Plan Utilities,Wetland,etc. 11 Specifications 12 Structural Peer Review 13 Structural Tests&Inspections Program 14 Fire Protection Narrative Report 15 Existing Building Surve /Investi ation 16 Energy Conservation Report 17 Architectural Access Review 521 CMR 18 Workers Compensation Insurance 19 Hazardous Material Mitigation Documentation 20 Other(Specify) 21 Other(Specify) 22 Other(Specify) *Areas of Design or Construction for which plans are not complete at the time of application submittal must be identified herein.Work so identified must not be commenced until this application has been amended and the proposed construction document amendment has been approved by the authority having jurisdiction.Work started prior to approval may be subjected to triple the original permit fee. Registered Professional Contact Information Name(Registrant) Telephone No. e-mail address Registration Number Street Address City/Town State Zip Discipline Expiration Date Name(Registrant) Telephone No. e-mail address Registration Number Street Address Ci /Town State Zi Discipline Expiration Date Name(Registrant) Telephone No. e-mail address Registration Number Discipline Expiration Date Street Address Ci /Town State Zi January 29, 2016 City of Salem 120 Washington Street Salem, MA 01970 Re: 335 Lafayette Street,Salem, MA To Whom It May Concern: The undersigned, being the owner of the above referenced property, hereby agree to the filing of a demolition permit by Robert Burr and 331 Lafayette LLC related to the development of the property after its acquisition by Robert Burr and 331 Lafayette LLC. Signed: Thomas Truong January 29, 2016 City of Salem 120 Washington Street Salem, MA 01970 Re: 331 Lafayette Street, Salem, MA To Whom It May Concern: i The undersigned, being the owner of the above referenced property, hereby agree to the filing of a I demolition permit by Robert Burr and 331 Lafayette LLC related to the development of the property after its acquisition by Robert Burr and 331 Lafayette LLC. i Signed: Lee Family Enterprises Sof' 4k, e t Ai x A� �qp�) Massachusetts -Department of Public Safety Board of Building Regulations and Standards Construction Supervisor License: CS-065440 ALAN S FAULKN)tR JLI. •. s. 41 SALEM ST _ SWAMPSCOTT FAA Expiration Commissioner 07/07/2016 The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street Boston, MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name(Businesatorgmizadon/Individual): Groom Construction Co. , Inc. Address: 96 Swampscott Road Salem, MA 781 -592-3135 City/State/Zip: Phone.#: Are you an employer?Check the appropriate box: Type of project(required): 1.® I am a employer with 7 5 4• ❑ I am a general contractor and[ 6. Now construction employees(full and/orpart-time).• have hired the subcontractors 2.❑ I am a sole proprietor"partner-. listed on the attached sheet 7. []Remodeling ship and have no employees These sub-contractors have 8. E]Demolition working for me in any capacity. employees and have workers' 9. E]Building addition [No workers'comp,insurance comp.insutrance.$ required.] 5. ❑ We are a corporation and its 10.❑Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised thew 11.❑Plumbing repairs or additions myself.[No workers'comp. right of exemption per MGL 12.❑Roof repairs insurance required]t c. 152, ¢1(4),and we have no employees.[No workers' 13.❑Other comp.insurance required.] •Any applicant that checks box#1 must also fill out the section below showing their wodaaa'compensation policy infomn icn. t Homeowners who submit this affidavit indicting they are doing all work add=hire outside eonbacton must submit anew affidavit indicting such. =Contractors that check thla box must attached an additional sheet showing the name of the subu trsctois and state whelbaor not those entities have employers. If the sub-contractors have artployec,they must provide their workers'comp.policy number. I am an employer that Is providing workers'compensadon insurance for my employees Below is the policy and jab site information, i insurance Company Name: - Hanover Tnsuran . rompany _ I Policy#orSelf-ins.Lie.#:_ WHNA552476 Expiration Digte: 3/10/16 - - Job Site Address,: City/State/Zip: Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). I Failure,to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine tip to$1,500,00 and/or one-,year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of j Investietitions of the DIA for insurance coverage verification I do hereby certify under thepains and penalties ofperjury that the information provided above is true and correct signature: Ikyl L d Date: ZoL Phone#: jP� I• �Z•g 7� O i ofilcial use only. Do not write in this area,to be comped y c or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6, Other I i Contact Person: Phone#: ACORD,./r�� 3/1 Client#: 237796 GROOMCONST ACO `®r" CERTIFICATE OF LIABILITY INSURANCE DATE IM0/2M/015YY0011' V) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT:If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed.If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement.A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT HUB/E.J.Wells Insurance NAME: 275 Great Road PHONE g78-392-4567 A/G No Est: ac,No: 976-392-9696 E-MAIL Acton, MA 01720 ADDRESS: INSURER(S)AFFORDING COVERAGE NAICtl INSURER A:MasS3CISUSettS Bay InsDra OCe CO 22306 INSURED INSURER B:Hanover Insurance Com pang 22292 Groom Construction Co.,Inc. Mark Bemato INSURER C:Navigators Specialty Insurance 36056 96 Swampscott Road,Suite 6 INSURER D: Salem,MA 01970-7004 INSURER E: INSURER F, COVERAGES- CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMEDABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDLSUBR LTR TYPE OF INSURANCE I R WVD POLICY NUMBER MM/DDYIYEYYV MMIDDYIYYXI'PY LIMITS A GENERAL LIABILITY ZDNA570457 3/10/2015 03/101201 EACHOCCURRENCEOECTCURRENCE $11000000 X COMMERCIAL GENERAL LIABILITY PAEMISJJ Ea acTwErr°nna 6500000 CLAIMS-MADE OCCUR MED EXP(Any one person) $10000 PERSONAL S ADV INJURY 31//00000 GENERAL AGGREGATE E2 OOn 100 GEWL AGGREGATE LIMIT APPLIES PER. PRODUCTS-COMPIOP AGG §2,000,000 POLICY X PRa X LOC $ A AUTOMOBILE LIABILITY ADNA553076 3/10/2015 113/101201 EaMeB6INNEeDLSINGLE LIMIT 1,100,000 X ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED AUTOS AUTOS BODILY INJURY(Per accident) $ X HIRED AUTOS X NON-OWNED PROPERTY DAMAGE AUTOS Per accident $ B X UMB0.ELLA LIAB J( OCCUR UHNA570452 3110/2015 03/101201 EACH OCCURRENCE $5 000 100 C X EXCESS LIAB X CLAIMS-MAOI IS15EXC7246711V 3/10/2015 03/10/201 AGGREGATE $5 000 000 OED I RETENTION$ S B WORKERS COMPENSATION WHNA552476 3/10/2015 03/10/201 X WCSTATU- OTH- AND EMPLOYERS'LIABILITY ANY PROPRIETOPJPARTNER/EXECUTIVE YIN $SOD OOO OFFICER/MEMBER EXCLUDED? NIA E.L.EACH ACCIDENT (Mes.describe y and E.L.DISEASE-EA EMPLOYEE §500000 Dyea,deacdbe antler DySCRIPTION Of OPERATIONS below E .DISEASE-POLICY LIMIT §500001 B Leased/Rented IHNA570980 0311012015 03/10/201 Total Limit: $750,000 Equipment Per Item:$150,000 Deductible:$2.500 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(Attach ACORD 101,Additional Remarks Schedule,If more space Is required) Blanket Additional insured with respect to the General Liability and Umbrella policies is on a primary and non-contributory basis for ongoing and complete operations where required by written contract. Blanket Additional Insured with respect to the Auto policy is on a primary basis where required by written contract.Waiver of subrogation with respect to the General Liability,Auto, Umbrella policies and Worker's Compensation(except NH)where required by written contract. Excess Policy is follow form to the Umbrella (See Attached Descriptions) CERTIFICATE HOLDER CANCELLATION Evidence of insurance SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Groom Construction Co., Inc. ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE C 1988.2010 ACORD CORPORATION.All rights reserved. ACORD 25(2010105) 1 of 2 The ACORD name and logo are registered marks of ACORD #S1337796/M7336278 TA002 CITY OF SALEM ROUTING SLIP New Construction Certificate of Occupancy LOCATION DATE / 2�- 16 ASSESSORS DATE41 /6 93 Washington St. CITY CLERK ATE // o;2 93 Washington St. / PUBLIC SERVICES 'Q f�-/ DATE_4V401 & /y 120 Washington St. �1 WATER OKI DATE ttilojltb 120 Washington St. � u W hL CROSS CONNECTION DATE l�l g llb / �1IbW i`� a 5 Jefferson Av VPLANNINGf � `�^ DATE !28 201(e 120 Washington St. /)1l�CONSERVATION DATE �� I 120 Washington St. r ELECTRICAL ATE 48 Lafayett t }� ,,FIRE P ENTION� e_ DATE 29 Fort Avenue �,. HEALTH DATE t2 120 Washington St. 0 UILDING INSPECTOR tm DATE /d . x/120 Washington St. �ONOi ����lllVB Salem Historical Commission 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 WAIVER OF THE DEMOLITION DELAY ORDINANCE It is hereby certified that the Salem Historical Commission has waived the Demolition Delay Ordinance for the proposed demolition as described below, as per the requirements set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. Address of Property: 331, 335 Lafayette Street and 5-7 West Avenue Name of Record Owner: Robert Burr/331 Lafayette Street LLC Description of Demolition Work Proposed: Demolition of all buildings on the above referencedproperties. Waiver is conditional upon submission of exterior vertical and horizontal dimensions of all buildings and three- quarter view photographs of all building facades, including the west fagade of the house at 335 Lafayette Street once the attached single-story storefront has been demolished. Applicant shall work with the Historical Commission to identify salvage companies to recycle historic materials and architectural trim. Prior to demolition, the applicant will obtain all necessary state and federal permits. Dated: 4/13/2016 SALEM HISTORICAL COMMISSION By: THIS IS NOT A DEMOLITION PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work. �omnmr CITY OF SALEM, MASSACHUSETTS ` BOARD OF APPEAL \ 120 WASHINGTON STREET♦ SALEM,MASSACHUSFM 01970 C� 05 YjmBERLEYDR[scOLL TUE:978-745-9595♦FAX:978-740-9846 MAYOR CITY r, February 3, 2016 Decision City of Salem Board of Appeals A petition of ROBERT BURR requesting a Special Permit per Sec. 3.3.2 Nonconforming Uses of the Salem Zoning Ordinance to change an existing nonconforming use of a multifamily residential units to another nonconforming use of mixed use commercial office/retail and a Special Permit per Sec. 3.3.3 Nonconforming Structures to alter a nonconforming structure. The petitioner is also requesting Variances for relief from Sec. 4.1.1 Table of Dimensional Requirements to exceed the maximum height and front yard setbacks at the properties located at 331-335 LAFAYETTE ST, 5-7 WEST AVE, 11 WEST AVE (Map 32 Lots 231,232,233,234)(Bl, Rl,112). A public hearing on the above Petition was opened on October 21, 2015 pursuant to M.G.L Ch. 40A, § 11. The public hearing was continued on November 11, 2015, December 16, 2015 and January 20, 2016. The hearing was closed on January 20, 2016 with the following Salem Board of Appeals members present: Ms. Curran (Chair), Mr. Copelas,Mr. Watkins, and Mr. Viccica (alternate). The Petitioner is requesting a Special Pemrit per Sec. 3.3.2 Nonconforming Uses of the Salem Zoning Ordinance to change an existing nonconforming use of a multifamily residential property to another nonconforming use of mixed use commercial office/retail and a Special Permit per Sec. 3.3.3 Nonconforming Structures to alter a nonconforming structure. The petitioner is also requesting Variances for relief from Sec. 4.1.1 Table of Dimensional Requirements to exceed the maximum height and front yard setbacks. Statements of fact: 1. Attorney Grover presented the petition on behalf of the petitioner. 2. In the petition date-stamped September 25,2015, the Petitioner requested a Special Permit per Sec. 3.3.2 Nonconforming Uses of the Salem Zoning Ordinance to change and existing nonconforming use of a multifamily residential property to another nonconforming use of mixed use commercial office/retail. The petitioner also requested Variances for relief from Sec. 4.1.1 Table of Dimensional Requirements to exceed the maximum height, front yard setbacks and relief from Sec. 5.0 Table of Parking ,Requirements and 5.1.5 Parking Design located at the properties located at 331-335 Lafayette Street and 5-7 West Ave (Map 32 Lots 231,232,233). 3. A public hearing for the petition was opened on October 21,2015 and continued to the next regularly scheduled meeting on November 11,2015 ,December 16,2015 and January 20,2016 at the request of the applicant to revise the original plans to eliminate the request for a variance from the parking City of Salem Board of Appeals 2/3/2016 Project: 331-335 Lafayette Street, 5-7 West Ave and 11 West Ave Page 2 of 6 requirements and lessen the impact of the proposed development on the neighborhood character particularly along the eastern boundary of the property. 4. The original petition, dated September 25, 2015, proposed a three (3) story building with approximately 7,000 square feet of retail space on the first floor and approximately 32, 000 square feet of office space on the upper two (2) floors. 5. The original petition, proposed a building with a height of 39.5 feet, which exceeds the allowable height of the B-1 and R-2 zoning districts. The proposed building also had setbacks proposed along Lafayette Street and West Avenue that encroached on the fifteen (15) feet front yard setback requirements. 6. The original petition, dated September 25, 2016,proposed to provide 55 parking spaces for a 39,000 square foot building. To meet the parking requirements of the Zoning Ordinance, the petitioner would need to provide 132 parking spaces for the proposed building square footage and uses. 7. At the public hearing on October 21, 2015, the Board stated concerns about the impacts of the proposal on the neighborhood character and concerns that the proposed square footage was directly causing the petitioner to request a Variance from the parking requirements. 8. At the public hearing on October 21, 2015, the petitioner requested a continuation to the next regularly scheduled meeting on November 11, 2015 to respond to the concerns of the Board and the public. 9. The applicant submitted a revised petition dated November 24, 2015. The petitioner withdrew the request for Variances for relief from Sec. 5.0 Table of Parking Requirements and 5.1.1 Parking Design. In addition, the petitioner entered into a purchase and sales agreement to purchase the property located at 11 West Avenue (Map 32 Lot 234). 10. The petitioner submitted a revised petition form dated November 24,2015 and the legal notice was re-advertised to include the additional property at 11 West Avenue (Map 32 Lot 234). 11. On November 11, 2015 the petitioner requested a continuation of the public hearing to the next regularly scheduled meeting on December 16,2015 for more time to revise plans.The Board granted the request. 12. On December 16, 2015,Attorney Grover presented the revised petition requesting a Special Permit per Sec. 3.3.2 Nonconforming Uses of the Salem Zoning Ordinance to change and existing nonconforming use of a multifamily residential property to another nonconforming use of mixed use commercial office/retail and a Special Permit per Sec. 3.3.3 Nonconforming Structures to alter a nonconforming structure. The petitioner is also requesting Variances for relief from Sec. 4.1.1 Table of Dimensional Requirements to exceed the maximum height and front yard setbacks. 13. The revised petition proposed to reduce the square footage of the three (3) story building by approximately 10,000 square feet. The total square footage of the revised building included approximately 6,300 square feet of retail on the first floor and 23,000 square feet of office space on the upper two (2) floors. 14. The applicant states that a two (2) - story office building would be more detrimental to the neighborhood than the proposed mixed use building. City of Salem Board of Appeals 2/3/2016 Project:331-335 Lafayette Street,5-7 West Ave and 1 I West Ave Page 3 of 6 15. The revised petition proposed to provide the requited eighty-three (83) parking spaces to be in conformance with the zoning requirements associated with the reduced building square footage and associated uses as proposed in the revised plans. 16. There were no dimensional changes proposed to the setbacks or building height in the revised plan dated November 24,2015. 17. Mr. Burr also proposed to grant an easement to the City to accommodate ongoing traffic improvements at the intersection of West Avenue and Lafayette Street.: if the City Engineer determines it would be beneficial. 