272 JEFFERSON AVENUE - BUILDING INSPECTION�a �� � a�<
APPROM'?
Subject twito6valby.any.othw
CITY.of sq' zm'�Mw.
FIPX,ID ml
By
PLAMEMEAPPROVEDSOLELY R
TYPE AND 1,00MON DFf LK
ALL FIRE;PROTECTION DEVICES To
FINAL TEST AND INSPECTION,FOR COMPLM— —C'W�a-
ANCE V41TH THE FIRE CODE.
4S�-ZVATiw3 5dJqLF- 1/i'� 1 -0,
AVE,
E:l L-1
LEFT SWE ELEVA-Tlot,3 SCALE '44"
FLF-VAT%Oi,) SCAL9-
E I El
JZ&A9, Et-FWATION3 SCRLF-
28'2
12'11 41 —9'6 1'8
r 2'2 1'11
OD
;;r --Tu:p -
co
�'4
C4 0 LIVING C910) 04
CD
co
1 l' — 0" X 13' — 6"
cp
90 04
6'3 12'— 8'3"1 — \\Z
26'6"l 177-
28'2
1 ST FL. FLOOR PLAN SCALE: 1/4" l'— 0"
7'10"6 512"2 IT5
4'5 3'5"6 2'10 - 107
1 1 1 IT-
OPEN BELOW co
0
ep
CF
BEDROOM BEDROOM
12 8" X 14' - 0" 9' - 0" X 1 l' - 8"
Lo
3'2"7 8-2-1 + 3'----�
14!5 2'4 919,11
28'2
2ND FL. FLOOR PLAN SCALE: 1/41, = 1 1- of,
28'2
cli
2 X 12 ' S 2
L L I
�111�1414 14 14 14 1.11 14 14 1-�14 1'�14 1414
-28'2
1ST FL. JOIST LAYOUT SCALE: 114'1 11- oll
28'2
1. 1. VV, T 1 o, 118
cl)
2 X 12' S 12" O.C.
klit 14 14 14 14 14 I'll I. I--T
r-r�
28'2
2 ND FL. JOIST LAYOUT SCALE: 1/4" V- 0"
M plA,%+ AC109 SkNNOqL"
eoopj�-,
ec (Z'v
*IX 19 -To N 5rT I(.,, o-
2.Ail- TOLST o C.
mnmt CITY OF SALEM, MASSACHUSETTS
PUBLIC PROPERTY DEPARTMENT
120 WASHINGTON STREET. 3RO FLOOR
SALEM, MASSACHUSETTS 0 1970
TELEPHONE: 978-745-9595 EXT. 380
FAX 978-740-9846
KIMBERLEY DRISCOLL
MAYOR
December 8, 2006
------Dean-Borders-
34 Wardsworth Street
Danvers, Ma. 01923
RE: 272 Jefferson Avenue
Dear Mr. Borders:
The Salem Zoning Board of Appeals approved a Variance for your project on December
1, 2005. The decision had 18 conditions attached to it. All 18 conditions needed to be
met before a building permit could be issued.
Your permit was not issued due to a failure to comply with condition 16, 18 and with the
time constraints of condition 14.
This letter is a denial of your building permit. If you feel you are aggrieved by this
denial, you may file an appeal to the Salem Zoning Board of Appeal.
Sincerely,
pto-�
Thomas St. Pierre
Zoning Enforcement Officer
Building Commissioner
cc: Councillor Pellitier
Assistant City Solicitor Jerry Parisella
Attorney Stephen Lovely
0272 JEFFERSON AVENUE 57-06
GIS#: 1980 COMMONWEALTH OF MASSACHUSETTS
Map: 123 CITY OF SALEM
Block: I
Lot:. 0031-302
Category: 434 Residential: additi
Permit# 57-06 BUILDING PERMIT
Project# JS-2006-0053
Est. Cost: $16,000.00
Fee Charged: $101.00
Balance Due: $.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: BRADLEY WILLIAM STATE-061026
Lot Size(sq.ft.): 5000 Owner: BORDERS DEAN
Zoning: BI
Units Gained: Applicant: BRADLEY WILLIAM
Units Lost: --]AT: 0272 JEFFERSON AVENUE
Dig Safe#:
ISSUED ON. 18-Jul-2005 AMENDED ON.- EXpIRES ON. 18-Jan-2006
TO PERFORM THE FOLLOWING WORK.
57-06 SIDING DECK AND ADDITION JB
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Electric Gas Plumbin Buildine
Underground: Underground: Underground: Excavation:
Service: Meter: Footings:
Rough: Rough: Rough: Foundation:
Final: Final: Final: Rough Frame;
Fireplace/Chimmey:
D.P.W. Fire Health
Insulation:
Meter: Oil:
Final:
House 9 Smoke:
Treasury:
Water: Alarm:
Sewer: Sprinklers:
THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VIOLATION OF ANY OF ITS
RULES AND REGULATIONS.
Signature:
Fee Type: Receipt No: Date Paid: Check No: Amount:
BUILDING REC-2006-000074 18-Jul-05 959 $101.00
GcoTMS@ 2006 Des Lauriers Municipal Solutions,Inc.
0272 JEFFERSON AVENUE 1001-2004
GIS#: 980 COMMONWEALTH OF MASSACHUSETTS
Map: 23
Block: CITY OF SALEM
Lot:. 0031-302
Category: PEPAIR/REPLACE
Perant# 1001-2004 BUILDING PERMIT
P1 Oject# JS-2004-1388
Est. Cost: $100,000,00
Fee Charged: $1,005.00
Balance Due: $.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: HERSEY JOHN CONSTRUCTIO SUPERVISOR-082262
Lot Size(sq. ft.): 5000
Zonin.-: BI —�Owner: BORDERSDEAN
Units Gained: lApplicant., HERSEY JOHN
Units Lost: IAT: 0272 JEFFERSON AVENUE
Dig Safe#: I I I
ISSUED ON. 18-May-2004 AMENDED ON. EXPIRES ON. 18-Nov-2004
TO PERFORM THE FOLLOWING WORK.-
1001-2004 REMODEL REHAB ALL UNITS CONVERT TO CONDOS FD
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Electric Gas Plumbing Buildin2
Underground: Underground: Underground: Excavation:
Service: Meter: Footings:
Rough: Rough: Rough: Foundation:
Final: Final; Final: Rough Frame;
Fireplace/Chinmey:
D.P.W. Fire Health
Insulation:
Meter: Oil:
Final:
House# Smoke:
Treasury:
Water: Alarm:
Sewer: Sprinklers:
THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VIOLATION OF ANY OF ITS
RULES AND REGULATIONS.
I Signature:
Fee Type: Receipt No: Date Paid: Check No: Amount:
BUILDING REC-2004-001486 18-May-04 453 $1,005.00
GcoTMS@ 2006 Des Lauriers Municipal Solutions,Inc.
(Citv of '�Wrm'
Poarb of Appeal 2
C/I
r
DECISION OF THE PETITION OF GEORGE & JUDITH-JETER-RE,�UB ASS
VARIANCE FOR THE PROPERTY LOCATED AT (B �F
A hearing on this petition was held February 18, 1999 with the following
Board members present: Nina Cohen, Albert Hill, Richard Dionne and Paul
Valaskagis. Notice of the hearing was sent to abutters and others and
notices of the hearing were properly published in the Salem Evening News in
accordance with Massachusetts General Laws Chapter 40A.
Petitioner requests a Variances from land area, lot width, lot coverage,
sideyard & rearyard setbacks and a Variance from parking to divide the lot
for the property located at 272 Jefferson Avenue.
The Variance which has been requested may be granted upon a finding of this
Board that:
1 . Special conditions and circumstances exist which especially affect the
land, building or structure involved and which are not generally affecting
other land, buildings, or structures in the same district.
2 . Literal enforcement of the provisions of the Zoning Ordinance would
involve substantial hardship, financial or otherwise, to the petitioner.
3 . Desirable relief may be granted without substantial detriment to the
public good and without nullifying or substantially derogation from the
intent of the district or the purpose of the Ordinance.
The Board of Appeal, after careful considerations the evidence presented at
the hearing, makes the following findings of fact:
1 . The property at 272 Jeflerson Avenue consists of a 5,000 square foot lot
with two buildings. The building closest to Jefferson Avenue is a
four-family residence, and the building at the rear of the lot is a
single family residence.
