Loading...
129 LAFAYETTE STREET - BUILDING JACKET 129 LAFAYETTE STREET NO. 7521/3 0 0 0 0 r ' ,gONDIr,I,�O CITY OF SALEM, MASSACHUSETTS PUBLIC PROPERTY DEPARTMENT s 120 WASHINGTON STREET, 3RD FLOOR SALEM, MASSACHUSETTS 01 970 TELEPHONE: 978-745-9595 r- nve FAX: 978-740-9846 KIMBERLEY ORISCOLL MAYOR 15-1 Ghw,-,* °I- 5�v,veri j- o r1 {�f}✓b 9✓/ S7; Section 116.0 fe, r -�-" 79 DEMOLITION ORSTRUCTURES Structures over fifty(50) years old must have approval of the Salem Historic Society UTILITY DISCONNECTIONS REQUIRED Authorized Agent Date of Disconnection Q -Yt- Water (see attached requirements) :tom— Electrical Firel /Z 441, Health ( ZiZ— �v 14 _--,7 Sewer 7 Salem Historic Commission Dig Safe Number OL2IqQV j �Iv0 Pest Control: ***DOCUMENTATION OF ALL THE ABOVE MUST BE ATTACHED BEFORE PERMIT CAN BE ISSUED*** Fee for Demolition $5.00 application fee plus $2.00 per 100 square ft gross area, Minimum $25.00 City of Salem, Massachusetts i Fire Department 48 Lafayette Street David Cosy Salem, Massachusetts 01 9 70-3 695 fire Prevention Chief TFef 978-744-1235 Bureau 978-744-6990 Fax 978-745-4646 dcody@salem.com 978-745-7777 Demolition • Before a structure can be demolished, the Salem Fire Department shall conduct a preliminary demolition inspection, to ascertain any conditions which may require a fire watch* or other preventative measures to be taken before, during, or after the demolition process. Minimum of two weeks notice required to schedule appointment • A permit to demolish or remove a structure shall not be issued until the preliminary inspection has been conducted and a report of requirements necessary to prevent life safety hazards has been obtained by the applicant. • The inspection report shall include but not limited to: cutting and welding permit, fire watch, on site storage of materials, underground storage tank compliance.... • Proof of utility disconnects. • The requirements outlined in the report shall become a part of the restrictions of the demolition permit issued by the Building Inspector. *Fire watch patrol Salem Code of Ordinances Sec. 20-124 October 5, 2010 ,•-, �„rONU17q��� � CITY OF SALEM SALEM, MASSACHUSETTS ENGINEERING DEPARTMENT 120 WASHINGTON STREET, 4TH FLOOR SALEM, MA 01970 Phone: (978) 745-9595 x5673 Kimberley Driscoll Fax: (978) 745-0349 Mayor DAVID H. KNoWLTON, P.E. CITY ENGINEER January 30, 2009 Water, Sewer and Drainage Requirements Regarding the Demolition of Structures within the City of Salem In accordance with the provisions of the General Laws of the Commonwealth of Massachusetts and the Salem Water and Sewer Department, the following regulations governing the demolition of structures within the City of Salem shall be followed. This regulation is made in the interest of protecting the city's water, sewer, drainage and public way infrastructure at each connection located within the City of Salem, as well as to prevent conditions which may cause danger to public safety, result in water loss, or damage to city or private property due to water or sewer loss or back-ups, or cause pollution of the city's storm water receiving waters. 1. Prior to demolition of structure, a licensed plumber shall ascertain where all water, sewer and drainage lines are located entering and leaving said structure. The plumber shall make a determination of existing or prior use of each line, including, but not limited to domestic, commercial or industrial use; irrigation; fire suppression; sewer, storm drain or septic system; roof drain; or sump pump. After all lines have been located, the plumber shall make a formal written report with plans of all lines found to the City Engineer. 2. Once the plumber's report*has been reviewed and approved by the City Engineer, a Registered Professional Civil Engineer (hereinafter referred to as "the Engineer") shall make a determination of the point of origin or discharge on each city main, for each line identified in the plumbers report. The Engineer shall also ascertain the location, use, and point of origin or discharge of any other lines on the property that may or may not be affected by the demolition or connected to the structure. The Engineer shall provide the City Engineer, for review and approval, a stamped plan of the property and adjacent City utilities, indicating the results of his investigations. 3. A request to the Department of Public Services, for assistance in shutting down any water main, prior to cutting and capping it, shall be made only after the City Engineer has approved the written reports and plans described above. `.'l'ate'r, Sewer and Drainage Requirements Regarding the Demolition of Structures January 30, 2009 Page 2 4. Prior to demolition of the structure and immediately following item #3 above, a City of Salem licensed drain layer shall cut and cap the water, sewer and drainage lines at the city main and arrange for an inspection by the Department of Public Services prior to backfill. Backfill, compaction, temporary and permanent paving will follow to current city standards. 5. In the event that the lines will be used immediately after demolition for construction. purposes, a set of plans and/or drawings, stamped by a Registered Professional Engineer, describing the lines to be used during construction, must be provided to the City Engineer for review and approval, prior to obtaining a building demolition permit. Any other lines identified shall be abandoned as described herein. 6. A demolition permit shall not be issued until the items above have been completed and the Department of Public Services has conducted an inspection and signed off on the water and sewer portion of the Building Department prerequisite Utility Disconnections Required Form. ti A proved by: �^ avid H. Knowlton, P.E. City Engineer \\Salemdc0l\WaterAdmin\dknowiton\My Documents\miscellaneous\demo regulations water,sewer and drainage 1-30-09.doc • 1 CITY OF SALEM, MASSACHUSETTS �ro iR Bo.,\RD or H>'- rl I 120 WASHINGTON STRee1',4"'FLOOR TEL. (978) 741-1800 KIM1317-M EY DRISCOLL FAx (978) 745-0343 IbL1YOR LRANR)RVns-u L ARHY RAiAIDIN, IS,C[10,(T-1;S H F;A1,111 A(;FINT DEMOLITION OF STRUCTURES Prior to demolition of any building the following information shall be provided to the Board of Health: • Asbestos testing report. o If asbestos is found, provide an Asbestos Notification form ( ANF) 001 and an asbestos clearance certificate with application • A pest control report from a licensed Pest Control Company. o If pests are found provide a treatment plan and certification from the pest control company that pests have been effectively controlled has to be submitted • A Dust mitigation plan indicating what measures will be instituted to ensure dust from the demolition project does not migrate over the property line. • If the structure was built before 1978; The Demolition contractor has to be licensed Lead Safe Renovation Contractor by the Department of Labor Standards and their employees trained in the use of Lead-safe work practices. Additional information may be required based on the nature, location and length of the project