95 JACKSON STREET - BUILDING INSPECTION s
e
s
u ��rab.
Oversi:¢bTab Folders
90%Larger Label Area(AA"�`"°�
N S E` EAE
KEEPING YOU ORGANIZED
No. 10301
PATENT PENDING
SUSTAINABLE
FORESTRY MIN.RECYCLED
INITIATIVE CONTENT10Yc
camr.c r¢ersemms POSTCONSUMER
vww..n¢roo�em,oio
swiew
MADE IN USA
GET ORGANIZED AT SMEAD.COM
r r .i
Certificate Number: B-17-672 Permit Number: B-17-672
Commonwealth of Massachusetts
City of Salem
This is to Certify that theTwo Family Building located at
Building Type
......................................................................_95 JACKSON STREET........................................................................ in the .....................................City.. jSrzlem
Address Town/City Name
IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY
C/O for second floor only
WANDER DE OLIVEIRA
This Permit is granted in conformity with the Statutes and Ordinances relating thereto, and
expires ...............................Not Applicable unless sooner suspended or revoked.
EViralion Date
Issued On: Thursday, September 28, 2017 '''
J
Commonwealth of Massachusetts
s
Citv of Salem a\Y4
120 Washington St,3rd Flair Salem,MA 01970(978)745-95 95 x5641
Return card to Building Division for certificate of Occupancy
Permit No, 8-17-s7
FEE PAID: $245.00
PERMIT TO 0IU,LD
DATE ISSUED: 7/26120117
This certifies that . DE OLIVEIRA WANDER
a
has permission to erect, alter, or demolish a,building--,4,96.JACKSON STREET Map!Lot: 250281-0 s s
as follows: ;Other Building Permit. a REPLACE: 2 KITCHENS, 2 BATHROOMS, DECKING;.ALL WINDOWS &
DOORS, PORCH RAILINGS; REMOVE 2 LOAD BEARING WALLS, 8 2 KITCHEN WINDOWS.IN UNIT
2.
Contractor Name: i t
DBA: }
Contractor License No:
7/26/2017 l
m . e
. . Buildirl Date
'
This permit shalt be deemed.abandoned and invalid unless the work authorized by this permit is commenced withinSlx�nihs after issuance:.The Builtling Official
,. may grant one or more extensions not to exceed six months each upon written request,All work authorized'by this permit shall conform to the approved application and the approved construcu'on documents for which this permit has been granted.
All construction;alterations and changes of use of any building and structures shall be in compliance with the I a6l zoning by-laws and codes: i
This permit shall be displayed in alocation clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same
The certificate of Occupancy will not be issued until all applicablesignattures by the Build,utg and Fire Officials are provided on"•psrmk,
A r
HI C#: .4•+'sons contractingwith unregistered contractors do not have aceese to the guaren fund'(as set forth in MGL G142A).
k
Restrictions: ]{F{ �� I
Building plans are to be available on site.
All Permit Cards.are the property of the PROPERTY OWNER. .l
i
1
Commonwealth of Massachusetts 416,t Citv of Salem
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5841
!
Return card to Building Division for Certificate of Occupancy t{ • _ s e F ,
Structure . CITY OF SALEM $UILDING PERMIT
Excavation �„ # f PERMIT TO BE POSTED.IN THE WINDOW - l
:. Q. J r.s -. • .. 4 � o
Footing .. - - °.,< .: .,,p INSPECTION.RECORD .-
Foundation,. .
Framing 8 -i•L 17 _
Mechanical,
Insulatio 8 1 $r 1 -2 INSPECTION:. BY _ •-DATE -
Chimney/Smoke Chamber
Final Vis.w C. /D I✓ _ "T .." .l..o. .,.ivm
Plumbing/Gas1�—
< � atiC9la � R'iA !!2 A'ci 1S .TtLoo�2 �i� �'�l9ll '�
Royp l'u&7 '
- y qqp'
Roug..:.Gas 1 N', y 'azs= ...
f
Final. J�-Ct�rr�S P' ow— �.,,.�. gCOAD.,+'"% '�Op/`'
1
� Electrical
Service } 1 e
Rough .,
Fir D artment 4
Preliminary
Final 7h�
Health Department' 41
Preliminary
Finalf ~