2 . Petitioners, who have owned the property since 1991, sought permission
to divide the property into two lots.
3 . Petitioner was represented by Attorney Stephen P. Maio of 85
Constitution Lane in Danvers.
Petitioner also sought variances from the requirements of the ordinance
with respect to each of the newly-created lots. With respect to the
lot closest to Jefferson Ave. shown on the drawings as Lot 2,
petitioner sought variances from front, side and rear setbacks, from
lot size, maximum lot coverage, frontage, and parking requirements.
5. With respect to the rear lot, shown on the drawings as Lot 1,
petitioners sought variances from front, side and rear setback, lot
area and frontage requirements.
DECISION OF GEORGE AND JUDITH JETER REQUESTING A VARIANCE FOR
THE PROPERTY LOCATED AT 272 JEFFERSON AVENUE
page two
6. Ms . Elizabeth Kauler, an abutter at 274 Jefferson Ave. , appeared and
requested that the Board require a fence to be installed between her
property and the petitioner's property to set apart areas that will
be used for vehicular traffic (on the Jeter's side) from areas to be
used for play (on her side) .
7
1 . There was no opposition to the proposed relief.
On the basis of the above findings of fact, and on the evidence presented
at the hearings, the Board of Appeal concludes as follows:
1 . Special conditions exist which especially affect the subject property
and not the district in general.
Literal enforcement of the provisions of the Zoning Ordinance would
involve substation hardship to the petitioner.
3 . Desirable relief can be granted without substantial detriment to
public good and without nullifying and substantially derogating from
the intent of the district or purpose of the Ordinance.
On the basis of the above findings of fact, and on the evidence presented
at the hearing, the Zoning Board of Appeal voted unanimously, 4-0 to grant
the variance requested, subject to the following conditions:
Lot I
1 . Petitioner shall comply with all city and state statures, ordinances,
codes and regulations.
.4.11 requirements of the Salem Fire Department relative to smoke and
safetv shall be strictly adhered to.
Certificate of Occupancy is to be obtained.
Petitioner is to obtain approval from any City Board or Commissions
having jurisdiction including, but not limited to, the Planning Board
and Conservation Commission.
Petitioner is to install a fence on the southerly side.
6 . Cross easement for Lot 2 to enter and exit.
Lot 2
1 . Petitioner shall comply with all city and state statures, ordinances,
codes and regulations.
2 . All requirements of the Salem Fire Department relative to smoke and
safety shall be strictly adhered to.
3. A Certificate of Occupancy shall be obtained.
DECISION OF THE PETITION OF GEORGE AND JUDITH JETER REQUESTING
A VARIANCE FOR THE PROPERTY LOCATED AT 272 JEFFERSON AVENUE
page three
4 . Petitioner is to obtain approval from any City Board or Commission
having jurisdiction including, but not limited to, the Planning Board.
5 . Cross easement to enter and exit the property.
Variances Granted
February 18, 1998
Nina Cohen, Member
Board of Appeal
A
A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY
CLERK
Appeal from this decision, if any, shall be made pursuant to Section 17 of
the Massachusetts General Laws Chapter 40A, and shall be filed within 20
days after the date of filing of this decision in the office of the City
Clerk. Pursuant to Massachusetts General Laws Chapter 40A, Section 11, the
Variance or Special Permit granted herein shall not take effect until a
copy of the decision bearing the certification of the City Clerk that 20
days have elapsed and no appeal has been filed, or that, if such appeal has
been filed, that it has been dismissed or denied is recorded in the South
1-ssilx Registry of Deeds and indexed under the name of the owner of record
or is recorded and noted on the owner's Certificate of Title.
Board of Appeal
CITY OF SALEM, MASSACHUSETTS
BOARD OF APPEAL
120 WASHINGTON STREET. 3RD FLOOR
SALEM, MASSACHUSETTS 0 1970
TELEPHONE: 978-745-9595
FAX: 978-740-9846
KIMBERLEY DRISCOLL 38
MAYOR
C"TY
June 8, 2009
Decision
City of Salem Zoning Board of Appeals
Petition of UNITED FINANCIAL CONSULTANTS, LLC, seeking Variances from
minimum lot area, minimum lot width, and minimum front, side and rear yard
setbacks; allowance of two dwelling structures on the lot; and allowance of five (5)
parking spaces; and a Special Permit to reconstruct a nonconforming structure, in
order to reconstruct a detached unit, previously demolished, as part of a five-unit
residential condominium, on the property located at 272 JEFFERSON AVENUE,
Salem, MA (111 zoning district).
A public hearing on the above Petition was opened on November 19, 2008 pursuant to
Mass General Law Ch. 40A, §§ 11. The meeting was closed on May 20, 2009 with the
following Zoning Board of Appeals members present: Robin Stein (Chair), Rebecca
Curran, Beth Debski, Richard Dionne, and Jimmy Tsitsmos (alternate).
Petitioner seeks Variances pursuant to the Salem Zoning Ordinance, §6-1, Residential
Uses, and §64, Table 11: Business and Industrial Density Regulations. Petitioner also
seeks a Special Permit pursuant to Salem Zoning Ordinance, §5-3 Special Permit
Uses: Extension of Nonconformity.
Statements of fact:
I. In a decision dated December 7, 2005, the Board of Appeals granted the relief
needed to allow the reconstruction of a detached unit, previously demolished, as
part of a five-unit residential condominium. A Special Permit and Variances were
granted with eighteen (18) conditions to the petitioner and owner at the time,
Dean Borders.
2. Reconstruction of the unit was never comoleted, and several of the Board of
Appeal's conditions were not met. The Building Commissioner ordered the
remainder of the unit, which had been only partially demolished, to be tom down
complete ly. The property was foreclosed on by its mortgager, United Financial
Consultants LLC, which then acquired the property from itself at auction.
3. Since the demolition of the detached fifth unit, the owners of the four units in the
front building have had difficulty selling and refinancing their units.
2
Additionally, the owners of the four existing units have incurred expenses from
higher insurance, required construction of a fence around the demolition site,
costs of demolition, and the nonpaymeht of condominium association fees from
the fifth unit for some of the time the unit remained unoccupied.
4. In a petition dated October 28, 2008, the current owner and petitioner, United
Financial Consultants LLC, requested Variances from minimum lot area,
minimum lot width, and minimum front, side and rear yard setbacks; and a
Special Permit to reconstruct the unit, which was a nonconforming structure. The
Building Commissioner determined that the petitioner also required Variances for
the allowance of two dwelling structures on the lot and allowance of five (5)
parking spaces, in order to complete the reconstruction.
5. Attorney George Atkins presented the petition on behalf of the United Financial
Consultants LLC. A public hearing on the Petition was opened on November 19,
2008, pursuant to Mass General Law Ch. 40A, §§ 11. The hearing was continued
to January 21, 2009, February 18, 2009, March 18, 2009, April 15, 2009, and May
20, 2009, when it was closed, with the following Zoning Board of Appeals
members present: Robin Stein(Chair), Rebecca Curran, Beth Debski, Richard
Dionne, and Jimmy Tsitsmos (alternate).
6. The petitioner submitted revised plans following the hearings on November 19,
2008, March 18, 2009, and April 15, 2009.
7. The original plans submitted showed a reconstructed unit with a different
configuration than the original structure in order to create additional space to
bring the parking into conformance with zoning; the original plan had not shown
sufficient parking area to meet zoning requirements.
8. Opposition to the petition was voiced at the November 19, 2008 meeting.
Attorney Anthony Keck, representing the owners of units 2, 4 and 5 of 272
Jefferson Avenue, objected to a plan that used common space of the
condominium without the consent of the association. He also raised objections to
the design of the unit and the parking configuration. Several other abutters
objected to anything being reconstructed in that space and cited concerns about
snow storage and aesthetics.
9. Support for the petition was voiced by Colin Martin, the owner of 272 Jefferson
Avenue, unit 3, who urged the rapid reconstruction of unit I because he had been
unable to sell his unit due to the demolition.
The Board expressed concern that if they approved the plan before them, the
petitioner would not have the legal right to construct it because it used common space
belonging to the entire condominium association. Since some of the unit owners
objected to the plan, permission to use the common space would likely not be granted
and the petitioner would have to come back to the Board with another proposal. The
Board asked the petitioner to rethink his proposal.
