7 HODGES COURT - BUILDING JACKET { 7 HODGES .COURT '
Certificate Number: B-14-774 Permit Number: B-14-774
Commonwealth of Massachusetts
City of Salem
This is to Certify that theTwo Family Building located at
Building Type
.........._.....,7 HODGES COURT ..._..........._......__........._.._.. in the ........................._.. City of Salem
Address Town/City Name
IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY
7 HODGES COURT
THOMAS H PSZENNY
This Permit is granted in conformity with the Statutes and Ordinances relating thereto, and
Not Applicable........ — — -
_ expires unless sooner suspended or revoked.
Expiration Date
a�
Issued On: Wednesday, December 03, 2014
Commonwealth of Massachusetts
City of Salem
120 Washington St,3rd Floor gnlom:MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupancy j
i
Permit No. B-14-774
nil
=EE PAID: $700.00 PERPOIT TO BUILU00'
SATE ISSUED: 4/14/2014
This certifies that PSZENNY THOMAS H
has permission to erect, alter, or demolish a building 7 HODGES COURT Mapll-ot: 350336-0
as follows: Renovation 747.14 RE FRAME ROOF, ADD DORMER,MOVE WALLS, SHEETROCK, NEW
KITCHENS & BATHROOMS, NEW ELECTRICAL SERVICE, UPDATE NEW PLUMBING FIXTURES -
DORMER PER ZBA SPECIAL PERMIT,
7/25/2014 ***NEW CONTRACTOR -A. ORFANOS REPLACING NORTHWIND BUILDERS. TSP
Contractor Name: Andrew P. Orfanos ,
DBA:
Contractor License No: Salem #164
��,, 411412014
Building fflclai/' Date
This permit shall be deemedabandoned and invalid unless the work authorized by this permit is commenced within sue months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
Ali work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws-and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued un61 all applicable signatures by the Building and Fire Officials are provided on this permit.
HIC #: "Persons contracting with unregistered contractors do not ham access to the guaranty fund"(as set forth in MGL e.142A).
Restrictions:
i
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER. j
pt
y SSM.
Nil
Structures
4
i t �
IExcavation P`
Fooling
y7 �
Fc>,anaatan
/r
F=naming
}Mechanical _ � _ .. .,� u
: I k
Insulation �r�lk�i�Yi INSPECTION;
Chimney/Smoke Chortihor
4 Y`✓ems _ j `i
p
l s r�aww`ww ` r
Nfil
e
Fire Department
Preliminary _ ` J
Final
Health D*part mmt
CITY OF SALEM MASSACHUSETTS
i BUILDING DEPARTMENT
120 WASHINGTON STREET,3AD FLOOR
\ u
'ISL. (978) 745-9595
FAX(978) 740-9846
KIMBERLEY DRISCOLL
MAYOR THOMAS STYIERRE
DIRECTOR OF PUBLIC PROPERTY/BUILDING COMMISSIONER
li
July 15, 2014
Andrew Balboni
Northwind Builders
87 Leach Street
Salem Ma. 01970
I1
Re: 7 Hodges Court
Dear Mr. Balboni,
We have received notice from the DPS that your CSL license has been suspended until January. It is necessary
for us to" Stop Work" on this permit until such time as another Construction Supervisor secures a permit.If
you have any questions,please contact me directly.
Sincerely,
Thomas Sarre
G �*�
Building Commissioner/Zoning Officer
�I
CITY OF SALEM MASSACHUSETTS
BOARD OF .APPEA1.
r�
r' 4Z r 20111 W -2 A ID 20
� 57011 itt iti,tt7\ itt St tr t't'a s vi H _AtaSSu a
l[-Lev 78-6 19i6a5 . t -%h 918-740-0404
K�a�nt'�na:v DrtCa..i. r ILL #
CITY CLERK. SALDI,MASS.
i
December 26, 2012
Decision
Cin- of Salem Zoning Board of \ppcal>
Petition of THOMAS H. PSZENNY requesting a Special Permit to construct a third-story
dormer on the two-family house located at 7 HODGES COURT (R-2).
