Loading...
0 HOLYOKE SQUARE - BUILDING INSPECTION r �No 5531a 'Oepoico�`�� HASTINGS, MN C -� Certificate Number: B-16-123 Permit Number: B-16-123 Commonwealth of Massachusetts City of Salem This is to Certify that the ..Gen Office Building........................................................... located at Building Type .......................................................................1 HOLYOKE SQUARE........................................................................ in the .....................................City.of Salem ................................... ................................................. Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY COMMONWEALTH CHECKER This Permit is granted in confornrity with the Statutes and Ordinances relating thereto, and expires ...............................Not Applicable unless sooner suspended or revoked. Expiration Date Issued On: Friday, September 30, 2016 W �6�6, .. 9�S1Q• � a w Div Emmqr .� ia►tTP�7 H EONOtpA Commonwealth of Massachusetts Y a Citv of Salem 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 ki Return card to Building Division for Certificate of Occupancy Permit No.$6 B-16-123 PERMIT T O BUILD FEE PAID: $6,600.00 DATE ISSUED: 2/18/2016 This certifies that HOLYOKE MUTUAL FIRE INS CO has permission to erect, alter, or demolish a building 1 HOLYOKE SQUARE Map/Lot: 2505740 as follows: Repair/Replace COMPLETE BUILD OUT (PER PLANS) Contractor Name: CARLO E. CAPONIGRO DBA: CAPONIGRO CONSTRUCTION Contractor License No: CS-61061 rlz_ Li 2/18/2016 Building bff lciaK Date This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. HIC #: 121999 'Persons contracting with unregistered contractors do not have access to the guaranty fund'(as set forth in MGL c.142A). Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. Commonwealth of Massachusetts ` City of Salem m 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 Return card to Building Division for Certificate of Occupancy Structure CITY OF SALEM BUILDING PERMIT Excavation PERMIT TO BE POSTED IN THE WINDOW Footing INSPECTION RECORD Foundation �... Framing -? /S /Iv Mechanical/ Insulation 7/ \aj 1L !�. INSPECTION: BY DATE Chimney/Smoke Chamber G Final frt Plumbing/Gas Rough:Plumbing nlr 1z Rough:Gas Final Electrical Service Rough Final Fire D artment Preliminary Final Health Department Preliminary Final A Commonwealth of Massachusetts Citv of Salem 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5841 .. Return card to Building Division for Certificate of Occupancy jEEPAI No. s .60 PERMIT TO B. UILD ' 1 EE PAID: $6,600.00 P , t , DATE ISSUED: 2/18/2018 This certifies that HOLYOKE MUTUAL FIRE INS CO has permission to erect,alter, ordemolish a building,-.,...I,HOLYOKE.SQUARE_ Map/Lot: 2505740 as follows: Repair/Replace COMPLETE BUILD OUT(PER PLANS) Contractor Name: CARLO E.CAPONIGRO DBA: CAPONIGRO CONSTRUCTION \ ., Contractor License No: CS-61061 { Frix le P 2/18/2016 Building fficia Date 'This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within s tonths after issuance.The Building Official - may grant one or more extensions not to exceed six months each upon written request All work authorized by this permit shall conformto the approved application and the approved construction documents for which this permit has been granted. All construction;alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws And codes. This permit shall be displayed in a.location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. I • I ' The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Official; a provided on.this permit. p r H IC#:.. 