3
10. Following comment from the public hearing on November 19, 2008, the applicant
submitted a revised plan dated March 13, 2009 showing plans for the
reconstruction of unit I that approximated the original footprint. The applicant
appeared before the Board again on April 15, 2009 and presented the revised
application. Attorney Atkins stated that negotiations for a buyout plan of unit I
by the other unit owners had been unsuccessful.
11. At the April 15, 2009 meeting, owners of units 2, 4 and 5 again expressed
opposition to the plan, stating they would not oppose reconstruction if it were
done in the same footprint as the original, but they felt the proposed building was
too large. The owner of unit 3 was not present, and Attorney Keck stated that this
unit was in foreclosure.
12. Board members also expressed concern that while the building design was closer
to the original than the prior submittal, the dimensions were not exactly the same.
Members of the Board expressed that they preferred a design in exactly the same
footprint and with the same dimensions as the original. The applicant conceded
that some of the calculations of the building's dimensions were incorrect.
13. Following public comments and Board feedback at the April 15, 2009 meeting,
the applicant submitted revised plans showing construction of a reproduction of
the original building, on what was estimated to be the exact same footprint as the
original, with the exception of a one-foot perimeter setback from the property
line, where none had originally existed. The petitioner again appeared before the
Board at its May 20, 2009 meeting and presented the revised plans.
14. At the May 20, 2009 meeting, opposition was voiced by several abutters who
wished to see no rebuilding at all. However, residents of units 2, 4 and 5 of 272
Jefferson Avenue, represented by Attorney Keck, did not oppose the
reconstruction as proposed, so long as the petitioner altered the plans to shorten
the porch and not block parking areas during construction.
15. At its meeting on May 20, 2009, the Board of Appeals voted five (5) in favor and
none (0) opposed to grant the Variances and Special Permit required to allow the
reconstruction of unit I as proposed in the revised plan dated May 12, 2009
prepared by Winter Street Architects, Inc.
The Board of Appeal, after careful consideration of the evidence presented at the public
hearing, and after thorough review of the plans and petition submitted, makes the
following findings:
1. Special conditions and circumstances exist affecting the parcel or building, which
do not generally affect other land or buildings in the same district;
2. Literal enforcement of the provisions of this ordinance would involve substantial
hardship, financial or otherwise, to the appellant;
4
3. Desirable relief may be granted without substantial detriment to the public good
and without nullifying or substantially derogating from the intent or purpose of
the zoning ordinance, since the proposed plan is a reconstruction of a building that
existed previously;
4. The applicant may vary the terms of the Residential One-Family District to
construct the proposed development, which is consistent with the intent and
purpose of the City of Salem Zoning Ordinance;
5. In permitting such change, the Board of Appeals requires certain appropriate
conditions and safeguards as noted below.
On the basis of the above findings of fact and all evidence presented at the public hearing
including, but not limited to, the Plans, Documents and testimony, the Zoning Board of
Appeals concludes:
I. To allow for the reconstruction of the condominium unit as proposed, the
requested Variances from dimensional, density and parking requirements are
granted.
2. To allow for the reconstruction of a structure with a nonconforming use, the
requested Special Permit is granted.
In consideration of the above, the Salem Board of Appeals voted, five (5) in favor
(Curran, Stein, Tsitsmos, Debski and Dionne) and none (0) opposed, to grant petitioner's
requests for a Variance and Special Permit subject to the following terms, conditions,
and safeguards:
1. Petitioner shall comply with all city and state statutes, ordinances, codes and
regulations.
2. All construction shall be done as per the plans and dimensions submitted to and
approved by the Building Commissioner.
3. All requirements of the Salem Fire Department relative to smoke and fire safety
shall be strictly adhered to.
4. Petitioner shall obtain a building permit prior to beginning any construction.
5. Exterior finishes of the new construction shall be in harmony with the existing
structure.
6. A Certificate of Occupancy is to be obtained.
7. A Certificate of Inspection is to be obtained.
8. Petitioner shall obtain street numbering from the City of Salem Assessor's Office
and shall display said numbers so as to be visible from the street.
5
9. Petitioner is to obtain approval from any City Board or Commission having
jurisdiction including, but not limited to the Planning Board.
10. Construction vehicles cannot be parked permanently on the site.
11. No dumpster on the site may block parking at any time.
12. Any common areas of the condominium—including the fence—that sustains any
damage shall be restored to its original condition.
Robin Stein, Chair
Salem Zoning Board of Appeals
A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLEPK
Appeal from this decision, if any,shall be made pursuant to Section 17 of the Massachusetts General Laws
Chapter 40A,and shall be filed within 20 days of filing of this decision in the office of the City Clerk,
Pursuant to the Massachusetts General Laws Chapter 40A, Section 11,the Variance or Special Permit
granted herein shall not take effect until a copy of the decision bearing the certificate of the City Clerk has
been filed with the Essex South Registry of Deeds.
TINT11 QUINN� GROVER & FREY, P.C.
222 ESSEX STREET
SALEM,MASSACHUSETTS 01970-3705
WILLIAM J,TINTI TELEPHONE
tinti@dntila�xo. (978)745-8065 - (978)744�2948 WILLIAM B.ARDIFF(1965- 1995)
WILLIAM F.QUINN MARCIA MULFORD CINI
Willia�17Quinn@aol.com TELECOPIER OF COUNSEL
(978)745-3369
SCOTT M.GROVER w��A.fila�x..
smgrover@finfflaw.co.
MARC P.FREY
mpftey@tinti1aw.co.
MARCY D.HAUBER
mhaub��@tintil.wxo�
2/17/2006
Mr. Tom St. Pierre
City of Salem Building Inspector
120 Washington Street
Salem, MA 01970
RE: Unit 1/272 Jefferson Avenue
Dean Borders, Owner
Dear Tom:
As you requested, I am writing to summarize my understanding of the status of
Dean Borders' efforts to meet the conditions of his Variance to construct Unit I of the
condominium at the above-captioned property. Each of the following numbers refers to
a condition of the Variance granted by the Board of Appeals.
(6) revised plans have been filed with you that I understand you find sufficient to
issue a building pen-nit, and which comply with this condition in substance because: they
show the reduced size of the second floor and it's 4 foot set-back from the McGrath
property; your have noted your requirement of the plans on file that the outside first floor
deck adjacent to the parking must be reduced to the minimum size allowed by the State
Building Code; the plans show the height of the structure will be only 24 feet from grade,
which my client believes to be no higher than the pre-existing 2-story structure, and
which will be significantly less than the height of a 2-story structure under the applicable
building codes;
(14) states that petitioner "shall initiate the construction within 30 days after this
approval becomes legally effective"; and as you know, under the statute, the Variance
becomes "legally effective" upon recording; the variance was recorded on 1/26/06 (copy
of recording receipt attached), therefore construction should be "initiated" by 2/25/06;
unless you advise my client or I otherwise, I will assume that issuance of a building'
permit would constitute the "initiation" of construction;
Page 2 Mr. Tom St. Pierre
(15) 1 have provided a signed and notarized hidemnification Letter to all of the
Unit owners (copy enclosed);
(18) 1 have provided copies of the same revised plans that you have approved to
all of the unit owners; while I have received their comments (copy of their letter dated
Feb. 8, 2006 is attached), most of the reasons that the condominium association is
withholding its anDroval of the plans relate to the collection of condominium assessments
and other issues Which are unrelated to whether the plans comply with the requirements
of the variance; I will make every effort to work with, and to answer the concerns of the
condominium association,but to the extent that it is withholding its approval for reasons
outside of the conditions of the variance, it is my position that my client has complied
with his obligations under this condition, that the building permit should issue upon an
appropriate application by a qualified and insured contractor, and that the 30-day period
to "initiate construction" should be extended to account for the refusal of the
condominium association to approve the plans for reasons unrelated to the conditions of
the Variance;
All of the other Board's conditions contained in the Variance relate to the
qualifications of my client's contractor, which you will ascertain when he applies for the
building permit, or to matters that would come up after construction has begun.
Please let me know if there are any reasons that you would not issue the building
permit at the timely request of my client's contractor.
Very truly yours,
AlliamlF. Qufi �
Copy: Dean Borders
Mike Goderre
Dear Mr. Quinn, February 8, 2006
We, the Condo Association, would like to thank you for sending the plans that your client, Mr.
