Loading...
205 HIGHLAND AVENUE - BUILDING INSPECTION (2) . 1 \ 0 G�I � ,,kECYflEJ�O UPC 90330 0 AND.1zit, Fan,sv� H asulas,mu � a � JOHN M.CORCORAN AND COMPANY Creating Communities Since sgy February 22, 2002 Peter Strout Building Commissioner City of Salem 120 Washington Street, 3 d Floor Salem, MA 01970 RE : Hawthorne Commons Dear Mr . Strout : Enclosed for your files is the original certification for the concrete retaining wall constructed between First Street and the referenced site by Evan Hankin, P.E . Please •call :should you ..have any questions . Sincerely, Thomas K. Albert Vice President TKA: vao Enclosure Cc : Dave Boucher, PHI Greg Jarold, Mellon Steve Zalecky; :Martin Arch . _. A. 100 Grandview Road, Suiie 203 Braintree, MA 02184 1 -781-849 7112 l ' �78,7y/•0752 • EVAN L. NANKIN, P.E. Consulting Engineer 202 Nehoiden Road Newton, MA 02468 617-965-1557 February 14, 2002 Mr. Thomas K. Albert RE RETAINING WALL JOHN M. CORCORAN &CO._ - HAWTHORNE COMMONS 100 Grandview Road, Suite 203 Salem, MA Braintree, MA 02184 FILE NO. 0206 Dear Mr. Albert: This letter certifies that the new concrete retaining wall constructed parallel to First Street is satisfactory. It has been erected in accordance with the plans and specifications; and the Massachusetts State ` Building Code and is capable of supporting the applied loads. Very truly yours, R�941A � HAS!qN, •�No.28Gle.y�s:'. Evan L. Hankin, P.E. f,`.:v. ". r,1.:'. r..i ..�)i I . -..+• t i'I 3rrl;i 1(° .�' � —. 4q 3 .. �J .. Sep 18 01 02: 26p The MZO GROUP (781 ) 279-4448 p. 2 1 ^ Architect's Field Report owner {x} Architect {x} AIA Document G711 — Consultant {x} Electronic Format Field {x} THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES;CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION, AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. PROJECT: Hawthorne Commons -205 Highland Avenue FIELD REPORT NO: 16 Salem,Massachusetts 01970 John M.Corcoran Co.-Owner ARCHITECT'S PROJECT NO:21.0723-03 DATE Aug,30,2001 TIME: 10:00 A.M. WEATHER: Sunny TEMP.RANGE:85 F PRESENT AT SITE: Dave Boucher-Plumb House,Inc. Tom Albert-J.M.Corcoran Co.,Inc. Jim Zegowitz-The MZO Group,Inc. John Anderson-Plumb House,Inc. David Erickson-Plumb Home,Inc. Joe Marston-Plumb House,Inc. WORK IN PROGRESS: A. Building#1 Frame to start 911 B. Building 42 First floor exterior wall framing complete,second floor underway. C. Building#3 Roof frame underway. D. Building#4 Roof framing and roofing complete,building wrap underway,windows and exterior doors 85%,decks and trim in progress E. Building#5 Lite gage framing underway F. Clubhouse-Pool hole excavated and reinforcing installed, interiorpaintfirstcoat complete G. 8 Bay garage,no change. H. 12 Bay Garage,foundation underway. I. Site utilities installation in progress,gas to start 914/01 J. General discussions included:Mechanical room space requirements,new color for colored concrete to be red,gas fireplace surrounds need tile selection,roof shingles color inconsistencies at Building 4 and associated manufacturers letter to be forthcoming,retaining wall options of VersaLock or concrete at back of retention tank discussed,timely decision required,Fire Departments requirement ofettic catwalks discussed,and fueplace,venting locations discussed. OBSERVATIONS: Beam end bracing and interior shear wall cutout conditions discussed with PHI,will verify with Structural Engineer upon structural impeclitxr. ITEMS TO VERIFY:Beam bracing and shear wall penetration appoval INFORMATION OR ACTION REQUIRED:Water heater suspension/mecahnical vroom clarification ATTACHMENTS:None AlA DOCUMENT 0711 -ARCHITECT'S FIELD REPORT-OCTOBER 1972 EDITION-AIA- COPYRIGHT 1972 -THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,20006-5292..WARNING;Unlicensed photocopying violates U.S.copyright laws and is subject ra legal pmsscutlon.This doamGrt ours electronically ptoduced with the permissim of the AIA and can be reproduced without violation until the date of explretlun as noted below. Electronic Format G711-1972 User Document G711.CON-5/1512001. AIA License Number 106817,which expires on 2/7/2002-- Page#1 Sep 18 01 02: 26p The MZO GROUP (781) 279-4448 p. 3 n REPORT BY: James Zegowim Project Manager,The MZO Group,Inc. This list is based upon the Architect's observations during a brief site visit and should not be considered to be a complete inspection of the Project nor to be a complete and exhaustive list of deficiencies,This list is based upon visual observation only and is not the result of any testing,nor does it contain any hidden defects