Auqust 28, 1986
William H. Munroe, Conmissioner
Salem Building Department, 3 �g
One Salem Green Re: Highland Avenue Development
Salem, MA. , 01970 Salem Highland Avenue Development Corp.
Dear Commissioner Munroe:
Be advised that the Developer of the above-listed project
is undertaking to proceed with the preparatory and development
construction work. Said work will done at the risk of the Developer.
Should it be determined that additional work and/or changes
must be made, the Developer shall do so under your instruction
and hold the City of Salem and the Salem Building Department harm-
less from any and all claims of liability.
Very truly yours
Mike Stasinos, President
J
r+
A'
CITY OF SALEM, MASSACHUSETTS '
CITY PLANNER ,1 - 1 .�•� 01970
"
CIV Y F ` (617) 744-4580
September 10, 1986
Mr. William Munroe
Building Inspector
City of Salem
One Salem Green
Salem, Ma. 01970
Re: Stasinos Project, 394 Highland Avenue
Dear Bill:
As required by the Consent Judgement, I have reviewed the proposed
plans for the above—mentioned project and find that Mike Stasinos has
met the following conditions:
I . submittal of preliminary plans to the appropriate boards (d)
2. submittal of Environmental Impact Statement to the Board of
Appeal (f)
3. compliance with design standards for streets, easements, open
spaces and protection of natural features as set forth in
Sections IV & V of the Sub—division Regulations and approved by
the City Planner (h)
4. compliance with required improvements as set forth in Section IV
& V of the Sub—division Regulations as per review on Thursday,
Sept. 4th with Paul Niman, Bill Munroe, Bob Turner, myself and
Tom Rouleau (electrical plans still to be reviewed) ( i)
5. establishment of 200' buffer zone (visual impact of development
on abutting neighborhood as yet to be assessed) (o)
6. submittal of all water, sewer and drainage improvements to the
Director of Public Services, approval of which is expected
within the next day (r)
7. submittal of plans to the Director of Public Services for
assessment of impact on infrastructure services, which approval
is expected within the next day (s)
2 -
tni1 „ _np irNm� �nncr be cmmni -r-d r rhe (-n:+.g"rr
2. 4.1 acres of land must be deeded to City for soccer field as
shown on site plan (b)
3 . City Planner must select a qualified engineer to serve as Clerk
of the Works (c)
4. revised definitive plan must be submitted to Board of Appeal
(plan currently in their possession does not reflect changes as
of Sept. 4th) (e)
5. performance bond must be submitted to the City Solicitor (g)
b. neighborhood review process must be completed (j)
7 . Covenant must be executed to prohibit construction on any other
portion of the property except portion utilized for 140
condominium units and the 3 ,000 s.f. office building (m)
8. all exterior building designs, building locations, lighting,
landscaping, infrastructure, site planning and design elements
must be approved by the Board of. Appeal and City Planner (n)
9. current foundation and building permits must be relinquished (q)
10. drainage and wetland impact must be reviewed and approved by
the Conservation Commission (on Sept. 11th agenda) (r)
11 . street names must be officially approved
While some further issues need to be resolved, the cooperation we
have received to date from Mike Stasinos leads me to recommend that a
building permit be issued for a small percentage of the total project.
This permit would be granted with the understanding on Stasinos' s part
that he would comply with any changes that may be required at a later
date to meet the conditions of the Consent Judgement even if such
changes affect work already undertaken.
Sincefely,
�7 j
/ ! .
Gerard �Kavanaugh
CitylPlaiiner
(Our �ntrm (6rrru
7d 5-02 13
William H. Munroe
Director of Public Property _ Maurice M. Martineau, Asst Inspector
Inspector of Buildings Edgar J. Paquin, Ass't Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
September /12, 1986
Mike Stasinos, President
Highland Avenue Deve?opment Corp.
Off 394 Highland Avck,
Salem, MA 01970
RE: Temporary Building Permits
Dear Mr. Stasinos:
Due to the fact that several issues remain to be resolved regarding your
property located off 394 Highland Ave. (i.e. street names, neighborhood meeting,
- - etc. ) prior to the issuance of Building Permits, this office cannot issue the
permits presently applied for.
However, in view of your letter dated August 28, 1986 in which you state
that work undertaken prior to receipt of all necessary approvals will be done
at the risk of the developer, and City Planner, Gerard Kavanaugh's letter of
September 10, 1986 recommending that due to your cooperation, permits be issued
for a small percentage of the project, this office agrees to the following:
1 . Work may commence on the three thousand (3000) squar;g foot
building to be used as your construction office;
2. Work may commence on one (1 ) six (6) unit building.
I will again remind you that this work is undertaken at your risk and that
foundations for these buildings will not be backfilled without the approval of
this department, as well as electrical and plumbing departments if services are
to be concealed by these foundations.
Sincerely,
William H. Munroe
Inspector of Buildings
WHM:bms
ccc City Planner
Councillor O' Leary
Electical
Plumbing
CITY OF SALEM, MASSACHUSETTS
nc nrnt oT••r
SHE SALE!,,6F.EtI,
CITY PLANNER - R•'+" L.� .I 01970
J617) 744-4580
October 21 , 1986
'e lid—
Mr. William Munroe —--'–""''----
Building Inspector
City of Salem
One Salem Green
Salem, MA 01970
Dear Bill :
Mike Stasinos has now met all the conditions of the Consent
Judgement (as revised per the October 15 , 1986 Board of Appeal Meeting) .
As a result, a building permit can be issued.
If you have any questions, please call me.
Si ce- ly,
/ f
/Gerard--Iql-" an gh
City Planner
bn622
r r 11 i, 1J;i 11.
Onc ;'Zflvm V_,roli
713-11!13
William H. Munroe
Director of Public Properly Maurice M. Martineau, Ass't Inspector
Inspector of Buildings Edgar J. Paquin, Ass't Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
December 12, !086
Mr. M. Stasinos
544 Chestnut Street
Lynn,MA 01904
RE: Highland Acres
Dear Mr. Stasinos;
Be aware that there is now confusion as to what and how your project
is being built.
-, Currently you are not developing your Site as per approved plans. Please
resolve this with both the Planning Department and Fire Department . Finally
an app.roved plan we all will work from must be provided to this department
for our use in our inpection and permit services .
Further you should be aware that no permits are now in place for Buildings
117, 8, and 12, where there now exist foundations.
Make immediate application to this depart-ment for the needed permits . Failure
to comply will, result in a stop wcrk order on these Buildings .
Also be aware that because of the discrepancy of the Site plan, no further
permits will be approved by this department
Should you have any questions in regards to this letter or any other area
of which we may be of assistance, feel free to contact us.
Respectfully,
(�,'O.r. J a,quin
- �,I i spector
Vul ng
EJP/laf
CC; L. Mroz Received by T date 1zjl�d�VL4
City Clerk
councillor Delivered by9Cp = date ?Ac=
Fire Inspector
Planning Dept . Witnessed by�J,,,.... date w2IAS3:�
File
i
1.
CITY OF SALEM, MASSACHUSETTS
cu„ ,, .,, �..am u:. �. . - arE SkLEIl, 'huN
CITY PLANNER - 'Cl J 01970
r. a (617) 744-4580
January 20, 1987
Mr. William Munroe
Building Inspector
One Salem Green
Salem, MA 01970
Dear Bill:
Five months ago, a Consent Judgment was handed down by the Superior
Court regarding the so—called Stasinos project located at 394 Highland
Avenue. I am writing to you to request that certain conditions of that
Judgment be addressed because of the lack of compliance which currently
exists.
First of all, the developer has been required to deed to the City a
4. 1 acre parcel of land following the construction of soccer fields.
Obviously, we do not want the parcel deeded over until the required
improvements are completed. It would be advisable, though, to do the
following:
1. Request that the developer submit a detailed site plan of the
proposed improvements, including the fields, parking, and
landscaping for review and approval;
2. Request that the developer, upon approval of the plan, ,
immediately begin to construct such improvements; and
3 . Request that the developer execute an agreement with the City
specifying the timetable for the above steps.
In addition, the site plan was reviewed and approved by the City,
but the developer is now proposing changes in the approved plan. There
are several site design alterations proposed which must be reviewed and
approved again. In this regard, my specific concern relates to the
proposed internal vehicular circulation system in which several
improvements to provide adequate fire access have been eliminated.
These changes should be addressed, and a final decision should be made
regarding the adequacy of the altered plan.
Finally, the developer is required to complete a neighborhood
review process. Because of the above amendments to the plan, I believe
that the developer should hold an additional. neighborhood meeting to
review the current status of the project, and make certain that all
concerns of the neighbors are fully addressed. This meeting should take
place immediately.
I would respectfully request that you require these issues to be
resolved to our satisfaction immediately. If that cannot be done, I
would recommend that building permits be revoked.
Thank you for your cooperation in this matter.
Sinc
Gerar Kavanaugh
Cityla..6lrer
3563 1 �/
cc: Leonard F. O'Leary
City Council President
�i�t1 II� �c�IL'I11 � �� c�55c�C��Li52��5
1
Onr ?alrni (brrru
7.13-11213
\Viliiam H. Munroe
Director of Public Property Maurice M. Martineau, Asst Inspector
Inspector of Buildings Edgar J. Paquin, Asst Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
January 23, 1987
Mr. Mike Stasino
544 Chestnut Street
Lynn, Ma 01904
RE: Superior Court Consent Judgement
394 Highland Avenue, Salem, MA
Dear Mr. Stasino,
It has been brought: to my attention that there has been a lack of compliance
with certain conditions of the Superior Court. Consent Judgement that effect 's
your property located at 394 Highland Avenue.
In order for this department to continue issuing Building Permits for your
project I must insist that you give the following your immediate attention.
1 . Submit a detailed site plan of the proposed soccer field's improvements
including field' s, parking and landscaping for review and approval.
2. Immediately upon approval of the plan's, start construction on these
improvements.
3. That an agreement with the City of Salem must be executed specifying
the time-table for the above steps.
4 . That a revised site plan be submitted for the entire project indicating
changes you are proposing from the plan previously approved by the
City of Salem. These changes must be addressed and final approval
granted by. the City of Salem prior to proceeding with any plan change.
5. If changes are proposed in the site plan, a neighborhood meeting must
be held immediately to review the current status of the project and to
make certain that all concern' s of the neighbor' s are fully addressed.
No further Building Permits will be issued for this project until these matters
have been resol�v o satisfaction of the City of Salem.
Delivered by: Sincerel
WHM/ea£
Received by: William H. Munroe
I Inspector of Buildings
C.C. Mayor Sal vo
Council President O'Leary
City Solictor
MICHOLAG . CURUBI'
February 3 , i1'98�
WILLIAM H. MUNROE, Inspector,
Public Property Department
Building Department, City of Salem,
One Salem Green
Salem, MA. , 01970
Dear Mr. Munroe: Re. _ -394 ,High'land:Ave ,' Salem
Consent' Judgment-
Your letter of January 23 , 1987 , was referred to
my office, resulting in a conference with Mr. Stasinos ,
the developer.
The matters set forth in your letter, needing an
answer, were discussed.
No major changes were made in the original plan sub-
mitted to the City Engineer and approved by all concerned
departments . The minor changes, not contravening the inte-
grity of the original plan, were to minimize the impact
of the necessary blasting to the neighborhood .
The developer intends to comply with said original
plan; and, he intends to proceed without any changes .
Therefore , no revised site plan is contemplated,
requiring a neighborhood meeting.
A copy of the approved general plan will be submitted
to your office for your files.
Very truly yours,
h
Nich 1 s G. Curuby
NGC/
cc: Planning Department
City of Salem
►situ of ` Ulcni mi5ac4uutt5
(One '_;nlrnt (6rrrn
7.15-0213
\Villiam H. Munroe
Director of Public Property Maurice M. Martineau, Ass't Inspector
Inspector of Buildings Edgar J. Paquin, Ass't Inspector
Zoning Enforcement Officer John L. LeClere, Plumbing/Gas Insp.
February 13, 1987
To the Honorable City Council
City of Salem
RE: Court Judgement, 394 Highland Ave.
Ladies & Gentlemen:
In response to the Council .Order of January 27 , 1987 regarding the
Court Judgement for property located at 394 Highland Avenue, I respectfully
submit the following.
Approval of the various sections of the conditions set forth lies with
the various Boards and Departments as specified. The only reference to the
Building Department being in Condition 2.0 which states that, "the City
Planner shall submit a written statement, of satisfaction of all such conditions
to the Building Inspector, City of Salem prior to the issuance of a Building
Permit."
In a letter dated October 21 , 1986 I was advised by the City Planner that
all conditions of the Consent Judgement had been met and that permits could be
issued. Based on this, permits requested were honored by this Department.
In a follow-up letter, dated January 20, 1987, I was advised by the City
Planner that, "certain conditions of the Judgement be addressed because of the
lack of compliance which currently exists." On January 23, 1987 , a letter was
hand delivered to Mr. Cris Stasinos,at the development site, outlining the City's
concerns and advising the developer that "no further Building Permits will be
issued for this project until these matters have been resolved to the satisfaction
of the City of Salem." This order still stands and will remain in effect until
such time as I am advised by the City Planner that all conditions have been met.
Respectfully,
/William H. Munroe
Inspector of Buildings
WHM:bms
cc: Councillor O' Leary
CITY uF Si LPA, PAPESAr" iv-�TTu
_.CITY PLANNER (y}, .,.I 01970
(017) 744-4580
February 24, 1987
Mr. William Munroe
Building Inspector
City of Salem
One Salem Green
Salem, MA 01970
Dear Bill:
Today Mike Stasinos submitted a new site plan to my office
for his development at 394 Highland Ave. which includes replacement
of some 6-unit buildings with 8-unit buildings among other changes.
Until this plan is reviewed and approved, I hereby request that you
revoke all existing building permits and not issue any new permits.
Thank you for your assistance. / /
7
TGeraKa
augh
cc: Mike Stasinos
v�it1 II �II>rrit, �i'Hc�55C�t�ISE
L rpf -�.Il:CAl lU i'Ccn
7,15-UG 13
William H. Munroe
Director of Public Property Maurice M. Martineau, Asst Inspector
Inspector of Buildings Edgar J. Paquin, Asst Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
February 25, 1987
Mr. Mike Stasinos
544 Chestnut Street
Lynn, MA 01904
RE: Stop Work Order, -.394 Highland Avenue, Salem
Dear Mr. Stasinos:
I have been informed by the City Planner that you have submitted a
new Site Plan,for review and approval, to his office.
I would call your attention to Section 115.3 of the Massachusetts
State Building Code which states, in part, "A lot or site shall not be
changed from that shown on the official site plan unless a revised plan
showing such changes shall have been filed and approved."
Until this matter is resolved I .must insist all work on this project
cease immediately upon your receipt of this Order.
Failure to comply with this Order will leave me no alternative but
to initiate the appropriate legal action. Be advised that conviction of
violation of the Massachusetts State Building Code carries a fine, not to
exceed One Thousand dollars ($1 ,000) a day for each violation and each day
the violation continues is a separate offense.
Sincerely,
William H. Munroe
Inspector of Buildings
WIN:bms
cc: City Clerk
Council President
City Solicitor
City Planner
STASINO''S PROJECT
10/23/86 11715 1 Spring Pond Road Office Bld. inconjuction with
project
10/24/86 716 lA Indian Hill Lane Erect dwelling
10/24/86 717 1B Indian Hill Lane Erect dwelling
10/24/86 718 IC Indian Hill Lane "
10/24/86 719 ID Indian Hill Lane "
10/24/86 720 3A Indian Hill Lane "
10/24/86 721 3B Indian Hill Lane "
10/24/86 722 3C Indian Hill Lane "
10/24/86 723 3D Indian Hill Lane "
10/24/86 724 3E Indian Hill Lane "
10/24/86 725 3F Indian Hill Lane "
10/24/86 726 4A Indian Hill Lane "
10/24/86 727 4B Indian Hill Lane "
10/24/86 728 4C Indian Hill Lane "
10/24/86 729 4D Indian Hill Lane "
10/24/86 732 2A Indian Hill Lane "
10/24/86 733 2B Indian Hill Lane "
10/24/86 734 2C Indian Hill Lane "
10/24/86 735 2D Indian Hill Lane "
10/24/86 736 2E Indian Hill Lane
10/24/86 737 2F Indian Hill Lane
STASINO' S PROJECT
10/24/86 11738 2D Overlook Lane Erect Dwelling
10/24/86 739 2C Overlook Lane "
10/24/86 740 2B Overlook Lane "
10/24/86 741 2A Overlook Lane
10/24/86 742 IA Overlook Lane
10/24/86 743 IB Overlook Lane "
10/24/86 744 1C Overlook Lane,
10/24/86 745 ID Overlook Lane "
10/24/86 746 IE Overlook Lane
10/24/86 747 IF Overlook Lane "
t1�itU of �$ttlrm, �fflttssurlluerits
Pnttra of c�i>pettl
8
eP 2S ,
DECISION ON A REQUEST FOR AN EXTENSION AT�3� 94 HIGHLAND AVE.
THOMAS KATSAPETSIS, TRUSTEE, PRIME INVESTMENT—TRUST s.,. , .,
A hearing on this petition was held September 19, 1990 with the following Board
Members present: Richard Bencal , Chairman; Joseph Correnti , Richard Febonio,
Edward Luzinski and Mary Jane Stirgwolt. Notice of the hearing was sent to
abutters and others and notices of the hearing were properly published in the
Salem Evening News in accordance with Massachusetts General Laws Chapter 40A.
Petitioner, owner of the property is requesting a twenty four month extension on
Condition 2(v) of a Consent Judgment that was entered into on August 18, 1986.
The property is located in a BPD District. The extension is requested to allow
the completion of the remaining units in the condominium project.
The Board of Appeal , after carefully considering the evidence presented, makes the
following findings of fact:
1 . All municipal services required by the Consent Judgment made on August 18,
1986 in Superior Court were installed within three (3) years from the date
of approval of definitive plans.
2. Construction of all of the proposed condominium units has not been completed
due to changes in economic conditions.
3. The petitioner acquired the property subject to the Consent Judgment and
requests a twenty four (24) month time extension to comply with that
Consent Judgment.
4. Several occupants and neighbors of the condominium complex spoke in favor
of the petition, citing improvements made by the petitioner once he acquired
an interest in the property.
5. A petition signed by ninety seven (97) individuals in favor of the extension
was presented for the record.
6. The construction thus far completed, coupled with changing economic conditions,
make this property unique within the zoning district and create a hardship
for the petitioner if the time extension is not granted.
Therefore, the Zoning Board of Appeal voted unanimously 5-0 to grant the 24 month
extension on condition all other conditions of the Consent Judgment made on April
18, 1986 in Superior Court be complied with.
Mary J tirgwo t, tuber Board of Appeal
A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK
Appeal from this decision, if any, shall be made pursuant to Section 17 of the Mass. General Laws, Chapter
808, and shall be filed within 20 days after the date of filing of this decision in the office of the City
Clerk. Pursuant to Mass. General Laws Chpater 808, section 11, the Variance or Special Permit granted herein
shall not take effect until a copy of the decision bearing the certification of the City Clerk that 20 days
have elapsed and no appeal has been filed, or that, if such appeal has been filed, that it has been dismissed
or denied is recorded in the South Essex Registry of Deeds and indexed under the name or the owner of record
nr is r nrAwi nnri mfoA nn tFw flwar'c fartifirafo of Tiflo.
l '
w
131 PVT
h f�rEN�--D
Condominium at yalem ;
September 28, 1987
Mr . William H. Munroe
Building Inspector
Building Department
City of Salem
Salem, MA. 01970
Re: EXTENSION OF BUILDING PERMITS
THE_HIGHLAND_CONDOMIN3U1:?AT-SALEM
L94_HIGHLAND AVENUE,-SALEM,-MASS .
Dear Mr. Munroe:
Request is hereby made that the Building
Permits for the following units at The Highland Condominium
at Salem, 394 Highland Avenue, Salem, Massachusetts , be
extended for an additional six (6) month period:
BUILDING UNIT
NO. NO. STREET ADDRESS PERMIT NO.