Borders, intends to file with the building inspector in order to get a building permit. We would also
like to thank you for the copy of the indemnification from Mr. Borders. We are not pleased, though,
with how much time it took you and your client to send any notification of any plans to move for-
ward. The decision made by the Building Committee was made on December 1, nearly two months
ago. We would like for this plan to be executed correctly and as soon as possible. However, before
any aoreement or approval can be made a few issues need to be resolved.
0
First, Mr. Borders is four(4) months behind on payment of Condo Fees. The total that is due
is five hundred dollars ($500). This should be paid in full if any approvals will be granted in an
expeditious manner. Secondly, we are very disappointed in the building plans that we received.
They are the same plans that were presented to the Building Committee which the committee stated
were not satisfactory. Regretfully, we feel the same way. The building plans are not complete and
do not accurately display the property to be built. Specifically, the porch adjacent to the parking
area, which is to be reduced in size, is still portrayed in the building plans. We have recognized the
Building Inspector's notes that porch will be reduced in size, however this is not satisfactory� New
plans that show, in detail, what will be built in that place will be required. Also the plans do not
accurately display the height of the building. This is required to ensure the height of the building to
be built does not exceed the "height of the demolished structure,"according to condition#6 ofthe
Build Committee's decision. Along with the new building plans we require, please send a copy of
the original building plans of"the demolished structure"for comparison.
Furthermore, for our records, we would like the information of the contractor that will be over-
seeing the construction of the building. We would like the name, phone number, proof of insurance,
and any credentials he may have to prove he is well qualified for the job. We require this because he
will not only be working on Mr. Borders' property, but he will be also working on and around the
Condo Association's community property� Finally, we would like to be notified when you and your
client plan on revising the Condominium documents to reflect any changes resulting from construc-
tion as it is required by condition #17 ofthe Building Committee's decision.
In conclusion, as was stated earlier, we would like this plan to be executed in a timely man-
ner. We apologize for any delay this might incur, but you must understand that we have to act in a
manner that puts the better interests of the Condominium Association in front of any individual's
interests. Thank you in advance for your cooperation. We expect to hear from you soon.
Sincerely,
272 Condominium Association
INDEMNIFICATION LETTER
As required under condition# 15 of the Decision of the City of Salem Board of
Zoning Appeals dated Dec. 1, 2005 granting the undersigned Dean Borders a Variance to
rebuild a demolished structure at 272 Jefferson Avenue, Salem, MA, and in consideration
of the approval of said Variance, said Dean Borders hereby agrees to indemnify and hold
harmless the 272 Jefferson Avenue Condominium Association, and also the owners of
each unit of said condominium,being James P. Callahan and Silvia Updegrove (Unit 2),
Colin J. Martin and Amanda L. Martin(Unit 3), Laura Buckley and Paul Trellopoulos
(Unit 4) and Katherine A. Stevens and Michael P. Corderre (Unit 5) from any and all
damages, claims and/or liabilities arising out the work performed by Borders or his
employees or contractors under the Variance, including, but not limited to any damage to
property held in common by the condominium association or damage to individual
property of the unit owners.
Signed and sealed this 25th day of January, 2006.
pzav
Commonwealth of Massachusetts
Essex, ss. Jan. 25, 2006
On this date,before me, the undersigned notary public,personally appeared Dean
Borders, proved to me by satisfactory evidence,which was his/her driver's license, to be
the person whose name is signed on the preceding document, and acknowledged that
he/she signed it voluntarily for its stated purpose.
Notary public
Commission expires: 8/31/12
Al
E
ss,ex, so,u tbe rn Dis tri c t
Rea'
-1 1�t.ru o f D.6e,j�.
36 F
e- eral e
Stre. t
Sall ell, MA
01970
A 1,126/2006.
T i me: I C4.56 Ty�,e.- OTHER
Inst 81 BK 25314-35o Loiz.
FEE
ENO FEE 55.00
20.Cio
Payment
75.00
CITY OF SALEM9 MASSACHUSEYtIkOF SALEM, MA
RK'&OFFICE-(
B0Ak6'-&V4PPk4L
120 WASHINGTON STREET, 3RD FLOOR
SALEM, MASSACHUSETTS 01970
STANLEY J. USOVICZ, JR. TELEPHONE: 978-745-9595 DEC -1
MAYOR FAx: 978-740-9846
2066012601081 Bk:25314 P1150
0112612006 10:56:00 OTHER a 1/5
DECISION ON TBE PETITION OF DEAN BORDERS REQUESTING A VARIANCE
FOR THE PROPERTY LOCATED AT 272 JEFFERSON AVENUE R-I
A hearing on this petition was held on December 1,2005 with the following Board
Members present;Nina Cohen,Richard Dionne, Steven Pinto,Bonnie Belair and Robin
Stein. Notice of the hearing was sent to abutters and others and notices of the hearing
were properly published in the Salem Evening News in accordance with Massachusetts
General Laws Chapter 40A.
The petitioneIr is requesting a Variance per Section 84(2)to rebuild a demolished
structure and Variances from lot coverage,lot size,front,side and rear setbacks and from
the limitation of one principal use on lot for the property located at 272 Jefferson Avenue
in an R-1 zone..,
The Variances,which have been requested,may be granted upon a finding by this Board
that:
a. Special conditions and circumstances exist which especially affect the land,
building or structure involved and which are not generally affecting other lands,
buildings and structures involve.
b. Literal enforcement of the provisions of the Zoning Ordinance would involve
substantial hardship,financial or otherwise,to the petitioners.
c. Desirable relief may be granted without substantial detriment to the public good
and without nullifying or substantially derogating from the intent of the district of
the purpose of the Ordinance.
The Board of Appeal,after careful consideration of the evidence presented at the hearing,
and after viewmig the plane,makes the following findings of fact:
At 272 Jefferson Ave in Salem,.Petitioner Dean Borders owns a 5000 sf lot with
two principal structures. a four-story multifimily house and a one and a half story
single family house. The buildings are dimensionally nonconforming and
nonconforming as to the existence of 2 principal uses on one lot;the Building
Commissioner has deemed the property grandfathered in this R-I zone,as to both
dimensional nonconformity and use.
2. The two structures belong to a condominium association consisting of four
ownership units in the larger house and a fifth unit in the single family. The four
units in the larger house have been transferred to new owners and are occupied.
All unit,owners were present at the zoning meeting.
'ALEM M�
C
L,RK S OFF16E
LX15C131MVr1nr1rWf11 01FOMBURDERS'REQUESTINGA
VARIANCE FOR THE PROPERTY LOCATED AT 272 JEFFERSON Avg"
page two C A 10L 31r
3. At some time in spring 2005,Mr. Borders or his agent demolished the single
family house and removed all parts of the budding above the foundation,except
one or more side walls. Immediately following the demolition,the Building
Commissioner issued a Stop Work Order barring any firdw wok at the site. The
bads for die Stop Work Order was Mr Border's failure to secure zoning relief
prior to undertaking the demolition.
4. Xft- Borders stopped work on the site and sought relief from this Board to rebuild
the single family house on die property.
5. 7bis Petition was first heard by the Board ofAppeal on October 19,20()4.but was
continued to November,at which time we agreed to hear the petition at a special
meeting on December 1, 2005.
6. Kevin McGrath,an abutter at 3 Arthur Stree4 testified that following the
demolition and stop work order,in violation of state and local building codes,the
demolition site was left unattended and open,and building debris was not
removed from the property.Mr. McGrath testified that he became aware that
electrical service to the demolished single family house was not disconnected,and
he strenuously objected to this saIL-ty hazard
7. Members of the condominium association confirmed Mr. McGrath's testimony
regarding the open site,building debris and electrical hazard. When Mr. Borders
failed to install a safety fence at the request of the condominium association,they
undertook to install a fence at their expense.They also secured a rider to their
liability insurance policy to cover occurrences on the site resulting from the
demolition and subsequent abandonment of the property.
8- All four unit OWn==PrOsed concern the Mr. Borders would be unable to
complete construction Of the single family house appropriately. The owners
objected to any increase in the size of the proposed dwelling,either in the
footprint of the building or its height including the addition of any side or rear
porches. The unit owners described Mr.Borders as unresponsive to their calls and
concern&
9. Echoing the community reaction, Ward Councillor Jean Pelletier stated that he
opposed the grant of any variances to this property on the grounds that Mr.