and the Architect shall not be responsible for such.The Architect reserves the right to te-observe portions of the Project and may find additional deficiencies.This list does not relieve the Contractor from compliance to correct deficiencies from any other observation,written or verbal,or the results from any previous testing that may have been performed. Compliance with the design docnmrelltS is solely Contiactoi s responsibility.Observation on site is only for conformance with the design concept of the Project.The Contractor is responsible solely for the fabrication processes and to the means,methods,techniques,sequences and procedures of construction;and for coordination of the Wolk of all trades.In addition,no inspection,observation,certificate or approval by Owner or Architect will in any way relieve the Contractor of its obligation to perform its work fully in accordance with the plans and specifications and all of the project requiremants. AIA DOCUMENT A201•INSTRUCTIONS TO BIDDERS—FORTH EDITION-AIA—COPYRIGHT 1987—THE AMERICAN INSTITUTE OF ARCHITF1'.1S, 1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,2M-5292.;Unlicensed photocopying violahu U.S.copyright laws mid is subiect to legal prosecution. This document was electronically produced with the permission of the AIA and can be reproduced without violation until the date ofmpirotion a noted below. Electronic Format A201-1987 User Document:A201.CON— 118/2001.AIA License Number 106817,which expires on 2/16/2002 Page#2 Sep 18 01 02: 26p The MZO GROUP (781 ) 279-4448 p. 4 Architect's Field Report Owner {x} Architect {x} AIA Document G711 — Consultant {x} Electronic Format Field {x} THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. PROJECT: Hawthorne Commons -205 Highland Avenue FIELD REPORT NO: 17 Salem,Massachusetts 01470 John M.Corcoran Co.-Owner ARCHITECTS PROJECT NO:21-0723-03 DATE Sept.06,2001 TIME: 10:00 A.M. WEATHER:Sunny TEMP.RANGE:80 F PRESENT AT SITE: Dave Boucher-Plumb House,Inc. Tom Albert-J.M.Corcoran Co,Inc. Jim Zegowitz-The MZO Group,Inc. John Anderson-Plumb House,Inc. John Robichaud-J.M.Corcoran Co.,Inc. Joe Marston-Pltlntb House,Inc. WORK IN PROGRESS: A. Building#1 First floor wall framing in progress B. Building#2 Third floor deck complete,wall layout underway. C. Building#3 Roof sheathing underway,and deck installations''iti progress. D. Building#4 Rough plumbing,electrical and HVAC substamially complete,tough sprinkler complete,siding and trim in progress E. Building#S Lite gage framing underway,rough MEP in progress F. Clubhouse-Prepping for finish floor installation,finish paint G. 8 Bay garage,no change. H. 12 Bay Garage,foundation complete. L Gas piping installation in progress,communications lines being pulled J. General discussions included:Mechanical room requirements,possible remedies to roof shingle color inconsistencies at Building 4, control joint pattems at pool apron,and exterior wall framing inspection prior to insulation at Budding 4 scheduled for Sept. 11,9:00 am., new turnover date for Clubhouse discussed,insulating details and mechanical closets discussed back entry trim details discussed at Clubhouse. OBSERVATIONS: Finish gyp,board and casing work at front entry to Chlbhotise out of plumb,needs attention. Discussed w/PHI,to remedy. ITEMS TO VERIFY:Mechanical room closet cciling requirements INFORMATION OR ACTION REQUIRED:PHI to remedy finishes at C.H.entry and other areas,Martin to clarify back entry casing configuration ATTACHMENTS:None AIA DOCUMENT G711 -ARCHITECT'S FIELD REPORT-OCTOBER 1972 EDITION-AIA-COPYRIGHT 1972-THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,20006-5292..WARNBJG;Unlicensed phats pying violates U.S.copyright taw,and is subject to legal prosecution. This document was electronically produced with the permission of the AIA and can to reproduced without violation unlit the daw of expiration m noted below. Electronic Format G711-1972 User Document: G711.CON—5/15/2001. AIA License Number 106817, which expires on 2!7/2002-- Page#1 Sep 18 01 02: 27p The MZO GROUP (781 ) 279-4448 p. 5 REPORT W James Zegowiu,Project Manager,The MZO Group,lnc. This list is based upon the Architect's observations during a brief site visit and should not be considered to be a complete inspection of the Project nor to be a complete and exhaustive list of deficiencies.This list is based upon visual observation only and is not the result of any testing,nor does it contain any hidden defects and the Architect shall not be responsible for such.The Architect reserves the right to re-observe