18. Attorney Grover presented the following grounds for the Variance requests: • Special conditions and circumstances that especially affect the land, building,or structure involved, generally not affecting other lands, buildings and structures in the same district are that parcel at 331 Lafayette Street is an odd "L"shaped lot that that cannot be commercially developed as allowed by-right. The irregular shape of this parcel required the petitioners to aggregate several parcels in order to create a site that could be practically developed. The property at 5-7 West Street is a six (6) unit residential property surrounded by two (2) commercially zoned properties including a portion of 331 Lafayette Street and 335 Lafayette Street is also a unique circumstance.Another unique feature of these properties is that there are four (4) separate parcels in three (3) different zoning districts. Since the public hearing in October, the petitioner has added an additional parcel to the project properties, 11 West Avenue, to meet the required parking regulations and piece together property can be developed. • Literal enforcement of the provisions of the Ordinance would involve substantial hardship to the applicant because the shape of 331 Lafayette Street has forced the applicant to The one irregularity along the northern edge of 331 Lafayette Street still presents some physical challenges and directly affects where a building can be located and how high the building needs to be. The irregular shape of 331 Lafayette along the northern edge also forced the location of the building to be within the front yard setbacks along Lafayette Street and West Avenue in order to make space for the required parking and on-site traffic circulation. The other reason for the proposed location of the building is to lessen the impact on the abutting residential properties. Both the Board and the neighborhood are concerned about the impacts of a commercial use on abutting residential properties. The proposed building height Variance is directly in response to these site-specific physical challenges. • Desirable relief may be granted without substantial detriment to the public good, and without nullifying or substantially derogating from the intent of the district or the purpose of the ordinance. The site is in poor condition with a series of commercial and residential properties that are in disrepair. The petitioner proposes put a program in place that significantly improves the properties and does so in a way to maintain a first floor retail space that is important to the neighborhood and also keeps a reasonable buffer between the proposed commercial and existing residential neighborhood. Diminishing the size of the building and increasing the parking addresses the negative aspects and concerns from the neighborhood that the project would cause increased traffic and parking overflow into the neighborhood. The petitioner has addressed the concerns of the neighborhood with the revised plan presented. 19. Mr. Cameron- Engineer- testified that the odd shape of the lot along the northern boundary presents significant challenges to the overall site design. The proposed building angle is designed in this way to accommodate the parking requirements. If the jog in the lot line were not irregularly shaped,along the City of Salem Board of Appeals 2/3/2016 Project: 331-335 Lafayette Street,5-7 West Ave and 11 West Ave Page 4 of 6 northern edge of 331 Lafayette, there would be space for another parking lane and altemative options for building location. However, this lot line angle pushes the building down further onto the corner of Lafayette Street and West Avenue. The proposed building is no closer to the street than any of the existing buildings. 20. Mr. Cameron-Engineer and Mr. Pittman-Architect testify that the project team studied the design and building orientation and found that the proposed configuration was the best option for three (3) reasons. 1) The comer has a major sight distance deficiency. By pulling the building back from the comer and placing it at this angle, the sight distance around the corner from West Avenue to Lafayette Street is significantly improved andwill help with traffic circulation; 2) Given the irregular shaped lot, there is no ability to orient the parking spaces at the 11 West Avenue property and meet the parking requirements and a safe parking lot design without this building orientation; 3) From an architectural perspective, the angle of the building also reduces the visual mass of the building along Lafayette Street. 21. The existing footprint square footage at 331-335 Lafayette Street is approximately 12,000 square feet with approximately 130 +/- linear feet along Lafayette Street. The existing width of the property is approximately seventy (70') feet. 22. The proposed footprint square footage is approximately 11,500 square feet with ninety- two (92) +/- linear feet along Lafayette Street,which is less than the existing development. 23. The existing buildings vary in height from eighteen (18) feet to thirty-nine (39') feet tall. 24. The proposed building height is thirty-nine (39') feet tall. 25. Mr. Pittman-Architect- testified that the additional building height beyond the maximum dimensional requirement of thirty (30') feet is necessary to provide visual and auditory screening for various mechanical systems including the elevator and HVAC. In order to construct a three (3) story structure within the 30' foot building height requirement is not physically possible. Mr. Pittman demonstrated that with this height restriction, the interior ceiling height would be seven (7) feet tall in many locations with a peak height of 7.8 (feet) tall. This height does not account for the roof,parapet, slope edges and mechanical systems. The thirty (30') feet requirement is unrealistic for a three (3) story structure. The height of the building to the bottom of the cornice detail is twenty (20) feet and to the top of the gutter and assembly is twenty-two (22) feet. From the grade level to the top of the dormer is thirty-one and a half feet (31.5) feet. 26. At the public hearing on December 16, 2015,in response to public concerns from abutters, the Board requested that the developer consider expanding the buffer between the development and residential neighborhood along the eastern edge of the property,move the dumpster pad location from any property edges, and further reduce the size of the proposed building to help reallocate space to lessen the impacts of the proposal on the neighborhood. 27. The applicant submitted revised plans to the Board on January 13, 2015 with the following changes: 1) A reduction in the building size from 29,000 square feet to 24,000 square feet; 2) An expansion of the buffer between the eastern edge of the subject property and abutting residential properties by shortening the proposed building along West Avenue by thirty (30') feet 3) A reconfiguration of the parking lot design and reduction in the number of parking spaces to include a total of seventy-two (72) parking spaces; 4) The location of the dumpster pad is located away from the property boundaries; 5) The petitioner proposed to keep and restore the existing two (2)- family dwelling unit City of Salem Board of Appeals 2/3/2016 Project: 331-335 Lafayette Street, 5-7 West Ave and 11 West Ave Page 5 of 6 at the property of 11 West Avenue (Map 32 Lot 234) and using the back portion of the 11 west street lot as parking and buffer for the proposed structure. 28. The requested relief, if granted, would allow the Petitioner to change and existing nonconforming use of a multifamily residential units to another nonconforming use of mixed use commercial office/retail and to exceed the maximum height and front yard setbacks in accordance with the revised site plan dated January 13,2016. 29. At the public hearings, a petition in opposition to the request was submitted and signed by one hundred and sixteen (116) residents. In addition, eight (8) letters of opposition were submitted. Three (3) letters of support were submitted and many people spoke both in opposition and support of the proposal.At the final hearing,residents expressed broad support for the revised plans. The Salem Board of Appeals, after careful consideration,of the evidence presented at the public hearing, and after thorough review of the petitions, including the application narrative and plans, and the Petitioner's presentation and public testimony, makes the following findings that the proposed project meets the provisions of the City of Salem Zoning Ordinance: Findings—Special Permit: The Board finds that the proposed project is not substantially more detrimental that the existing nonconforming use to the neighborhood. 