Border's track record as a developer manifested his mability or unwillingness to
address legitimate sa&4y and other concerns of the neighbors.
10.Addressing the neighbor's concern, William Quinn,Eq.,representing Mr.
Borders,apologized for his client's failure to comply with zoning and building
codes,which he stated was due to mciperience Mr Borders is anxious to finish
budding a single family house on the footprint of the house that was originally on
this site,and regrets inadvertently exposing neighbors or condo owners to
dangerous conditions.
11. Mr.Borders offered to commence rebuilding the demolished house by contracting
with an experienced licensed construction supervisor,and he undertook to
complete construction within 5 months.
CLEPWS OF,
DECISION OF THE PETITION OF DEAN BORDERS REQUESTING A
VARIANCE FOR THE PROPERTY LDCATED AT 272 JEFFERSON AVENUE
page three 2085 DEC
On the basis of the above findings of fhc�and on, the evidence presented the Board
of Appeals finds as follows;
I. Special conditions exist when especially affect the subject property but not he
District.
2. Literal enforcement of die provisions of die Zoning Ordinance would involve
substantial hw**to the petitioner.
3. Desirable relief can be granted without substantial detriment to the public good
and without nullifying or substantially derogating firom the intent of the district or
the purpose of the Ordinance.
Therefore,the Zoning Board of Appeal voted 5 in favor and 0 in opposition to grant the
Variances requested,subject to the following conditions:
I. Petitioner shall comply with all city and state stature,ordinance,codes and
regulations.
2. Petitioner shall obtain approval from any City Board or Commission having
jurisdiction, including but not limited to the Planning Board.
3. Ali requirements of the Salem Fire Department relative to smoke and fire safety
shall be strictly adhered to.
4. Petitioner shall obtain a building permit prior to beginning any construction.
5. A Certificate of Inspection shall be obtained.
6. Ali construction shall be done according to plans submitted to and approved by
the Building Commissioner,with plans to be amended to reduce the she of the
second floor by eliminating the outside deck adjacent to the parking area and
setting the second floor back an additional four(4)feet from the property
Hue shared with the McGrath family.The amended plans and new
construction cannot exceed the footprint or height of the demolished
structure
7. Petitioner shall hire and use at all times an experienced construction supervisor
licensed to work in the City of Salem to oversee construction and both petitioner
and construction supervisor shall be responsible for ensuring that all building
practices on the site comply with state and local laws and regulations. Petitioner
shall submit executed contact with the supervisor to die Building Commissioner
when applying for a permit.
8. Work shall not be conducted between the hours of 5:00 pxL and 8:00 am. the
following day,or any time on Sundays or Holidays.
H;�:RK'S OFFK
DECISION OF THE PETITION OF DEAN BORDERS REQUESTING A
VARIANCE FOR THE PROPERTY LOCATED AT 272 JEFFERSON AVENUE 1015 DEC -I A
page four
9 Ali reasonable actions shall be taken to minimize the negative effects of
construction on unit owner and abutters.Advance notice shall be provided to
other unit owners and abutters at least 72 hours prior to commencement of
construction,and 24 hour advance notice shag be given both verbally and in
writing to the McGrath family of any work to be conducted within ten-feet
(101)of the McGmth property;
10. The construction site shall be lift in a clean condition free of dust and debris at the
end of each day;
11. Consnuction vehicles shall be removed from the site at the end of each day;
12. Petitioner shall require his contractors not to interfere at any time with the ability
of the resident unit owners to access or use their parking spaces on the property.
13. The conditions shall be enforced by the Department of the Budding
Commissioner,and any violation identified by him which is not cured to his
satisfaction after notice to the Petitioner,shall be grounds for the Building
Commissioner to stop the work at the site,and upon his request,shall be sufficient
cause for this Board to revoke this approval.
14.Petitioner shall initiate the construction within 30 days after this approval
becomes legally effective,shall conduct the work diligently and continuously,
shall complete the work within five months after beginning it,unless extreme
weather conditions cause delay and then only upon application to the
Budding Commissioner for a specific additional de for completion.A
Certificate of Occupancy b required prior to occupancy of the uWL
15.Petitioner shall indemnify and hold harmless the condominiurn association and
each member thereof for any and all liability arising out of damage to property
held in common by the condo association or to damage to individual property.
16. Petitioner shall reimburse within 30 days of demand any additional expense
incurred by the condominium association as a result of his actions or inactions
arising from the demolition and stop work order, including without limitation
legal fees up to$1,000.00 and the cost of additional insurance premiums incurred
by the condominium association.
17. Petitioner through his counsel shall revise the condominium documents to reflect
the changes to the condominium documents resulting from the reconstruction and
shall be solely responsible for the costs of such revision and of recording same on
the condominium deed and master plan.
DECISION OF THE PETMON OF DEAN BORDERS REQUESTING A VARIANCE
FOR THE PROPERTY LOCATED AT 272 JEFFERSON AVENUE R-I
page five
I S.Petitioner shall submit revised plans for die single fiandy house to the
condominium association for approval and comment by the members prior to
applying for a building permit to begin construction.
VARIANCE GRANTED
DECEMBER 1,2005
Nina hen, Cha�ser�
_1
Board of Appeal
A COPY OF TFIIS DECISION HAS BEEN FILED Wrffl THE PLANNING BOARD
AND THE CITY CLERK
Appeal fiom this decision, if any, shall be made pursuant to Section 17 of the
T M[assachusetts General Laws Chapter 40A,and shall be filed within 20 days date of fifing
of this decision in the office of die City Clerk Pursuant to Massachusetts General Laws
Chapter 40A, Section 11,the Variance or Special Permit granted herein shall not take
effect until a copy of the decision bearing the certificate of the City Clerk that 20 days
have elapsed and no appeal has been filed,or that,if such appeal has been filed,that is
has been dismissed or denied is recorded in the South Essex Registry of Deeds and
indexed under the name of the owner of record or is recorded and noted on the owner's
Certificate of Tide.
Board of Appeal
ESSEX SOLI[TH REGISTRY DISTRICT
-j CD r-
JOHN L.O'BRIEN,JR. REGISTRY Of DEEDS
T�
DATE
r-n
RECEIVED O'CLOCK—M-
131<�PG�
CITY OF SALEM, MASSACHUSETTS
Q
PUBLIC PROPERTY DEPARTMENT
120 WASHINGTON STREET, 3RD FLOOR
SALEM, MASSACHUSETTS 0 1970
TELEPHONE: 978-745-9595 EXT. 380
FAX: 978-740-9846
KIMBERLEY DRISCOLL
MAYOR
August 24, 2006
Dean Borders
34 Wadsworth Street
Danvers, Ma. 01923
RE: 272 Jefferson Avenue
Dear Mr. Borders:
The Salem Zoning Board of Appeals is planning to discuss under Old Business, this
Board's decision dated December 1, 2006. This discussion will be during the regular
meeting on October 18, 2006. Your attendance is encouraged.
If you have any questions, please contact me directly.
Sincerely,
Building Commissioner
I
Zoning Officer
cc: Nina Cohen, Chairman ZBA
Attorney Jerry Perrisala
Attorney Stephen Lovely
272 Condo Jefferson Ave Association
ON CITY OF SALEM, MASSACHUSETTS
PUBLIC PROPERTY DEPARTMENT
120 WASHINGTON STREET. 3RD FLOOR
SALEM. MASSACHUSETTS 0 1970
TELEPHONE: 978-745-9595 EXT. 380
FAX: 978-740-9846
KIMBERLEY DRISCOLL
MAYOR
August 24, 2006
Dean Borders 272 Jefferson Ave Condo Trust
34 Wadsworth Street 272 Jefferson Avenue
Danvers, Ma. 01923 Salem, Ma. 0 1970
RE: 272 Jefferson Avenue
Dear Mr. Borders:
The remaining first floor wall and foundation have been out in the weather since you first
dismantled the structure in July of 2005. Due to the length of time and the upcoming fall
storm season, I am declaring the building "unsafe"per the State Building Code 780
CMR, Section 12 1. This statue requires that you begin to remove the structure within
24 hours of this notice
There is no appeal from this order. This action should have no effect on the zoning
decision previously granted.