121999 _ 'Persons contracting with unregistered contractors do not have access to the guaranty fund'(asset fort In MGL c.142A). Restrictions: J Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. y Commonwealth of Massachusetts City of Salem 120 Washington St.3rd Floor Salem,MA 01970(978)745-9595 x5841 Return card to Building Division for Certificate of Occupancy - structure CITY OF SALEM BUILDING PERMIT Excavation - - PERMIT TO BE POSTED IN THE WINDOW IFooling '- •. -- - - -� INSPECTION RECORD Foundation - - - Framing Mechanical Insulation7 INSPECTION: i BY rlol� IIo `�. DATE ChimneylSmokeChamber Final Plumbing/Gas s r Rough:Plumbing 1' Rough:Gas !! Final ElectricalLU I, .. SerNca Rough - Final Fire DOW ment Preliminary final - - . Health Department _ Preliminary -P • Final aCITY OF SALEM, MASSAQiUSEM BUILDING DEPARTMENT 120 WASHINGTON STREET,3RDFLOOR 'IEL.(978)745-9595 KIMBERLEY DRISODI-L FAX(978) 740-9846 MAYOR THOMAS ST.PIERRE DIRECTOR OF PUBLICPROPERTY/BUILDING cc)MNIISSIONER February 22, 2016 To Whom it May Concern RE: 1 Holyoke Square Salem, Ma. 01970 According to our records, it has been determined the property located at 1 Holyoke Square also known as 38& 39 Norman Street is a legal commercial use located in an B-5 zone. This is to determine use only and in no way meant to confirm or deny whether said property is in compliance will all building, plumbing, gas, electrical, fire or health codes. Sincerel Thomas St. Pierre Zoning Enforcement Officer Commonwealth of Massachusetts 1L11 a City of Salem 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 Return card to Building Division for Certificate of Occupancy Permit No. B-16-123 PERMIT TO BUILD FEE PAID: $660.00 DATE ISSUED: 2/18/2016 This certifies that HOLYOKE MUTUAL FIRE INS CO has permission to erect, alter, or demolish a building 1 HOLYOKE SQUARE Map/Lot: 2505740 as follows: Repair/Replace COMPLETE BUILD OUT (PER PLANS) Contractor Name: CARLO E. CAPONIGRO DBA: CAPONIGRO CONSTRUCTION Contractor License No: CS-61061 2/18/2016 Building Official Date This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. HIC #: 121999 'Persons contracting with unregistered contractors do not have access to the guarantyfund"(as set forth in MGL c.142A). Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. v�'��w`O��i�O��. � I L. ! 1991hm#)991Re01aresBl9BF]2 ' `st AIRS FJOR WARRANTY . Gape El Adhesive] BuIJ utas PlioDucTs Complete Repairs,Sign,And Return Within 60 Days Of Inspection s Building Name: n, ��� r4��,� -^f"a.�S�„�� <� FBPCONo t1,'- ,7<).Zj Building Address: (only needs to be completed if address is different from PIN): ,6 Q, �f.ts Y1 0..1,ia ! , Firestone Contractor(Firm Name • '� Firestone License or Registration No: f Contractor's Representative: o Inspection Date:- a — _Firestone Inspector:—' l- 1�,w.:iA - -- Phone 1-800-428-4511(ext):. Requested Inspection: S+st ❑2nd ❑3rd ❑4th ❑ th ❑Interim_% Completed ❑Other: *It is the contractor's responsibility to ensure the repair is completed per current policy,including repairs caused by other(CBO)- System Type: tiXo Repairs Required ❑ The Following Repairs Must Be Completed Within 60 Days Of The Inspection Leaks Reported [-]Yes ❑No PRIOR TO MAKING REPAIRS ALL SURFACES MUST BE CLEANED WITH SOAP AND WATER,RINSED AND DRIED,THEN FOLLOW PROPER SPLICING PROCEDURES SEAMS PENE,MATIONS I.Apply Lap Sealant/Sealant Per Detail: 18.ReBash Pipe Per Detail: 2.Repair"Fishmouth"Or Wrinkle&Strip In Seam 19.Install/ReBash Penetration Pocket Per Detail: 20.Remove And Replace Soft Pourable Sealer. 3'SMp,ln Seam/Flashing(A)Where No Seam Edge Treatement Was Applied. 21 t Add Additional Pourable Sealer Or Roof Mastic To Shed Water - (B)Which Has Less Than The Minimum Required Lap(C}Where QuiekPrime i Was Not Applied properly or At An Inadequate Rate. (D)Sean Tape Not 22.ReBash Scupper Per Detail: .. Properly Placed In Seam 23.Drains:(A.)Replace Broken Drain Bolt.(B.)Tighten Loose Drain Bolt.(C.)Install y Missing Drain Bolt/Clamp.(D.)Install 4'x 4'Target Patch.(E.)Strip-In Seam 4.Install"T'Joint Patches Per Detail: Within 18"Of Drain With 6"FormFlash.(F.)Unplug Drain.(G.)Install Screen 5.Strip-In Seams With(A)Excessive/Insufficient Bleed Out(B)Feathered Lap Edges Basket.