9. . . . . 901 . . . 21 TANGLEWOOD LANE. . . . 206
9. . . . . 902 . . . 23 TANGLEWOOD LANE. . . . 207
9. . . . . 903 . . . 25 TANGLEWOOD LANE. . . . 208
9. . . . . 904 . . . 27 TANGLEWOOD LANE. . 209
19. . . . . 905 . . . 29 TANGLEWOOD LANE. . . . 210
9. . . . . 906 . . 31 TANGLEWOOD LANE. . . . 211
10 . . . . 1001 . . . 28 TANGLEWOOD LANE . . . . 212
10 . . 1002 . . . 26 TANGLEWOOD LANE. . . . 213
10 . . . . 1003 . . 24 TANGLEWOOD LANE. . . . 214
10 . . . . 1004. . . 22 TANGLEWOOD LANE. . . . 215
13 . . . . 11306. . . 12 COUNTRYSIDE LANE . . . 147
13 . . . . 1305. . . 10 COUNTRYSIDE LANE . . . 148
13 . . . . 1304. . . 8 COUNTRYSIDE LANE. . . . 149
13 . . . . . 1303. . . 6 COUNTRYSIDE LANE. . . . 150
13 . . . . 1302. . . 4 COUNTRYSIDE LANE. . . . 151
13 . . . . 1301. . . 2 COUNTRYSIDE LANE. . . . 152
14 . . . . 1401 . . . 1 COUNTRYSIDE LANE. . . . 220
14 . . . . 1402 . . . 3 COUNTRYSIDE LANE. . . . 221
14 . . . . 1403 . . . 5 COUNTRYSIDE LANE. . . . 222
One Olde Village Drive, Salem, MA 01970 Phone(617) 741-2003
(Formerly 394 Highland Avenue, Salem, MA 01970)
Mr. William H. Munroe
Page -2-
September 28, 1987
BUILDING UNIT
NO. NO. STREET ADDRESS PERMIT NO.
14. . . . . 1404. . . 7 COUNTRYSIDE LANE. . . . . . . 223
14. . . . . 1405. . . 9 COUNTRYSIDE LANE. . . . . 224
14. . . . . 1406. 11 COUNTRYSIDE LANE .. . . . . . . 225
15. . . . . 1501 . . . 3 OLDE VILLAGE DRIVE . . . . . 233
15. . . . . 1502. . . 5 OLDE VILLAGE DRIVE. . . 234
15. 1503 . . . 7 OLDE VILLAGE DRIVE. . . 235
15. . . . . 1504. . . 9 OLDE VILLAGE DRIVE: . . . 236
15. . . . . 1505. . . 11 OLDE VILLAGE DRIVE . . . . . 237
15. . . . . 1506. . 13 OLDE VILLAGE DRIVE . . . 238
15. . . . . 1507 . . . 15 OLDE VILLAGE DRIVE . . . . 239
15. . . . . 1508. . . 17 OLDE VILLAGE DRIVE . . . . . 240
16. . . . . 1601 . . . 19 OLDE VILLAGE DRIVE . . . . . 241
16. . . . . 1602. . . 21 OLDE VILLAGE DRIVE . . . . . 242
16 . . . . . 1603. . . 23 OLDE VILLAGE DRIVE . . 243
16. . . . . . 1604. 25 OLDE VILLAGE DRIVE . . . 244
16. . . . . 1605. . . 27 OLDE VILLAGE DRIVE . 245
16. . . . . 1606. . . 29 OLDE VILLAGE DRIVE . . . . 246
17 . . . . . 1701 . . . 2 LIONS' LANE. . . . . . 247
17. . . . . 1702. . . 4 LIONS LANE. . . . . . . . 248
17. . . . . 1703. . 6 LIONS LANE . . . . . . . . 249
17. . . . . 1704 . . . 8 LIONS LANE. . . . . . 250
17. . . . 1705. . . 10'-LIONS LANE . . . . . 251
17 . . . . 1706. . 12 LIONS LANE . . . . . . . . 252
18. . . . 1801 . . . 14 LIONS LANE . . . . . . . . 253
18. . . . . 1802. . . 16 LIONS LANE . . . . . . 254
18. . . . . 1803. . . 18 LIONS LANE . . . . . . . . 255
18 . . . . 1804. . . 20 LIONS LANE . . . . . . . . . 256
19. . . . . 1901 . 36 LIONS LANE . . . . . . . . 264
19. . . . 1902 . . . 34 LIONS LANE . . . . . . 263
19. . . . . 1903 . . . 32 LIONS LANE . . . . 262
19 . . . . 1904. . . 30 LIONS LANE . . . . 261
19. . . . 1905. . 28 LIONS LANE . . . . . . . 260
19. . . . 1906. . . 26 LIONS LANE . . . . . . . . . 259
19. . . . . 1907 . . 24 LIONS LANE . . . . . . . . 258
19 . . . . . 1908 . . . 22 LIONS LANE . . . . . . . . . 257
Mr. William H. Munroe
Page -3-
September 28, 1987
BUILDING UNIT
NO. NO. STREET ADDRESS PERMIT NO.
20. . . . . . 2001 . . . 9 LIONS LANE. . . . 265
20. . . . . . 2002. . . 11 LIONS LANE . . . . . . 266
20. . . . . 2003_ . . 13 LIONS LANE . . . 267
20. . . . . . 2004. . . 15 LIONS LANE '. . . . 268
20. . . . 2005. . . 17 LIONS LANE . . . . . 269
20. . . . . 2006 . . . 19 LIONS LANE . . . . . . 270
21. . . . . . 2101. . . 111LIONS LANE . . . . . . 271
21 . . . . . . 2102. . . 3 LIONS LANE. . . . . . 272
21 . . . . . . 2103 . . 5 LIONS LANE. . . 273
21 . . . . . . 2104. . . 7 LIONS LANE. . . . . 274
22 . . . . . 2206. . . 12 CARRIAGE HILL LANE 275
22. . . . . . 2205. . . 10 CARRIAGE HILL LANE . 276
22 . . . . . . 2204. . . 8 CARRIAGE HILL LANE. . 277
22. 2203 . . . 6 CARRIAGE HILL LANE. . . . 278
22. . . . . . 2202. . . 4 CARRIAGE HILL LANE. . . 279
22. . .. - . 2201 .- 2 CARRIAGE HILL LANE. . . . 280
23 . . . . . . 2301. . . 14 CARRIAGE HILL LANE . 281
23 . . . . . 2302 . 16 CARRIAGE HILL LANE . . . 282
23 . . . . . . 2303 . . . 18 CARRIAGE HILL LANE . 283
23 . . . . . . 2304.. . 20 CARRIAGE HILL LANE . . . 284
24. . 2406. . . 38 LIONS LANE. . . . 285
24 . . . . . 2405. . . 40 LIONS LANE. . . 286
24. . . . . . 2404. . . 42 LIONS LANE. . . . . . . 287
24 . . . . . . 2403 . 44 LIONS LANE. . . . . 288
24 . . . . 2402. . . 46 LIONS LANE. . . . . . . 289
24 . . . . . . 2401 . . . 48 LIONS LANE. . . . . . . 290
25. . . . . . 2501 . . . 9 CARRIAGE HILL LANE . . . 291
25. . . . . . -2502. . 11 CARRIAGE HILL LANE. . . 292
25. . . . 2503 . . 13 CARRIAGE HILL LANE. . . 293
25. . . . . 2504. . . 15 CARRIAGE HILL LANE. . . 294
25. . . . . . 2505. . . 17 CARRIAGE HILL LANE . 295
25. . . 2506. . 19 CARRIAGE HILL LANE . . . 296
Mr. William H. Munroe
Page -4-
September 28, 1987
BUILDING UNIT
NO. NO.:. STREET ADDRESS PERMIT NO.
26:._. 2601 . . . 1 CARRIAGE HILL LANE. 297
26. . . . . 2602. . .3 CARRIAGE HILL LANE. .. 298
26. . . . . 2603 . . . 5 CARRIAGE HILL LANE. . . 299
26 . . . . . 2604. -. . 7 CARRIAGE HILL LANE. . . 300
Your kind attention to this request is greatly
appreciated.
Very truly yours ,
SALEM HIGHLAND D ELOPMENT CORP.
BY:
H4' e Stasinos
President
MS: caj
Th
Condominl= at yalem
June 29 , 1988
William H . Munroe ,
Director of Public Property
City of Salem
One Salem Green
n
Salem, MA 01970
�Ws
c--
RE : THE HIGHLAND CONDOMINIUMS at SALEM Q, "
r CO) T
Dear Mr . Munroe :
nxp crJ
This letter is to inform you that allthe units are owner== = "
occupied . There are no rental units . k
In regards to the swimming pool , it will only be used by the
unit owners and their guests .
Yours truly ,
SALEM HIGHLAND DEVELOPMENT CORP .
Thomas Katsapetse
Builder
TK/bg
One Olde Village Drive, Salem, MA 01970 Phone (617) 741-2003
(Formerly 394 Highland Avenue, Salem, MA 01970)
PETER F. DIMEO ASSOCIATES, SNC, ARCHITECTVRE 3'LAZgNl1VC3
$44 MAIN STPSET . STONEHAM, MAS SACHOSE T 15 01100 TE { 5PNONC 470-0900
May 18, 1990
Building Department
City of Salem
One Salem Green
Salem, MA . 01970
Attention ; Mr. William Munroe
Re;:7HIGHfAND ACRES
X394 HIGHLAND AVENUE, SALEM, MASS,
Dear Mr. Munroe;
I , PETER F. DI MEO, Registration No . 1665, being a Registered
Architect her certify that I have prepared or directly supervised
the preparation of all design plane, computations and specifications
for the above-referenced project and that , to the best of my
knowledge , such plans , computations and specifications meet the
applicable provisions of the Massachusetts State Building Code, '. all
acceptable engineering practices and applicable laws and ordinances
for the proposed use and occupancy .
I further certify that I shall perform the necessary professional
services and be present on the construction site on a regular and
periodic basis to determine that the work is proceeding in accordance
with the documents approved for the Building Permit .
Sincerely ,
PETER NEO ASSOCIATES, INC. `' �\StEae°-nacyr
BY: /4-1/ a No.1666 0 \
I STON EHA M.
Peter F. Di eo, AIA \5 MASS. %f
s
Cow (94 of '*1CM, 'fflassar4usetts
8 S•. "
Public PropertU Pepartnteut
�. s 7A
�luildiuq 3flepartntent
One *alrm tbrrrn
7.15-0213
William H. Munroe
Director of Public Property Maurice M. Martineau, Ass't Inspector
Inspector of Buildings Edgar J. Paquin, Ass't Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
October 5, 1987
Mr. Mike Stasinos
The Highland Condominium at Salem
394 Highland Avenue
Salem, Ma. 01970
RE: Extension of Building Permits
Dear Mike,
I have discussed your request for extensions of building permits
with Mr. Munroe. This letter is to inform you that your request for
a six (6) month extension has been granted.
I have enclosed a photo copy of your original letter of request.
These are the units and permits that we are extending at this time.
Sincerely,
iStepen W. an
� Asst. Buil ing spector
CC: Planning Dept.
Engineer
Electrical
Fire Dept.
ENC.
;Mr. William H. Munroe
Page -4-
September 28 1987
BUILDING UNIT
NO. NO STREET ADDRESS PERMIT NO.
24. . . 2406. . . 38 LIONS LANE. . . . . . . 285
24 . . . 2405.. . 40 LIONS LANE. . . . . 286
24. . . . . . 2404. . . 42 LIONS LANE. . . 287
24 . . . . . . 2403 . . . 44 LIONS LANE. . . . . 288
24 : . : . . . . 2402. . . 46 LIONS LANE. . . . . . 289
24 . . . . . . 2401. . . 48 LIONS LANE. . . . . . . 290
25. . . . . . 2501. . . 9 CARRIAGE HILL LANE . . . 291
25. . . . . . 2502. . 11 CARRIAGE HILL LANE. . . 292
25. . . . . 2503. . . 13 CARRIAGE HILL LANE. . . 293
25. . . . . . 2504. . . 15 CARRIAGE HILL LANE. . . 294
25. . . . . 2505. . . 17 CARRIAGE HILL LANE. 295
25. . . . . . 2506. . . 19 CARRIAGE HILL LANE. 296
26- . . . . 2601 . . . 1 CARRIAGE HILL LANE. . . 297
26. . . . . 2602 . . . 3 CARRIAGE HILL LANE. , 298
26. . . . . 2603 . . 5 CARRIAGE HILL LANE. . . 299
26. . . . 2604. . . 7 CARRIAGE HILL LANE. . . 300
Your kind attention to this request is greatly
appreciated.
Very truly yours ,
SALEM HIGHLAND D ELOPMENT CORP.
BY:
ale)StAos
President
MS : caj
� r
(9ttV of �*alem, Aussar4usetts
Public Vropertq Pepurttnettt
AA 9 �p
•`�to{NML V�+'4v ' uilhijtg Peparttnent
O)nr Salem (f[irren
7.15-0213
William H. Munroe
Director of Public Property Maurice M. Martineau, Asst inspector
Inspector of Buildings Edgar J. Paquin, Asst Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
October 5, 1987
Mr. Mike Stasinos
The Highland Condaninium at Salam
399 Highland Avenue
Salam, Ma. 01970
RE: Extension of Building Permits
Dear Mike,
I have discussed your request for extensions of building permits
with Mr. Munroe. This letter is to inform you that your request for
a six (6) month extension has been granted.
I have enclosed a photo copy of your original letter of request.
These are the units and permits that we are extending at this time.
Sincerely,
%Stephen W. an
As Buil ingspector
CC: Planning Dept.
Engineer
Electrical
Fire Dept.
ENC.
f
y
mr.� William H. Munroe
Page -4-
September 28 1987
BUILDING UNIT
NO. NO. STREET ADDRESS PERMIT NO.
24 . . . 2406. . . 38 LIONS LANE. . . . . . . . 285
24 . . . . . . 2405. . . 40 LIONS LANE. . . . . . . 286
24. . . . . . 2404. . . 42 LIONS LANE. . . . . 287
24 . . . . . . 2403. . . 44 LIONS LANE. . . . . 288
24 . . . . . . . 2402. . . 46 LIONS LANE. . . . . . . 289
24. . . . . . 2401. . . 48 LIONS LANE. . . . . . . 290
25. . . . . 2501. . . 9 CARRIAGE HILL LANE . . . 291
25. . . . . . 2502. . 11 CARRIAGE HILL LANE. . . 292
25. . . . . 2503. . . 13 CARRIAGE HILL LANE. . 293
25. . . . . . 2504. . . 15 CARRIAGE HILL LANE. . . 294
25. . . . . . 2505. . . 17 CARRIAGE HILL LANE. 295
25. . . . . . 2506. . . 19 CARRIAGE HILL LANE. . 296
26. . . . . . 2601 . . . 1 CARRIAGE HILL LANE. . . 297
26 . . . . . 2602 . . .3 CARRIAGE HILL LANE. . . 298
26. . . . . 2603 . . . 5 CARRIAGE HILL LANE. . . 299
26. .. . . . 2604 . . . . 7 CARRIAGE HILL LANE. 300
Your kind attention to this request is greatly
appreciated.
Very truly yours ,
SALEM HIGHLAATD D ELOPMENT CORP.
BY :
Je)Stasinos
President
14S :.caj
1 t
IT
ETEEL F. DIMEO ASSOCIATES, IN'C1- � ''AACI;ITECTVItE PLANNING
5 6 6 M A I N S T R E E T , S T O N E H A M , M A 5 5 A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 43 8-09 00
May 16, 1988 ry n}jj
Building Department
City of Salem
One Salem Green CITY
• I : y ;,'s•' ,
Salem, Ma. 01970
Attention: Mr. William Munroe
Re: Highland Acres
394 Highland Avenue
Salem, Ma
Dear Mr. Munroe:
We have inspected the entire condominium development at the
above address on May 16, 1988, and the condition.,of. the_
development, which includes Buildings number 13, 14, 15, 16,
17, 18, 19, 20, 21 , 22 and 23 are as follows:
BUILDING #13. 6 UNITS "B" TYPE:
1 . Siding - 100% completed.
2. Exterior Painting 100% completed.
3. Exterior stairs 100% completed.
4. Drywall 100% completed.
5. Interior Finish 100% completed.
6. Prime Coat Interior Paint completed.
7. Rough Plumbing completed.
8. Finish Heating 100% completed.
9. Finish Electrical 100% completed.
10. Exterior Landscaping completed.
BUILDING #14. 6 UNITS "A" TYPE:
1 . Rough Framing 100% completed.
2. Roof shingles 1008 completed.
3. Exterior windows and doors installed.
4. Exterior Siding completed.
5. Rough Plumbing, Heating and Electrical 100% completed.
6. Insulation completed.
7. Drywall 100% completed.
ETEn F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET , STONEHAM , MASSACHUSETTS 02180 TE E'EPH0NE 438-0900
Building Department
City of Salem
Re: Highland Acres
Page 2.
May 16, 1988
BUILDING #14. 6 UNITS "A" TYPE: (cont'd. )
8. Prime coat interior paint completed.
9. Exterior Stain completed.
10. Exterior Landscaping completed.
BUILDING #15. 6 UNITS "B" TYPE:
1 . Foundation completed.
2. Underslab Utilities completed.
3. Concrete Slab Floor completed.
4, Concrete Block Party Wall completed.
5. Exterior Rough Framing completed.
6. Roofing Completed.
7. Exterior Doors and Windows Installed.
8. Exterior Siding completed.
9. Installing of Interior insulation has commenced.
10. Rough Plumbing, Heating and Electrical Completed.
11 . Exterior Stairs completed (no railings) .
12. Exterior Driveway grading ready to receive bituminous
concrete paving.
BUILDING #16. 6 UNITS "A" TYPE:
1 . Footings completed.
2. Foundation Walls completed
3. Underground Utilities Completed.
EETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 M A IN S T R E E T , S TO N E H AM . M A S S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 438-0900
Building Department
City of Salem
Re: Highland Acres
Page 3.
May 16, 1988
BUILDING #17. 6 UNITS "B" TYPE:
1 . Exterior Framing 1008 completed.
2. Interior Partitions 1008 installed.
3. Rough Plumbing, Heating, and Electrical 1008 completed.
4. Roof Shingles 1008 installed.
5. Clapboard Siding 1008 completed.
6. Doors and Windows installed.
7. Insulation 1008 completed.
8. Drywall 1008 completed.
9. Exterior Coat of Stain completed.
10. Exterior Brick Stairs completed (no railings) .
11 . Exterior Driveway grading ready to receive bituminous
concrete paving.
BUILDING #18. 6 UNITS "B" TYPE:
1 . Foundation 1008 Completed.
2. Interior Grading Completed.
3. Underground Utilities Completed.
4. Concrete Floor Slab Completed.
5. Masonry Party Walls to Second Floor.
6. Rough Framing up to 2nd. floor ready to receive roof
trusses.
7. Rough Exterior Grading Completed.
EETE'R F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET . STONEHAM , MASSACHUSETTS 02180 TE L'EPH0N1 438-0900
Building Department
City of Salem
Re: Highland Acres
Page 4.
May 16, 1988
BUILDING #19. 6 UNITS "A" TYPE:
1 . Foundation 100% completed.
2. Concrete Floor Slab completed.
3. Rough exterior grading 1008 completed.
4. Underground Utilities Completed.
BUILDING #20. 6 UNITS "A" TYPE:
1 . Foundation 1008 completed.
2. Concrete Floor Slabs Completed.
3. Rough exterior grading 1008 complete.
4. Underground Utilities Installed.
5. Masonry Party Walls to Second Floor.
6. Rough Framing to 2nd. Floor, Roof Framing 508 completed.
BUILDING #21 . 4 UNITS "A" TYPE:
1 . Rough Framing 1008 completed.
2. Interior Partitions 100% completed.
3. Doors and Windows installed.
4. Clapboard Siding 1008 completed.
5. Exterior Stain completed.
6. Rough Plumbing, Heating and Electrical completed.
7. Drywall 758 completed.
8. Rough grading completed, ready to receive Driveways.
BETE.'R F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 M A I N 5 T R E E T , S T O N E H A M , M A S S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 43 8-09 00
Building Department
City of Salem
Re: Highland Acres
Page 5.