1. Social, economic and community needs are served by the proposal. An office building could be constructed on the parcel as of right, but the first floor retail component is an important use that provides a better opportunity to meet the needs of the community. 2. Traffic flow and safety, including parking and loading are adequate as the proposal meets the parking requirements. 3. There are no changes to the impact on utilities and other public services. 4. Impacts on the natural environment, including drainage are no more than what already exists. In particular, the petitioner has shown that there is a decrease in impervious surfaces than the existing development. 5. The proposal is in keeping with the neighborhood character. The proposal is a change to the overall look of the building, .the board determined that in order for the project to be less detrimental than the existing use,a landscape buffer and fencing and dumpster location were critical to this. a significant buffer between the proposed building and the residential neighborhood as the petitioner is proposing to keep the use and structure of 11 West Avenue 6. The potential fiscal impact, including the impact on the City tax base is positive as this will be an improved property. For these reasons, the special permit is warranted. Findings—Variances from maximum height(feet) and front yard setback requirements. 1. Special conditions and circumstances that especially affect the land, building, or structure involved, generally not affecting other lands, buildings, and structures in the same district is that the property is within three (3) different zoning districts and an Overlay District, the irregular shape of the property along the northern boundary is different. 2. Literal enforcement of the provisions of the Ordinance would involve substantial hardship to the applicant in that any altemative proposal to develop this site, including what is allowable by right, would not be less detrimental to the neighborhood. City of Salem Board of Appeals 2/3/2016 Project:331-335 Lafayette Street,5-7 West Ave and 11 West Ave Page 6 of 6 3. The desired relief may be granted without nullifying or substantially derogating from the intent or purpose of the City of Salem Zoning Ordinance. On the basis of the above statements of facts and findings, the Salem Board of Appeals voted four (4) in favor (Ms. Curran, Mr. Watkins,Mr. Copelas,Mr. Viccica (alternate)) and none (o) opposed, to grant a Special Permit per Sec. 3.3.2 Nonconforming Uses of the Salem Zoning Ordinance to change and existing nonconforming use of a multifamily residential units to another nonconforming use of mixed use commercial office/retail, a Special Permit per Sec. 3.3.3 Nonconforming Structures to alter a nonconforming structure and Variances for relief from Sec. 4.1.1 Table of Dimensional Requirements to exceed the maximum height and front yard setbacks, subject to the following terms, conditions, and safeguards: 1. The Petitioner shall comply with all city and state statutes, ordinances, codes and regulations. 2. All construction shall be done as per the plans and dimensions submitted to and approved by the Building Commissioner 3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 4. Petitioner shall obtain a building permit prior to beginning any construction. 5. Exterior finishes of new construction shall be in harmony with the existing structure. 6. A Certificate of Occupancy is to be obtained. 7. A Certificate of Inspection is to be obtained. 8. Petitioner is to obtain approval from any City Board or Commission having jurisdiction including, but not limited to, the Planning Board. Special Conditions: 1. The existing structure and residential dwelling at 11 West Avenue will remain. 2. The fence and vegetative buffers shall be maintained by the petitioner, his successors or assigns. 3. This decision requiring the buffer between the approved proposal and the residential properties shall be recorded in the chain of title on the deed of the property. n Rebecca Curran, Chau Board of Appeals A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Aypeat from this decision, if any,.shalt be made pursuant to Section 17 of the Marsachurens Gemral La s Chapter 40A,and shall be filed within 10 days of filing of this decision in the affcce of the City Clerk Pursuant to the Massachuretts General Laws Chapter 40A, Section 11, the Variance or Spedal Permit granted herein shall not take effect until a ropy of the decision bearing the certificate of the Cky Clerk has been filed with the Essex South Registry of Deedr. �oNo1rA CITY OF SALEM ,r. DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT KTMBE RLEY DRISCOLL MAYOR 120 WASHINGTON STREI..T♦ SAI.--.M,MASSACHUSETTS 01970 LYNN GOONTN DUNCAN,AICD TFL:978-619-5685 ♦ FAX;978-740-0404 UIRECIOR March 1, 2007 Thomas Ho Nail and Spa Co. 331 Lafayette Street Salem, MA 01970 RE: Illegal Banner Signs a331 afayette Street Dear Business Owner, It has come to my attention that business owners at 331 Lafayette Street have hung banner signs on their storefronts. I am writing to rem nd you the only temporary signs permitted by the Sign Ordinance are signs that pertain to special sales or events and hung inside your establishment's windows. All exterior signs require a sign permit and without a permit are illegal. Therefore, the banner signs located on the exterior of 331 Lafayette Street are illegal signs and must be removed immediately. If the signs are not removed immediately, I will forward this matter to the Building Inspector who will enforce the penalties and fines under Sec 3.36, Sec 3.29 of the Salem Sign Ordinance and 780 CMR Sec 3102.4 of the Building State Code. If you need any help navigating the sign permit process, pleases contact me. Please keep in mind that the City of Salem Storefront Improvement Program is available to assist you in creating signage that both meets the requirements of the sign code and attracts customers to your business. I have enclosed a flyer outlining the details of the matching grants available through this program. Should you have any questions regarding this matter, I can be reached at (978) 619-5685. Sincerely, Kirsten Kinzer CDBG Planner Cc: Thomas St. Pierre,Building Commissioner Councilor Matthew A.Veno CITY OF SALEM I BUILDING SALEM, MASSACHUSETTS 01970 PERMIT MARC?._, ¢,. 97 133-1997 _ DATE 19 PERMIT NO. APPLICANT 1=' 'HiRi�' 'r!RTh{EI1� - FO .BOX- 257 „ __.,G.__-___ADDRESS (NO.) (STREET) (CONTR'S LICENSE) t CITY STATE ,r,A ZIP CODE 02181 TEL.NO. - - PERMIT TO AL.TIE RATI CN _ (_) STORY RF_ST AU kANT NUMBEROF DWELLINGUNITS 0 (TYPE OF IMPNCVEIAFNT) - NO. !PROPOSED USE) AT(LOCATION) @731 !_ F'A AYETTE STREET ZONING(NO.) (STREET) DISTRICT BETWEEN AND (CROSS STREET) (CROSS STREET) SUBDIVISION KIAP "'= LOT LOT IT 31 BLOCK _ SIZE- BUILDING SQ";yFT BUILDING IS TO BE----,FT.NIDE BY - FT.LONG BY FT,IN HEIGHT AND SHALL CONFORMINCONSTRUCTIOP TO TYPE USE GROUP- BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: TNTEPTOdR RENOVATIONS. FOR NEW RESTAURANT AS PER PLANS 'SUBMITTED. - L. AREA OR ' ' - - PERMIT VOLUME "�r - ESTIMATED COST$ 51 , 000 FEE .$ 31 1. CIO ICU�ICISOIAARE FEET) - OWNER ADDRESS ("II"18/-IN MA y BBVIL0ING DEPT. L. E. T THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENT-' ► ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAYBE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS '.APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK:.-:- POSTED UNTIL'FINAL_INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR 1.FOUNDATIONS OR FOOTINGS. - ELECTRICAL,PLUMBING AND 2.PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANG IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL"F'I it-INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VIS - -----T DING INSPECTICIV APPROVALS LUMBINGINSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS . 1 ev BOARD OF HEALTH GAS I PPRO LS FIRE DEPT.INSP CTING APPROVALS As=G - 9 -7 OTHER CITY ENGINEER 2 ) 2 'p CERTIFI ATE 0 OCCUPANCY � def a Issued:4� Permit#-l5 2 J7 coty ala ep . w R ALL OT PROc MIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION.' ° ;AS.NOTED ABOVE. OR WRITTEN NOTIFICATION. Business Certificate Citp of isaggarbus'ettg � P 2 DATE FILED �LI�,New Type: Expiration Date ` ❑ Renewal, no change Number a ❑ Renewal with change In conformity with the provisions of Chapter one hundred and ten, Section five of the Massachusetts General Laws, as amended, the undersigned h reby eclare(s) that a business is conducted under the title of: n at. A3 S type of business by the following named person(s): (Include corporate name and title if corporate officer) Full Name Residence "w- 0 Signatures ------/V-W- - / - ---- ----- /U � -------- --------- ---------------------- - ------------- ----------------------------------------------------- on 19the above named persons) personally appeared before me and made an oath that th regoing statement is true. CITY CLERK Notary Public (seal) Date Commission Expires identification Presented State Tax I.D. # S.S. # t ) / 31 V2 (if available) ------------------------------------------------------- In accordance with the provision of Chapter 337 of the Acts of 1985 and Chapter 110, Section 5, of Mass. General Laws, business certificates shall be in effect for four(4) years from the date of issue and shall be renewed each four vears thereafter. A statement under oath must be filed with the town clerk upon discontinuing, redring, or withdrawing from such business or partnership. Copies of such certificates shall be available at the address at which such business is conducted and shall be furnished on request during regular business hours to any person who has purchased goods or services from such business. Violations are subject to a fine of not more than three hundred dollars ($300.00) for each month during which such violation continues. r^ Co a � BUIE_i�iMG !iE(�i ,1 Z CITY OF SALEM HEALTH DEPARTMENT 12 40 r9 BOARD OF HEALTH 9North Street RECEfvD ROBERT E. BLENKHORN Salem,Massachusetts 01970 CITY OF SrtLcN,1'ASS. HEALTH AGENT 508-741-1800 August 28, 1991 Peppy Poulet c/o Ira Lexus 99A Andover Street Danvers, MA 01923. Attention: Dan Wright Dear Mr. Wright: Based on the site review of the proposed food establishment located at:_3312� LafayetteT_Stre- eC_conducted on August 6, 1991, the Health Department issues the following comments in accordance with 105 CMR 590.000; State Sanitary Code Chapter 10 "Minimum Sanitation Standards for Food Establishments". - Walls, floors and ceilings in food preparation, food storage warewashing areas, and all walk-in refrigerators, dressing rooms, toilet rooms shall be constructed of smooth non-absorbent easily cleanable surfaces. An example is stainless steel, "glassboard" or equivalent material. As discussed glassboard material is to be installed in the "Chicken Prep Room" and on walls surrounding the mop sink area. - All equipment and utensils to be constructed of stainless steel or an equivalent smooth easily cleanable Taterial. Equipment to be installed with adequate space surrounding it to allow for regular, effective cleaning. - Accessible wall-hung handwashing sink(s) with liquid soap and paper towel dispensers to be installed in each food preparation and warewashing area. Sinks used for food preparation or for warewashing shall not be used for washing of hands or for any other purpose. A hand sink is to be installed in the "Chicken Prep Room". - The installation of exposed horizontal utility service lines and pipes on the floor is prohibited. Exposed utility service lines and pipes shall be installed in a way that does not obstruct or prevent cleaning of the walls, floors and ceilings. - All construction must meet the code, requirements set forth by the Building, Fire, and Electrical Departments as well as the Health Department. continued JSSALEM HEALTH DEPARTMENT 9 North Street Salem, MA 01970 Peppy Poulet c/o Ira Lexus Page 2 of 2 August 28, 1991 - Any changes of this proposed food establishment requires Board of Health approval. The Health Department appreciates your cooperation in this matter. Contact this office to arrange compliance inspections throughout the construction process. If you have any questions, kindly contact this office. FOR THE BOARD OF HEALTH REPLY TO ROkERT E. BLENKHORN, C.H.O. WILLIAM T. BURKE, III, R.S. HEALTH AGENT SENIOR SANITARIAN . REB/m cc: Building Department Electrical Department Fire Prevention Licensing Department BUILDING DEPARTMENT S Citp of Rpalem, Angacbugettg Public Propertp Bepartment �3uilbing 3Department One 6stem Orren 745-9595 Cxt. 380 William H. Munroe Director of Public Property Inspector of Buildings Zoning Enforcement Officer September 10 , 1991 Essex County Craftsman, Inc. Raymond Noyes 60 Ward Street Salem, MA 01970 RE: 331 Lafayette Street Dear Mr. Noyes, Regarding your building permit for the kitchen hood- duct system, please be advised that this system has been included in a previous permit. Enclosed is your application and your check in the amount of $20 . 00 dollars . Sincerely, David J. Harris Assistant Building Inspector DJH/eaf enc : (2) Paul G. Fermano & Associates, Inc. Architecture Interior Design Engineering Space Planning cn September 09 , 1991 ro c rn Mr. David Harris, Building Inspector-City of Salem, MAfr' Building Department r p o 2 Salem Green c a -v 3 Salem, Massachusetts 01970 i v N cis Dear Dave; The following is an attachment to the notarized affidavit which outlines my role in the Peppy Poulet Restaurant at 331 Lafayette Street. It is my pleasure to inform your office today, of the completion of construction of the subject project. During the more than 10 weeks of construction I have observed the progress of Beaver Construction Co. and have been most impressed with the skill of the crew and their responsiveness to the few minor issues which we have presented to them during their work. I feel that at this time , I can in all honesty say that the space is properly constructed and ready for use as a restaurant. If you or any member of the inspection team have any questions or comments relative to this project , please feel free to call our office at your convenience. Sincerely, 1 0, AIA Principal PGF/sf 4 Evergreen Rd. Reading, MA 01867-1834 617-942-0294 Paul G. Fermano & Associates, Inc. 'Architecture Interior Design Engineering Space Planning I' AFP �tl �i1 M1 Mire �E;G Id !J � SOT�✓�ZI� 18° HIIJ. T . 5 N2T1. 6NI�i.n�6 Cmio T Hew, &xJ ll11 MttJ- - '- - WAPLI �bww/ WIRB HBI$K K*ltJF- LrT 11 U `r- NFI°A 1 �._ WP"f�SLrs GVJfS Gl�11,C '(i 1.8 Tl - 00 i y'� 1� dll 01 e sL 2 b READING, 2 MASS, h r 01�F rH MNSs?`�J 4 Evergreen Rd. Reading, MA 01867-1834 617-942-0294 Paul G. Fermano & Associates, Inc. ,Architecture Interior Design Engineering Space Planning — � N��t'(Iol• THEW Win IN P`rAIV 15Y�O ' i X11 MIS• G��l'� _ -o WWF WAA0 INO, 'III A MII Mir1. �, — --- —mg osgv IJO�-coli l �'I It�t E — --- -- -- 4Z. (I�111J. gHE�T M L OJ O Mttd- --I--- WIF? N sH IZEI F. PPP - -- --- - -- —G�rR �. VEFIJ 65K ON rK-GW13 Ew E o a;ye SEG`({b1J (.0 /cof.1�/. c�,/ 1 �FEq yrs 1/bll �li��ll e Z II o a N..691e b READING, y�F rM MPSS�ci 4 Evergreen Rd. _ Reading, MA 01867-1834 �� 617-942-0294 _ Paul G. Fermano & Associates, Inc. Architecture Interior Design Engineering Space Planning TO: Mr. David Harris , Building Inspector - Salem, MA 01970 FROM: Mr. Paul G. Fermano, Principal DATE: September 9 , 1991 CP PROJECT NUMBER 362-91 n �O PROJECT TITLE Peppy Poulet Restaurant p PROJECT LOCATION 331 Lafayette Street � — NATURE OF PROJECT -Complete tenant fit-up for new restaurantcnc' r' r;� CD IN ACCORDANCE WITH SECTION 127 . 0 OF THE MASSACHUSETTS STAT=l BMDING CODE, I , PAUL G. FERMANO , REGISTRATION NO. 5915 BEING A REUISI;bED PROFESSIONAL ARCHITECT HEREBY CERTIFY THAT I HAVE PREPARED ORLDIRE�aLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS A`IID SPECIFICATIONS CONCERNING: ENTIRE PROJECT XXX ARCHITECTURAL STRUCTURAL MECHANICAL FIRE PROTECTION ELECTRICAL FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEDGE, SUCH PLANS , COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRACTICES AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 127 . 2 . 2 : 1 . Review of shop drawings , samples and other submittals of the contractor as required by the construction contract documents as submitted for building permit, and approval for conformance to the design concept. 2 . Review and approval of the quality control procedures for all code-required controlled materials . 