Loading...
204 JEFFERSON AVENUE - BUILDING INSPECTION� a� � � �� ,�;� ; FCertificate703-10 Building Permit No.: 703-10 Commonwealth of Massachusetts City of Salem Building Electrical Mechanical Permits This is to Certify that the CONDOMINIUM located at Dwelling Type 204 JEFFERSON AVENUE in the CITY OF SALEM Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY 204 JEFFERSON AVENUE UNIT 1 This permit is granted in conformity with the Statutes and ordinances relating thereto, and expires unless sooner suspended or revoked. Expiration Date Issued On:Thu Aug 12, 2010 GeoTMS®2010 Des Lauriers Municipal Solutions.Inc t �ovmr�q CITY OF SALEM, MASSACHUSETTS BOARD OF APPEAL 'c 1.20 WASHINGTON STREET, 3RD FLOOR SALEM, MASSACHUSETTS 01970 �n e' TELEPHONE: 978-745-9595 me ly FAX 978-740-9846 KIMBERLEY DRISCOLL MAYOR April 6, 2010 To Whom it May Concern: RE: 204 Jefferson Avenue According to our records, it has been determined that the property located at 204 Jefferson Avenue is a legal grandfathered non-conforming three family dwelling located in a Residential Three family zone R-3. This is to determine use only and in no way is meant to confirm or deny whether said property is in compliance with all building, plumbing, gas, electric, fire or health codes. Sincerely, b Thomas St. Pierre Zoning Enforcement Officer CONSTRUCTION CONTROL AFFIDAVIT-Final PROJECT LOCATION: 204 Jefferson Avenue, Salem,MA PROJECT NAME: Renovations to 204 Jefferson Ave. NATURE OF PROJECT: Interior renovation ARCHITECT: DMS design, lie ADDRESS: 100 Cummings Center, Suite 424G,Beverly,MA 01915 TELEPHONE: 978-578-5748 In accordance with Section 110.0 and 116.0 of the Massachusetts State Building Code,I,Daniel M. Skolski,Registration No. 20038, being a registered professional Architect,hereby certify that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning,ARCHITECTURAL,for the above named project and that,to the best of my knowledge, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code,all accepted engineering practices and applicable laws and ordinances for the proposed use and occupancy.To the best of my knowledge and belief,the work has proceeded in accordance with the documents approved for the building permit and is substantially complete and ready for occupancy. d Signature Then personally appeared the above namecl-)9 KKOe5e/and made oath that the above statement by him is true. ABefie , M1 �-MICHAELOBRIEN ;+ �� fP.:�•. NOTARYPUBUC F•" N MMONY4PALTH OF MASSACHUSETTS ' `� �My Comm.Expires Jan.17,2014 204 JEFFERSON AVENUE 703-10 GIS# ,, SSss Map COMMONWEALTH OF MASSACHUSETTS 24 ,- :r= Block: �; CITY OF SALEM Lot:,,,',, 0079 ,' Category: REPAIR/REPLACE Jijj r• renrut#11 703->0 BUILDING PERMIT Project#.& JS-2010-001050 a , Est:Cost: $200,000.00 Fee Charged: $2,205.00 jr)6r Balance Due: $.00 PERMISSION IS HEREBY GRANTED TO: Const?Class:: e ` `svt. ', Contractor: License: Expires Use GroupMll REDCO CONSTRUCTION CONSTRUCTI ,SUPERVISOR-CS98724 Lot Slze(sq.ft) 4500 1836 h Zoning - ;t R3 a j ,;,;,,tp, _ Owner: 204 Jefferson Avenue LLC X Units Gained: PP A lieant: REDCO CONSTRUCTION Units Lost ;(i ,, „ `r AT: 204 JEFFERSON AVENUE DIB Safe#:''e"A' ISSUED ON. 26-Apr-2010 AMENDED ON. EXPIRES ON: 26-Sep-2010 TO PERFORM THE FOLLOWING WORK: RECONSTRUCT(3)FAMILY AFTER FIRE,DEMO INTERIOR ONLY REPAIR AND REPLACE FRAMING AS NEEDED (3)BATHS&(3)KITCHENS jbh POST THIS CARD SO IT IS VISIBLE FROM THE STREET Electric Gas Plumbing Building Underground: Underground: Underground: Excavation: /� 1(� Service: / Meter: � a),0 v}� Footings: Rang hj //� RoughD� �p Rough Foundation: Final: n/ Q ^ Final:®�jr�r�li g���w . Final: QJ/ �1/ �l�ra Rough Frame: OSS S\111 19'At& Fireplace/Chimney: D.P.W. Fir Health Insulation: Meter: Oil: House# Smoke: _ Final: Oe Water: Alarm: Assessor 'Treasury: ll Sewer: Sprinklers: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. DSignature: b _ " Fee Type: R�Ceip0IR "Wr Date Paid: Check No: Ton t: ,;,UyIFkbIR6 j* - C°201b-00'1225 26-Apr-IO 025180 $2,205.00 , m-Ilplet1Ul) > OfK, P Gu .