May 16, 1988
BUILDING #22. 6 UNITS "B" TYPE:
1 . Foundation 100% Completed.
2. Underground Utilities completed.
3. Concrete Floor Slab installed.
4. Rough Exterior Grading 100% Completed.
BUILDING #23. 4 UNITS "A" TYPE:
1 . Foundation 100% completed.
2. Interior Grading completed, ready to receive concrete slab.
3. Underground Utilities completed.
All work is progressing satisfactory in accordance with drawings
provided by this office.
If there are any questions regarding any of the above, please do
not hesitate to contact this office.
Sincerely,
P R F. DIMEO ASSOCIATES, INC
1G '1�J�\ \g'(F.REF A ,
{
Peter F. DiMeo, AIA lu a No.16650
3 STONEHAM. W
MASS. J
PFD/rkk ��FgfTH OF MpSSQc
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 M A I N S T R E E T , ST O N E H A M . M A 5 5 A C H U S E T T 5 0 2 1 8 0 T E L E P H O N E 43 8-09 00
April 5, 1988
Building Department
City of Salem
One Salem Green
Salem, Ma. 01970
Attention: Mr. William Munroe
Re: Highland Acres
394 Highland Avenue '
Salem, Ma.
,i
n 0
Dear Mr. Munroe: Ln c-ra
We have inspected the entire condominium development at the
above address on April 4, 1988, and the condition of the
development, which includes Buildings number 13, 14, 15, 16,
17, 18, 19, 20, 21 and 22 are as follows:
BUILDING #13. 6 UNITS "B" TYPE:
1 . Siding - 100% completed.
2. Exterior Painting 1008 completed.
3. Exterior stairs 100% completed.
4. Drywall 100% completed.
5. Interior Finish 100% completed.
6. Prime Coat Interior Paint completed.
7. Rough Plumbing completed.
8. Finish Heating 90% completed.
9. Finish Electrical 1008 completed.
BUILDING #14. 6 .UNITS "A" TYPE:
1 . Rough Framing 100% completed.
2. Roof shingles 1008 completed.
3. Exterior windows and doors installed.
4. Rough Plumbing, Heating and Electrical 100% completed.
5 . Insulation completed.
6. Drywall 1008 completed.
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET , STONE HAM , MASSACHUSETTS 02180 TE L P H 0 N L 438-0900
Building Department
City of Salem
Re: Highland Acres
Page 2.
April 4, 1988
BUILDING #15. 6 UNITS "B" TYPE:
1 . Foundation completed.
2. Underslab Utilities completed.
3 . Concrete Slab Floor completed.
4. Concrete Block Party Wall up to Second Floor.
5. Exterior Rough Framing to Roof.
6. Roofing Completed.
7. Exterior Doors and Windows Installed.
8. Rough Plumbing and Electrical Completed.
BUILDING #16. 6 UNITS "A" TYPE:
1 . Footings completed.
2. Foundation Walls completed
3 . Underground Utilities Completed.
BUILDING #17. 6 UNITS "B" TYPE:
11 . Exterior Framing 100% completed.
2. Interior Partitions 100% installed.
3. Rough Plumbing, Heating, and Electrical 1008 completed.
4. Roof Shingles 100% installed.
5. Clapboard Siding 100% completed.
6. Doors and Windows installed.
7 . Insulation 100% completed.
8. Drywall 100% completed.
9. Exterior Prime Coat of Paint.
PETER F. nXbIEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 M A I N S T R E E T , ST ON E H AM , M A 5 5 A C H U S E T T 5 0 2 1 8 0 T E L E P H O N E 43 8-09 00
Building Department
City of Salem.
Re: Highland Acres
Page 3.
April 4, 1988
BUILDING #18. 6 UNITS "B" TYPE:
1 . Foundation 1008 Completed.
2. Interior Grading Completed.
3. Underground Utilities Completed.
4. Concrete Floor Slab Completed.
5. Masonry Party Walls to First Floor.
6. Rough Exterior Grading Completed.
BUILDING #19. 6 UNITS "A" TYPE:
1 . Foundation 1008 completed.
2. Interior grading ready to receive concrete slab floor.
3. Rough exterior grading 1008 completed.
4. Underground Utilities Completed.
BUILDING #20. 6 UNITS "A" TYPE:
1 . Foundation 1008 completed.
2. Concrete Floor Slabs Completed.
3 . Rough exterior grading 1008 complete.
4. Underground Utilities Installed.
5 . Masonry Party Walls to First Floor.
PETER F. DIMEO ASSOCIATES, INC. ARCI;ITECTVRE PLANNING
546 MAIN STREET . ST 0NEHAM . MASSACHUSETTS 02180 TE L'EPH0NE 438-0900
Building Department
City of Salem
Re: Highland Acre
Page 4.
April 4, 1988
BUILDING #21 . 4 UNITS "A" TYPE:
1 . Rough Framing 1008 completed.
.2. Interior Partitions 100% completed.
3. Doors and Windows installed.
4. Clapboard Siding 1008 completed.
5. Rough Plumbing, Heating and Electrical completed.
6. Drywall 50% completed.
BUILDING #22. 6 UNITS "B" TYPE:
1 . Foundation 100% Completed.
2 . Interior Grading Completed and ready to receive
Concrete Floor Slab.
3.. Rough Exterior Grading 100% Completed.
All work is progressing satisfactory in accordance with drawings
provided by this office.
If there are any questions regarding any of the above, please do
not hesitate to contact this office.
Sincerely,
PETER F. DIMEO ASSOCIATES, INC.
QkG 02,e�
Peter F. DiMeo, AIA
PFD/rkk
TTER F. DIMEO ASSOCIATES, INC. A-1 CI ITECTVRE PLANNING
X54 MAIN STREET , STONE HAM , MASSACHUSETTS 02180 TE l'EPH0NE 438-0900
March 15, 1988
�Itt r I 7 f+'�°r., ^off
, , 2 u
Building Department u; + _0
City of Salem CITY Or SWL"ti i'dSS.
One Salem Green
Salem, Ma. 01970
Attention: Mr. William Munroe
Re: Highland Acres
394 Highland Avenue
Salem, Ma.
Dear Mr. Munroe:
We have inspected the entire condominium development at the
above address on March 14, 1988, and the condition of the
development, which includes Buildings number 13 , 14 , 15, 16,
17, 19, 20 and 21 are as follows:
BUILDING #13. 6 UNITS "B" TYPE:
1 . Siding - 1008 completed.
2. Exterior Painting 1008 completed.
3. Exterior stairs 1008 completed.
4 . Drywall 100% completed.
5. Interior Finish 1008 completed.
6. Prime Coat Interior Paint completed.
7. Rough Plumbing completed.
8. Finish Heating 908 completed.
9. Finish Electrical 1008 completed.
BUILDING #14. 6 UNITS "A" TYPE:
1 . Rough Framing 1008 completed.
2. Roof shingles 1008 completed.
3. Exterior windows and doors installed.
4. Rough Plumbing, Heating and Electrical 1008 completed.
5. Insulation completed.
6. Drywall 1008 completed.
Pi TER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 M A I N S T R E E T , ST 0 N E H A M , M A S S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 43 8-0900
Building Department
City of Salem
Re: Highland Acres
Page 2.
March 15, 1988
BUILDING #15. 6 UNITS "B" TYPE:
1 . Foundation completed.
2. Underslab Utilities completed.
3. Concrete Slab Floor completed.
4. Concrete Block Party Wall up to Second Floor.
5 . Exterior Rough Framing to Roof.
BUILDING #16. 6 UNITS "A" TYPE:
1 . Footings completed.
2. Foundation Walls completed
BUILDING #17. 6 UNITS "B" TYPE:
1 . Exterior Framing 1008 completed.
2. Interior Partitions 1008 installed.
3. Rough Plumbing, Heating, and Electrical 1008 completed.
4. Roof Shingles 1008 installed.
5 . Clapboard Siding 1008 completed.
6. Doors and Windows installed.
7. Insulation 1008 completed.
8. Drywall 508 completed.
BUILDING #19. 6 UNITS "A" TYPE:
1 . Foundation 1008 completed.
2 . Interior grading ready to receive concrete slab floor.
3. Rough exterior grading 1008 completed.
,
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
5.46 M A I N S T R E E T , ST 0 N E H A M . M A S S A C H U S E T T S 0 2 1 6 0 T E L E P H 0 N E 43 8-09 00
Building Department
City of Salem
Ree Highland Acres
Page 3.
March 15, 1988
BUILDING #20. 6 UNITS "A" TYPE:
1 . Foundation 100% completed.
2. Interior grading ready to receive concrete slab floor.
3. Rough exterior grading 100% complete.
BUILDING #21 . 4 UNITS "A" TYPE:
1 . Rough Framing 1008 completed.
2 . Interior Partitions 100% completed.
3 . Doors and Windows installed.
4. Clapboard Siding 100% completed.
5. Rough Plumbing, Heating and Electrical completed.
All work is progressing satisfactory in accordance with drawings
provided by this office.
If there are any questions regarding any of the above, please do
not hesitate to contact this office.
Sincerely,
PETER F. DIMEO ASSOCIATES, INC. 4`G\SSREFARCy/TFr a _ V
a No. 1665 0
Peter F. DiMeo AIA 3 STONER
T 3 MASS..
Jy
02
M
PFD/rkk
4
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 M A I N S T R E E T . ST O N E H A M . M A S 5 A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 43 6-0900
March 1 , 1988
Building Department
City of Salem
One Salem Green r,
Salem, Ma. 01970
o� =
Attention: Mr. William Munroe _ `01
Re: Highland Acres ;
394 Highland Avenue -
Salem, Ma. J
Dear Mr. Munroe:
We have inspected the entire condominium development at the
above address on February 29, 1988, and the condition of the
development, which includes Buildings number 13, 14, 15, 16,
17, 19, 20 and 21 are as follows:
BUILDING #13. 6 UNITS "B" TYPE:
1 . Siding - 1008 completed.
2. Exterior Painting 1008 completed.
3. Exterior stairs 100% completed.
4. Drywall 100% completed.
5. Interior Finish 100% completed.
6. Prime Coat Interior Paint completed.
7 . Rough Plumbing completed.
8. Finish Heating 908 completed.
9. Finish Electrical 100% completed.
BUILDING #14. 6 UNITS "A" TYPE:
1 . Rough Framing 100% completed.
2. Roof shingles 100% completed.
3. Exterior windows and doors installed.
4. Rough Plumbing, Heating and Electrical 100% completed.
5. Insulation completed.
6 . Drywall 508 completed.
C�
PETER F. DiMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 M A I N S T R E E T , S T O N E H A M M A S S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 4 3 8-09 00
Building Department
City of Salem
Re: Highland Acres
Page 2.
March 1 , 1988 = _
BUILDING #15. 6 UNITS "B" TYPE:
1 . Foundation completed.
2. Underslab Utilities completed.
3. Concrete Slab Floor Completed.
4 . Concrete Block Party Wall up to Second Floor.
5. Rough Framing to Second Floor.
BUILDING #16. 6 UNITS "A" TYPE:
1 . Footings completed, ready to receive Foundation Walls
BUILDING #17. 6 UNITS "B" TYPE:
1 . Exterior Framing 100% completed.
2. Interior Partitions 100% installed.
3. Rough Plumbing, Heating, and Electrical 100% completed.
4. Roof Shingles 100% installed.
5. Clapboard Siding 50% completed.
6. Doors and Windows installed.
7. Interior ready to receive Insulation.
BUILDING #19. 6 UNITS "A" TYPE:
1 . Foundation 100% completed.
2. Interior grading ready to receive concrete slab floor.
3. Rough exterior grading 100% completed.
Y
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 M A IN S T R E E T . 5 TONE H AM , M A 5 S A C H U S E T T 5 0 2 1 8 0 T E L-E P H O N E 43 8-09 00
Building Department
City of Salem
Re: Highland Acres
Page 3.
March 1 , 1988 °
v
t✓
BUILDING #20. 6 UNITS "A" TYPE:
cn .o
1 . Foundation 1008 completed.
2. Interior grading ready to receive concrete slab floor.
3. Rough exterior grading 100% complete.
BUILDING #21 . 4 UNITS "A11 TYPE:
1 . Rough Framing 1008 completed.
2. Interior Partitions 1008 completed.
3 . Doors and Windows installed.
4. Clapboard Siding 100% completed.
5. Rough Plumbing, Heating and Electrical 508 completed.
All work is progressing satisfactory in accordance with drawings
provided by this office.
If there are any questions regarding any of the above, please do
not hesitate to contact this office.
Sincerely,
P F. DIMEO ASSOCIATES, INC.
G\S1EpED ARC\
Peter F. D Meo, AIA °y tip`' F °'y °r
v NO. 1665 G „
SI UNI MAN. i-
MASS.
0 4
PFD/rkk
U
I
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MA I N ST RE E T . STONE H AM , M A S S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 118-0900
October 15, 1986
BuiIdInn Department
City of Salem
1 Salem Green Street
Salem, Ma . 01970
Attn : Mr. 'Wi I I iam Munroe
RE: Flighland Acres
394 Hlohland Avenue
Salem, Ma.
Gentlemen :
This letter is to certify that we have inspected the footinns and foundation
walls for Buildings Number One through Nine, at the above referenced Develop-
ment, and found all work to be in conformance with The Massachusetts State
Building Code and drawings provided by this office.
• Sincerely,
PETER F. DIMEO ASSOCIATES , INC.
Peter F. CII'leo
Registered Architect
F'FD/rkk
Citp of balem, ,lam5acbUOM5
Public Propertp department
"�4nme �3uilbing Mepartment
One 9palem Oreen
745-9595 Cxt. 380
William H. Munroe
Director of Public Property
Inspector of Buildings
Zoning Enforcement Officer
May 18, 1990
Informational Memo
To: David Shea
Chief Administrative Aide
From: William H. Munroe
Inspector of. Buildings
RE: Stasino' s Condos
I have been contacted by William and Thomas Katsepetsis who have purchased the
rights to the twenty six (26) remaining condos at the former Stasino's proiect
at 394 Highland Avenue regarding finishing these units.
Six (6) of the units are almost complete and an inspection of these units will
be made by the Building, Plumbing and Electrical Departments on Monday, May 19
1990 to determine what permits will be necessary to complete them. (Building
Permits expire in six (6) months when work has stopped) .
The remaining twenty (20) units willrequire new building permits at a cost of
three hundred, thirty three dollars ($333.00) per unit .
Tom Katsepetsis has stated that he will re-apply for the twenty units the first
of the week as they are needed as collateral for the lender.
A little back-ground on the brothers:
They are currently building four unit sub division of medium priced houses on
Malone Drive. Served as construction supers for Stasinos and own "Ornimental
Iron Company", a metal pre fabrication Co. in Danvers.
Will keep you advised.
PETER F. DIMEO ASSOCIATES, INC. ARCUITECTUAik "-PL AINN7NG
546 MAIN STREET , ST ONE HAM , M A S S A C H U 5 E T TS 02180 TE L'EPH0N1 43B-0900
1
•
FEH ID g 11 14F �pp
February 11 , 1988 JU
CITY 1"cCtl ',' Q
OF Ssl c- , PASS.
Building Department
City of Salem
One Salem Green
Salem, MA 01970
Attention : Mr . William Munroe
Re.: Highland Acres
394 Highland Avenue
Salem, MA 01970
Dear Mr . Munroe :
We have inspected the entire condominium development at the
above address on February 10 , 1988 , and the condition of the
development , which includes Buildings number 13 , 14 , 15 , 16 ,
17 , 19 , 20 and 21 are as follows :
• BUILDING 1113 . 6 UNITS "B" TYPE :
1 . Siding - 100% completed .
2 . Exterior Painting 100% completed .
3 . Exterior stairs 100% completed .
4 . Drywall 100% completed .
5 . . Interior Finish 100%completed .
6 . Prime Coat Interior Paint completed .
7 . Rough Plumbing Completed .
8 . Finish Heating 90% completed .
9 . Finish Electrical 100% completed .
BUILDING 1114 . . 6 UNITS "A" TYPE :
1 . Rough Framing 100% completed .
2 . Roof Shingles 100% completed .
• 3 . Exterior windows and doors installed .
4 . Rough Plumbing , Heating and Electrical 100% 'completed .
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET , STONEHAM , MASSACHUSETTS 02180 T E L E P H 0 N L' 43 8-09 00
• Building Department
CityofSalem
Re : Highland Acres
Page 2 .
February 10 , 1988
Continuation of Building 1114
5 . Insulation completed . Building ready to receive drywall .
BUILDING 1115 . . 6 UNITS "B" TYPE :
1 . Foundation completed .
2 . Underslab Utilities completed .
3 . Concrete Slab Floor completed .
4 . Concrete Block Party Wall up to first floor .
5 . Rough Framing to first floor .
•
BUILDING 1116 . . 6 UNIT "A" TYPE :
1 . Excavated and ready to receive footings and foundation
walls .
BUILDING 1117 . 6 UNITS "B" TYPE :
1 . Exterior Framing 100% completed .
2 . Interior Partitions 100% installed .
3 . Rough Plumbing , Heating , and Electrical 100% completed .
4 . Roof Shingles 100% installed .
5 . Clapboard Siding started .
6 . Doors & Windows installed .
BUILDING # 19 . 6 UNITS "A" TYPE :
1 . Foundation 100% completed .
• 2 . Interior grading ready to receive concrete slab floor .
3 : Rough exterior grading 100% completed .
PETER F. D;MEO ASSOCIATES, INC. ARCXIITECTVRE PLANNING
. 546 MAIN STREET , STONEHAM , M A 5 S A C H U S E T TS 02180 TE L'EPH0NE 438-0900
Building Department
City of Salem
Re : Highland Acres
Page 3 .
February 10 , 1988
BUILDING 1120. 6 UNITS "A" TYPE :
I . ' Foundation 100% completed .
2 . Interior Grading ready to receive concrete slab floor .
3 . Rough exterior grading 100% complete ,
BUILDING 1121 . 4 UNITS "A" TYPE :
I . Rough Framing 100% completed .
2 . Interior Partitions 100% completed .
3 . Doors & Windows installed .
. 4 . Clapboard Siding 50% completed .
All work is progressing satisfactory in accordance with drawings
provided by this office .
Tfthere are any questions regarding any of the above , please do
not hesitate to contact this office .
Sincerely ,
P F . DI EO ASSOCIATES , INC .
�\S.�rcRED ARpy/T
Peter F . DiMeo , AIA o a No. 1665 0
ETON EH AM,
MA$5. Jy
PFD/bjg y
SFA H 5
•
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE'i PLANNING
546 M A I N 5 T R E E T . S T O N E H A M , M A 5 5 A C H U S E T T 5 0 2 1 8 0 T E L E P H O N E 43 8-09 00
• - January 20, 1988
Building Department CITY0;r
City of Salem
One Salem Green
Salem, Ma. 01970
Attention: Mr. William Munroe
Re: Highland Acres
394 Highland Avenue
Salem, Ma.
Dear Mr. Munroe:
We have inspected the entire condominium development at the
above address on January 19, 1988, and the condition of the
development, which includes Buildings number 9, 10, 13, 14, 15,
17, 19, 20 and 21 are as follows:
BUILDING #9. 6 UNITS "B" TYPE:
100% COMPLETED
• BUILDING #10. 4 UNITS "A" TYPE:
100% COMPLETED
BUILDING #13. 6 UNITS "B" TYPE:
1 . Siding - 100% completed.
2. Exterior Painting 100% completed.
3. Exterior stairs 100% completed.
4. Drywall 100% completed.
5. Interior Finish 50% completed.
6. Rough Plumbing, Heating and Electrical 100% completed.
BUILDING #14, 6 UNITS "A" TYPE:
1 . Rough framing 100% completed.
2. Roof shingles 100% completed.
3. Exterior windows and doors installed.
• 4. Rough Plumbing, Heating and Electrical 100% completed.
5. Insulation started.
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MA I N STREET , ST ON E H AM , M A S S A C H U S E T T S 0 2 1 8 0 T E L P H O N L' 438-0900
•
Building Department
City of Salem
Re; Highland Acres
Page 2.