3 . Special architectural or engineering professional inspection of critical construction components requiring controlled materials or construction specified in the accepted engineering practice standards listed in Appendix B. PURSUANT TO SECTION 127 . 2 . 3 , I SHALL SUBMIT PERIODICALLY, A PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO THE CITY OF SALEM COMMISSIONER. UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINA PORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJ C 0 CCUPANCY. SINAT-U-Rt Fermano, AIA SUBSC IBED AND S RN TO BEFORE ME TH S 9th DAY OF September, 1991 NOTARY PUBLIC Sandra A Fermano MY COMMISSION EXPIRES 9/6/96 4 Evergreen Rd. - Reading, MA 01867-1834 617-942-0294 PAUL G. FERMANO & ASSOCIATES [LIE44EM (OF VERAMMUTUL 4 Evergreen Road READING, MASSACHUSETTS 01867-1834 /�` GATE JOB NO- (617) � \617, 942--01/�2\(�9/4� ATTENTION TO U > WE ARE SENDING YOU Attached ❑ Under separate cover via the following items: ❑ Shop drawings prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of .letter ❑.Change order ❑ COPIES DATE NO. a -.DESCRIPTION A'D C , M 'h r""Ii r 'T V41 WIIAAOI&� al VI d '_bleAh THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval (KFor your use ❑ Approved as noted - ❑ Submitcopies for distribution > ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ _ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIG ED: PRONCT202 �Irc,Geon,era 01111. If enclosures are not as noted, kindly if_us7t once Paul G. Fermano & Associates, Inc. Architecture Interior Design Engineering Space Planning \ F'�11 k - 4uud j \/ C) i' / I I \ � /p tit y k �C } I Mc vice VIEW fl xEjD bL.A&i IN e` :711A 1d/kc_bNft`f aFNIN�aS EWA- FLAN �•`''vGFEq �f pEPf7'f 'ouT s► tvt , MA, r z o d No.5916 d READING. t yyF4 pC' . OF 4 Evergreen Rd. Reading. MA 01867-1834 617-942-0294 Paul G. Fermano & Associates, Inc. Architecture Interior Design Engineering Space Planning t%ED 4­1y n d No.6916 H READMO, 3 YAS$. y O�kF4 ,M pSSp`rJ i i ! j } 1Nfryll wf,P•l�l�K T N� S Hi 1 i i i i I i. .f. r , ' , ,• , j i I 1 AU Flo i i II I f i� Y i 1 i A4 i i I P1 i l � it 4 ! i tswcr s1 wit j � Ul� SON 4 Evergreen Rd. Reading, MA 01867-1834 617-942-0294 PEPPY POULET JOB -- RONALD S. FULLER, P. E. SHEET NO SK-2 — OF Caneuiting Engineer CAICUTATEOBv__ RSF PATE 7/29/91 CHECKED By DATE LINTEL DETAIL (REVISED) i WSX35 i PL 3/8 X Iii" (CONT.) SECTION ,-Q„ I 2„ 8' -0" (M.O.) l W8X35 RONALD rf�� 3/8" PLATE a s. Q fN+, AAAA All op /�CP •may SOLID BLOCK FULL HEIGHT �gNALEa�`� FROM FOUNDATION. BEARING DETAIL - (SIMILAR OPPOSITE END) . 1y"=1'-0" NOTE: EXISTING TIBEAM TO BE SHORED DURING ERECTION OF LINTEL. FCPM 204 Av.ft4#,o NEWT.I [ T0MI99Ib.10Y921.111 _ NewEngkiMTeleph = A NYNE=-®Company 451 Main Street Wakefield,Massachusetts 01880 January ll, 1993 Leo Tremblay Building Inspector City Hall Salem, MA 01970 Dear Mr. Tremblay: Dolores S. Selenkow, owner of #331 and 333 Lafayette Street, Salem, Massachusetts, has given her consent to enter into an agreement with New England Telephone and Telegraph Company to place a telephone cabinet on a twelve (12) 'foot by fourteen (14) foot easement area being situated at the .back corner of her lot being five (5) feet off the respective property lines. CORRECT: DDOOLLORES S. SELENKOW APPROVED: ` MARY ANDRUSZKIEW CZ Area Operations Manager New England Telephone and Tele raph Company LAEAYETE.SAL NYNEX Recycles No. �y City of Salem Ward .i N APPLICATION FOR PERMIT TO BUILD ADDITION, MAKE ALTERATIONS OR NEW CONSTRUCTION IMPORTANT-Applicant to complete all Items in sections:1, Il, Ill, IV,and IX. I. AT(LOCATION) 331 Lafayette Street ZONING CT LOCATION (1,10) (MEET) OF BETWEEN blest Street AND BUILDING (CROSS STREET) CROSS STREET) OT SUBDIVISION N.A. LOT 231 BLOCK 32 SIZE 23340 sq.ft. II. TYPE AND COST OF BUILDING -All applicants complete Parts A -D A. TYPE OF IMPROVEMENT D. PROPOSED USE-FOR"DEMOLITION'USE MOST RECENT USE 1 ® New building Residential Nonresidential 2 ❑ Addition(It residential,enter number of new 12 ❑ One family 18 ❑ Amusement,recreational housing units added,d any,in part D, 13) 19 E] Chruch,other religious 13 C] Twoor more family-Enter number 3 ❑ Alteration(See 2 above) of units ....................................................... 20 ❑ Industrial 21 ❑ Parking garage 4 ❑ Repair replacement 14 ❑ Enter nu hotel,motel,or dormitory.. 22 ❑ Service station,repair garage Enter number of units ........................... 5 ❑ Wracking(it multifamily residential,enter number 23 ❑ Hospital,institutional of units in building in Part D, 13) 15 ❑ Garage 24 E] Office.bank,professional 6 ❑ Moving(relocation) 16 ❑ Carport 25 ® Public utility 7 ❑ Foundation Only 26 ❑ School,library,other educational 17 ❑ Other-Specify 27 ❑ Stores,mercantile B.OWNERSHIP 28 ❑ Tanks,towers 8 ® Private(individual,corporation,nonprofit 29 ❑ Other-Specify institution,etc.) 9 ❑ Public(Federal,Sate,or local government C.COST (Omit cents) Nonresidential-Describe in detail proposed use of buildings,e.g.,food processing plant, machine shop,laundry building at hospital,elementary school,secondary school,college, 26,000.000. parochial school,parking garage for department store,rental office building,office building 10. Cost of improvement ........................................................ $ at industrial Plant If use of existing building is being changed,enter proposed use. To be installed but not included in the above cost 1,500. To provide electronic telephone service for a. Electrical........................................................................... b. Plumbing............................_._......................................... N.A. approximately 2000 customers in area. c. Heating,air conditioning............................................. d. Other(elevator,etc.)..................................................... N.A. 11. TOTAL COST OF IMPROVEMENT $ 27,500 III. SELECTED CHARACTERISTICS OF BUILDING -For new buildings and additions, complete Parts E-L;demolition, complete only Parts J 8 M, all others skip to IV E. PRINCIPAL TYPE OF FRAME F. PRINCIPAL TYPE OF HEATING FUEL G. TYPE OF SEWAGE DISPOSAL I. TYPE OF MECHANICAL 30 ❑ Masonry(wall bearing) 35 ❑ Gas pp40 ❑ Public or private company Will there be central air 31 Elwood frame 36 C] Oil N•'4t ❑ Private(septic tank etc.) conditioning? N.A. 32 ® Stnlctural steal 37 ❑ Electricity 44 ❑ yes 45 ❑ No 33 Reinforcedconcrete 38 ❑ coal H. TYPE OF WATER SUPPLY Will there by an elevator? 34 ❑ Other-specify 39 ❑ Other-specify N•A• 42 ❑ Public or private company 46 E] Yes 47 E] No NA 43 ❑ Private(well,cistern) J.DIMENSIONS 1 _ M. DEMOLITION OF STRUCTURES: 48. Number of stories ......................................................... 49. Total square feet of Boor area Has Approval from Historical Commission been received all Boors based on exterior dimensions ................................5.9 z..._s.q.._ft.. for any structure over fifty(50)years? Yes_ No_ N.A. 50. Total land area,sq.B. ........_..59 _...,sg..._ft.• Dig Safe Number N_A_ (Not publir way) K.NUMBER OF OFF-STREET PARKING SPACES 51. Enclosed N.A. Pest Control: N_A_ HAVE THE FOLLOWING UTILITIES BEEN DISCONNECTED? 52. outdoors.................. Yes Yes NO L RESIDENTIAL BUILDINGS ONLY Water: N.A. 53. Enclosed..........N.-A................._..._........................... Electric. Gas: Full.._...__N.f_A_!................ Sewer: N.A. 54. Number of bathrooms DOCUMENTATION FOR THE ABOVE MUST BE ATTACHED Partial._LA. BEFORE A PERMIT CAN BE ISSUED. IV. COMPLETE THE FOLLOWING: Historic District? Yes_ No X (If yes, please enclose documentation from Hist Com.) Conservation Area? Yes_ NOEL (If yes, please enclose Order of Conditions) Has Fire Prevention approved and stamped plans or applications? Yes_ No_ N.A. Is property located in the S.R.A. district? Yes_ NOEL Comply with Zoning? Yes X No (If no,enclose Board of Appeal decision) Is lot grandfathered? Yes_ No_ (If yes,submit documentation/if no, submit Board of Appeal decision) N.A. If new construction,has the proper Routing Slip been enclosed? Yes_ No N.A. Is Architectural Access Board approval required? Yes_ No (if yes, submit documentation) Massachusetts State Contractor License # 024547903 Salem License # Home Improvement Contractor # N.A. Homeowners Exempt form (if applicable) Yes_ No N.A. CONSTRUCTION TO BE COMMENCED WITHIN SIX(6) MONTHS OF ISSUANCE OF BUILDING PERMIT CONSTRUCTION IS TO BE COMPLETED BY: June 1, 1994 If an extension is necessary,please submit in writing to the Inspector of Buildings. V. IDENTIFICATION • To be completed by all applicants Name Mailing address-Number.street.city,and state LP Code Tel.No. New England Telepho e 459 Main Street 01906 Owner or Saugus, d. Lessee & Telegraph Co. 381-6438 2. Caruso &McGovern, 23 Sutton Street 01901 (617)592-1210 Contractor Builder's Inc. Lynn, Ma. License No. 3. Reliable Electric 11333 Addison Street 708) Architect or — T Engineer rutility Products Franklin Park, I1 . 