29 HOWLEY STREET - BUILDING JACKET� a9uo �iq ,%� Y h f t � f Massachusetts Department of Environmental Protection DEP File Number Bureau of Resource Protection - Wetlands 64-331 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: When filling From: out forms on Salem the computer, Conservation Commission use only the tab key to This issuance if for(check one): move your cursor-do ® Order of Conditions not use the return key. ❑ Amended Order of Conditions To: Applicant: Property Owner(if different from applicant): Peabody Glass and Mirror Co. A&A Howley Street Trust Name Name a� 29 Howley Street 29 Howley Street Mailing Address Mailing Address Peabody MA 01960 Peabody MA 01960 Cityrrown State Zip Code cityrrown State Zip Code 1. Project Location: 29 Howley Street Peabody & Salem, MA Street Address — City/Town Map 16r Lot 241 Assessors Map/Plat Number Parcel/Lot Number 2. Property recorded at the Registry of Deeds for: Essex South 8376 508 County .' Book Page NA Certificate(if registered land) 3. Dates: January 8, 2002 January 24, 2002 February 7, 2002 Date Notice of Intent Filed Date Public Hearing Closed Date of Issuance 4. Final Approved Plans and Other Documents (attach additional plan references as needed): Site Development Permit Plan located in Peabody Mass. November 21, Title 2001 5. Final Plans and Documents Signed and Stamped by: Christopher R. Mello Name 6. Total Fee: $525.00 (from Appendix B:Wetland Fee Transmittal Form) WPA Form 5 Page 1 of 7 Rev.02100 Massachusetts Department of Environmental Protection DEP File Number: V' Bureau of Resource Protection - Wetlands 64-331 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: ❑ Public Water Supply ❑ Land Containing Shellfish ® Prevention of Pollution ❑ Private Water Supply ❑ Fisheries ❑ Protection of Wildlife Habitat ❑ Groundwater Supply ❑ Storm Damage Prevention ® Flood Control Furthermore, this Commission hereby finds the project, as proposed, is: (check one of the following boxes) Approved subject to: ® the following conditions which are necessary, in accordance with the performance standards set forth in the wetlands regulations, to protect those interests checked above. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations to protect those interests checked above. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests, and a final Order of Conditions is issued. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the'Act's interests,and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). General Conditions (only applicable to approved projects) 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. WPA Fan 5 Page 2 of 7 Rev.02/00 �y � - Massachusetts Department of Environmental Protection DEP File Number Bureau of Resource Protection - Wetlands 64-331 any WPA Form 5 — Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title ci rthe affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to this Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, "MA DEP"] "File Number 64-331 " 10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein,the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A) to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a' new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. WPA Farm 5 Page 3 of 7 Rev.02100 rP Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands 64-331 WPA Form 5 - Order of Conditions Provided by DEP ` Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 17. All sedimentation barriers shall be maintained in good repair'until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. Special Conditions(use additional paper, if necessary): See Attachment. Findings as to municipal bylaw or ordinance Furthermore, the Salem hereby finds (check one that applies): Conservation Commission ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: Name Municipal Ordinance or Bylaw Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or bylaw, specifically: Name Municipal Ordinance or Bylaw The Commission orders that all work shall be performed in accordance with the said additional conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. WPA Form 5 Page 4 of 7 Rev.02100 Massachusetts Department of Environmental Protection DEP File"umber. Bureau of Resource Protection - Wetlands 611-33� WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 y B. Findings (cont.) Additional conditions relating to municipal ordinance or bylaw: This Order is valid for three years, unless otherwise specified as a special condition pursuant to General Conditions#4, from the date of issuance. Date This Order must be signed by a majority of the Conservation Commission. The Order must be mailed by certified mail (return receipt requested)or hand delivered to the applicant. A copy also�must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office(see Appendix A) and the property owner(if different from applicant). On Ofw.v.wi`� 20"Z Da Month and Year before me personally appeared to me known to be the person described in and who executed the foregoing instrument and ackn ledged that h I as his/her free act and deed. 30 2-oc)--- Notary Public My ComrAission Expires This Order is issued to the applicant as follows: ❑ by hand delivery on by certified mail, return receipt requested,on arc lorv.v�� -I Date Date WPA Foos 5 Page 5 of Rev.0= Massachusetts Department of Environmental Protection DEP File Number = Bureau of Resource Protection - Wetlands 64-331 4 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Appendix E: Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L. c. 131, § 40) and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. D. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final'Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on Page 7 of Form 5 shall be submitted to the Conservation Commission listed below. Salem Conservation Commission WPA Farm 5 Page 6 of 7 Rev.07/00 Massachusetts Department of Environmental Protection DEP File Number: rs _ Bureau of Resource Protection - Wetlands 64-331 * : WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Recording Information (cont.) Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. -------------------------------------------------------------------------------------------------------------------------- To: Salem Conservation Commission Please be advised that the Order of Conditions for the Project at 29 Howley Street Peabody MA 64-331 Project Location DEP File Number Has been recorded at the Registry of Deeds of: County .Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant WPA Form 5 Rev.02100 Page 7 of 7 Salem Conservation Commission SPECIAL CONDITIONS—DEP FILE # 64-331 29 Howley Street, Peabody & Salem, MA 1. The Conservation Agent will be notified 48 hours prior to commencement of construction activities(978-745- 9595 ext. 311). Members and agents of the Salem Conservation Commission(Commission)shall have the right to enter and inspect the premises to evaluate and ensure compliance with the conditions and performance standards stated in this Order,the Notice of Intent,the referenced plans,the Act,'and 310 CMR 10.00, and may require any information,measurements, photographs,observation and/or materials or may require the submittal of any data or information deemed necessary by the Commission,agent, or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the Commission is satisfied that the work will comply, and has so notified the applicant in writing. 2. Approval of this application does not constitute compliance with any law or regulation other than MGL Chapter 131, Section 40, and Wetlands Regulations 310 CMR 10.00. 3. This Order shall apply to any successor in control or successor in interest of the property described in the Notice of Intent and accompanying plans. These obligations shall be expressed in covenants in all deeds to succeeding owners or portions of the property. 4. The form provided at the end of this Order shall be completed and stamped at the Registry of Deeds after the expiration of the 10-day appeal period and within 30 days of the issuance if no request for appeal has been filed with the Department of Environmental Protection. This form shall be returned to the Commission within 21 days of recording accordance and prior to commencement of any activities subject to the Order of Conditions. 5. Prior to any work commencing,a sign shall be displayed showing DEP file# 64-331, and not placed on a living tree. 6. The term"Applicant"as used in this Order of Conditions shall refer to the owner, any successor in interest or successor in control of the property referenced in the Notice of Intent, supporting documents and this Order of Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of any portion of the property that takes place prior to issuance of the Certificate of Compliance. 7. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and approvals associated with this project. These permits may include but are not necessarily limited to the following: (1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816),U.S. Army Corp of Engineers. (2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec. 27 (5) of Chapter 21 of the Massachusetts General Laws as codified (3) Flood Plain (4) Grading Ordinance 8. If there are conflicting conditions within this Order,the stricter condition(s)shall rule. 9. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters during construction or after completion of the project. 10. The Commission and its Administrator shall have the discretion to modify the erosion/siltation control methods and boundary during construction if necessary. 11. All work shall be performed in accordance with this Order of Conditions and approved site plans(s). No alteration of wetland resource areas or associated buffer zone,other than that approved in this Order, shall occur on this property without prior approval from the Commission. 12. If any changes are made in the above-described plan(s)which may or will alter an area subject to protection under the Wetlands Protection Act,or any changes in activity subject to regulations under G.L. Ch. 131, Section 40,the applicant shall inquire from this Commission in writing,prior to their implementation in the field, whether the change(s) is significant enough to require the filing of a new Notice of Intent. Any error in the plans or information submitted by the applicant shall be considered changes and the above procedures shall be followed. A copy of such request shall at the same time be sent to the Department of Environmental Protection. 13. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been issued,the applicant or current landowner shall submit to the Commission a signed statement by the buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of Conditions. 14. Conditions number NA as indicated shall continue in force beyond the Certificate of Compliance, in perpetuity, and shall be referred to in all future deeds to this property. PRIOR TO CONSTRUCTION 15. Prior to commencement of any activity on this site,there shall be a PRECONSTRUCTION MEETING between the project supervision;the contractor responsible for the work or its administrator to and phone numbers of all responsible parties shall be registered with the Commission at the pre-construction meeting. 16. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Commssion and/or its Administrator shall inspect and approve such installation at the pre-construction meeting. 17. Prior to the commencement of any activity on this site,the applicant or current landowner shall submit to the Commission in writing a construction schedule/sequence of work to complete this project. 18. Prior to an} work on site,the proposed limits of work shall be clearly marked with stakes or flags and shall be confirmed by the Commission or its Administrator. Such markers shall be checked and replaced as necessary and shall be maintained until all construction is complete. Workers shall be informed that no use of machinery, storage of machinery or materials,stockpiling of soil or construction activity is to occur beyond this line at anytime. 