portions of the Project and may find additional deficiencies.This list does not relieve the Contractor from compliance to correct deficiencies from any other observation,written or verbal,or the results from any previous testing that may have been performed. Compliance with the design documents is solely Contractor's responsibility.Observation on site is only for confonnance with the design concept of the Project.The Contractor is responsible solely for the fabrication processes and to the means,methods,techniques,sequences and procedures of construction;and for coordination of the Work of all trades.In addition,no inspection,observation,certificate or approval by Owner or Architect will in any way relieve the Contractor of its obligation to perform its work fully in accordance with the plans and specifications and all of the project requirements. AIA DOCUMENTA201•INSTRUC71ONS TO BIDDERS—FORTH EDITION-AIA—COPYRIGHT 1987—THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,20006-5292.;Unlicensed photacopying violates G.S.copyright laws and Is subject to legal prosecution. This tlocun ent cow electmnieally produced ugh due peru¢sion of the AIA and can he reproduced wiawut violation until the date et expiration as noted below. Electronic Format AN1-1987 User Document: A201.CON— 11812 001.AIA License Number 106817, which expires on 2116/2002 Page#2 Sep 18 01 02: 27p The M20 GROUP (781) 279-4448 p. 6 Architect's Field Report Owner {x} Architect (x) AIA Document G711 — Consultant ix) Electronic Format Field {x} THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES;CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUI'HEN'rICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. PROJECT: Hawihome Commons -205 Highland Avenue FIELD REPORT NO: 18 Salem,Massachusetts 01970 John M.Corcoran Co.-Owner ARCHITECT'S PROJECT NO:21-0723-03 DATE Sept. 13,2001 TIME: 10:00 A.M. WEATHER:Sunny TEMP.RANGE:75 F PRESENT AT SITE: Dave Boucher-Plumb House,Inc. Tom Albert-J.M.Corcoran Co.,Inc. Jim Zegowitz-The MZO Group,Inc. John Anderson-Plumb House,Inc. Jahn Robichaud-J.M.Corcoran Co.,Inc. Joe Marston-Plumb House,Inc. Ken Book-BLW Engineering,Inc. WORK IN PROGRESS: A. Building#l Second floor deck in progress B. Building#2 Rooffrmning underway. C. Building 93 Rooting underway,and deck installations in progress, D. Building#4 Rough plumbing,electrical and HVAC substantially complete,rough sprinkler complete,siding and trim substantially complete E. Building#5 Lite gage framing underway,rough MEP in progress,siding and deck installation in press F. Clubhouse Finish floor installation underway,finish paint underway G. 8 Bay garage,no change. H. 12 Bay Garage,foundation complete. 1. Gas piping hhsre0atlon in progress,communications lines being pulled J. General discussions included:Structural inspection completed this am,and report forthcoming,exterior finishes at Clubhouse entry discussed and PHI noted they will be addressing at time oftrim replacement,roofing remedy at Building 4,color variations a result of pressure variations during manufacturing process, mechanicalcloset requirements and the need to maintain clearance for water heater and Magik Pak access and removal/replacement discussed and investigated in Building#4 OBSERVATIONS: Magik Pak/water heateraccess ITEMS TO VERIFY:Mechanical closet requirements INFORMATION OR ACTION REQUIRED:None ATTACHMENTS:None AIA DOCUMENT 0711 -ARCHITECT'S FIELD REPORT-OCTOBER 1972 EDITION -AIA-COPYRIGHT 1972-THE AMERICAN INS17rUTE OF ARCHITECT6, 1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,20006-5292.,WARNING;Unlicensed Photocopying Violates U.S.copyright laws and K sub*[w legal prosecution.'110 doewnetn was electronically produced with the Permission of the AIA and can be reproduced without violation until t1w date of expiration as noted below. Electronic Format G711-1972 User Document: G711.CON-511512001, AIA License Number 106817,which expires on 2/712002 - Page*1 Sep 18 01 02: 27p The MZO GROUP (781 ) 279-4448 p. 7 REPORT I3 e: James Zegowitz,Project Manager,The MZO Group,Inc. This list is based upon die Architect's observations during a brief site visit and should not be considered to be a complete inspection of the Project nor to be a complete and exhaustive list of deficiencies.This fist is based upon visual observation only and is not the result of any testing,nor does it contain any hidden detects and the Architect shall not be responsible for such.The Architect reserves the tight to re-observe portions of the Project and may find additional deficiencies.This