January 20, 1988
BUILDING #15. 6 UNITS "B" TYPE:
1 . Rough framing 100% completed.
. 2. Roof shingles 100% completed.
3. Exterior windows and doors installed.
4. Rough Plumbing, Heating and Electrical 100% completed.
5. Insulation started.
• BUILDING #17. 6 UNITS "B" TYPE:
1 . Exterior framing 100% completed.
2. Interior Partitions 50% installed.
3. Rough Plumbing and Heating 50% completed.
4. Roof Shingles 75% installed.
BUILDING #19. 6 UNITS "A" TYPE:
1 . Foundation 100% completed.
2. Interior grading ready to receive concrete slab floor.
3. Rough exterior grading 100% completed.
BUILDING #20. 6 UNITS "A" TYPE:
1 . Foundation 100% completed.
2. Interior grading ready to receive concrete slab floor.
• 3. Rough exterior grading 100% complete.
PETER F. DIMEO ASSOCIATES, INC. ARCUITECTVRE PLANNING
546 MAIN STREET . STONEHAM . MASSACHUSETTS 02180 TE E'EPH0NE 438-0900
•
Building Department
City of Salem
Re: Highland Acres
Page 3.
January 20, 1988
BUILDING #21 . 4 UNITS "A" TYPE:
1 . Rough framing 100% completed.
2. Interior partitions 50% completed.
All work is progressing satisfactory in accordance with drawings
provided by this office.
If there are any questions regarding any of the above, please do
not hesitate to contact this office.
•
Sincerely,
TER F. DIMEO SOCIATES, INC.
Peter F. DiMeo, AIA
PFD/rkk
•
PETER F. DIMEO ASSOCIATES, INC. ARCFiITECTLTRE P3LATgMr4G
546 MAIN STREET . ST ONEHAM . MASSACHUSETTS 02190 TELEPHONE 439-0900
October 5, 1987
Building Department =
City of Salem
One Salem Green 1
c;
Salem, MA. 0197.0
Attention : Mr . William Munroe
v
Re : HIGHLAND ACRES
394 HIGHLAND AVENUE
SALEM, MASS .
Dear Mr. 14unroe :
We have inspected the entire condominium development at
the above address on October 2, 1987, and the condition of
the development , which includes Buildings numbered 7 through
14 and Buildings numbered 17 and 21 are as follows :
BUILDING #7 . . 6 UNITS "B" TYPE :
• Signed off by Building Inspector and 500 occupied .
BUILDING #8. . . 4 UNITS "A" TYPE:
Signed off by Building Inspector and 100% occupied.
BUILDING #9. . . 6 UNITS "B" TYPE :
1 . Rough Framing and Partitioning completed.
2. Insulation completed.
3 . Rough Plumbing completed.
4. Rough Electrical completed.
5. Rough Heating completed.
6. Sheet rock installed and taping completed.
7. Interior finish - 80% completed.
8. Interior prime coat completed.
9. Kitchen cabinets and vanities installed except for
• countertops .
10. Exterior siding completed with one coat of stain.
f
PETER F. DIMEO ASSOCIATES, INC. AILCHITECTVRE FLAMMIMG
546 MAIN STREET , ST ONE HAM , MASSACHUSETTS 02190 TE t'EPHONE 439-0900
• Building Department
City of Salem
Page -2-
October 5 1987
BUILDING #10. . . 4 UNITS "A" TYPE:
1. Rough Framing completed.
2. Windows and doors installed.
3. Roof Shingles and exterior siding completed with one
coat of stain.
4. Rough plumbing completed.
5. . Rough Electrical completed.
6. Rough Heating completed.
7 . Insulation installed.
BUILDING #11 . . 4 UNITS "B" TYPE :
• 1 . Four units 100% completed - two units have been signed
off by Building Department and the remaining two
units are ready for final inspection by the Building Department .
BUILDING #12 . . . 6 UNITS "A" TYPE :
Signed off by Building Inspector and 50% occupied .
BUILDING #13 . . . 6 UNITS "B" TYPE :
1 . Concrete foundation walls 100`/'o completed.
2. Underground utilities completed.
3. Concrete floors completed.
4. Rough framed to second floor plate.
5. Concrete block party walls up to second floor plate.
BUILDING #14, 6 UNITS "A" TYPE :
1 . Footings and foundation complete.
2. Underground utilities complete.
• 31. Concrete slab floors complete.
,
4. Rough framed to second floor level .
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET . STONEHAM . M A S S A C H U S E T T5 02.190 TELEPHONE 4780900
Building Department
City of Salem
Page -3-
October 5, -1987
BUILDING #17. . . 6 UNITS "B TYPE :
1. Footings - 100% completed.
2. Foundation walls - 700 completed.
BUILDING #21 . ;-, . 4 UNITS :
1 . Footings - 100% completed.
4 . Foundation - 100% completed.
3 . Underground plumbing and electrical completed .
4. Interior grading to receive concrete slab floor.
MAIL HOUSE - 72 UNITS :
1 . ';fail house complete except for electrical .
•
Very truly yours,
PETER F DI MEO ASSOCIATES, INC.
BY 4 - D
Peter F. Di_4e
pED AR,CyTIF
PFD: caj
a No.1665 0 t
O STONEHAM. -
�>
MASS-
0
41
ASS.oq[TOF �PSSPvs
•
CtV of , assadjuzdfia
3 a Pubfic Property Department
s
epartnirnt
(If)nc �adcm (brcrn
7.1�-11213
William H. Munroe
Director of Public Property Maurice M. Martineau, Ass't Inspector
Inspector of Buildings Edgar J. Paquin, Ass't Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
October 5, 1987
Mr. Mike Stasinos
The Highland Condominium at Salem
394 Highland Avenue
Salem, Ma. 01970
RE: Extension of Building Permits
Dear Mike,
I have discussed your request for extensions of building permits
with Mr. Munroe. This letter is to inform you that your request for
a six (6) month extension has been granted.
• I have enclosed a photo copy of your original letter of request.
These are the units and permits that we are extending at this time.
Sincerely,
Atehen
Asst. Buil i.ng spector
CC: Planning Dept.
Engineer
Electrical
Fire Dept.
Highland � � q ,� :, o�
:� l
• H c'�[.:'i is ii
�j011aO17Ilt11lllIZ at Jalevl
September 28 , 1987
Mr . William H. Munroe
Building Inspector
Building Department
City of Salem
Salem, MA . 01970
Re: EXTENSION OF BUILDING PERMITS
THE HIGHLAND COND0MINIUM AT SALE7,
394 HIGHLAND AVENUE, SALEM, MASS .
Dear Mr. Munroe :
Request is hereby made that the Building
Permits for the following units at The Highland Condominium
at Salem, 394 Highland Avenue, Salem, Massachusetts be
• , extended for an additional six (6) month period :
BUILDING UNIT
INTO. NO. STREET ADDRESS PERMIT NO.
9. 901 . . . 21 TANGLEWOOD LANE. . . . 206
9. 902 . . . 23 TANGLEi900D LANE. . . 207
9. 903 . . . 25 TANGLEWOOD LANE. . . . 208
9. 904 . . . 27 TANGLEWOOD LANE. . . 209
9. 905 . . . 29 TANGLEWOOD LANE. . . . 210
9. 906. .. 31 TANGLEWOOD LANE. . 211
10 1001 . . . 28 TANGLEWOOD LANE. . . . 212
10 . . . . 1002 . . . 26 TANGLEWOOD LANE. . . . 213
10 . . . . 1003 . 24 TANIGLEWOOD LANE. . . . 214
10 . . . . 1004 . . . 22 TANGLEWOOD LANE. . . . 215
13 . . . . n1306. . . 12 COUNTRYSIDE LANE . . . 147
13 . . . . 1305. . . 10 COUNTRYSIDE LANE . . . 148
13 . . . . 1304 . . . 8 COUNTRYSIDE LANE. . . . 149
13. . . . . 1303 . . . 6 COUiNTRYSIDE LANE. . . . 150
13 . . . . 1302. . . 4 COUNTRYSIDE LANE. . . 151
13 . . . . 1301 . . . 2 COUNTRYSIDE LANE. . . . 152
• 14 . . . . 1401 . . . 1 COUNTRYSIDE LANE. . . . 220
14 . 1402. . . 3 COUNTRYSIDE LANE. . 221
14 . . . . 1403 . . . 5 COUNTRYSIDE LANE. .' 222
One Olde Village Drive, Salem, MA 01970 Phone (677) 74
(formeriv 334 Highland Avenue, Salem, AIA 01970)
r
• Mr. F7illiam H. Munroe
Page _2_ .
September 28 , 1987
BUILDING UNIT
NO. N0. STREET ADDRESS PERMIT NO.
14. . 1404 . 7 COUNTRYSIDE LANE. . . . . . . 223
14. . 1405 . 9 COUNTRYSIDE LANE. . . . . . 224
14. . . . . 1406 . 11 COUNTRYSIDE LANE . . . . 225
15. 1501 . 3 OLDE VILLAGE DRIVE. . . . . . 233
15. . 1502 . 5 OLDE VILLAGE DRIVE . . . . 234
15. . 1503 . 7 OLDE VILLAGE DRIVE . 235
15. . 1504 . 9 OLDE VILLAGE DRIVE : 236
15. . 1505 . 11 OLDE VILLAGE DRIVE . . 237
15. . 1506 . 13 OLDE VILLAGE DRIVE . . . . 238
15. . 1507 . 15 OLDE VILLAGE DRIVE . . . . . 239
15. . . . . 1508 . 17 OLDE VILLAGE DRIVE . . . . . 240
16. . 1601 . . 19 OLDE VILLAGE DRIVE . . . . . 241
16. . 1602 . . . 21 OLDE VILLAGE DRIVE . . . . 242
16. . 1603 . . 23 OLDE VILLAGE DRIVE 243
• 16. . . 1604 . . 25 OLDE VILLAGE DRIVE . . 244
16. . 1605 . . 27 OLDE VILLAGE DRIVE . 245
16. . . . . 1606 . . . 29 OLDE VILLAGE DRIVE . . . . . 246
17. . . . . 1701 . . . 2 LIONS LANE. . . . . . . . . 247
17. . 1702 . . . 4 LIONS LANE. . . . . . . . . . . 248
17. . 1703 . 6 LIONS LANE. 249
17. . . 1704 . . . 8 LIONS LANE. . . . . . . . . . 250
17. . . 1705 . . . 10- LIONS LANE . . . . . 251
17. . . . . 1706 . . . 12 LIONS LANE . . . . . . . . 252
18. . . . 1801 . . . 14 LIONS LANE . . . . . 253
18. . . 1802 . . . 16 LIONS LANE . . . . 254
18. . 1803 . . . 18 LIONS LANE . . . . . . . . 255
18. . . . . 1804 . . . 20 LIONS LANE . . . . .. . . 256
19. . . 1901 . . 36 LIONS LANE . . . . . . . . . 264
19. . . 1902 . . . 34 LIONS LANE . . . . . . . . . 263
19. 1903 . . 32 LIONS LANE . . . 262
19 . . 1904 . . . 30 LIONS LANE . . . . . . 261
19. . 1905 . . . 28 LIONS LANE . . . . . . . . . 260
19 . . 1906 . . . 26 LIONS LANE . . . . . . . . . 259
19. . 1907 . . . 24 LIONS LANE . . . . . . . . . 258
19. . . . . 1908 . . . 22 LIONS LANE . . . . . . . . . 257
•
• ?r . )''illiam H. ISunroe
Page -3-
September 28 , 1987
BUILDING UNIT
No . NO. STREET ADDRESS PERMIT NO .
20 . . 2001 . . . 9 LIONS LANE. . . . . . 265
20 . . . . . . 2002 . . . 11 LIONS LANE 266
20 , . . . . 2003 . . . 13 LIONS LANE . . . . . . . 267
20, . . . . . 2004 . . . 15 LIONS LANE . . . . 268
20 . . 2005 . 17 LIONS LANE . . . . 269
20. . . . . . 2006 . 19 LIONS LANE . . . . . . 270
21 . . . 2101 . 1 '1I0NS LANE 271
21 . . . 2102 . . . 3 LIONS LANE.- . . . . . . . 272
21 . . . 2103 . . . 5 LIONS LANE. . . . . . 273
21 . . . . . . 2104 . . . 7 LIONS LANE. . . . . . 274
22 . . 2206 . . . 12 CARRIAGE HILL LANE . . . 275
L2. . 2205. . . 10 CARRIAGE HILL LANE . . . 276
22 . . 2204 . . . 8 CARRIAGE HILL LANE . . . . .277
• 22. . . . . . 2203 . . . 6 CARRIAGE HILL LANE . . . . 278
22. . 2202. . . 4 CARRIAGE HILL LANE . . 279
22. . . . . . 2201 . 2 CARRIAGE HILL LANE . 280
23 , . 2301 . . . 14 CARRIAGE HILL LANE 281
23 . . 2302. . . 16 CARRIAGE HILL LANE . . . 282
23,• ,•, . 2303 . . . 18 CARRIAGE HILL LANE . . . 283
23 .* . . . . . 2304 . . . 20 CARRIAGE HILL LANE . . . 284
24. . . . 2406 . . . 38 LIONS LANE. 285
24. . . - 2405. . . 40 LIONS LANE. . . . . 286
24, . 2404. . . 42 LIONS LANE. . 287
24 . . 2403 . . . 44 LIONS LANE. 288
24. . . . 2402. . . 46 LIONS LANE. . . . . . . 289
24 . . . . . . 2401 . . . 48 LIONS LANE. . . . . . . 290
25. 2501 . . . 9 CARRIAGE HILL LANE . . . 291
25. . 2502. . 11 CARRIAGE HILL LANE. . . 292
25. . . 2503 . . . 13 CARRIAGE HILL LANE. . . 293
25. . 2504 . . . 15 CARRIAGE HILL LANE. 294
25 . . 2505. . . 17 CARRIAGE HILL LANE. 295
25 . . . . . . 2506. . . 19 CARRIAGE HILL LANE. 296
• tir . Jyilliam H. Munroe
Page -4-
SeptemUer 28 1987
BUILDING UNTIT
j0
NO STREET ADDRESS PERMIT NO.
26 . . . 2601 . . 1 CARRIAGE HILL LANE. 297
26 . . 2602 . . 3 CARRIAGE HILL LANE . 298
26. . 2603 . . . 5 CARRIAGE HZLL LANE . 299
26. . . . . 2604 . . . 7 CARRIAGE HILL LANE. 300
Your kind attention to this request is greatly
appreciated.
Very truly yours ,
SALE'S HIGHLAND D %ELOP1MENT CORP.
BY: r
213 :eStasinos
President
• MS: caj
•
PETER F. DIMEO ASSOCIATES, INC. ARCIIITECTVRE PLANNING
5�6 M A I N S T R E E T . S TONE HAM . M A S S A C H U S E T T S 0 3 1 8 0 T E L E P H O N E 4 3 8-0900
September 15 , 1987
William H. ?lunroe ,
Director of Public Works
Public Property Department
City of Salem
One Salem Green
Salem, MA. 01970
C1 :D
Re : THE HIGHLAND CONDOMINIUM at SA=1
BUILDINGS numbered 7 , 8 , 11 and 12 - -
BUILDING n7 - 1-3-5-7-9-11 TANGLEWOOD LANE
BUILDING n8 - 13-15-17-19 TANGLEWOOD LANE C'
BUILDING #11- 14-16-18-20 TANGLEWOOD LANE ;
BUILDING n12- 2-4-6-8-10-12 TANGLEWOOD LANE
Dear '.1r. 'lunroe :
This letter is to inform you that we have made our final
inspection of the Buildings numbered , 7 , 8 , 11 and 12
of the above-referenced development .
• We find that the buildings have been constructed substantially
in accordance with the plans and specifications provided by
this office and in accordance with the State Building Code
of the Commonwealth of P4assachusetts and the requirements
of the City of Salem.
Sincerely ,
qjFAIMi//Ej//O� ASSOCIATES , INC.
�4V P v Q //} I
"l P 1� r' 9-
Peter F. Dilleo
Registered Architect
•
TeAA
• ighland
Condominium titclyalPn1
September 15, 1987
n
William H. Munroe -
Director of Public Property '
Public Property Department
City of Salem
One Salem Green
Salem, MA. 01970 -
Re: THE HIGHLAND CONDOMINIUM at SALEM
BUILDINGS numbered 7 , 8 , 11 and 12
- BUILDIIZG #7 - 1-3-5-7-9-11 TANGLEWOOD LANE
- BUILDING #8 - 13-15-17-19 TANGLEWOOD LANE
- BUILDING #11- 14-16-18-20 TANGLEWOOD LANE
- BUILDING #12- 2-4-6-8-10-12 TANGLEWOOD LANE
• Dear Mr. Munroe :
This letter is to inform you that we have made our final
inspection of the above-referenced buildings at the above
condominium development .
We find that the buildings have been constructed substantially
in accordance with the plans and specifications provided by this
office and in accordance with the State Building Code of the
Commonwealth of Massachusetts and the requirements of the City
of Salem.
Sincerely ,
SALEM HIGHLAND DEV L/OPMENT CORP.
BY : `
Th as N. Katsape ses , Yfiilder
LICENSE NO. 865
•
One Olde Village Drive, Salem, MA 01970 Phone (617) 741-2003
(Formerly 394 Highland Avenue, Salem, MA 01970)
The 4*4k�-
• ighlanW
Condominium at yalem
September 15, 1987
n ID
William H. Munroe +
Director of Public Property o
Public Property Department
City of Salem nn Lel
One Salem Green
Salem, MA. 01970
y
Re: THE HIGHLAND_CONDOMINIUM at SALEM
BUILDINGS numbered 7, 8 , 11 and 12
- BUILDING #7 - 1-3-5-7-9-11 TANGLEWOOD LANE
- BUILDING #8 - 13-15-17-19 TANGLEWOOD LANE
- BUILDING #11- 14-16-18-20 TANGLEWOOD LANE
- BUILDING #12- 2-4-6-8-10-12 TANGLEWOOD LANE
• Dear Mr. Munroe :
This letter is to inform you that we have made our final
inspection of the above-referenced buildings at the above
condominium development .
We find that the buildings have been constructed substantially
in accordance with the plans and specifications provided by this
office and in 'accordance: with the State Building Code of the
Commonwealth of Massachusetts and the requirements of the City
of Salem.
Sincerely ,
SALEM HIGHLAND DEV L/OPMENT CORP .
BY:
Th as N. Iiatsape ses , ilder
LICENSE NO. 865
•
One Olde Village Drive, Salem, MA 01970 Phone (617) 741-2003
(Formerly 394 Highland Avenue, Salem, MA 01970)
PETER F. MMEO ASSOCIATES, INC. ARCIIITECT1URE PLANNING
546 MAIN STREET, STONEHAM. MASSAGHU5E T TS 02.180 TELEY HONE 418-0900
• ,
September 15, 1987
William H. Munroe,
Director of Public Works
Public Property Department
City of Salem
One Salem Green
Salem, `4A . 01970
Re : TI3EyHIGHLAND_ONDOiIINI_U'_4_at SALEM r v
BUILDINGS numbered 7 , 8, 11 and 12
BUILDING n7 - 1-3-5-7-9-11 TANGLE11700D LANE n n
BUILDING ,'#8 - 13-15-17-19 TANGLEWOOD LANE
BUILDING #li- 14-16-18-20 TANGLEWOOD LANE
BUILDING #12- 2-4-6-8-10-12 TANGLEWOOD LANE n T
cn =+
Dear ',Ir. Munroe :
This letter is to inform you that we have made our final
inspection of the Buildings numbered, 7 , 8 , 11 and 12
of the above-referenceddevelopment .
• We find that the buildings have been constructed substantially
in accordance with the plans and specifications provided by
this office and in accordance with the State Building Code
of the Commonwealth of 1,1assach'usetts and the requirements
of the City of Salem.
Sincerely,
VN- EO ASSOCIATES , INC.