19. Prior to commencement of construction on site,the limits of wetland resource areas closest to construction activity shall be flagged with surveyor's tape and shall remain in place during construction. The limits of areas to be impacted and the limits of work in the replication area(s)shall be clearly flagged. 20. There shall be 20 hay bales and wooden staked stored under cover on the site to be used only for emergency erosion control. EROSION CONTROL 21. Appropriate erosion control devices shall be in place prior to the beginning of any phases of construction, and shall be maintained during construction in the wetland areas and buffer zones. The erosion control specification provided in the Notice of Intent and the erosion control provision in the Order will be the minimum standards for this project; additional measures may be required by the Commission. 22. All debris,fill and excavated material shall be stockpiled a location far enough away from the wetland resource areas to prevent sediment from entering wetland resource areas. 23. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 24. The areas of construction shall remain in a stable condition at the close of each construction day. 25. Any de-watering of trenches or other excavations required during construction shall be conducted so as to prevent siltation of wetland resource areas. All discharges from de-watering activities shall be filtered through haybale sediment traps,silt filter bags or other means approved by the Commission or its Administrator. 26. Within thirty days of completion of construction on any given portion of the project,all disturbed areas in the completed portion of the site shall be permanently stabilized with rapidly growing vegetative cover, using sufficient top soil to assure Ion,--term stabilization of disturbed areas. 27. If soils are to be disturbed for longer than two months,a temporary cover of rye or other grass should be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth, exposed surfaces shall be stabilized by other appropriate erosion control measures, firmly anchored,to prevent soils from being washed by rain or flooding. DURING CONSTRUCTION 28. A copy of the Order of Conditions,construction plans, and copies of the documents and reports cited in Condition 9 11, shall be on the site upon commencement and during any site work for contractors to view and adhere to. 29. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 30. Only clean fill, free of masonry, stumps,asphalt,and any other kind of waste material shall be used on the site. 31. All waste products, grubbed stumps, slash,construction materials, etc. shall be deposited at least 100 feet from wetland resource areas and 200 feet from rivers. 32. All filling or removal of waste material from the site shall be done in accordance with the regulations of the City of Sa[Em Health Department. 33. Cement trucks shall not be washed out in any wetland resource or buffer zone area. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be removed by hand. 34. No fuel,oil,or other pollutants shall be stored in any resource area or the buffer zone thereto, unless specified in this Order of Conditions. 35. There shall be no pumping of water from wetland resource areas. 36. During construction, all drainage structures shall be inspected regularly and cleaned as necessary. 37. The project shall not cause an increase in run-off onto adjacent properties, either during construction or when completed. 38. The applicant is hereby notified that failure to comply with all,requirements herein may result in the issuance of enforcement actions by the Conservation Commission including, but not limited to, civil administrative penalties under M.G.L. Chapter 21A,section 16. . POST CONSTRUCTION 39. All disturbed areas, slopes and proposed landscape areas shall be learned and seeded or stabilized through the use of erosion control blankets or other approved means. All disturbed areas will be graded, loamed, and seeded prior to November 1 of each year, if possible. No disturbed areas or stockpiled material will be left unprotected or without erosion controls during the winter. 40. Upon completion of construction,the applicant or current landowner shall submit the following to the Commission to request a Certificate of Compliance: (1) A letter requesting a Certificate including the following information: a. Name and address of current landowner; b. Name and address of the individual/trust or other entity to whom the Certificate is to be issued: c. Street address and lot number for the project;and d. DEP file number (2) A letter from a Registered Professional Engineering or Land Surveyor certifying compliance of the property with this Order of Conditions (3) An"As-Built"plan signed and stamped by a Registered Professional Engineer showing post-construction conditions and: a. As-built elevations of all drainage ways constructed within 100 feet of any wetland resource area; b. As-built elevations and grades of all filled or altered wetland resource areas,buffer zones and replicated areas; and c. Distances to all structures within 100 feet of any wetland resource area. 41. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds. 42. if the completed work differs from that in the original plans and conditions, the report must specify how the work differs;at which time the applicant shall first request a modification to the Order. Only upon review and approval by the Commission, may the applicant request in writing a Certificate of Compliance as described above. 43. Erosion control devices shall remain in place and properly functioning until all exposed soils have been stabilized with final vegetative cover and the Commission and/or its Administrator has authorized their removal. s