60131 455-8010 1 hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as his authorized agent and we agree to conform to all applicable laws of this jurisdiction. Si ture of applicant Address App ica6 " date 6 DO NOT WRITE BELOW THIS LINE VI. VALIDATION Building _ FOR DEPARTMENT USE ONLY Permit number __//�� /S Building se LAY/ 4 UGroup Permit issued � 19 � Fire Grading Building Permit Fee $ ©• �� Live Load'"y Certificate of Occupancy $ r Load Approved b ' Drain Tile $ ✓ "� Plan Review Fee $ NOTES AND Data - (For department use) PERMIT TO BE MAILED TO: tiv DATE MAILED: 3 9 Construction to be started by: Completed by: VI ZONING PLAN EXAMINERS NOTES DISTRICT USE FRONT YARD SIDE YARD SIDE YARD REAR YARD NOTES SITE OR PLOT PLAN -For Applicant Use NEW ENGLA2W3ffiEPHONS AND COMPANY ESHiB1T w JANUARY 8, 1993 SHOWING LOCATION OF EASEMENT AREA AT 331-333 LAFAYEITE,STREET, SALEM, MASSACHUSLCM r S IL.t 3> � 4G p1LK!N A124 A < m t u OWNED; N ,' MORES S.SELENICOWI 12X . EAS CO- iARE R j � NT 3' WIDC INGRE*S swo 'EC rt!•95 M h � fUIZ!'^.EiZl�-1 PAGE)I y�T SrRE[T Reliable Electric/Utility Products Section RLEC 631-205-004 Outside Plant Series Issue 3, October 1990 UNIVERSAL ENCLOSURE (UE) DESCRIPTION AND INSTALLATION CONTENTS PAGE 1. GENERAL .................................................. 2 2. SYSTEM DESCRIPTION............................ 2 s _ A. CABINET........................................... 2 B.`DC POWER OPTIONS...................... 6 C.PROTECTION ................................... 6--- D. DIGITAL/FIBER EQUIPMENT .......... 6 ' 3. STANDARD UE LAYOUTS........................ 7 4. OPTIONAL EQUIPMENT........................... 12 A.-,HEATER:........................................... 12 B.-;-CROSS-CONNECT.......................:... 12 - C.':R366 BLOCK .................................... 12 S.- SITE SELECTION ....................................... 13 Fig-1 - Universal Enclosure(UE) Front Access Cabinet 6. , SITE PREPARATION.............................::.. 13.. A:GROUNDING .....................:.............. 13 B-GEOGRAPHICAL CONSIDERATIONS 14 C. STUB CABLES .................................. 25 C.�#IE�FHT: �QS.LAhc....Fl�r. Tri 16 D-.ACCESSORIES ..................:.:..::....... 25 D.:DRYWELL......................................... 17 V' 10. . CABLE SPLICING...................................:. 27 7. INSTALLATION.......................................... 17 A. OUTSIDE PLANT(OSP) CABLE ..... 27 -- _ B TIP CABLE........................................ 28 . ,. -- -- B. START-UP ::............................................... 18 -. A.'NON-POWER EQUIPMENT.............. 18 11. MAINTENANCE AND B POWER19 REPLACEMENT PARTS .........................-:..... 31 C.:COMMERCIAL AC POWER ............. A. AIR CONDITIONING......................... 31 CONNECTION................................... 20 B. SUMP PUMP..................................... 31 D.LIGHTING._....................................... 20 C:EMERGENCY LAMP ........................ 31 E..ALARMS ........................................... 21 D..SMOKE ALARM................................ 32 F. SUMP PUMP...................................... 23 E. REMOVABLE ROOF ............._......... 32 F. REPLACEMENT PARTS::................ 34 9. R399 CONNECTORS................................. 23 G. ACCESSORIES ................................ 34 A. DESCRIPTION(CONNECTORS) ..... 23 B. PROTECTOR MODULES ................. 25 12. ORDERING INFORMATION ...................... 35 ,Page 1 SECTION RLEC 631-205-004 ' 2.05 The UEs are equipped with 100-amp main circuit 1. GENERAL breakers and a power distribution panel or load center containing individual 15-,20-or 30-amp line circuit 1.01 This section covers the description of and installa- breakers.An electrical schematic is next to the load center tion instructions for Reliable Electric/Utility Products' (Fig.4).TheAC power distribution panel is mounted on a Universal Enclosure(UE)designed to house outside plant side wall of the UE under the main circuit breaker. electronics(Fig. 1).For digital loop carrier(DLC)equip- ment options,refer to engineering practice 631-305-001. 2.06 Each piece of environmental apparatus(air conditioner,etc.)is powered from separate lines with its 1.02 This practice is reissued to provide more complete own 15-amp or 20-amp, 110-volt AC circuit breaker. information on new air conditioners,grounding,alarms, lighting,ordering,and installation,including lifting ienc Two power eq ipment GFI duplex lights, aconvend fence outlets power test equipment,extension lights,and other necessary equipment. 1.03 Refer to other company practices or local building codes for the proper tools,methods and procedures to be 2.08 A ceiling mounted fluorescent fixture contains used in performing work items not specifically included in four 20-watt bulbs that are enclosed by a clear wrap-around this practice. safety lens(Fig.5).The light is controlled by a 12-hour timer switch.An emergency lamp is also furnished that 2. SYSTEM DESCRIPTION provides light for approximately 60 minutes in the event of a commercial power failure. 2.01 Reliable Electric/Utility Products' high capacity UE provides an aesthetically pleasing,flexible system for using remote terminal channel banks in a controlled = ` environment.The UE can house up to 3 bays of remote ; terminal equipment,with all the protection,multiplexers, DC power,cabling,digital cross-connection and batteries required to operate the equipment. A. CABINET 3: 6 i 2.02 The UE is manufactured for reliability and durability.All exterior panels,chambers,doors,and caps have a baked beige enamel finish specifically designed for 3' ' use outdoors.The majority of the unit is made of 13-gauge, mill-galvanized,hot rolled steel.The entrance door,splice s, chamber,and removable roof access panel are welded concoction manufactured from 1/8-in.thick aluminum. Interior walls and ceiling are covered by Rellectex insula- G tion. 2.03 Dimensions of the UE above grade are 71 inches high by 103 inches long and 72 inches wide(Fig.2).From 1'_.• the ground line,the base is 29 inches high by 72 inches long,and 68 inches wide.The fully equipped steel base UE weighs approximately 6,000 lbs.;the fully equipped j concrete base UE weighs 12,000 lbs. , 2.04 On a standard cabinet,a power transfer switch and an auxiliary generator input connector are included in each UE to power the equipment from a secondary source if i there is an extended commercial power failure.The main circuit breaker with the power transfer switch is on the inside wall near the doorway(Fig.3).The auxiliary generator input connector is mounted near the entrance Fig.3-Transfer Switch and Circuit Breaker Box way. Page 2 Issue 3, SECTION RLEC 631.205-004 65.00 e 4 old. Lin• 100.00 �-- 68.00 --� �-- 72.00 —+•� 35.00 (Beck View) (Side View) (Front View) 103.00 - 16.00 80.00 19.00 1 SUMP I -- 1 PUMP $%ICE30.00 30.00 CHAMBER ENTRANCE 68.00 72.00 . . 72.00 Fig.2- Dimensions of UE Cabinet Page 3 SECTION RLEC 631.205-004 PPP NOTES, 1. EMERGENCY GENERATOR REQUIRES A i MENNEKES P/N ME4100012 OR EOUIV- ` 120/2AOV SINGLE PHASE ILENT 10 CONNECT TO EMERGENCY INLET. M ETERED PROTECTS DV SERVICE AC LOAD CENTER JB J9 II 12 GND NEU {{ LL C' F IXST�I DED D _ 3 2 PUP U S N i _ E 0 U CBI CB2 1 6LK _ 1 G GRN LG i N E N U 0 T LIGHTING AC" B ARREST TRANSFER U BOX __ TIMER K S.ITC. '. JI2 X .. G N VHT 3 JA 3 GRNORD 1 P D ROD 1 EMERGENCY 1.15 J61 _ POWER INLET SEE NOTE I . JI PDS CIRCUIT BREAKER CODE Co. JI RECT. II 130 AMPI C52 J2 RECT. 12 (30 AMP) JJ J. JD Ji 12D AMI iCl Co. JB J A/ /I IS A P J] CB JI0 II A/ 1211 AMP [ 6 JI JIA LMT IB AMP CB JI M LM 1 AM .A CB J SM N IB 1LV29E Fig.4-General Electrical Schematic mergency Lamp I / Overhead ! Fluorescent I U Fixture I R1 Fig. 5- Fluorescent Light Fixture and Emergency Lamp Page 4 01^ e' i i " AVERAGE DEPTH OF FROST PENETRATION (INCHES) ! s ) a 40 a6 30 36 12 ? 36 21 n9 30 1J 6 221 so S 3606 30 40 76 60 0316 64 j 46 t 2 6066 424p 6C 04 SCI 7 60 1J /? 