4 HODGES COURT - BUILDING JACKET !�_ 4 Hodges Court
.r.r . .. ��3".. . n1T•n.. -i�r.r5^FVf^'h3. ....r�r..�.'�n_; an'o-P.P�trryY�F 'f^Mry'a4--¢X�we �. -.w.µ)+nM1vnf %}.41, ^fi.NN.::1. ...s..h.......1 Y.... v
APP
cJ' �O THIS PEERMI`I NCOTV ALLIID UNLESS
CITY OF SALEM BUILDING 0a PROPERLY RECEIPTED BY CASHIER
3 4 SALEM, MASSACHUSETTS 01970 PERMIT
a
T4 _ � � VALIDATION
T)EE �,�1 p�� DATE 6/G619 90 PERMIT NO. 350-90
APPLICANT Raynand Beaupre T ADDRESS aridRd. Salem, NAR 38
(N0.) (STREET) ICONT'S LICENSE)
Install siding. Dwelling. NUMBER OF
PERMIT TJ I_1 STORY DWELLING UNITS
ITnPE OF IMPROVEMENT) N0. (P.O'OSEO USE)
AT (LOEAT)oNl 4_ Hodges Ct. Ward 1 oosiAlcT R2 .
IMO.) ISTREETI
BETWEEN AND
(CROSD STREET) (CROSS STREET)
. LOT.
SUBDIVISION LOT BLOCK SIZE
BUILDING IS TO OF FT. W-DE IT, FT. LONG BY FT. IN HEIGHT AND SMALL CONFORM IN CONSTRUCTION
TO TYPE USE GROUP BASEMENTWALLSOR FOUNDATION
(TVPL)
REMARKS: Install vinyl siding. (penui.t in Street file -no elec. penuit pulled) ?
CALL FOR INSPrA L W 745-9595AREA - p
VOLUME - ESTIMATED COSTS 4000• PERMIT S20.
(CUBIC SOUARE FEEII
OWNER Maryyy�Sptickens o
AODRE5' rAxb s ct. Salem, MR.
INSPWMR OF BUILDINGS D.H.
YOUR SPECIAL ATTENTION is wdled to this 6Alowing:
This permit is granted on the express condition that the said construction shall, in all respects,conform
to the Ordinances of this jurisdiction including the Zoning Ordinance,regulE'�ting the construction an 4useof
buildings, and may be revoked at any time upon violation of any provisions of said ordinances.
INvathurprouf pla,urd given at uw, time permit is issued must bo displayed un premises. the department must
N notified and inspe,tion tmde of prior conslru. tion aurk aes requesu•d on weather card. All new buildings and
aklitiuns ad Ateralinns to existing buildings rcCluiry a minimum of three cull inspections, namely, (1) Footings,
drain the s)stvms, found;dion aid basement walls, when walls are at lOaCt two feet high, hat before back filling
the wall and before proeredina with the �f+rrstrurturvv. (2) Framing prior w lathing and plaster-ng,duct work,
fire stopping end other equipment before it is i.mcvalv,l. (3) Final inspection when building or structure iu cors.
plead.
On jobs involving reinforced concrete work, inspection must be made after steel is in place and before concrote
is poured
The Department reserves the right to reject any work which hay been concealed or completed without first
having tarn :end appruvcd by lhr Uel.vtmrnt in atr•oordtmvt• with the requirements of the various codes.
Any deviation from the approved Alms must be athorizvd by the approval of revised plans subject to the same
procedure established for Ute examtnation of the original piss. An additional permit fee is also charged predicated
on the extent of the sear ration from the original plats'
Permits we not valid if construction work is not started within six months from date permit is issued.
Request for Fina! Inspection should be mads- by pustcard or phone call to ibis department when the
construction work is completed and heating apparatus has been instilled. Painting or decorating is not required
before the Final Building Inspection.
Final Inspection aid certificate of occupmev must be obtained befury cncupying building.
w
71 4z
Y T
-V-"est Abatement Inc.
fi
Certificate of Completion
TO: MRS. LUCIA ROBLES
. i 4 HODGES CT
SALEM, MA 01970
This is to certify that asbestos removal work, completed on the date listed below, has
been performed at the following address:
4 HODGES CT
SALEM, MA
• The work has been reviewed and was found completed in a competent and professional
ii manner.
2 • Required procedures specified in the contract documents and/or Federal and State laws
and regulations has been strictly adhered to with respect to asbestos transportation and
disposal at an approved landfill site.
• CONTRACTOR: A-BEST ABATEMENT, INC.
• LICENSE NUMBER. MA AC/000197 ME CF-0077
NH C-056 CT 000223
• SITE SUPERVISOR RODNEY FEUGILL
• CERTIFICATION NUMBER MA 030983 NH 1027 ME 0523
• COMPLETION DATE FEBRUARY 09, 2007