Sincerely,
Thomas St. Pierre
Building Commissioner
Zoning Enforcement Officer
cc: Nina Cohen, Chairman ZBA
Attorney Jerry Perrisala
Attorney Stephen Lovely
272 Condo Jefferson Ave Association
CITY OF SALEM, MASSACHUSETTS
PUBLIC PROPERTY DEPARTMENT
120 WASHiNGTON STREET, 3RD FLOOR
SALEM, MASSACHUSETTS 0 1970
TELEPHONE: 978-745-9595 EXT. 380
FAX 978-740-9846
KIMBERLEY DRISCOLL
MAYOR
October 18, 2006
Dean Borders
34 Wadsworth Street
Danvers, Ma. 01923
RE: 272 Jefferson Avenue
Dear Mr. Borders:
A letter dated August 24, 2006 was sent to you to have you attend a meeting of the
Zoning Board of Appeals on October 18, 2006 under Old Business to discuss your
property located at 272 Jefferson Avenue.
At this time we would like to reschedule the hearing of your property to have it properly
advertised in the legal ads for the November 15, 2006 hearing.. I aphorize for any
inconvience this might have cause.
S�in drely
� Z,—,
Thomas St. Pierre
Zoning Enforcement Officer
CITY OF SALEM9 MASSACHUSETTS
PUBLIC PROPERTY DEPARTMENT
120 WASHINGTON STREET, 3Ro FLOOR
SALEM. MASSACHUSETTS 0 1970
TELEPHONE: 978-745-9595 EXT. 380
FAX: 978-740-9846
KIMBERLEY DRISCOLL
MAYOR
December 8, 2006
----------Dean Borders---------
34 Wardsworth Street
Danvers, Ma. 01923
RE: 272 Jefferson Avenue
Dear Mr. Borders:
The Salem Zoning Board of Appeals approved a Variance for your project on December
1, 2005. The decision had 18 conditions attached to it. All IS conditions needed to be
met before a building permit could be issued.
Your permit was not issued due to a failure to comply with condition 16, 18 and with the
time constraints of condition 14.
This letter is a denial of your building permit. If you feel you are aggrieved by this
denial, you may file an appeal to the Salem Zoning Board of Appeal.
Sincerely,
rz4_4'-'0
Thomas St. Pierre
Zoning Enforcement Officer
Building Commissioner
cc: Councillor Pellitier
Assistant City Solicitor Jerry Parisella
Attorney Stephen Lovely
CITY OF SALEM9 MASSACHUSETTS
PUBLIC PROPERTY DEPARTMENT
120 WASHINGTON STREET, 3RD FLOOR
SALEM, MA 0 1970
TEL. (978)745-9595 EXT. 380
FAX (978) 740-9846
STANLEY J. USOVICZ, JR.
MAYOR
Copy
July 23, 2003
To Whom it May Concern
RE: 272 Jefferson Avenue
According to our records, it has been determined that the two buildings located at 272
Jefferson Avenue a legal grandfathered non conforming
They are located in a B-1 Neighborhood Business District which allows multi family
dwelling. The first building has 4 units and the rear building contains 1 unit.
This is to determine use only and in no way is meant to confirm or deny whether said
property is in compliance with all building, plumbing, gas, electric, fire or health codes
Si n ely,
Thomas St. Pierre
Zoning Enforcement Officer
CITY OF SALEM9 MASSACHUSETTS
PUBLIC PROPERTY DEPARTMENT
120 WASHINGTON STREET, 3RD FLOOR
SALEM, MASSACHUSETTS 01970
STANLEY J. USOVICZ, JR. TELEPHONE: 978-745-9595 EXT. 380
MAYOR FAX: 978-740-9846
STOP WORK ORDER
N
Property Location 272 Jefferson Avenue
July 19, 2005
Dean Borders 004
34 Wadsworth Street
Danvers, MA 01923
Dear Mr. Borders;
The above listed property has been posted with a Stop Work Order due to being in
violation of the following State Codes and/or City Ordinances.
780 CMR Section 113.3, Section 118, and Section 119.1. Further, it will now be
theprovince of the Salem Zoning Board ofAppeal, as to whether or not to issue
the needed variances in orderfor this project to gofurther.
No further work may be done until such time as the order is lifted. Any person who shall
continue any work in or about the building or structure after having been served with a
Stop work order, except such work as that person is directed to perform to remove a
violation or unsafe condition, shall be liable to a fine of not more than $1000, or by
imprisonment for not more than one year, or both for each violation; with each day
constituting a separate violation.
If you have any questions regarding this letter, please contact the Building Inspectors
Office at (978) 745-9595 ext. 386.
Sincerely,
/Jos/eph E. Barbeau, Jr.
Assistant Building Inspector
CC: file, William Bradley, Mayor's Office, Fire, Health, Police, Councilor Pelletier
0272 JEFFERSON AVENUE 34-06
CIS#: 1980 COMMONWEALTH OF MASSACHUSETTS
Map: 123
Block: CITY OF SALEM
Lot'. 0031-302
Category: DEMO
Permit# 34-06 BUILDING PERMIT
Project# JS-2006-0045
Est. Cost: $5,000.00
Fee Chat ged: $35.00
BalanceDue: $.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: William Bradley
Lot Size(sq. ft.)� 5000 �Owner: BORDERSDEAN
Zoning: —BI ---jApplicant: William Bradley
Units Gained:
Units Lost: AT: 0272 JEFFERSON AVENUE
Dig Safe#: I
ISSUED ON. 14-Jul-2005 AMENDED ON: EXPIRES ON. 14-Jan-2006
TO PERFORM THE FOLLOWING WORK.-
34-06 DEMO TJS
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Electric Gas Plumbin2 Building
Underground: Underground: Underground: Excavation:
Service: Meter: Footings;
Rough: Rough: Rough: Foundation:
Final: Final: Final: Rough Frame:
Fireplace/Chmnuey:
D.P.W. Fire Health
Insulation:
Meter: Oil:
Final:
House# Smokc:
Treasury:
Water: Alarm:
Sewer: Sprinklers;
THIS PERMIT MAY BE REVOKED BY THE CI�Y OF SALEM UPON VIO' LATION OF ANY OF ITS
RULES AND REGULATIONS.
Signature:
Fee Type: Receipt No: Date Paid: Check No: Amount:
DEMOUTION REC-2006-000066 14-Jul-05 X $35,00
GeoTMS&2006 Des Lauriers Municipal Solutions,Inc.
CITY OF SALEM9 MASSACHUSETTS
PUBLIC PROPERTY DEPARTMENT
120 WASHINGTON STREET, 3RD FLOOR
SALEM, MASSACHUSETTS 01970
STANLEY J. USOVICZ, JR. TELEPHONE: 978-745-9595 FXT. 380
MAYOR FAX: 978-740-9846
VIOLATION NOTICE
PROPERTY LOCATION 272 JEFFERSON AVENUE
October 4,2005
Dean Borders
34 Wadsworth Street
Danvers, MA 01923 004PI)00.
Dear Mr. Borders;
The above listed property has been found to be in violation of the following State
Codes and/or City Ordinances:
780 CMR, Massachusetts State Building Code, Section 113,governing
compliance with code.
780 CMR, Massachusetts State Building Code,Section 118, concerning
violations of the code.
780 CMR, Massachusetts State Building Code, Section 121, concerning unsafe
structures.
Said violations must begin to be corrected,repaired, and/or brought into
compliance within 2 days of your receipt of this notice. Failure to do so may result in
further actions being brought against you, up to and including the filing of complaints at
District Court.
This property must be made safe, this includes the removal of all debris
inclusive of wall sections that have fallen into the adjacent yard, the removal of all
hanging wires, and installation of a protective barrier to keep people clear of this
site. The current condition of said property is such that it is endangering adjoining
properties, this is an unacceptable situation, and must be immediately rectified.
If you have any questions regarding this letter,please contact the Building
Inspectors Office at (978) 745-9595, extension 386.
Sincerely,
eph E,. BarbeagJr.
Assistant Building Inspector
CC: file, Mayor's Office, City Solictor's Office, Health, Fire, Councilor Pelletier
CITY OF SALEM9 MASSACHUSETTS
PUBLIC PROPERTY DEPARTMENT
120 WASHINGTON STREET, 3RD FLOOR
SALEM, MASSACHUSETTS 01970
STANLEY J. USOVICZ, JR. TELEPHONE: 978-745-9595 EXT. 380
MAYOR FAX: 978-740-9846
STOP WORK ORDER
Property Location 272 Jefferson Avenue
July 19, 2005
Dean Borders
34 Wadsworth Street
Danvers, MA 01923
Dear Mr. Borders;
The above listed property has been posted with a Stop Work Order due to being in
violation of the following State Codes and/or City Ordinances.