4♦t IS I4 51 94 46 7 1 6 4e 41 )24 3 ` 5 5 2 1e 1 64 26 15 40 q 15 35]6 42 30 2 3 J 64 a 2l 6 24 30 le 4e 25 35 43 1 2 1202 4 q0 12 36 30 4 0 to 25 T E / 20 22 N 24 4B 30 74 20 35 042 i3 ' m e I2 t is 36 s4 15 to N 2 Yl 12 to to ]0 24 6 co 1 1 H YI 60 23 10 e IT 20 ? 6 2)0 6 16 30 15 3 pQ 12 10 10 ii t 2 20 6 r ? 6 24 21 1T I J 13 J d 1 3 B4 9 1210 3 1 1 4 e 3 3 k 2 1 � w f PERIOD 1899-1938 m INFORMATION ROMMU UNOFFICIAL AL SOUROCES' I From Climate and Man Yearbook of Agriculture 1941 page 747 Z A r y t1 M N SECTION RLEC 631-205-004 NOTE: Steel bases may be used in most areas 2) A concrete slab may be used.The foundation where soil conditions are not highly corrosive to hole must be dug a minimum of 51 inches deep,and. metals such as low water table areas. Concrete stone or No.8 fill rock added,then 5 inches of concrete base UEs are more suitable to areas with sandy poured on top. Thefinish depth from the top of the slab soils or high water table areas(sea level). should be 29 inches.Also,the slab must extend six inches beyond the perimeter of thecabinet base.Care a) In areas where ground frost is not a concern,the should be taken to insure the slab is level. (Fig.31) foundation hole for the unit should be 3 feet deep,with 5 inches of pea gravel placed in the bottom of the hole. Pea gravel is used as a leveling surface on the top of undisturbed earth(Fig.29). I 5.. 6 6 02" � Pour Contrera Slab p O e oe e e J/�•- (5" thick minimum) ,J . .'o'u Y °o. ,'o.-D 5 __—_— ''+)i Below Frost Line tpea Gravel 3' Deep — — _ — Frost Line l Fig. 31 - Concrete Slab Pea gravel 6.08 In areas where there are deeper frost lines than those mentioned in 5.06 above,the hole must be 6 inches. fq Fig. 29-Foun tion for LIt Frost Areas past the frost line and may be filled with fill rock or fill i rock on a concrete pad. b) In far northern arras, w rare the frost line 6.09 It is recommended that the cabinet be installed is at 36 inches,either. even.and-level.If the cabinet must be tilted in relation to the ground,the tilt should be toward the sump pump end. 1) The foundation hole must be dug a minimum Also,if some slope is unavoidable,a 1/4-inch pitch in four of 42 inches deep.Stone or No. 8 fill rock must be feet toward the door(sump pump end)is acceptable. added and tamped to give a 31-inch finish depth. (Fig.30),or C. CONDUIT 6.10 Install the conduit for feeder and distribution cabling before installing the UE.All materials and proce- &77- N CF C-P /N I � dtues must conform to local electrical building construction- , standards for conduit materials and sizing(Fig.32). Irc �� C� t 11Nt EACAVA71OPV 9y"X 8.2'X' SI/ fcaR /N Ro9c� — l CEyENT CoNc,?s7c l Fig. 30- Foundation wtt Fig. 32- Conduit for Feeder& Distribution Cable Cana�,e�s Page 16 �. Issue 3, SECTION RLEC 631-205-004 NOTE:the UE should be placed so that the cable glands located in the cable rearrangement facility (CRF)are properly positioned over the PVC conduit for feeder and distribution cabling.The four cable conduit should be directly below the glands,5 U2 inches apart.The conduit should be positioned to allow adequate space for maneuver- - ing cables into the splice chamber,approximately 12" from the overhang where the base and the top of the UE are joined. D. .DRY WELL_. 6.11- . The dry well.for thesump pump should be dug before the UE is installed.A suitable dry well should be dug in accordance with local building codes,then filled with gravel(Fig.33). 7. INSTALLATION — 7.01 Upon arrival at the installation site or at a staging = area,remove the tarpaulin and plastic from the UE.Detach _ the spreader bars packed with the cabinet Put.them aside for later use in hoisting the cabinet. • r'a 7.02 : Proper lifting equipment,i.e.,a crane should.be ° used to raise the UE.Also,the 2x4 spreader bars are used Lifting Holes ! in positioning the lifting cables so that the weight of the cabinet is distributed evenly during lifting Fig. 34- Lifting Steel Base Cabinet 7.03 On the steel base cabinet(6.7,000 lbs.fully equipped),lifting cables are secured from the.cratie to the cabinet with clevises attached to the four lifting:holes a,r located on the angles at the,comers on the cabinet.base: -_-- (Fig.34):On the concrete base cabinet(approximidely l0- -- - 12,000 lbs.fully equipped),lifting cables are secured to the ^`w cabinet with clevises attached to four lifting points in the base(Fig.35).', _r �.� �••,t.� err �� Il _ Y Y ''II11 r I�1 5 _ wy` , Fig.33• Dry Well for Sump Pump Fig.35=Concrete Base Cabinet-" sa Page 17 SECTION RLEC 631-205.004 7.04 The spreader support assembly is constructed of Refer to this number when contacting Reliable for customer 2x4s.Place the spreader support assembly on top of the service.Also,check to be sun:all necessary power and 1 cabinet to position the lifting straps away from the sides of cabinet instruction manuals are included. the cabinet and to distribute the weight evenly during lifting(Fig.36).Nylon straps are positioned from the base 8.03 Remove the packing from around the protection through the four(4)U-shaped ends of the spreader support verticals and sump pump. assembly to a single lifting point When the nylon straps are safely and securely fastened to the cabinet,raise the 8.04 Standard lighting is furnished by a ceiling- cabinet off the flat bed truck. mounted fluorescent fight fixture enclosed within a clear - plastic safety lens.The fixture contains four 20-watt fluorescent tubes.During shipment,the light fixture is packaged separately and stored in the UE.Locate the light fixture and remove it from the protective packaging.The fluorescent tubes and safety lens should already be in stalled.Mount the fixture to the rod in the ceiling using the two clamps provided(Fig.39).The light is supplied with an AC plug that is inserted into the receptacle on the top — ,� ' left front wall. _s Fig. 36- Spreader Bars 7.05 When lifting,to provide maximum leverage,avoid extending the arm of the crane.Raise the UE and lower it into the prepared hole,being careful to place the base so that there is 6 inches of space around the perimeter of the cabinet,and that the enclosure is in proper relation to the condi'*[.After the UE has been seated,check the sides and top of the unit to be sore itis level. Fig.37-Tamping Ground Around Site 7.06 After the UE has been placed,back fill around the unit with original earth and properly tamp the ground surrounding the UE until it is level and even(Fig.37).A decline of the tamped earth away from the cabinet,is suggested to provide a proper water run-off. RELIANCE 8. START-UP COMM/TEC O A. =NON-POWER EQUIPMENT UNIVERSAL ENCLOSURE SERIAL NO. UE90-0030 8.01 Open the door using a 216 tool.Secure the Reliable Electric windlatch and inspect the inside of the unit for any damage. 11333 Addison Street Check to make sure a0 equipment is secure and anyFranklin Park, Illinois 60131-1181 necessary electrical plugs are snug in their sockets. 86688d 708-451-5546 8.02 Find the UE registration plate located on the instruction manual pocket on the UE door(Fig.38).Write the serial number down and save it for future reference. - Fig.38-UE Registration Plate Page 18 NDI � UP of *aiem, Auggarbugettg � :0 09 Q"'NgO Withdrawal or Deceased from Business or Partnership In conformity with the provisions of Chapter 110, Section 5, of the Mass. General Laws, the undersigned hereby declare(s) that we (I) have this day: ❑ Discontinued AP, ' Withdrawn from the business known as• C. conducted at- as set forth in the certificate filed on• — Name Address � � t✓ h �2 The location of ❑ the business ❑ my residence as it appears on the business certificate of: filed on- has been changed to: �3 As executor or administrator for the estate of: I hereby request a: who died on--, ❑ Discontinuance of the business certificate ❑ Withdrawal of his/her name from the business certificate so named: filed on: -------------------------------------------------------------------------------------------------- Si�?ta ,r ft) -------------- t__J_ --------------------- --------- ------------------------------------------- ----------------------------------------------------- on 19 oa utat me to egos 6tthe above named persons) personally appeared before me and made an o s temeru e. ---------------------------------------------------- ----------------------------------------------------- CITY CLERK NotarvPubiic (seal) Date Commission Exi)ires