Peter F. DiMeo
Registered Architect
,
•
PETER R DIMEO ASSOCIATES, INC. ARCI;ITEC TffR s Ti} PLANNING
546 M A I N S T R E E T , S TON E HAM , M A S S A C H U S E T T S 0 2 1 8 0 T E L E .P H O N E 43 8-09 00
•
JuL 30 4 T
rEc-
July 24, 1987 CITY [lF SALS)4,MASS.
William H. Munroe,
Director of Public Property
Public Property Department
City of Salem
One Salem Green
Salem, MA. 01970
Re: THE HIGHLAND CONDOMINIUM at SALEM
BUILDINGS numbered 3, 4, 5 and 6
Building #3 - 14-16-18-20 INDIAN HILL LANE
Building#4 - 2-4-6-8-10 INDIAN HILL LANE
Building #5 - 2-4-6-8 LONGFELLOW LANE
Building #6 - 1-3-5-7-9-11 LONGFELLOW LANE
Dear Mr. Munroe:
This letter is to inform you that we have made our final
inspection of the buildings numbered 3, 4, 5 and 6 of the
• above-referenced development .
We find that the buildings have been constructed substantially
in accordance with the plans and specifications provided by this
office and in accordance with the State Building Code of the
Commonwealth of Massachusetts and the requirements of the
City of Salem.
Sincerely,
E F I MEO ASSOCIATES, INC.
Peter F. Dip
Registered Architect
•
lig4land iallk ,3.9 4 i9 Phi T
Condominium at jalemr.IT Y 0` S�' 6j mu r
July 24, 1987
William H. Munroe,
Director of Public Property
Public Property Department
City of Salem
One Salem Green
Salem, MA. 01970
Re : THE HIGHLAND CONDCMINIUM AT SALEM
BUILDINGS numbered 3, 4, 5 and 6
Building #3 - 14-16-18-20 INDIAN HILL LANE
Building #4 - 2-4-6-8-10-12 INDIAN HILL LANE
Building #5 - 2-4-6-8 LONGFELLOW LANE
Building #6 - 1-3-5-7-9-11 LONGFELLOW LANE
Dear Mr. Munroe:
• This letter is to inform you that we have made our final
inspection of the above-referenced buildings at the above
referenced condominium development .
We find that the buildings have been constructed substantially
in accordance with the plans and specifications provided by
this office and in accordance with the State Building Code of
the Commonwealth of Massachusetts and the requirements of the
City of Salem.
Sincerely,
SA= IGHLAND EVEL P:IIENTORP.
BY : r.42...., j4Z;QF'-_jV�'A
Tii-edas I{atsa etses Builder
LICEYSE NO. 865
•
394 Highland Avenue Salem, Mass 01970 Phone (617) 741-2003
395-4777
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 M A I N S T R E E T , S T O N E H A M M A 5 5 A C H U S E T T 5 0 2 1 9 0 T E L E P H O N E 4 3 0-0900
•
August 31 , 1987
Building Department
City of Salem T 1
One Salem Green
Salem, MA. 01970
,'Attention: Mr. William Munroe zn
Vl „J
Re :,HIGHLAND ACRES
394 HIGHLAND AVENUE
SALEM,MASSACHUSETTS
Dear Mr. Munroe :
We 'have inspected the entire condominium development
at the above address on August 31 , 1987, and the condition of the
development , which includes Buildings numbered l through 14 ,
are as follows :
BUILDING #1 . . 4 UNITS "B" TYPE :
• Signed off by Building Department and occupied.
3UILDING #2 . . 6 UNITS "B" TYPE :
Signed off by Building Department and occupied.
BUILDING #3. . 3 UNITS "A" TYPE :
Signed off by Building Department and occupied.
BUILDING #4. 6 UNITS "A" TYPE :
Signed off by Building Department and occupied.
BUILDING #5. . . '4 UNITS "B" TYPE :
Signed off by Building Department and occupied.
BUILDING #6. : 6 UNITS "A" TYPE:
Signed off by Building Department and occupied.
•
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
• 546 M A I N "I'll , 5T ON E HAM , MAI IACH U S E 1 T 5 0 2 18 0 T E 1 P H O N E 411-0900
Building Department
City of Salem
Page -2-
August 31 , 1987
BUILDING #7. . 6 UNITS "B" TYPE :
1 . Interior Finish completed.
2. Interior prime coat completed.
3 . Kitchen cabinets and vanities installed.
4. Electrical completed.
5. Plumbing .completed.
6. Heating completed.
BUILDING #8 . 4 UNITS "A'' TYPE :
1 . Sheetrock completed.
• 2. Interior prime coat completed.
3 . Interior Finish - 50% completed.
4. Kitchen cabinets and vanities installed.
5. Plumbing completed.
6. Electrical completed.
7 . Heating completed.
BUILDING #9. 6 UNITS "B" TYPE :
1 . Rough Framing and Partitioning completed.
2 . Insulation completed.
3 . Rough plumbing completed.
4. Rough electrical completed.
5. Rough heating completed.
6 . Sheetrock installed and taping 507o completed.
•
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
• 546 M A I N 11R111 , 5 i O N f HAM , M A S S A C H U S E T T S 0 2 11 0 T E L E P H O N C 411-0900
Building Department
City of Salem
Page -3-
August 31, 1987
BUILDING #10 . 4 UNITS "A" TYPE :
1. Rough Framing completed.
2. Windows installed.
3 . Roof Shingles completed.
4. Rough Plumbing - 50% completed.
5. Rough Electrical - 50% completed.
6. Rough Heating - 50% completed.
BUILDING #11 . . 4 UNITS "B" TYPE:
1. Sheetrock - 1007o completed.
• 2. Two (2) units have kitchen cabinets and vanities
installed.
3 . Rough Plumbing completed.
4. Rough Electrical completed.
5. Rough Heating completed.
BUILDING #12 . . 6 UNITS "A" TYPE :
1 . Interior finish - 100% completed.
2. Interior prime coat completed.
3. Kitchen cabinets and vanities installed.
4. Finish plumbing - 50% completed.
5. Finish electrical-100% completed.
6. Finish heating - 50% completed.
•
PETER F. O MEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET . STONEHAM , MASSACHUSETTS 02180 TE LA P H 0 N L 4300900
Building Department
City of Salem
Page -4-
August 31 1987
BUILDING #13 . . 6 UNITS "B" TYPE :
1 . Concrete foundation walls - 100% completed.
2 . Underground utilities completed.
3. Concrete floors completed.
MILDING #14. 6 UNITS "A" TYPE:
1. Footings and foundation completed.
2 . Underground utlities completed.
3 . Concrete slab floors completed.
• Very truly yours,
PET P. DI MEO SSOCIATES, NC.
BY : 00
Peter F. DiMeo
PFD: caj
•
PETER F DIMEO ASSOCIATE5, INC. AF4CYF1111ECTVRE PLANNING
546 MAIN STREET . ST 0NEHAM . MA55ACHUSET TS 02180 TE L PHONE 43 8-09 00
•
July 6, 1987 ( SCIEWy D
CITY OF SALEM, SASS.
Building Department
City of Salem
One Salem Green
Salem, MA. 01970
Attention: Mr. William Munroe
Re: 'HIGHLAND ACRES
394 HIGHLAND AVENUE
SALEM, MASSACHUSETTS
Dear Mr. Munroe:
We have inspected the entire condominium development
at the above address on July 3, 1987, and the condition of the
development, which includes Buildings numbered 1 through 13,
are as follows :
BUILDING #1. . 4 UNITS "B" TYPE:
• Signed off by Building Department and occupied.
BUILDING #2. . 6 UNITS "B" TYPE:
Signed off by Building Department and occupied.
BUILDING #3 . . 4 UNITS "A" TYPE:
Signed off by Building Department and occupied.
BUILDING #4. . 6 UNITS "A" TYPE:
Signed off by Building Department and occupied.
BUILDING #5. . 4 UNITS "B" TYPE:
Signed off by Building Department and occupied.
BUILDING #6 . 6 UNITS "A" TYPE:
Five (5) units signed off by Building Department.
Unit #602 ready for Certification of Occupancy inspection.
•
PETER F.;DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN ST BEET . ST 0NEHAM . M A 5 5 A C H U S E T TS 02180 TE L PHONE 43 8-09 00
• Building Department
City of Salem
Page -2-
July 6, 1987
BUILDING #7. . 6 UNITS "B" TYPE:
1. Sheetrock completed.
2. Interior Finish - 50% completed.
3. Interior prime coat completed.
4. Rough plumbing completed.
5. Rough electrical completed.
6 . Rough. heating completed.
NOTE: Wood trusses between Units numbered 703 and 704 have been
repaired and are structurally secured.
BUILDING #8 . . 4 UNITS "A" TYPE:
• 1. Installation of insulation completed.
2. Sheetrock started and 25% completed.
3 . Rough interior partitioning - 100% completed.
4. Rough plumbing - 100% completed.
5. Rough Heating - 100% completed.
6 . Rough Electrical - 100% completed.
BUILDING #9. . 6 UNITS "B'" TYPE:
1. Concrete block party walls - 80% completed.
2. Wood framing completed to r.00f .trusses..
BUILDING #10 4 UNITS "A" TYPE:
1. Concrete foundation completed.
2 . Concrete floor slab completed in all units .
•
PETER Z DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET , STONEHAM . MASSACHUSETTS 02180 TE L PHONE 43 8-09 00
•
Building Department
City of Salem
Page -3-
July 6, 1937
BUILDING #11 . 4 UNITS "B" TYPE:
1. Interior partitioning - 80% completed.
2. Exterior siding completed.
3. Rough Plumbing - 80% completed.
4 . Rough Heating - 80% completed.
5. Rough Electrical - 80% completed.
BUILDING #12 . 6 UNITS "A" TYPE:
1. - Installation of insulation - 100% completed.
'. Sheetrock 100% completed.
• 3. Exterior siding - 95% completed.
4 . Interior partitioning - 100% completed.
5. Rough Plumbing - 100% completed.
6 . Rough Heating - 100% completed.
7. Rough. Electrical - 100% completed.
BUILDING #13 . 6 UNITS "B'" TYPE:
1. Concrete footing completed.
2. Concrete foundation walls - 60% completed.
Very truly yours,
PETE F. DI( h
SOOCIA ES, INC.
BY:
Pe er
• PFD:caj
VETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE, ;'.,?l(PI;ANNING
546 MA I N 5T REE T . 5T ON E H AM , M A 5 5 A C H U S E T T 5 0 2 18 0 T E L P H 0 N L' 43 8-0900
May 29r 1987
RECFiVF0
CI Y 0 '°lLHJ,1ASS.
Building Department
City of Salem
One Salem Green
Salem, MA. 01970
Attention: Mr. William Munroe
Re: HIGHLAND ACRES
394 HIGHLAND AVENUE
SALEM, MASSACHUSETTS
Dear Mr. Munroe:
We have inspected the entire condominium development
at the above address on May 29, 1987, and the condition of the
development, which includes Buildings numbered 1 through 12,
are as follows:
BUILDING #1 . . 4 UNITS "B" TYPE:
• Three (3) units have Certificates of Occupancy and
Unit #104 is ready for a Certificate of Occupancy.
BUILDING #2. . 6 UNITS "B" TYPE:
Four (4) units have Certificates of Occupancy and
Units #201 and #206 will be ready for Certificates of
Occupancy in approximately one week.
BUILDING #3. . 4 UNITS "A" TYPE:
1. Siding is completed.
2. Exterior Painting completed.
3. Sheetrock completed.
4. Interior finish on two (2) units completed.
5. Interior prime coat of paint completed on two (2) units .
•
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 M A I N S T R E E T . ST O N E H A M . M A S S A C H U S E T T S 0 2 1 8 0 T E L E P H O N E 43 8-09 00
•
Building Department
City of Salem
Page -2-
May 29, 1987
,BUILDING #4. . 6 UNITS "A" TYPE:
1. Exterior painting completed.
2. Finish trim and doors completed.
3. Kitchen cabinets and vanities installed.
4 . Plumbing completed.
5. Electrical completed.
BUILDING #5. . 4 UNITS "B" TYPE:
1. Exterior painted completed.
2. Interior finish - 100% completed.
• 3 Interior prime coat of paint completed.
4 . Finish plumbing completed.
5. Finish electrical - 50% completed.
BUILDING #6 . . 6 UNITS "A" TYPE:
Completed with exception of the following:
A. Second coat of interior paint.
B. Interior Handrails.
BUILDING #7. l. 6 UNITS "B" TYPE:
1. Rough plumbing completed.
2. Rough electrical completed.
3. Rough heating completed.
Building is ready to receive insulation and sheetrock.
• NBTE: Units #703 and #704 - A roof truss in each unit, which
i3 adjacent to the concrete block party wall, have sections ,of
the 2" x 4" truss members cut by the chimney flue installer.
We have instructed Bill Katsapetses, of Salem Highland Development
Corporation, on how to repair the roof trusses and to secure the
roof framing in this area. He will call this office for an
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET . STONE HAM , MA55ACHUSET TS 02180 TE L PHONE 43B-0900
•
3ulding Department
City of Salem
Page -3-
May 29, 1987
BUILDING #7. . 6 UNITS "B" TYPE (continued) :
inspection when the work is completed.
BUILDING #8. . 4 UNITS' "''A"' 'TYPE:
1. Roof Shingles - 100% completed.
2. First floor - concrete slab installed.
3. Rough Interior Partitioning 80% completed.
4. Rough Plumbing - 80% completed.
5. Rough Heating - 80% completed.
6 . Rough Electrical - 80% completed.
• BUILDING #9 . . 6 UNITS "B" TYPE:
1. Concrete Foundation - 100% completed.
2. Concrete block party walls to second floor completed.
3. Wood framing commenced today.
BUILDING 410 . 4 UNITS "A" TYPE:
1. Concrete footing completed.
2. Forming for concrete walls commenced.
BUILDING #11 . 4 UNITS "'B" TYPE:
1. ; 1: .„ Foundation completed.
2. Concrete block party walls completed.
3. Framing completed.
4 . Interior partitioning 80% completed.
•
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET , ST 0NEHAM , MA55ACHUSE T TS 02180 TE L'EPH0NE 438-0900
•
Building Department
City of Salem
Page -4-
May 29 , 1987
BUILDING #12: . 6 UNITS "A" TYPE:
1. Roof Shingles - 100% completed.
2. Exterior siding - 25% completed.
3. Interior partitioning - 80% completed.
4. Rough Plumbing - 80% completed.
5. Rough Heating - 80% completed.
6 . Rough Electrical - 80% completed.
Very truly yours,
• PETER F. DI MEO ASSOCIATES , INC.
BY:
Peter F. DiMeo
PFD:caj
•
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 M A I N S T R E E T , 5 T O N E H A M . M A 5 5 A C H U S E T T 5 0 2 1 8 0 T E L E P H O N E 43 8-09 00
June 8, 1987
Building Department
City of Salem
One Salem Green
Salem, Ma. 01970
Attn : Mr. William Munroe "
r,1
Re: Highland Acres IN-Z 7 y
394 Highland Avenue rn
Salem, Massachusetts _=
�s
• -w ;cam
Dear Mr. Munroe:
With respect to the fireplace hearth, exterior wrought iron railings at the
end unit porches and the interior stair handrails, please be advised of the
following:
1 . The fireplace hearth is to be constructed using a base layer of 7/1611
thick Substrate "500", screwed to the plywood rough flooring and .a field
of ceramic the 54"x 24" layed on the Substrate "500". Substrate "500"
is a non combustible composition core board. It has a portland cement
• base with acrylic additives bonded to, a fiberglass screen. Manufacturers
data is enclosed.
2. Exterior wrought iron rails located on the end unit porches are to be
raised to a height of 36".
3. All interior stairs handrails are to extend out 18" horizontal with the
floor from the top and bottom stair where ever possible, as per Massachu-
setts State Code requirements.
Should there be any further questions regarding any of the above, please feel
free to call this office.
Sincerely,
F. IM�SSOC�S, INC.
Peter F. DiMeo
Registered Architect
PFD/rkk
• xc: Salem Highland Development Corp.
enc:
PETER F. DIMEO ASSOCIATES, INC. ARCFIITECTVRE PLANNING
546 MAIN 5T RE ET . STONEHAM , M A S 5 A C H U S E T T5 02180 TE L PHONE 43B-0900
•
Building Department
City of Salem
Page. -2-
May 29, 1987
BUILDING #4 . . 6 UNITS "A" TYPE:
1. Exterior painting completed.
2 . Finish trim and doors completed.
3• Kitchen cabinets and vanities installed.
4 . Plumbing completed.
5. Electrical completed.
BUILDING #5. . 4 UNITS "B" TYPE:
1. Exterior painted completed.
2. Interior finish- 100°% completed.
• 3. Interior prime coat of paint completed.
4 . Finish plumbing completed.
5 . Finish electrical - 50% completed.
BUILDING #6 . . 6 UNITS "A" TYPE:
Completed with exception of the following:
A. Second coat of interior paint.
B. Interior Handrails .
BUILDING V . . 6 UNITS "B" TYPE•
1. Rough plumbing completed.
2 . Rough electrical completed.
3. Rough heating completed.
Building is ready to receive insulation and sheetrock.
• NDTE: Units #703 and #704 - A roof truss in each unit, which
i3 adjacent to the concrete block party wall, have sectio.ns ,of
the 2" x 4" truss members cut by the chimney flue installer.
We have instructed Bill Katsapetses, of Salem Highland Development
Corporation, on how to repair the roof trusses and to secure the
roof framing in this area. He will call this office for an
r
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET , ST ONEHA M , M A 5 S A C H U S E T T5 02180 TE L'EPH0 NL 438-0900
•
Building Department
City of Salem
Paqe -3-
May 29 , . 1987
BUILDING #7. . 6 UNITS "B" TYPE (continued) :
inspection when the work is completed.
BUILDING #8 . . 4 UNITS "A" TYPE:
1. Roof Shingles - 100% completed,
2. First floor - concrete slab installed.
3. Rough Interior Partitioning - 80% completed.
4 . Rough Plumbing - 80% completed.
5. Rough Heating - 80% completed,
6 . Rough Electrical - 80% completed.
• BUILDING #9. . 6 UNITS "B" TYPE:
1. ' Concrete Foundation - 100% completed.
2. Concrete block party walls to second floor completed.
3 . Wood framing commenced today.
BUILDING #10 .4 UNITS "A" TYPE:
1. Concrete footing completed. '
2. Forming for concrete walls commenced.
BUILDING #11 .4 UNITS "B" TYPE:
1. Foundation completed.
2. Concrete block party walls completed.
3. Framing completed.
4 . Interior partitioning 80% completed,
•
PETtR F. DIMEO ASSOCIATES, INC. ARCIIITECTLTRE PLANNING
546 MAIN STREET . STONE HAM . M A 5 S A C H U S E T TS 02180 TE L P H 0 N L 438-0900
Building Department
City of Salem
Page -4-
May 29 , 1987
BUILDING #12. . 6 UNITS "A"TYPE:
1. Roof Shingles - 100% completed.
2. Exterior siding - 25� completed.
3. Interior partitioning - 80% completed.
4. Rough Plumbing - 80% completed.
5. Rough Heating - 80% completed.
6 . Rough Electrical - 80% completed.
Very truly yours,
• PETER F. DI MEO ASSOCIATES , INC.
BY:as��' '
Peter F. DiMeo
PFD: caj
•
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN 5T REET , STONEHAM . M A 5 S A C H U S E T TS 02180 TE L PHONE 438-0900
•
May 29 , 1987
Building Department
City of. Salem
One Salem Green
Salem, MA. 01970
Attention: Mr. William Munroe
Re: HIGHLAND ACRES
394 HIGHLAND AVENUE
SALEM, MASSACHUSETTS
Dear Mr. Munroe:
We have inspected the entire condominium development
at the above address on May 29, 1987, and the condition of the
development, which includes Buildings numbered 1 through 12,
are as follows:
BJILDING #1. . 4 UNITS "B" TYPE:
• Three (3) units have Certificates of Occupancy and
Unit #104 is ready for a Certificate of Occupancy.
BUILDING #2. . 6 UNITS "B" TYPE:
Four (4) units have Certificates of Occupancy and
Units #201 and #206 will be ready for Certificates of
Occupancy in approximately one week.