- Call f®lp Purillit to Occupy ®735,&55,1 GeoTMS®2010 Des Lauriers Municipal Solutions,Inc. f. O _ o 3 4' VS VE AD CITY OF SALEM BUILDING PERMIT Certificate Na: 703-10 Building Permit No.: 703-10 Commonwealth'of Massachusetts City of Salem Building Electrical Mechanical permits This is to Certify that the CONDOMINIUM located at Dwelling Type 204 JEFFERSON AVENUE in the CITY OF SALEM Address - - - - -Town/City Name I IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY 204 JEFFERSON AVENUE UNIT 2 This permit is granted in conformity with the Statutes and ordinances relating thereto, and expires unless sooner suspended or revoked. Expiration Date Issued On:Thu Aug 12, 2010 GeoTMS®2010 Des Launers Municipal Solutions,Inc. - ! ✓ I Certificate No: 703-10 Building Permit No.: 703-10 Commonwealth of Massachusetts City of Salem Building Electrical Mechanical Perriuts This is to Certify that the CONDOMINIUM located at Dwelling Type 204 JEFFERSON AVENUE in the CITY OF SALEM Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY 204 JEFFERSON AVENUE UNIT 3 This permit is granted in conformity with the Statutes and ordinances relating thereto, and expires unless sooner suspended or revoked. Expiration Date i ---- . .... •' .. .. Issued On: Thu Aug 12, 2010 � r GeoTMS®2010 Des Lauriers Municipal solutions,Inc, 204 JEFFERSON AVENUE 703-10 G I ap:P. sass_ COMMONWEALTH OF MASSACHUSETTS .M 24 !Block: CITY OF SALEM Lot: 0079 Category: REPARMEPLACE ProJeit# JS-201 BUILDING PERMIT 703-10 Project# JS-2010-001050 Est.Cost: $200,000.00 Fee Charged: $2,205.00. Balance Due: $.00 PERMISSION IS HEREBY GRANTED TO: Const:Class: Contractor: License: Expires Use Group: REDCO CONSTRUCTION CONSTRUCTIO SUPERVISOR-CS98724 Lot Size(sq.R.): 4500.1836 Zoning. R3 Owner: 204 Jefferson Avenue LLC Units Gained: - A licant: REDCO CONSTRUCTION Units Lost: AT. 204 JEFFERSON AVENUE Dig Safe#: ISSUED ON. 26-Apr-2010 AMENDED ON: EXPIRES ON. 26-Sep-2010 TO PERFORM THE FOLLOWING WORK: RECONSTRUCT(3)FAMILY AFTER FIRE,DEMO INTERIOR ONLY REPAIR AND REPLACE FRAMING AS NEEDED (3)BATHS&(3)KITCHENS jbh POST THIS CARD SO IT IS VISIBLE FROM THE STREET Electric Gas Plumbing Building Underground: Underground: Underground: Excavation: Service: Meter: /4010 t yi �,,s•�� Footings: Ron h: Rou hO(�'a�f , � r t ((( g /J Hong /� 1 l Foundation: Final: / Flnal:0/(`,�lr:�eg����o Final: Q'0�jft,? �r7 Rough Frame: OIS S'M 10 W(j Fireplace/Chimney: D.P.W. Fir Health Meter: Oil: Insulation: OL House# Smoke: 7��lio Final: ,F1.i,.AA „ Water: Alarm: / Assessor Treasury:: CC Sewer: Sprinklers: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature• ,� Fee Type: Recei t Date Paid: ICDIh7 +`'�P1••s Check Na: Amou t• -! 4:�y 1* it 1201N60122$s 26-Apr-10 025180 . 1 UUtRpI@ll(}1) U, v;t�ry �ilagaw Cw* P $2205.00 a7i i a � Call 'for pora it t0 Occupy GeoTMS®2010 Des Lauriers Municipal Solutions,Inc. Fm:DM lesign, He To:Salem Building Department(19787409846) 09:32 05121110GMT-0•` ,'g 01-02 r " 100 Cummings Center,Suite 424G DMS design, llc Beverly,MA 01915 Tel 978 5748 Architectural Design Services Fax 88251 g Fax 866 648 8251 daniel@dmsdesign.com y � Architect's Field Report roject Name: 204 Jefferson Ave Renovation Project Address—a fcoctttre S m Mtl' — A a e o Visit: May 20, 2010 Weather: Sunny, 85° Approximate %Complete: 45% Present on Site: Work in Progress, Exterior: Work in Progress, Basement: -solid blocking must be added for new beam above -tough plumbing appears complete -rough electrical in progress -sprinkler piping has been installed Work in Progress, First Floor: -solid blocking must be added for new beam above -rough plumbing appears complete -rough electrical appears complete -window installation is complete -sprinkler piping has been installed -fireblocking in progress -blocking in progress for kitchen cabinets Work in Progress, Second Floor: -solid blocking must be added for new beam above -sprinkler piping has been installed where blocking for post must be installed, so sprinkler piping must be relocated -rough plumbing appears complete -rough electrical appears complete -window installation is complete -sprinkler piping has been installed frreblocking in progress -blocking in progress for kitchen cabinets -HVAC unit has been installed, some ductwork has been installed Work in Progress, Third Floor: -new beam has been installed, solid blocking must be added at third floor level -rough plumbing appears complete -rough electrical appears complete -window installation is complete -sprinkler piping has been installed - 1 Fm:DMS design, Ile To:Salem Building Department(19787409846) 09:32 05/21/1 OGMT-04 Pg 02-02 -fireblocking in progress -blocking in progress for kitchen cabinets -HVAC unit has been installed Report By: Daniel M. Skolski, AIA, NCARB Manager, DMS design, Ile Distribution: City of Salem Building Department via fax, Jeff Holloran via fax - 2-