�\ public hearing()it the above Petition was opened on December '19, 2012 pursuant to Mass
Genesi 1_aw Ch. 40,1, § 11. -1 be hearing was closed on December 19,2012 with the following
Zoning Board of Appeals members present. Rebecca Curran (Chair), Annie Harris, Michael buffy,
Richard Dionne, and Jimmy Tsitsinos (alternate).
Petitioner seeks a Special Pcrnut pursuant to Section 3.3.5 of the City of Salem Zoning Ordinances.
Statements of fact:
I. In.t petition date stampcd November 20, 2012 petitioner re", tested a Special Permit to
construct it third-story dormer on the two-farnily house located at 7 Hodes Cc.
2. ]Bela rd Stanley, the project's architect, presented the petition at the hearing. Mr. Pszeany
was also present
3. At the he:uring, no member of the public spokc in favor of or aganmst the project.
"the Boird of appeals,after careful consideeltion of the eridencu presenre.d at tie public hearing,
nd afro thorough review of rhe plaits and petition subnvttCd, makes the followin
ag findings:
L
Des irible relict li ai be eriumd without dcuirivni ici the pobfic good and without, nullif}�ing
or subscantialla derogating ftonm the intent or purpose of the zoning ordinance, since the
proposal is mLutnal and would not increase the nonconforraing nature of the structure, and
here would be no impact on traffic or utilities.
?. In permitting such change, the:Board ofAppealrs requires certain appropriate conditions and
safeguards as doted below.
i
1
On the basis of the.above Findings of fact and all evidence presented at the public hearing including,
but not lunate to, the Plnns, Documcrin and restimony, the Zoning Board of Appeals vored five (S)
in furor (Curran, l-1-ams, Dionne. DufQ and MrsmQ and name (0} 6oppmed, to grant the requested
epi caul Pet:nnt. :A Special Permit under Smnon 3 115 is grutred m allnm For the pYTnwd dormer
addiuun <:m i liudgest Ut, as shown on daL subnntted plans.
The Hoard of Appeals voted to grant,petitioner's request for a Special Petuut subject to the -
folloa,ing terms, conditions, and safegttards:
1. Petitioner shall comply with all cars, and state statutes, ordinances, codes and regulations.
?. All consrntction shall be done as per die plans:and dimensions sulmtined to and approved
by the Building; Conmu,sioner.
i. All requirements of the Salem Fire Department reletir-e to smoke and fire safetc�shall be
suicdy adhered to.
4. PetitiCtner shall obtain a building permit prior to beginning any construction.
S. Exterior finishes of the new construction shall be in hartnonr with the existing structure.
G. A Certificate of O,ccupancv is to be obtained.
a, Peritioner is tO obtain appmmol from ane Circ Board or Commission ha%ing jun-,diction
Including, but not Minuted to, the Planning Board and Flistorical Comnussion.
K Unless this Decision expressly provides otherwise, any zoning relief granted does not
empower or authorize the Petitioner to devrolish or QUYA$trnCt the structures} located on
the subject property to an extent of more than fifty=percent(50%) of its floor area or more
Than fifty= percent(50%) of its replacement cost at the time of destruction. If the structure is
demolished by any}means to an extent of more than fifty percenr (.50%) of its replacement
cost esu more than AS percent (5010) of its floor area at the time of destruction, it shall not
he rccon.rructc 1 e cepr in confornun as ith rbc fno1 isions of rhe Ordinance,
Rebecca Curran,Chau
Salem Board of Appeals
COPY OFTHIS DECISION HAS BEEN FILED Wl'I'H THF, PLANNING BOARD AND
CITY CLL-.RK
Appeal from this decision, Kant', shall be inqdr, pursuiu r to Section "I? of the Nlasndwsetts (kneral
I_nvs Chapter HM, and shall be filed wnhin 20 dans of filing of dos cit- irvion to due office of the Cin-
Chill. Pa,usuaM to the "N[Asachusuts General W v Chapter 40A, Section 1 I. the C mance or Special
Petnvt granted herein stall not take effect until a Copy of the decision }caring The certificate of the
C:ir (;leak has been Filed math rho F swx South Re hp aC Wdf,,
2