BUILDING #3. . 4 UNITS "A" TYPE:
1. Siding is completed.
2. Exterior Painting completed.
3. Sheetrock completed.
4 . Interior finish on two (2) units completed.
5. Interior prime coat of paint completed on two (2) units .
•
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET', STONE HAM , M A 5 S A C H U S E T TS 02180 TE L'EPH0NL 43 8-09 00
•
May 11, 1987
� c
r--T 1-
William H. Munroe
Director of Public Property vc
Public Property Department ter, 03
One Salem Green
Salem, MA. 01970 v
u�
Re: THE HIGHLAND CONDOMINIUM at SALEM
BUILDINGS NUMBERED 1 and 2
1, 3, 5, 7, 9, 11, 13, 15, 17 and 19
INDIAN HILL LANE, SALEM, MASS.
Dear Mr. Munroe :
This letter is to inform you that we have made our final inspection
of buildings numbered one and two of the above-referenced project.
We find that the buildings have been constructed substantially in
• accordance with the plans and specifications provided by this
office and in accordance with the State Building Code of the
Commonwealth of Massachusetts and the City of Salem requirements .
Sincerely,
PggeR F. DI MEO ASSOCIATES, INC.
46
VV"
Peter F. DiMeo
Registered Architect tE DAI 1�
a . tr.1665�,1 F
PFD:Ykk b sToneama. ;
W
•� , r `
•
%e
• ighland
Condominium at yalem-
May 11, 1987
C�
William H. Munroe,
� N
Director of Public Property o-��„
Public Property Department iz:; Z
City of Salem ` E'
One Salem Green
Salem, 14A. 01970 w
n
<n ca
Re: THE HIGHLAND CONDOMINIUM at SALEM —'
BUILDINGS numbered 1 and 2
1, 3, 5, 7, 9, 11, 13, 15 , 17 and 19
INDIAN HILL LANE, SALEM, MASS .
Dear Mr. Munroe:
This letter is to inform you that we have made our final
• inspection of buildings numbered one and two of the above
referenced project.
We find that the buildings have been constructed substantially
in accordance with the plans and specifications provided by
this office and in accordance with the State Building Code of
the Commonwealth of Massachusetts and the City of Salem
requirements.
Sincerely,
SALEM HIGHLAND DEVELOPMENT CORP.
(/OBY: M+, L;fc;�
Thomas Katsapets
Builder
LICENSE NO. 865
•
394 Highland Avenue Salem, Mass 01970 Phone (617) 741-2003
395-4777
l'1`.�f l.i�t 1�. lDYlr(1?O ALSO CYn1 T'.S, TNC. t1 Y�.0 T-TYT�EC7'Y72�.]G Ty7LAN NTN Ci
• " m F N 5 t k[ l 1 , 5 1 O N C M w M , m A 5 S F (' " U 5 C I 1 S O 2 1 y O i C l E Y 11 O N 1 I l p..0, 00
April 24 , 1987
Building Departmentlz
n
City of Salem -
One Salem Green o _
Salem, MA. 01970
ID rn G;;
Attention: Mr. William Munroe n� lv �_•
x ,
Re: HIGHLAND ACRES
394 HIGHLAND AVENUE
SALEM, MASSACHUSETTS
Dear Mr. Munroe:
We have inspected the entire condominium development
at the above address on April 24, 1987 , and the condition of
the development, which incluees Buildings numbered 1, 2, 3, 4 ,
5, 6 , 7, 8, 9, 11 and 12 are as follows :
BUILDING #1 . . 4 UNITS "B" TYPE:
• No further progress .
BUILDING #2 . . . 6 UNITS "B" TYPE:
No further progress.
BUILDING #3. -. 4 UNITS "A" TYPE:
1. Siding - 50% completed.
2. Sheetrock completed.
BUILDING #4 . 6 UNITS "A TYPE:
1. Finish trim and doors - 100% completed.
2 . Kitchen cabinets installed.
BUILDING #5. 4 UNITS "B" TYPE:
1. Interior finish - 50% completed.
•
r'
YY:T1Y2 Y', r'iYh11.0 <iSaOCYs�7CL:;, INC. .�YtCY-YYTY;C"Y"(T�Et7L'. Y'Y.�'ihINTNC:
• % mnI {1 :I Y I L I SI ON [ " aM , mA5 AC " U $ [ 115 021U0 1 L L 0r, rip-0vJ0
Building Department
City of Salem
Page -2-
'1pzil 24 , 1987
BUILDING #6 . . . 6 UNITS "A" TYPE:
No further progress.
BUILDING #7 . . 6 UNITS "B" TYPE:
1 . Interior Partitioning - 100% completed.
2 . Roof Shingles - 100% completed.
3 . Rough Electrical - 80% completed.
4 . Rough Heating - 80% completed.
5 . Rough Plumbing .- 80% completed.
• BUILDING #8. . 4 UNITS "A" TYPE:
1., Roof Shingles - , 75% completed.
2. Rough Interior Partitioning - 80% completed.
3. Rough Plumbing - 80% completed.
4. Rough Heating - 80% completed.
5 . Rough Electrical - 80% completed.
BUILDING #9 . . 6 UNITS "B" TYPE:
1. Concrete Foundation Footings - 100% completed.
2 . Concrete Foundation Walls - 30% completed.
BUILDING #11. . . 4UNITS "B" TYPE:
1. Foundation Completed.
2 . Concrete Block Party Walls Completed to Second Level .
3. Framing completed to second floor.
•
h
Y'LT2.<t 2�. ]DYlrlO r.SaOCYr1T1:S, YNC. AltCYYYTY:CTI(JTtL 1�Y.<iNNTNG
% mA � R :IY LL I . S I On I " Am , m A ; , A C " u S 1 1 5 0 2 1 tl O I ( l l v " O u
Building Department
City of Salem
Page -3-
April 24 , 1987
BUILDING #12. . . 6 UNITS "A" TYPE:
1. Roof Shingles - 100% completed.
2. Interior Partitioning - 80% completed.
3. Rough Plumbing - 80% completed.
4 . Rough Heating - 80% completed.
5. Rough Electrical - 80% completed.
Very truly yours,
PETER DI MEO ASSOCIATES , INC.
•
BY:
i
Peter F. i
PFD:caj
•
'CON Ctv of Assar4usetts
• � Public Property Pepartlneut
� 7�Ap
�J��C1MMC m�n1r r ltllbing Pepartturnt
(ane '*ttlem (Preen
74�-0213
William H. Munroe
Director of Public Property Maurice M. Martineau, Ass't Inspector
Inspector of Buildings Edgar J. Paquin, Ass'tInspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
April 15, 1987
Salem Highland Development Corp.
394 Highland Ave.
Salem, Ma. 01970
William Katsapeteses
Dear Bill:
This letter will serve to inform you of the requirement on floor covering
as per Mass. Code Section 920.7.2 as applies to your development.
In that your structures are classified as B-4 the Code makes the
• exception in your favor.
No flame test is required as per Mass. Code.
4ar
c ully,
P n Bu' ng Inspector
EJP/lyd
CC: File
Delivered in hand
To
B
•
The
ig hland
Condominium at yalem
April 8, 1987 DELIVERED IN HAND
Mr. William Munroe
Building Department
City of Salem
One Salem Green
Salem, MA. 01970
Re: HIGHLAND ACRES
394 HIGHLAND AVENUE, SALEM, MASS.
Dear Mr. Munroe:
Enclosed please find an update on the condition
of the following buildings at the HIGHLAND ACRES
development prepared by Peter F. DiMeo Associates , Inc.
as of APRIL 8 , 1937 :
BUILDINGS #1, 2, 3, 4, 5 , 6, 7 , 8 and 12.
Very truly yours,
SALEM HIGHLAND DEVELOPMENT CORP.
BY: I �6q.t1�
'MiRE Stasino
MS :caj
Enclosure
n Rte„
p-n N
x tT'i
394 Highland Avenue Salem, Mass 01970 Phone (617) 741-2003
395-4777
PSN TER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 MAIN STREET , STONE HAM , M A S S A C H U S E T T5 02180 TE L P H 0 N L' 438-0900
April 7, 1987
Building Department
City of Salem
One Salem Green
Salem, MA 01970
Attention: Mr. William Munroe
Re: HIGHLAND ACTES
394 HIGHLAND 'AVENUE
SALEM, MASSACHUSETTS
Dear Mr. Munroe:
we have inspected the entire condominium development
at the above address on April 7, 1987, and the condition of
the development, which includes Buildings numbered 1, 2, 3 , 4,
5, 6, 7, 8 and 12, are as follows:
BUILDING 41. . . 4 UNITS "B TYPE:
No further progress . ':
BUILDING #2. 6 UNITS "B" TYPE:
No furthar progress .
BUILDING #'3'. .' '4 UNITS "AI" TYPE:
No further progress.
BUILDING '.#4. 6 UNITS "A" TYPE:
1. Finish trim. and doors - 50% completed.
BUILDING #'5. . 4 UNITS "B'" TYPE:
1. Sheetrock completed.
PETER F. DIMEO ASSOCIATES, INC. ARCHITECTURE PLANNING
546 M A I N S T R E E T . S T O N E H A M . M A 5 5 A C H U S E T T 5 0 2 1 8 0 T E L E P H O N E 43 8-09 00
Building Department
City of Salem
Page -2-
April 7, 1987
BUILDING #6 . . . 6 UNITS "A" TYPE:
1. Ceramic tile in bathrooms completed.
2. Kitchen cabinets and vanities installed.
3 . Finish plumbing completed.
4. Electric finish completed.
5. No electrical power.
BUILDING #7. . . 6 UNITS "B" TYPE:
1. Rough interior partitioning - 60 completed.
BUILDING #8 . . . 4 UNITS "A" TYPE:
1. Rough interior partitioning - 65% completed.
BUILDING #12 . . 6 UNITS "A" TYPE:
1. Roof shingles - 75% completed.
2. Rough wiring - 66% completed.
3. Rough interior partitioning - 60% completed.
In response. to your letter of March 5, 1987 , please
be advised as follows (Paragraphs 1 through 4) :
1. PARAGRAPH 41 A fire separation wall consisting of
2" x 4" studs, with a layer of 5/8th's inch firecoded gypsum
board on each side has been installed between all chimneys.
2,, PARAGRAPH #2 - Enclosed is a copy of a letter addressed
to Mr, Chris Stasinos, from Alpine Structures, which should
answer the questions you raised. With regard to the assembly
and integrity of the beams, at .the meeting that was held at your
offz~ce by, Mr, Mabie, you were Igiven a complete detail and
structural data catalogue of the products being used in this
development.
PETER F. DIMEO ASSOCIATES, INC. ARCUITECTUFLE PLANNING
546 M A I N S T R E E T , ST 0 N E H A M . M A S S A C H U S E T T S 0 2 1 8 0 T E L E P H 0 N E 43 B-09 00
Building Department
City of Salem
Page -,3-
April 7, 1987
3. PARAGRAPH #3 - The headers on the end units, as framed,
are more than adequate for the respective spans , and further,
the headers do not carry the entire roof as you have stated
in your letter. They, at best, carry approximately 25% of the
roof load.
4 . PARAGRAPH #4 - The chimney hanger nailing has been
corrected. The hangers are being nailed with two 8d nails
as recommended by the manufacturer.
Verification of the strength of the concrete,
structural lumber and the roof shingles are being forwarded
to you under separate cover.
If you have any further questions , please do not
hesitate to contact me.
Very truly yours ,
PETE DI MEO ASSOCIATES , INC.
BY:
Peter F. Di_ o
PFDpcaj
na c 'uymw
INCORPORATED-
PO. Box 1006 . Oxford, NC 927565
(919) 693-6571
April 2, 1987
Mr. Chris Stasinos
Highland Acres Development
Highland Avenue
Salem, Massachusetts
Re: Highland Acres, Units "A" & "B"
ASI Job 1186-093
Dear Chris:
In reference to your questions about the use of our products in the above
referenced units:
1. Web stiffeners or fillers are not required at the supports of the ASI
23 and 24 x 14" floor joists which are supported by the 14" WMI
(masonry type) connectors.
2 Attaching the ASI 22 x 914" beams used as roof rafters to the sloped
bearing plztes with at least two nails at each bearing and four nails
connecting overlapping flanges at the roof ridge is adequate attach-
ment for typical installations of our product, assuming the building
construction incorporates diaphragm connections for transfer of lateral
loads.
3. Concerning the "B" type unit, substituting ASI 24 x 14" joists in lieu
of the originally specified ASI 23 x 14", and keeping the spacings, loads,
and spans the same, an increase in stiffness of approximately 157 can be
expected.
Please call if you have any further questions.
,�Sine redl �17L (rE'C( l
C. M. Rhodebeck, P.E.
Manager of Engineering
CMR/ls
cc: Mr. Peter Dimeo
Peter Dimeo Associates
546 Main Street
Stoneham, Mass. 02180
cc: Pete Mabie
A DIVISION OF ALPINE_ENGINEERED PRODUCTS, INC.
-
'� " ubtic bra erfg e�arfutenf
T �
Q;)nr �alr:u (rirrrn
743-0213
William H. Munroe
Director of Public Property Maurice M. Martineau, Asst Inspector
Inspector of Buildings Edgar J. Paquin, Ass't Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. It
t
April 2, 1987
Peter F. Dimeo Associates Inc.
Architecture Planning
546 Main Street
Stoneham, Ma. 02180
RE: Stasinos--394 Highland Ave.
Salem, Ma. 01970
Dear Sir:
We have in hand your report dated 3/24/87 as referred to the above project.
on review of said report you have adherred to the concerns of this depart-
Ment on our last inspection and also given us a current status of structures
# 1,2,3,4,5,6,7,8, and 12.
Unfortunatly you have neglected to answer questions and concerns brought to
to your attention in our letter dated 3/5/87. Your response is required
in that we feel because of the deviation as described in our letter from
the plans submitted on application, we at this time are unable to determine
wether or not the structures now standing are safe. Please make your
response in writing to us prcanptly. '
` Be aware that reports are needed on a by-weekly basis. Attached
ed is aof
COPY" of your. agreement as signed by you. Also, y
ou will findour letter to you of 3/5/87 for your reference.
Respec full ,
4' 11 'ng
I ctor
Enc. 2
CC: City Clerk
Councillor
Planning
Fire `
• 394 Highland Ave.
File
t
c:.artmrnt
7.15-0"113
William H. Munroe
l Director of Public Property Maurice M. Martineau, Asst Inspector..
Inspector of Buildings Edgar J. Paquin, Asst Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. s
!,arch 5, 1987
i
Peter F. Dimeo Associated, Inc.
II I Architecture & Planning
546 Main Street
Stoneham, Ma. 02180 RE: Highland Acres
394 Highland Ave_
D; ar Sir:
ii
This letter will serve to acknowledge your report of the above project
and to address points we feel need further review.
1. On prior inspection by our ce:artrnent we found that no fire h`'
C
walls separation was in place between chimney pipes within the co Ton
• chi:-,mey boxes on buiI=* g 1 and -2. -res this problem been corrected?
To date we have not received an updated drawing. This separation is
needed on all buildings.
2. On prior inspection by our depa_rtrrent we found that the rav' ^ Sir
manufactures installation guide for ASI beams suh-nitted to this office
is not being used in construction. This fact was brought out and
discussed both with yourself and the manufactures representive Mir. Mabie
at an earlier meeting. To date we have no input as to the manner in which
these beams are being assembled and their integrity. Revised drawings and
engineered specs should be provided to us.
3. We have snre concern as to the headers at the end walls over the s
arched windows on your type "A" buildings. In that this header carries
a large lam beam and the entire roof fram, we were unable to determine
their bearing to foundation or transfer of load. Same header description
as found on sight (2x6 solid blocked, 2x10 hollow center) . Which is
appropriate and have .the needed correction been made on all buildings of
this design?
4. On inspection it was found that the straps which are required
as support to the zero clearance fireplace chimneys where improperly
nailed and or not nailed tightly. Have these straps been checked prior
• to covering up.
The report received does give us a mines eye picture of the current
! status but neglects to give grade and type of material used. This
` i
T '
AL2
i
S culd you rc;uire our assistance on a�:y of the above _`eel free to .
�ct us.
i
Respectfully,
I
I •J
i
rdcar J. a in
Ass Bu' 1 + g Ins -ctor
=/lyd
C.C. City Clerk
L. Mroz
Councillor
Planning
• Fire
File
`�=1 :� j'�[ttiflittq �:�e�urftitent
Otic �ialrni (r3rrrn
745-0213
William H. Munroe
Director of Public Property Maurice M. Martineau, Asst Inspector
Inspector of Buildings Edgar J. Paquin, Asst Inspector
Zoning Enforcement Officer John L. LeClere, Plumbing/Gas Insp.
April 2, 1987
Peter F. Dimeo Associates Inc.
Architecture Planning
546 Main Street
i
Stoneham, Ma. 02180
RE: Stasinos--394 Highland Ave.
Salem, Ma. 01970
r
Dear Sir:
} We have in hand your report dated 3/24/87 as referred to the above project.
on review of said report you have adherred to the concerns of this depart-
ment on our last inspection and also given us a current status of structures
r 1,2,3,4,5,6,7,8, and 12.
Unfortunatly you have neglected to answer questions and concerns brought to
to your attention in our letter dated 3/5/87. Your response is required
J that we feel because of the deviation as described in our letter from
the plans submitted on application, we at this time are unable to determine
i wether or not the structures now standing are safe. Please make your
response in writing to us promptly.
t Be aware that reports are needed on a by weekly basis. Attached is a
copy of your agreement as signed by you. Also, you will find a copy of
our letter to you of 3/5/87 for your reference.
Respec ull ,
4LA-
it g I for
Enc. 2
CC: City Clerk
Councillor
Planning
Fire
• 394 Highland Ave.
File
P 445 292 149
RECEIPT FOR CERTIFIED MAIL
NO INSURANCE COVERAGE PROVIDED
NOTI@R INTERNATIONAL MAIL
(See Reverse)
e
n Sent
'pe c)
beet and Np/
O P.O.,SCtate antl ZI Code
6 J � ��
N
Postage S
Certified Fee
Special Delivery Fee
Restricted Delivery Fee
Return Receipt showing
to whom and Date Delivered
N
m Return Receipt showinglh whom.
Date,and Address o1 Delivery
d
j TOTAL Postage and Fees 5
o Postmark or Date
m
E
0
a
N
a
STICK POSTAGE STAMPS TO ARTICLE TO COVER FIRST CLASS POSTAGE,
CERTIFIED MAIL FEE,AND CHARGES FOR ANY SELECTED OPTIONAL SERVICES. (see front)
1. It you want this receipt postmarked,stick the gummed stub to the right of the return address leaving
the receipt attached and present the article at a post office service window or hand it to your rural carrier.
(no extra charge)
2. If you do not want this receipt postmarked,stick the gummed stub to the right of the return address of
the article,date,detach and retain the receipt,and mail the article.
3. It you want a return receipt, write the certified mail number and your name and address on a return
receipt card,Form 3811,and attach it to the front of the article by means of the gummed ends if space per-
mits. Otherwise,affix to back of article. Endorse front of article RETURN RECEIPT REC UESTED
adjacent to the number.
4. If you want delivery restricted to the addressee,or to an authorized agent of the addressee,endorse
RESTRICTED DELIVERY on the front of the article.
5. Enter fees for the services requested in the appropriate spaces on the front of this receipt If return
receipt is requested, check the applicable blocks in item 1 of Farm 3811.
6. Save this receipt and present it it you make inquiry. Is
• n a el 1
�' a � �Hub1tC �ra�serf� �e�tttrttnent
}}_pp
llihntg 1C�e P
ttrttllent
One $nlent Green
7.13-17213
William H. Munroe
Director of Public Property Maurice M. Martineau, Ass't Inspector
Inspector of Buildings Edgar J. Paquin, Ass't Inspector
Zoning Enforcement Officer John L. LeClere, Plumbing/Gas Insp.
April 2, 1987
Peter F. Dimeo Associates Inc.
Architecture Planning
546 Main Street
Stoneham, Ma. 02180
RE: Stasinos--394 Highland Ave.