780 CMR Section 113.3, Section 118, and Section 119.1. Further, it will now be
theprovince of the Salem Zoning Board ofAppeal, as to whether or not to issue
the needed variances in orderfor this project to gofurther.
No further work may be done until such time as the order is lifted. Any person who shall
continue any work in or about the building or structure after having been served with a
Stop work order, except such work as that person is directed to perform to remove a
violation or unsafe condition, shall be liable to a fine of not more than $1000, or by
imprisonment for not more than one year, or both for each violation; with each day
constituting a separate violation.
If you have any questions regarding this letter, please contact the Building Inspectors
Office at (978) 745-9595 ext. 386.
Sincerely,
/ �7
Joseph E. Barbeau, Jr.
Assistant Building Inspector
CC: file, William Bradley,Mayor's Office, Fire, Health, Police, Councilor Pelletier
CITY OF SALEM9 MASSACHUSF-TT!t.1-1' 1' U
' '��ILEM- MA
2 BOARD OF APPEAL CLERK S OFFICE
120 WASHINGTON STREET, 3RD FLOOR
a SALEM, MASSACHUSETTS 01970
STANLEY J. USOVICZ, JR. TELEPHONE: 978-745-9595 2005 DEC -I A 3
MAYOR FAX: 978-740-9846
DECISION ON THE PETITION OF DEAN BORDERS REQUESTING A VARIANCE
FOR THE PROPERTY LOCATED AT 272 JEFFERSON AVENUE R-1
A hearing on this petition was held on December 1,2005 with the following Board
Members present;Nina Cohen, Richard Dionne, Steven Pinto, Bonnie Belair and Robin
Stein. Notice of the hearing was sent to abutters and others and notices of the hearing
were properly published in the Salem Evening News in accordance with Massachusetts
General Laws Chapter 40A.
The petitioner is requesting a Variance per Section 8-4 (2)to rebuild a demolished
structure and Variances from lot coverage, lot size, front, side and rear setbacks and from
the limitation of one principal use on lot for the property located at 272 Jefferson Avenue
in an R-I zone.
The Variances,which have been requested, may be granted upon a finding by this Board
that:
a. Special conditions and circumstances exist which especially affect the land,
building or structure involved and which are not generally affecting other lands,
buildings and structures involve.
b. Literal enforcement of the provisions of the Zoning Ordinance would involve
substantial hardship, financial or otherwise, to the petitioners.
c. Desirable relief may be granted without substantial detriment to the public good
and without nulliPling or substantially derogating from the intent of the district of
the purpose of the Ordinance.
The Board of Appeal,after careful consideration of the evidence presented at the hearing,
and after viewing the plane,makes the following findings of fact:
I. At 272 Jefferson Ave in Salem, Petitioner Dean Borders owns a 5000 sf lot with
two principal structures: a four-story multifamily house and a one and a half story
single family house. The buildings are dimensionally nonconforming and
nonconforming as to the existence of 2 principal uses on one lot; the Building
Commissioner has deemed the property grandfathered in this R-I zone as to both
dimensional nonconformity and use.
2. The two structures belong to a condominium association consisting of four
ownership units in the larger house and a fifth unit in the single family. The four
units in the larger house have been transferred to new owners and are occupied.
All unit owners were present at the zoning meeting.
L
CLFWS OFFIC' E
UISMIR IN I VE PE I I I IM OF ------
VAJUANCE FOR TTIE PROPERTY LOCATED AT 272 JEFFERSON AV&"C -1 A 10-- 35
page two
3. At some time in spring 2005,Mr. Borders or his agent demolished the single
family house and removed all parts of the building above the foundation, except
one or more side walls. Immediately following the demolition,the Building
Commision issued a Stop Work Order barring any further wok at the site. The
basis for the Stop Work Order was Mr. Border's failure to secure zoning relief
prior to undertaking the demolition.
4. Mr. Borders stopped work on the site and sought relief from this Board to rebuild
the single family house on the property.
S. This petition was first heard by the Board of Appeal on October 19,2004, but was
continued to November� at which time we agreed to hear the petition at a special
meeting on December 1, 2005.
6. Kevin McGrath,an abutter at 3 Arthur Street,testified that following the
demolition and stop work order,in violation of state and local building codes,the
demolition site was left unattended and open,and building debris was not
removed from the property. Mr McGrath testified that he became aware that
electrical service to the demolished single family house was not disconnected, and
he strenuously objected to this safiAy hazard.
7. Members of the condominium association corifirmed Mr. McGrath's testimony
regarding the open site,building debris and electrical hazard. When Mr. Borders
failed to install a safiny fence at the request of the condominium association, they
undertook to install a fence at their expense. They also secured a rider to their
liability insurance policy to cover occurrences on the site resulting from the
demolition and subsequent abandonment of the property.
8. All four unit owners expressed concern the Mr. Borders would be unable to
complete construction of the single family house appropriately. The owners
objected to any increase in the size of the proposed dwellin& either in the
footprint of the building or its height including the addition of any side or rear
porches. The unit owners described Mr. Borders as unresponsive to their calls and
concerns.
9. Echoing the community reaction, Ward Councillor Jean Pelletier stated that he
opposed the grant of any variances to this property on the grounds that Mr.
Border's track record as a developer manifested his inability or unwillingness to
address legitimate safay and other concerns of the neighbors.
10.Addressing the neighbor's concern, William Quinn, Esq.,representing Mr.
Borders, apologized for his client's failure to comply with zoning and building
codes, which he stated was due to inexperience. Mr. Borders is anxious to finish
building a single family house on the footprint of the house that was originally on
this site, and regrets inadvertently exposing neighbors or condo owners to
dangerous conditions.
11. Mr. Borders offered to commence rebuilding the demolished house by contracting
with an experienced licensed construction supervisor,and he undertook to
complete construction within 5 months.
CLERK'S OFFIC
DECISION OF THE PETITION OF DEAN BORDERS REQUESTING A
-' VAPAANCE FOR THE PROPERTY LOCATED AT 272 JEFFERSON AVENUE
page three ZOOS DEC -I A I(
On the basis of the above findings of fact,and on, the evidence presented the Board
of Appeals finds as follows;
I. Special conditions exist when especially affect the subject property but not he
District.
2. Literal enforcement of the provisions of the Zoning Ordinance would involve
substantial hardship to the petitioner.
3. Desirable relief can be granted without substantial detriment to the public good
and without nuffiffing or substantially deropting from the intent of the district or
the purpose of the Ordinance.
Therefore,the Zoning Board of Appeal voted 5 in favor and 0 in opposition to grant the
Variances requested, subject to the following conditions:
I. Petitioner shall comply with all city and state stature, ordinance, codes and
regulations.
2. Petitioner shall obtain approval from any City Board or Commission having
jurisdiction, including but not limited to the Planning Board.
3. All requirements of the Salem Fire Department relative to smoke and fire safety
shall be strictly adhered to.
4. Petitioner shall obtain a building permit prior to beginning any construction.
5. A Certificate of Inspection shall be obtained.
6. All construction shall be done according to plans submitted to and approved by
the Building Commissioner,with plans to be amended to reduce the size of the
second floor by eliminating the outside deck adjacent to the parking area and
setting the second floor back an additional four(4) feet from the property
fine shared with the McGrath family.The amended plans and new
construction cannot exceed the footprint or height of the demolished
structure
7. Petitioner shall hire and use at all times an experienced construction supervisor
licensed to work in the City of Salem to oversee construction and both petitioner
and construction supervisor shall be responsible for ensuring that all building
practices on the site comply with state and local laws and regulations. Petitioner
shall submit executed contract with the supervisor to the Building Commissioner
when applying for a permit
8. Work shall not be conducted between the hours of 5:00 p.m. and 8:00 am. the
following day,or any time on Sundays or Holidays.