(H.)Install Waterbloek.(I.)Replace Missing/Broken Clamping Ring. (C)improper adhesion (I)Install Y x 3'Modified Target Patch.(K.)Install Lead.(L.)Install Roof Mastic 6.Batten/Seam Plate misplaced in Seam(Contact Firestone Technical Services) 7.Install T-Joint Patches at Roof Edge per Detail: 24.Install Additional Fasteners Per Specifications. (A)Insulation (B)Termination Bar (C)Base Tie-In (D)Drain Bar(E)In Seam 8.Install Base Tie-in and Flesch Per Detail: 9.Apply Joint Cover To Vertical EPDM Seam Per Detail: 25,Fill Void In Insulation And Repair Per Firestone Specification 10.Cut Out And Repair"Bridging" 26.Repair Damaged Membrane/Flashing. 11.ReBash Outside Corner Per Detail: 12.ReBash Inside Comer Per Detail: 27.Locate And Repair Leaks.(Reinspection is necessary) 28.Install Protective Layer Under Wood Sleeper/Pavers: 4 13.Install(Horiz./Vert.)Termination/CounterBashing Per Detail: 29.Redistribute/Add Ballast To Provide Proper Coverage. t 14.Fasten Flashing o.c.Per Detail: S 30.Install Walkway At Roof Access. 15,Apply Water Block Per Detail: 31.Submit Roof Drawing Showing All Seams And Penetrations. 16.Re-Apply Lap Sealant to lop of T-Bar: 32.Remove Debris From The Roof. 17.Add additional fasteners to T-Bar to provide continuous compression: 33.Repair Unfused Membrane. 34.Additional Repair(s): Owners Representative at inspection: x UPON COMPLETION OF REPAIRS,REINSPECTION BY FIRESTONE ❑Sq Footage of Roof appears ROOF ACCESSIBILITY S ❑NO P EWs not Necessary At This Time ❑Is Necessary ❑Field Deviation - to differ(rota PIN Installation Rating I) 11 III IV V The above repairs were complete in accordance with Firestone's Specification's on: By: And the roof system now conforms with Firestone specifications,details,and installation requirements. Applicator's Signature: Title(Authorized Officer Or Agent): Please sign and return Yellow Copy to your Regional,Technical Coordinator,by mail or fax. White-Firestone file copy Yellow-Acknowledgement: Sign And send copy to Firestone Tan-Applicator file copy Mail Or Fax To: Contractor Technical Services/Firestone Building Products P.O.Box 1962 Carmel,In.46032-5607/Fax 317-575.7031 Citp of 6alem, AaaarfjwMW Police ]Department Awbguarterg Chief of Police Robert M. St. Pierre July 31, 2002 Thomas St.Pierre Building Inspector City Of Salem 120 Washington Street Salem,MA 01970 The Salem Police Traffic Division gives permission to Crane&Rigging the right to work in Salem,Massachusetts on Sunday August 4, 2002. Permission to work is granted for the day. Summer Street may also be closed to traffic from Broad Street to Chestnut Street. This permit is issued due to the nature of the work and the required street closing which would not be practical during normal weekday commuting hours. If you have any questions please feel free to contact me at 978-744-0171 ext. 115. On August 4, 2002 all interested parties may contact the Salem Police Watch Commander at 978-744-0171 ext. 110. Sgt. Robert Preczeewski� Salem Police Traffic Supervisor 95 Margin Street Salem,MA 01970 ��oxol CITY OF SALEM, MASSACHUSETTS PUBLIC PROPERTY DEPARTMENT 1g 120 WASHINGTON STREET, 3RD FLOOR SALEM, MA 01970 •p� rllf� TEL. (978) 745-9595 EXT. 380 FAX (978) 740-9846 STANLEY J. LISOVICZ, JR. PETER STROUT, DIRECTOR OF PUBLIC PROPERTY MAYOR August 1,2002 Doug Campbell Crane &Rigging Service 251 Boston Road Southborough, Ma 01772 Dear Doug: Re: SUNDAY WORK PERMIT AUGUST 4, 2002 The City Of Salem Building Department authorizes a Sunday Work Permit. This permit is in conjunction with the Salem Police Traffic Division. The work involved is limited to the lifting of a shed building to the top of the Holyoke Insurance Building. The work is scheduled for Sunday, August 4, 2002 because of the street closings required. If there are any problems 1 can be reached 24 hours through the Salem Fire Department. Sincerely, Thomas J. St. Pierre Acting Building Commissioner TSP:mlk