Salem, Ma. 01970
Dear Sir:
We have in hand your report dated 3/24/87 as referred to the above project.
on review of said report you have adherred to the concerns of this depart-
• meet on our last inspection and also given us a current status of structures
# 1,2,3,4,5,6,7,8, and 12.
Unfortunatly you have neglected to answer questions and concerns brought to
to your attention in our letter dated 3/5/87. Your response is required
in that we feel because of the deviation as described in our letter from
the plans submitted on application, we at this time are unable to determine
wether or not the structures now standing are safe. Please make your
response in writing to us promptly.
Be aware that reports are needed on a by-weekly basis. Attached is a
copy of your agreement as signed by you. Also, you will find a copy of
our letter to you of 3/5/87 for your reference.
Res pec pngI
ctor
Enc_ 2
CC: City Clerk
Councillor
Planning
Fire
• 394 Highland Ave.
File
1 Cnur ?sfrm 6rrrn
7.15-0213
\'William H. Munroe
Director of Public Property Maurice M. Martineau, Asst Inspector
Inspector of Buildings Edgar J. Paquin, Asst Inspector
Zoning Enforcement Officer John L. LeClere, Plumbing/Gas Insp.
March 5, 1987
Peter F. Dimeo Associated, Inc.
P Architecture & Planning
546 Main Street
Stoneham, Ma. 02180 RE: Highland Acres
394 Highland Ave.
Dear Sir:
d
This letter will serve to acknowledge your report of the above project
and to address points we feel need further review.
I
' 1. On prior inspection by our department we found that no fire
walls separation was in place between chimney pipes within the ccanmon
• chimney boxes on building Rl and .'2. Has this probiem been corrected? `
To date we have not received an updated drawing. This separation is
needed on all buildings.
2. on prior inspection by our depot-nent we found that the rtv'
manufactures installation guide for ASI beams submitted to this office
is not being used in construction. This fact was brought out and
discussed both with yourself and the manufactures representive Mr. Mabie
at an earlier meeting. To date we have no input as to the manner in which
these beams are being assembled and their integrity. Revised drawings and
t engineered specs should be provided to us.
3. We have sane concern as to the headers at the end walls over the
arched windows on your type "A" buildings. In that this header carries
a large lam beam and the entire roof fram, we were unable to determine
their bearing to foundation or transfer of load. Some header description
as found on sight (2x6 solid blocked, 2x10 hollow center) . Which is
appropriate and have the needed correction been made on all buildings of
this design?
4. on inspection it was found that the straps which are required 01)
as support to the zero clearance fireplace chimneys where improperly
q nailed and or not nailed tightly. Have these straps been checked prior
to covering up.
I
The report received does give us a mines eye picture of the current
,P status but neglects to give grade and type of material used. This
r4 '
i '
Should you require our assistance on any of the above feel free to
�,:LZct us.
Respectfully,
i
i
rdga J. a in
Ass Bu' 1 g Ins ctor
e
EJP/lyd
C.C. City Clerk
L. Mroz
Councillor
Planning
Fire
File
•
T 713111 U t� r1 IIIc"i� llts C ` �z. �SC? �SE
I°� t ,� �), �Ltblic �trn�erfu �e�rttrfntent
F $
q :Beuarfntrnf -
0nc �alrm (5rrrn
745-U%13 ��
\Villiam H. Munroe
Director of Public Property Maurice A Martineau, Ass't Inspector
Inspector of Buildings Edgar J. Paquin, Ass't Inspector
John L. Leclerc, Plumbing/Gas Insp.
Zoning Enforcement Officer
RF: CONSTRUCTION CONTROL: Permit
^' Gert emeln sure: Construction Control Form
k �
Please be advised that the construction authorized under the above
stated permit is subject to section 127, CONSTRUCTION CONTROL, of the
Massachusetts State Building Code.
All construction documents, including but not limited to working
' drawings, shop drawings and specifications shall be prepared and approved
by a registered professional architect or engineer. These documents shall
? . be submittedto the Budding Department-tcr permit xeuiesa—pur?4ses _ --
Progress reports shall be submitted by a registered professional
architect or engineer to the Building Department on a by-weekly basis.
Reports shall contain all information regarding the readiness of the
• project to .proceed and any comments pertinent to problems encountered on
E the site that effect compliance with any and all codes. Deviations from
approved plans shall be brought to the attention of the Building Department.
At the completion of the project, a report shall be prepared by the
registered professional architect or engineer comenting on the readiness
m
of the project for occupancy and listing any pertinent deviations from the
approved building permit documents.
Also, at the completion of the project, the general contractor recorded
on the permit shall certify to the best of his knowledge the the work has
Peen performed in accordance with the approved construction documents and in
�• a safe and satisfactory manner in accordance with all applicable local, state
and federal statutes and regulations.
Failure to produce reports shall result in a cease and desist order
k placed upon your project within five (5) days after an established due date
i has passed.
• Please feel free to contact this office if there are any questions.
,Delivered Respectfully/
uI
Received
William H. Munroe
Inspector of Buildings
/JJ -U7 c. ,
CONSTRUCTION CONTROL \
IVUEiBER: �
CT TITLE:
=ICT LOCATION: k(-1
1:l 'E OF BUILDING:
?:MORE OF PROJECT:
114 ACCORDANCE WITH SECTION 127.0 OF THE MASSACHUSETTS STATE BUILDING CODE,
17y Registration No.
BEING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECT HEREBY CERTIFY THAT I HAVE PREPARED
OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICA-
•
770"" CONCERNING:
ENTIRE PROJECT T ARCHITECTURAL STRUCTURAL
FIRE PROTECTION ELECTRICAL MECHANICAL
• OTHER (specify)
THE ABOVE IvP11•1ED PROJECT AND THAT, TO THE BEST OF MY KNOWLEDGE, SUCH PLANS,
C'"'/FUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE, MASSACHUSETTS
STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRACTICES AND APPLICABLE LAWS AND
ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY.
16URTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE
PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT
THE WORK IS PROCEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING
PERM- IT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 127.2.2:
1 . Review of shy, draair4p, saples and other submittals of the contractor as required by the
construction contract dozrra:ts as submitted for building permit, and approval for conformance
to the desigi M- ept.
2. Review and approval of the quality control procedures for all code-rewired controlled materials.
3. Special architectural or a);in--ring professional inspection of critical o3structicn oaTPPmts
requiring controlled materials or instruction specified in the accepted agineerirg practice
standards listed in Appendix B.
PURSUANT TO SECTION 127.2.3, I SHALL SUBMIT PERIODICALLY, A PROGRESS REPORT TOGETHER
40ITH PERTINENT COX[MENTS TO THE /- BUILDING INSPECTOR.
PON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL R S TO THE SATISFACTORY
COMPLETION AND READINESS OF THE PROJECT FOR OCCUPANC C
r
� 1
� �IGflAiDRE .
SUE_`°CRIBED AND SWORN TO BEFORE ME THIS�DAY OF
CITY OF SALEM, MASSACHUSETTS
r PLANNING DEPARTMENT
• 1
GERARD KAVANAUGH ONE SALEM GREEN
CITY PLANNER 701970
S S
(617) 744-4580
f f
�CLMVF
March 31 , 1987
Mr. William Munroe
Building Inspector
One Salem Green
Salem, MA 01970
RE: Stasinos Project, 394 Highland Avenue
Dear Bill:
At our meeting of department heads on Tuesday, March 24, 1987,
regarding the Stasinos condominium project, we reviewed a revised plan
(1A) . The major changes from Plan 1 to Plan IA were reviewed at that
time, and the following department head concerns with these changes were
defined as follows:
• 1 . The water line should be looped, but is not looped in the
revised plan;
2. Drive E should be provided with a hammerhead turnaround, as
previously defined; and
3 . Drives F and G should not include the turnaround spurs as
shown. _
T To address these concerns,- Mr. Stasinos has 'submitted another new
,'plan(1B). On this plan, the concerns of department heads are addressed
as follows: 1) The water main is once again looped; 2) a hammerhead
turnaround has been installed at the,end of Drive E; and 3) the
turna`rou'nd spurs previously shown 'on drives F and G have been
eliminated. The appropriate department heads including Paul. Niman, the
Director of Public Services, and Captain Robert Turner of the Fire
Prevention Bureau have reviewed this plan and agree that it satisfies
their concerns.
' Before building permits_may—be_iss.ued.,—however_; Mr. Stasinos must
initiate the nei hborhood reviewcess for Phase II-
`) g _ ro
p _ _ as he has agreed
to do for all phases. This process has begun through the scheduling of
,1 a meeting for Saturday,_April 4, 1987 at the Stas-inns site==As a
result, Phase II permits may be granted and the revised plan_(-1B.).should�
ibe adhered to__r
•
- z -
r
Prior to any further building permits being provided, though,
please request and receive confirmation from the Planning Department
that all conditions of the Consent Judgement are being complied with;
and:.that the neighborhood review process has been complied with.
Sincerely,e^ly�,
�k
Gerard Kavanaugh
City Planner
C1155
•
•
he
• i
g hland
Condominium at yalem
March 24, 1987
NOTICE TO: Honorable Anthony Salvo,
Mayor of the City of Salem
Gerald Kavanaugh, City Planner,
William Munroe, Building Inspector
Paul Nyman, City Engineer
Peter Caron, Assessor
Robert E. Blenkhorn, Health Inspector
Josephine Fusco, City Clerk
Michael O'Brien, City Solicitor.
James Backer, Board of Appeals
Hon. Leonard O ' Leary , Ward 4 Councillor
Zion. Frances Grace, Councillor at Large.
• ?ion. Vincent Fafaro, Ward 3 Councillor
Hon. Robert Gauthier, Councillor
Hon. Neil Harrington, Councillor
Hon. Richard Swiniuch, Councillor
Chief of Police Robert St. Pierre
Fire Chief Joseph Sullivan
and
Residents of 355-459 HIGHLAND AVENUE:;
346-440 HIGHLAND AVENUE; 2 CEDAR ROAD,
SAVONT. STREET; RAVENNA AVENUE; SOPHIA ROAD;
APPLEBY ROAD; MADELINE AVENUE; PYBURN
AVENUE and BARCELONA AVENUE
There will be a Site Review of THE HIGHLAND CONDOMINIUM at SALE;";
at 394. HIGHLAND AVENUE, SALEM, MASSACHUSETTS, on SiPU:F;DAY,
A''RIL 4 , 1987, b ' een the hours of 12 : 00 :P.M. and _ .Q0 I .M, to }
review the site plan and to tour the condominium ural: development.
Your attendance: wi'..l be appreciated.
Very truly yours,
SALEM HIGHLAND DEVELOPMENT
O',P
394 Highland Avenue Salem, Mass 01970 Phone (617) 741-2003
395-4777
J . _
c CITY OF SALEM, MASSACHUSETTS
CITY PLANNER„ �T]�` � i t '. _ . ...:;� 01970
Ay Iw pi (617)744.4580
JT
�GIM�T Od
January 20, 1987
Mr. William Munroe
Building Inspector
One Salem Green
Salem, MA 01970
Dear Bill:
Five months ago, a Consent Judgment was handed down by the Superior
Court regarding the so—called Stasinos project located at 394 Highland
Avenue . I am writing to you to request that certain conditions of that
Judgment be addressed because of the lack of compliance which currently
exists.
First of all, the developer has been required to deed to the City a
4. 1 acre parcel of land following the construction of soccer fields.
Obviously, we do not want the parcel deeded over until the required
improvements are completed. It would be advisable, though, to do the
following:
1 . Request that the developer submit a detailed site plan of the
proposed improvements, including the fields, parking, and
landscaping for review and approval;
2. Request that the developer, upon approval of the plan,
immediately begin to construct such improvements; and
3 . Request that the developer execute an agreement with the City
specifying the timetable for the above steps.
In addition, the site plan was reviewed and approved by the City,
but the developer is now proposing changes in the approved plan. There
are several site design alterations proposed which must be reviewed and
approved again. In this regard, my specific concern relates to the
proposed internal vehicular circulation system in which several
improvements to provide adequate fire access have been eliminated.
These changes should be addressed, and a final decision should be made
regarding the adequacy of the altered plan.
Finally, the developer is required to complete a neighborhood
review process. Because of the above amendments to the plan, I believe
that the developer should hold an additional neighborhood meeting to
review the current status of the project, and make certain that all
concerns of the neighbors are fully addressed. This meeting should take
place immediately.
I would respectfully request that you require these issues to be
resolved to our satisfaction immediately. If that cannot be done, I
would recommend that building permits be revoked.
Thank you for your cooperation in this matter.
Sinc r ly�
Gerar Kavanaugh
City 1 e
3563
cc: Leonard F. O'Leary
City Council President
NICHOLAS G . CURUBY
er, --
February 3 , 19859fV
WILLIAM H. MUNROE , Inspector, /
Public Property Department
Building Department, City of Salem,
One Salem Green
Salem, MA. , 01970
Dear Mr. Munroe: Re 39:4 Highland Ave , Salem
Consent-'Judgment` r: ;
Your letter of January 23 , 1987 , was referred to
my office, resulting in a conference with Mr. Stasinos ,
the developer.
The matters set forth in your letter, needing an
answer, were discussed.
No major changes were made in the original plan sub-
mitted to the City Engineer and approved by all concerned
departments . The minor changes , not contravening the inte-
grity of the original plan, were to minimize the impact
of the necessary blasting to the neighborhood .
The developer intends to comply with said original
plan; and, he intends to proceed without any changes.
Therefore, no revised site plan is contemplated,
requiring a neighborhood meeting.
A copy of the approved general plan will be submitted
to your office for your files .
Very truly yours ,
Nich 1 s G.'kCuruby
NGC/
cc: Planning Department
City of Salem
One _--;,alrm (brrrn
7.13-11213
William H. Munroe
Director of Public Property Maurice M. Martineau. Asst Inspector
Inspector of Buildings Edgar J. Paquin, Ass't Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
January 23, 1987
.Mr. Mike Stasino
544 Chestnut Street
Lynn, Ma 01904
RE: Superior Court Consent Judgement
394 Highland Avenue, Salem, MA
Dear Mr. Stasino,
It has been brought to my attention that there has been a lack of compliance
with certain conditions of the Superior Court. Consent Judgement that effect's
your property located at 394 Highland Avenue.
"In order for this department to continue issuing Building Permits for your
project I must insist that you give the following your immediate attention.
1 . Submit a detailed site plan of the proposed soccer field's improvements
including field's, parking and landscaping for review and approval.
2. Immediately upon approval of the plan's, start construction on these
improvements.
3. That an agreement with the City of Salem must be executed specifying
the time—table for the above steps.
4. That a revised site plan be submitted for the entire project indicating
changes you are proposing from the plan previously approved by the
City of Salem. These changes must be addressed and final approval
granted by. the City of Salem prior to proceeding with any plan change.
5. If changes are proposed in the site plan, a neighborhood meeting must
be held immediately to review the current status of the project and to
make certain that all concern's of the neighbor's are fully addressed.
No further Building Permits will be issued for this project until these matters
have been resolyedo satisfaction of the City of Salem.
Delivered by: Sincerel
WHM/ea£ or
Received by: William H. Munroe
I Inspector of Buildings
C.C. Mayor Sol vo
Council President O'Leary
City Solictor
�t u of $aleni, �fflassar4uutt5
Ozer :�_nlrnt Grrrn
7,15-0213
William H. Munroe
Director of Public Property Maurice M. Martineau, Ass't Inspector
Inspector of Buildings Edgar J. Paquin, Ass't Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
February 13, 1987
To the Honorable City Council
City of Salem
RE: Court Judgement, 394 Highland Ave.
Ladies & Gentlemen:
In response to the Council .Order of January 27, 1987 regarding the
Court Judgement for property located at 394 Highland Avenue, I respectfully
submit the following.
Approval of the various sections of the conditions set forth lies with
the various Boards and Departments as specified. The only reference to the
Building Department being in Condition 2.0 which states that, "the City
Planner shall submit a written statement of satisfaction of all such conditions
to the Building Inspector, City of Salem prior to the issuance of a Building
Permit."
In a letter dated October 21 , 1986 I was advised by the City Planner that
all conditions of the Consent Judgement had been met and that permits could be
issued. Based on this, permits requested were honored by this Department.
In a follow-up letter, dated January 20, 1987, I was advised by the City
Planner that, "certain conditions of the Judgement be addressed because of the
lack of compliance which currently exists." On January 23, 1987, a letter was
hand delivered to Mr. Cris Stasinos,at the development site, outlining the City's
concerns and advising the developer that "no further Building Permits will be
issued for this project until these matters have been resolved to the satisfaction
of the City of Salem." This order still stands and will remain in effect until
such time as I am advised by the City Planner that all conditions have been met.
Respectfully,
William F. Munroe
Inspector of Buildings
47HM: bms
cc: Councillor O'Leary
CITY OF SALEM,, VIASSArl-11IMTS I c
CITY PLANNER 0 $0y _� C1 V LI ;i':,S S. 01970
(617) 744-4580
February 24, 1987
Mr. William Munroe
Building Inspector
City of Salem
One Salem Green
Salem, MA 01970
Dear Bill:
Today Mike Stasinos submitted a new site plan to my office
for his development at 394 Highland Ave. which includes replacement
of some 6-unit buildings with 8-unit buildings among other changes.
Until this plan is reviewed and approved, I hereby request that you
revoke all existing building permits and not issue any new permits.
Thank you for your assistance.
Si 1 -,
Gera Ka a ugh
City Pl n r
cc: Mike Stasinos
�itu II �IlPtlt, Cc�55cC�t�iSE
7.15-0213
William H. Munroe
Director of Public Property Maurice M. Martineau, Asst Inspector
Inspector of Buildings Edgar J. Paquin, Ass't Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
February 25, 1987
Mr. Mike Stasinos
544 Chestnut Street
Lynn, MA 01904
RE: Stop Work Order, `394 Highland Avenue, Salem
Dear Mr. Stasinos:
I have been informed by the City Planner that you have submitted a
new Site Plan,for. review and approval, to his office.
I would call your attention to Section 115.3 of the Massachusetts
State Building Code which states, in part, "A lot or site shall not be
changed from that shown on the official site plan unless a revised plan
showing such changes shall have been filed and approved."
Until this matter is resolved I :must insist all work on this project
cease immediately upon your receipt of this Order.
Failure to comply with this Order will leave me no alternative but
to initiate the appropriate legal action. Be advised that conviction of
violation of the Massachusetts State Building Code carries a fine, not to
exceed One Thousand dollars ($1 ,000) a day for each violation and each day .
the violation continues is a separate offense.
Sincerely,
William H. Munroe
Inspector of Buildings
WhM.bms
cc: City Clerk
Council President
City Solicitor
City Planner
CITY OF SALEM, MASSACHUSETTS
pl RI!I lllln nCbn CT RI CIIT
CITY PLANNER '^ '"1 01970
Q-�x
.� % `S- 1617) 744-4560
�.- ' 9as.c�"
October 21 , 1986
Mr. William Munroe
Building Inspector
City of Salem
One Salem Green
Salem, MA 01970
Dear Bill :
Mike Stasinos has now met all the conditions of the Consent
Judgement (as revised per the October 15, 1986 Board of Appeal Meeting) .
As a result, a building permit can be issued.
If you have any questions, please calln me.