M
CL�_:RK.S oFFICE
DECISION OF THE PETITION OF DEAN BORDERS REQUESTING A
VARIANCE FOR THE PROPERTY LOCATED AT 272 JEFFERSON AVENUE
page four N55 OEC I A 10:
9. All reasonable actions shall be taken to nuinirmize the negative effects of
construction on unit owner and abutters. Advance notice shall be provided to
other unit owners and abutters at least 72 hours prior to commencement of
construction, and 24 hour advance notice shall be given both verbally and in
writing to the McGrath family of any work to be conducted within ten-feet
(10')of the McGrath property;
10. The construction site shall be lift in a clean condition free of dust and debris at the
end of each day;
11. Construction vehicles shall be removed from the site at the end of each day;
12. Petitioner shall require his contractors not to interfere at any time with the ability
of the resident unit owners to access or use their parking spaces on the property.
13. The conditions shall be enforced by the Department of the Building
Commissioner,and any violation identified by him which is not cured to his
satisfaction after notice to the Petitioner,shall be grounds for the Building
Commissioner to stop the work at the site, and upon his request, shall be sufficient
cause for this Board to revoke this approval.
14. Petitioner shall initiate the construction within 30 days after this approval
becomes legally effective, shall conduct the work diligently and continuously,
shall complete the work within five months after beginning it, unless extreme
weather conditions cause delay and then only upon application to the
Building Commissioner for a specific additional tie for completion. A
Certificate of Occupancy is required prior to occupancy of the unit
15. Petitioner shall indemnify and hold harmless the condominium association and
each member thereof for any and all liability arising out of damage to property
held in common by the condo association or to damage to individual property.
16. Petitioner shall reimburse within 30 days of demand any additional expense
incurred by the condominium association as a result of his actions or inactions
arising from the demolition and stop work order, including without limitation
legal fees up to$1,000.00 and the cost of additional insurance premiums incurred
by the condominium association.
17. Petitioner through his counsel shall revise the condominium documents to reflect
the changes to the condominium documents resulting from the reconstruction and
shall be solely responsible for the costs of such revision and of recording same on
the condominium deed and master plan.
DECISION OF THE PETITION OF DEAN BORDERS REQUESTING A VARIANCE
FOR THE PROPERTY LOCATED AT 272JEFFERSON AVENUE R-I
page five
18. Petitioner shall submit revised plans for the single family house to the
condominium association for approval and comment by the members prior to
applying for a building permit to begin construction.
VARIANCE GRANTED
DECEMBER 1,2005
hN.:�Cohe'n, ChZman(scn�
Board of Appeal
A copy OF THIS DECISION HAS BEEN FILED WITII THE PLANNING BOARD
AND THE CITY CLERK
Appeal from this decision, if any,shall be made pursuant to Section 17 of the
Massachusetts General Laws Chapter 40A, and shall be filed within 20 days date of filing
of this decision in the office of the City Clerk Pursuant to Massachusetts General Laws
Chapter 40A, Section 11,the Variance or Special Permit granted herein shall not take
effect until a copy of the decision bearing the certificate of the City Clerk that 20 days
have elapsed and no appeal has been filed, or that, if such appeal has been filed,that is
has been dismissed or denied is recorded in the South Essex Registry of Deeds and
indexed under the name of the owner of record or is recorded and noted on the owner's
Certificate of Title.
Board of Appeal
C-)
C-)
V CTJ
C::1
C:)r-
�r—.
n:L�
C-)
rn 3:
311
CITY OF SALEM9 MASSACHUSETTS
PLIBUC PROPERTY DEPARTMENT
120 WASHINGTON STREET, 3RD FLOOR
SALEM, MA 0 1970
TEL. (978)745-9595 EXT. 380
FAX (978) 740-9846
STANLEY J. USOVICZ, JR.
MAYOR
copy
July 23, 2003
To Whom it May Concern
RE: 272 Jefferson Avenue
According to our records, it has been determined that the two buildings located at 272
Jefferson Avenue a legal grandfathered non conforming
They are located in a B-1 Neighborhood Business District which allows multi family
dwelling. The first building has 4 units and the rear building contains I unit.
This is to determine use only and in no way is meant to confirm or deny whether said
property is in compliance with all building, plumbing, gas, electric, fire or health codes
Si ely,
Thomas St. Pierre
Zoning Enforcement Officer
City of Salem, Massachusetts
Fire Departnwnt
48 Lafayette Street
DavufW. Cody Salem, Massachusew 01970-3695 Fire Prevention
Chief Tel. 978-744-1235 Bureau
978-744-6990 FaX978-745-4646 978-745-7777
dcody@salem.com
August 24, 2006
Mr. Thomas J. St. Pierre
Building Commissioner
City of Salem
120 Washington Street
Salem, MA 0 1970
Dear Mr. St. Pierre,
This letter is to confirm our earlier discussion relative to the building located at 272 rear
Jefferson Avenue. This building is a safety/fire hazard to the general public and also to
the fire department personnel, especially because of its inability to be secured from public
access. Thank you for your immediate attention to this matter.
Respectfully,
Charles R. Holloran, Jr.
Fire Inspector
CITY OF SALEM9 MASSACHUSETTS
PUBLIC PROPERTY DEPARTMENT
120 WASHINGTON STREET, 3RD FLOOR
SALEM, MASSACHUSETTS 0 1970
TELEPHONE: 978-745-9595 EXT. 380
FAX: 978-740-9846
KIMBERLEY DRISCOLL
MAYOR
C Py
August 24, 2006
Dean Borders 272 Jefferson Ave Condo Trust
34 Wadsworth Street 272 Jefferson Avenue
Danvers, Ma. 01923 Salem, Ma. 0 1970
RE: 272 Jefferson Avenue
Dear Mr. Borders:
The remaining first floor wall and foundation have been out in the weather since you first
dismantled the structure in July of 2005. Due to the length of time and the upcoming fall
storm season, I am declaring the building "unsafe"per the State Building Code 780
CMR, Section 12 1. This statue requires that you begin to remove the structure within
24 hours of this notice
There is no appeal from this order. This action should have no effect on the zoning
decision previously granted.
Sincerely,
Thomas St. Pierre
Building Commissioner
Zoning Enforcement Officer
cc: Nina Cohen, Chairman ZBA
Attorney Jerry Perrisala
Attorney Stephen Lovely
272 Condo Jefferson Ave Association
0272 JEFFERSON AVENUE 211-07
IGIS#: 7829 COMMONWEALTH OF MASSACHUSETTS
Map:
jBIock: CITY OF SALEM
Lot: 0031-301
Category: DEMO,'�
Permit# 211-07 BUILDING PERMIT
Project# JS-2007-0302
Est. Cost: $5,800.00
,Fee Charged: $30.00
Balarice Due: $.00 PERMISSION IS HEREBY GRANTED TO:
IConst.Class: Contractor: License.
Use Group: BAY SHORE DEMOLITION
Lot Size(sq. ft.): 5000
Zoning: BI --�Owner: 272 JEFFERSON AVENUE REALTY TRUST
T T-fts Applicant: BAY S14ORE DEMOLITION
jUnits Lost: I IAT. 0272 JEFFE RSON AVENUE
jDig Safe#: I
ISSUED ON.- 14-Sep-2006 AMENDED QN.- EXPIRES ON. 14-Mar-2007
TO PERFORM THE FOLLOWING WORK-
TEAR DOWN REMAINING STRUCTURE AT 272 JEFFERSON AVENUE REAR
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Electric Gas Plumbing ARLIding
Underground: Underground: Undergrcun& Excavation:
Service: Meter: Footings:
Rough: Rough: Rough: Foundation:
Final: Final; Final; Rough Frame:
D.P.W. Fire Health Firepla.ce/Chmancy:
Meter: Oil; Insulation;.
Final:
Home It Smoke:
Water: Alaren: Treasury:
Sewer: Sprinklers: L— I
THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VIOLATION OF ANY OF ITS
RULES AND REGULATIONS.
SignfuFe—L al :;i� -'F%01L�
Fee Type; Receipt No: Date Paid: Check No: Amount:
DEMOLITION REC-2007-000373 14-Sep-06 3289 $30.00
An inspectioll IS la-DMI. ; �M
upon complatorl�Iwoik pleaSe Call
745-wZ)595 F–\t. 385
GeoTMS@ 2006 Des Lauriers Municipal Solarium,Inc.
Vn3QVV AD
CITY OF SALEM
I
BUILDING PERMIT