Sinl,
/Gerar- -"K��vanaygh
City {'lamer
bn622 (/
STASINO''S PROJECT
10/23/86 1!715 I Spring Pond Road Office Bld. inconjuction with
project
10/24/86 716 lA Indian Hill Lane Erect dwelling
10/24/86 717 IB Indian Hill Lane Erect dwelling
10/24/86 718 IC Indian Hill Lane "
10/24/86 719 ID Indian Hill Lane
10/24/86 720 3A Indian Hill Lane "
10/24/86 721 3B Indian Hill Lane "
10/24/86 722 3C Indian Hill Lane "
10/24/86 723 3D Indian Hill Lane "
10/24/86 724 3E Indian Hill Lane "
10/24/86 725 3F Indian Hill Lane "
10/24/86 726 4A Indian Hill Lane "
10/24/86 727 4B Indian Hill Lane "
10/24/86 728 4C Indian Hill Lane "
10/24/86 729 4D Indian Hill Lane "
10/24/86 732 2A Indian Hill Lane "
10/24/86 733 2B Indian Hill Lane "
10/24/86 734 2C Indian Hill Lane "
10/24/86 735 2D Indian Hill Lane "
10/24/86 736 2E Indian Hill Lane "
10/24/86 737 2F Indian Hill Lane
STASINO'S PROJECT
10/24/86 11738 2D Overlook Lane Erect Dwelling
10/24/86 739 2C Overlook Lane " "
10/24/86 740 2B Overlook Lane " "
10/24/86 741 2A Overlook Lane " It
10/24/86 742 lA Overlook Lane "
10/24/86 743 IB Overlook Lane "
10/24/86 744 IC Overlook Lane "
10/24/86 745 ID Overlook Lane "
10/24/86 746 IE Overlook Lane "
10/24/86 747 IF Overlook Lane "
T
COMMONL4EALTH OF MASSACHUSETTS
ESSEX , SS . SUPERIOR COURT DEPT.
CIVIL ACTION NO. 86-1534
MIKE STASINOS
VS
CITY OF SALEM BOARD OF APPEAL,
AND JAMES B. HACKER, RICHARD A.
BENCAL, JAMES M. FLEMING, EDWARD MOTION FOR HEARING ON FORM OF JUDGMENT
LUZlNSI,I , PETER STROUT, ARTHUR
LABRECQUE, PETER A. DORE, AS THEY
ARE MEMBERS OF THE CITY OF SALEM
BOARD OF APPEAL
Now comes the Plaintiff , Mike Stasinos , pursuant to Rule 58 (a ) of
the Massachusetts Rules of Civil Procedure , and moves this Honorable
Court to schedule a hearing on the form that the judgment in this action
should take and to order that judgment enter in the form attached hereto .
' I'L By the Plaintiff ' Attorney
Nicholas G. Curu Street , Esq .
7 Franklin Str__t
Lynn , MA. , 01902
�� ( 617 ) 595-0009
Ass2.•Tted oto by Defendant orney
1 E. O ' Brien
City Solicitor
City Hall , 93 Washington St. t
Salem, MA . , 01970
c �
CIVIL ACTION NO. 86-1534
MIKE STASINOS
VS
CITY. OF SALEM BOARD OF APPEAL,
AND JAMES B. HACKER, RICHARD A.
BENGAL, JAMES M. FLEMING, EDWARD CONSENT JUDGMENT
LUZINSKI , PETER STROUT, ARTHUR
LABRECQUE, PETER A. DORE, AS
THEY ARE MEMBERS OF THE CITY OF
SALEM BOARD OF APPEAL
It is hereby agreed by all parties that Consent Judgment
shall be entered in the appeal from a decision of the City of
Salem Board of Appeal , denying the Plaintiff ' s Petition request-
ing the Board to issue a variance to allow construction on prem-
ises located at #394 Highland Avenue, Salem, encompassing appro-
ximately twenty-five ( 25 ) acres 'and lying in Districts R-1 , R-C,
and BPD , which has been previously described as lying in Dis-
tricts R-1 , R-C .and B-2 , and that the contested decision of the
Defendant Board of Appeal be amended and that its decision be
entered granting a variance with the following conditions :
1 ) The Plaintiff, Mike Stasinos , shall withdraw a pending
subsequent petition presently before the Defendant Board of Ap-
peal , with prejudice , upon final approval of this Agreement for
Consent Judgment by this Court.
2 ) That the variance to be granted to the Plaintiff , Mike t
Stasinos , by the Defendant Board of Appeal shall contain the fol-
lowing conditions , that the Plaintiff agrees to :
a ) That the Plaintiff , Mike Stasions , shall be allow-
ed to construct 140 condominium residential units and bu g ,
containing a total of 3000 square feet of floor space o •. on
floor on a parcel of land containing 27 , 000 square feet o land ,
all set forth in a plan entitled "Highland Acres , Salem Highland
Ave . Development Corp . , Owner and Developer , Peter F. MiDeo Assoc .
Arch . " , dated August 3 , 1986 , a copy of which has been furnished
the Defendant Board `of Appeal and the City Planner, City of Salem .
Said building is to be deeded to the, Condominum Association with-
in a thirty-six month period from acceptance of this Agreement .
The building is to be used for a temporary job site/real estate
sales . The building is to be used solely by the developer .
b) That the Plaintiff , Mike Stasior:s , shall grant to
n
totalling 4 . 1 acres of land
UL
in height , parking area and water iounca-
: ,
proved by the City Planner , City of Salem, in the location desianat-
ed in the aforementioned plan.
c ) That the City Planner , subject to the approval of the
Board of Appeal , shall select a qualified professional engineer , at
the Plaintiff ' s test, who o include the
shall provide his services , t
supervise and oversee the construction
duties of Clerk of Works , and
to be underaken by the Plaintiff , to insure that said construction the
complies with Section IV and V of the Sub-division Regulations of
City of Salem; and , that said ofgSalem,ineer saawritten ll 1progress reportt to the Board of
Appeal and City Planner, City
the undertaken construction every two ( 2 ) weeks . That said engineer-
ing services shall include the supervision and overseeing of the im-
provements required in the installation of streets ; roadways ,rovded sin the
ide-
walks , grass strips, monuments and utilities , all as p
approved definitive plans submitted by the Plaintiff . It is agreed
Plaint
that said services to be furnished by the Plaintiff shall not exceed
any and all normal design standards for traffic mdeemedpact nprope�N for
waivers by the Board of Appeal , City d of Appeal , which shall
Final approval shall be given .by the Boar
not unreasonably be with-held .
d ) The Plaintiff , MIke Stasions , shall submit a pleshall be su
ary plan of the odevelopment
d by todthe
Boalth�rConservationHealth hCommissbon ,
Citted ar.d app
Police
City Engineer , Superintendent of Streets , Fire Department ,
Department, and School Department , City of Salem.
e ) The Plaintiff , Mike Stasinos , shall submit, prior to
the start of construction, a final definitive oplan
cand tconte�tsto
the Board of Appeal , City or Salem, all in proper formRegulations , City of
as required by Section IIIB, of the Sub-division
Salem.
r ) The Plaintiff , Mike Stasinos , shall, prior to construc-
ental Impact Statement in full and clear form,
tion , submit an Environmthe proposed project to the total environ-
indicating the relation en iits inhabitants , and a copy *of such to
ment ofthe City of Salem and
the Board of Appeal , City of Salem.
g ) The Plaintiff , Mike Stasinos , shall file with the City
Solicitor , City of rSalem, a performance bond , on approved form , and in
an amount approved by the Director of Public Services guaranteeth
that the proposed constructions shall , upon completion , comply ng
with
this Consent Judgment and all pertinent sections of the Sub-division
Regulations , City of Salem, to be applied to the unfinished work ,
prior to issuance of necessary compliance permits .
2 -
h ) That the Plaintiff , Mike Stasinos , in the construction
of the subject project , shall meet all design standards for streets ,
UVC:] SD.Ce all C: Llle L'.OLeC:i of"1 Oi lla LU-h1 � Cc L'u1C_ r all
be unreasonably be with-held .
i ) That the plaintiff , Mike Stasinos , in the construction
of the subject project , shall meet all required improvements , as set
forth in Section IV and V, sub-division Regulations , City of Salem.
j ) That a neighborhood review process shall be initiated
between the Plaintiff , neighborhood residents and the City Planning
Department , City of Salem, through which a neighborhood meeting shall
be held to review the project and its components and necessary changes
and alterations to such plans shall be made as requested within the
parameters of the approved variance .
.k ) The Plaintiff shall contribute to any and all proposed
traffic improvements on the Highland Avenue-Swampscott Road area , as
defined by the City through its ComprehensiveTraffic Study now being
undertaken. Such a contribution shall be made with the approval of the
City Planner according to a formula designed such that all developments
within the surrounding geographical area shall fairly share such costs .
1 ) The Plainitff shall be required to reserve a strip of
land to be defined by the City, along Highland Avenue, for the future
widening of the roadway if deemed necessary by the Comprehensive Traf-
fic Study now being undertaken .
m ) The Petitioner, Mike Stasinos , amend his deed to the real
property located at 399 Highland Avenue , Salem, Massachusetts , and said
amendment to be a covenant not to build on any portion of said real es-
tate , other than on that portion utilized for 190 condominium units and
3 , 000 square foot building . Said amendment is to be approved in form by
the City Solicitor .
n ) That all exterior building designs , b�ui4lding locations ,
lighting , landscaping, infrastructure , and site planning and design
el-ements of the proposed development shall be subject to the review
and approval of the Board of Appeal and City Planner , City of Salem.
o ) That a buffer zone of 200 feet along the -.eastern boun-
dary of the property shall be created so that the abutters of Pyburn
Avenue and Madeline Avenue not be adversely impacted ; and , that in
order to eliminate any visual impact of the development upon the ab-
utting neighborhood , the proposed landscaping to screen buildings
from the residencese of the above avenues shall be revi-ewed and ap-
proved by the City Planner . The Plaintiff shall also provide that
there be no other access to the parcel other than from Highland Ave-
nue , prohibiting any access to said parcel from Appleby Road , Made-
line Avenue , Pyburn Avenue , Ravenna Avenue , or Sophia Road or any
other accepted public way.
P ) That there will be no attempted closure of the median way
on Highland Avenue , at the entrance of Ravenna Avenue by the develop-
er or Condominium Association .
- 3 -
o ) The Plaintiff shall relinquish the foundation and build-
ing permits , as issued by the City of Salem currently existing for
^arCE' L , unOn -_nana.L aDGroval D'✓ �.._ boaro
r ) That all water , sewer and drainage improvements on the
site shall be subject to the review and approval of the City Plan-
ner and Director of Public Services , City of Salem ; and , that all
issues and concerns regarding drainage and wetlands shall be re-
viewed and approved by the Conservation Commission, City of Salem.
s ) That an assessment of impact of the proposed project
on existing infrastructure services , including water , sewer and
drainage , shall be made by the City Planner and Director of Pub-
lic Services , City of Salem. That upon such assessment, the Plain-
tiff shall make any necessary improvements , at his costs , if re-
quested by the City Planner and Director of Public Services . If
it is deemed that improvements are necessary, and attributable
to the project, to upgrade the existing wastewater pump station
on Ravenna Ave. said improvements shall be implemented by and at
the cost of the Plaintiff .
t ) If required by the State Department of Public works ,
the Plaintiff shall contribute the demanded funds for drainage
improvements proposed in the vicinity of Rich ' s Department Store ,
Highland Avenue , Salem, in ah effort to eliminate drainage pro-
blems found in the geographical area .
U ) That the City Planner shall submit a written state-
ment of satisfaction of all such conditions to the Building In-
spector, City of Salem prior to the issuance of a building per-
mit.
V ) That the Plaintiff shall complete all cosntruction
and install all required municipal services within three ( 3 )
years from date of approval of the definitive plans ; and , he
shall provide that the proposed construction will be in five
( 5 ) phases , all as provided for in the definitive plan to be
submitted for approval .
1 . That , in the work to be done on said pro-
ject , the General Contractor and all sub-contractors shall
restrict the performance of the work between the hours of
7 : 00 A. M. and 6 : 00 P.M. , Monday through Friday , excluding
work of a quiet nature . The hours for blasting shall be de-
termined by the Salem Fire Marshall .
2 . `'That the By-Laws' of the Condominium Assoc-
iation , to be executed and administered by the Condominium
Association , shall provide that all costs of trash collec-
tion and snow removal shall be paid for .by the Association .
4 -
w ) That the petitioner , Mike Stasinos , upon filing of
the Definitive Plan with the Board of Appeal , shall also file
said ..Definitive -fan *with the Board of Health.
Mike Stasinos , P' aintiff
by his attorne
Nicholas G. Curuby
7 Franklin Street
Lynn, MA. , 01902
( 617 ) 595-0009
City of Salem,
and of Appeal ,
b its attorne 1
��������
Michael E. O ' Brien
City solicitor
City Hall
93 Washington Street
Salem, MA. 01970
m
. August 15 , 1986
r
5 -
AT-
William H. Munroe
Director of Public Property Maurice M. Martineau, Ass't Inspector
Inspector of Buildings Edgar J. Paquin, Ass't Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
December 12, !186
,Ar. M. Stasinos
544 Chestnut Street
Lynn,MA 01904
RE: Highland Acres
Dear Mr. S,tasinos;
Be aware that there is now confusion as to what and how your project
is being built.
Currently you are not developing your Site as per approved plans. Please
resolve this with both the Planning Department and Fire Department . Finally
an. approved plan we all will work from must be provided to this department
for our use in our inpect-ion and permit services .
Fu.rther you should be aware that no permits are now in glace for Buildings
V, 8, and 12, where there now exist foundations.
Make immediate application to this department for the needed permits . Failure
to comply wil,' result 4-'n a ot--p wcrk order on these Buildings.
Also be aware that because of the discrepancy of the Site plan, no further
permits will be approved by this department
Should you have any questions in regards to this letter or any other area
of which we may be of assistance, feel free to contact us .
ResDectfully,
q in
gar/jJ,
Ing
Id
11 d U n Spector
A-,qj 11
EJP/laf
CC:. L. Mroz . Received by t date ld'ZOL
City Clerk L
Councillor Delivered byrIA55 :-'�Cw�— date
Fire Inspector
Planning Dept . Witnessed byMccy - date
File
NICHOLAS G . CURUBY
Corr
Auqust 28, 1986
William H. Munroe, Colnnissioner
Salem Building Department, # 3 yt�
One Salem Green Re: Highland Avenue Development
Salem, MA. , 01970 Salem Highland Avenue Development Corp.
Dear Commissioner Munroe:
Be advised that the Developer of the above-listed project
is undertaking to proceed with the preparatory and development
construction work. Said work will done at the risk of the Developer.
Should it be determined that additional work ani/or changes
must be made, the Developer shall do so under your instruction
and hold the City of Salem and the Salem Building Department harm-
less from any and all claims of liability.
Very truly yours
Mike Stasinos, President
CITY OF SALEM, MASSACHUS.ETTS
..r
CITY PLANNER ^
01970
(617) 744-
4560
�
September 10, 1986
Mr. William Munroe
Building Inspector
City of Salem
One Salem Green
Salem, Ma. 01970
Re: Stasinos Project, 394 Highland Avenue
Dear Bill :
As required by the Consent Judgement, I have reviewed the proposed
plans for the above—mentioned project and find that Mike Stasinos has
met the following conditions:
1 . submittal of preliminary plans to the appropriate boards (d)
2. submittal of Environmental Impact Statement to the Board of
Appeal (f)
3. compliance with design standards for streets, easements, open
spaces and protection of natural features as set forth in
Sections IV & V of the Sub—division Regulations and approved by
the City Planner (h)
4. compliance with required improvements as set forth in Section IV
& V of the Sub—division Regulations as per review on Thursday,
Sept. 4th with Paul Niman, Bill Munroe, Bob Turner, myself and
Tom Rouleau (electrical plans still to be reviewed) (i)
5. establishment of 200' buffer zone (visual impact of development
on abutting neighborhood as yet to be assessed) (o)
6. submittal of all water, sewer and drainage improvements to the
Director of Public Services, approval of which is expected
within the next day (r)
7 . submittal of plans to the Director of Public Services for
assessment of impact on infrastructure services, which approval
is expected within the next day (s)
- 2 -
'I_hp rn� lnt'i�_ arc m,,pr hP rninn ! or ad to cari5{'v Chn ( nnannt
2. 4.1 acres of land must be deeded to City for soccer field as
shown on site plan (b)
3 . City Planner must select a qualified engineer to serve as Clerk
of the Works (c)
4. revised definitive plan must be submitted to Board of Appeal
(plan currently in their possession does not reflect changes as
of Sept. 4th) (e)
5. performance bond must be submitted to the City Solicitor (g)
6. neighborhood review process must be completed (j)
7. Covenant must be executed to prohibit construction on any other
portion of the property except portion utilized for 140
condominium units and the 3 ,000 s.f. office building (m)
8. all exterior building designs, building locations, lighting,
landscaping, infrastructure, site planning and design elements
must be approved by the Board of Appeal and City Planner (n)
9. current foundation and building permits must be relinquished (q)
10. drainage and wetland impact must be reviewed and approved by
the Conservation Commission (on Sept. 11th agenda) (r)
11 . street names must be officially approved
While some further issues need to be resolved, the cooperation we
have received to date from Mike Stasinos leads me to recommend that a
building permit be issued for a small percentage of the total project.
This permit would be granted with the understanding on Stasinos ' s part
that he would comply with any changes that may be required at a later
date to meet the conditions of the Consent Judgement even if such
changes affect work already undertaken.
SinceZel
q"-7
Gerard Kavanaugh
Cit P1.v1"
7
Vitt) of �IIEl11, ct �tC���tSEf
011c !E�alcnt orcrtt
7.15-0213
William H. Munroe
Director of Public Property Maurice M. Martineau, Ass't Inspector
Inspector of Buildings Edgar J. Paquin, Asst Inspector
Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp.
September 12, 1986
Mike Stasinos, President /
Highland' Avenue Development Corp.
Off 394 Highland Aver
Salem, MA 01970
RE: Temporary Building Permits
Dear Mr. Stasinos:
Due to the fact that several issues remain to be resolved regarding your
property located off 394 Highland Ave. ( i.e. street names, neighborhood meeting,
etc. ) prior to the issuance of Building Permits, this office cannot issue the
permits presently applied for.
However, in view of your letter dated August 28, 1986 in which you state
that work undertaken prior to receipt of all necessary approvals will be done
at the risk of the developer, and City Planner, Gerard Kavanaugh's letter of
September 10, 1986 recommending that due to your cooperation, permits be issued
for a small percentage of the project, this office agrees to the following:
1 . Work may commence on the three thousand (3000) squar,g foot
building to be used as your construction office;
2. York may commence on one (1 ) six (6) unit building.
I will again remind you that this work is undertaken at your risk and that
foundations for these buildings will not be backfilled without the approval of
this department, as well as electrical and plumbing departments if services are
to be concealed by these foundations.
Sincerely,
William H. Munroe
Inspector of.Buildings
WHM:bms
ccc City Planner
Councillor O' Leary
Electical
Plumbing
BUILDING DEPT
PETER F. DIMEO ASSOCIATETJARIIPDC.2 4 ,fi C KTTECTURE PLANNING
546 Main Street, Stoneham, � assachus tits V21SO Tel. 438-0900
F{ECEIVc0
CITY 01F SALEM,MASS.
February 20, 1992
City of Salem Building Department
One Salem Green
Salem, MA. 01970
Re: Highland Acres;Condominiums
394 Highland Avenue
a3 em,MA'..1970
Dear Mr. Munroe:
We have inspected the entire condominium development at the above
address on February 7, 1992, and the condition of the development,
which includes Buildings number 22, 23 , 24, 25 and 26, are as
follows:
BUILDING #22 6 UNITS "B" STYLE:
1. Commenced construction of 8" concrete blocks.
2 . Firewalls 25% complete.
3 . Sills have been installed on foundation.
4 . Outside partition walls completed - ready for first floor
truss system.
BUILDING #23 4 UNITS "A" STYLE:
1. Roof frame and plywood installed.
2 . Asphalt roof shingles 100% completed.
3 . Exterior clapboard siding 100% completed.
4. Garage doors installed.
5. Front walkways installed.
6. Rough plumbing and electrical completed.
7. Sheetrocking - 100% complete.
Page -2-
City of Salem Building Department
February 20 1992
S . Interior doors and trim - 50% complete.
9. Commence installation of kitchen cabinets.
BUILDING 124 6 UNITS "B" STYLE:
1. ,Backfill and rough grading.
BUILDING #25 6 UNITS "A" STYLE:
1. Backfill and rough grading.
2 . Driveways rough graded.
BUILDING #26 6 UNITS "A" STYLE:
1. Backfill and rough grading.
2 . Driveways rough graded.
All work is progressing satisfactorily in accordance with drawings
provided by this office.
.�.�µ if,ARC,
rF
�F �� F• O, of
a
No.1665
� $T01'c nA .lAw J�
PETER F. DIMEO n+ass.
fin.