list does not relieve the Contractor frau compliance to correct deficiencies from any other observation,written or verbal,or the results from any previous testing that may have been performed Compliance with the design documents is solely Contractor's responsibility.Observation on site is only for conformance with the design concept ofthe Project.The Contractor is responsible solely for the fabrication processes and to the means,methods,techniques,sequences and procedures of construction;and for coordination of the Work ofall trades.In addition,no inspection,observation,certificate or approval by Owner or Architect will in any way relieve the Contractor of its obligation to perform its work fully in accordance with the plans and specifications and all of the project requirements, AIA DOCUMENT A201 -INS'IRUITIONS TO BIDDERS-FORTI4 EDITION-ATA—COPYRIGHT 1997—THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,20006-5292.;Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. This document was electronically produced with the permission ofthe AIA and can be reproduced without violation until the date ofexpiration as noted below. Electronic Format A201-1987 User Document: A201.CON-1/8/2001. AIA Llcense Number 108817,which expires on 2118/2002 Page#2 K t�itp of baiem, fRam5arbufsaw t Office of the Citp council citpaU COUNCILLORS-AT-LARGE JOAN B. LOVELY WARD COUNCILLORS 2001 PRESIDENT LAURA A.DeTOMA DEBORAH E. BURKINSHAW 2001 THOMAS H. FUREYSCOTT A.LaCAVA CITY CLERK KEVIN R.HARVEY REGINA R.FLYNN ARTHUR C.SARGENT III JOAN B. LOVELY LEONARD F.O'LEARY KIMBERLEY L.DRISCOLL SARAH M. HAYES YJOSEPH A.O'KEEFE, SR. It�O October 29, 2001 Mr. Thomas Albert, Vice President John M. Corcoran Company 100 Grandview Rd., Suite 203 Braintree, MA 02184 Dear Mr. Albert: At a meeting of the Salem City Council, held in the Council Chamber on Thursday, October 25, 2001, the City Council voted to grant your request to work on the holiday, Veteran's Day, Monday, November 12, 2001. Very truly yours, �E BUR 1 SHA CITY CLERK cc: Watch Commander Building Inspector i �`�� f � * £ t r� fi �l � $ B-23-201 1SSPM FROM p 1 City of Salem, Massachusetts is Fire Department 48 Lafayette Smet Robert'W.7urner Salem,Massachusetts 02970-3695 gire Pmvention fief rreL 978-744-1235 Buren« 978-744-6990 FaX 978-745-4646 9?8-74rr7777 August 23, 2001 Mr. Sohn Anderson RE: Cat walk at Highland Commons Plumb House 205 Highland Avenue Salem, Ms. 01970 Mr. Anderson: With regards to the inspection conducted by Chief Robert Turner, and Deputy Chief Thomas Brophy last ,week;, the following work must be completed In the roof area's of the residential properties. A cat walk from one end of the attic to the other, with lights, and a pull down staircase for the access of fire fighters to check heat detectors etc. Thank you in advance for your anticipated cooperation in this matter. Respectifully 6 Ittad F'tank Precaewski Fire Inspector Salem Fire Department CC: Chief Turner Building Department Sent By: Martin Architectural Group; 2155615064; Aug-6-01 2:40PM; Page 2/5 Architect's ;Field Report Owner {x} Arotiitect {x} AIA Document 6711 — Consultant {x} Electronic Format Field {x} THIS DOC'UMPNT HAS IMPORTANT LWAL CoNsEQUENCEN:CONSULTATION WITH AN ATTORNEY IN FNCOURAOED WITH RESPECT'TO ITS COMPLEtTON OR MODIFIOATION. AUTHENTICATION OF TRIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY HR MADE By (,SING AIA DOCUMENT DaOI. PROJECT: Hawftrne Commons -205 Highland Avenue FIELD REPORT NO: 11 Satan,Milmdluseni;01970 John M.Corcoran Co.-Owner AR.CHP[LCr's PROJEI:'I NO:21-0723-03 DATE July 26,2001 TIME: 10:00 A.M. WEATHER Run TEMP.RANGE:65 F PRESENT AT SI FE: Tom Alhert-J M Corcurm Co.,IM Andrew Coppeloti-Plumb House,Inc. Jahns Robichaud Plumb IIousc,ius. John Alderson-Plumb Ilouso,Inc. Joe Nlarem-Plumb Horse,Ift, WORK IN PROGRESS: A. Building#I slab 00*ete 9. Building#2 slab complete C Building#3 Wall panels delivered-Preparation for framing underway. f husses underway D. �g#5 training underway,!floor and deck almplete 2"d floor SO°/o complete.ughs begun & Bail ' #5 F. Clubhouse-Reofnlg nearing ernnpletim EYte nm true near,g mplet on Plumbing and Electric rough-ins'at approx.g0%. Sprinkler approx.30%compete. G. 8 DaY 9=906 c1c6trical rouEfi underway. Garage doors installed H. Site trenching for utilities undaway. I. General brans discuasid were altemste Uui ,w,cathednal ceiI4 urmfrbvratian; Site retailing wall status;Acceptability of Mimick Trim far tmtire Project. 2"d 900r deck 60liit to be shortened to allow more liglu react balconies. OBSERVATIONS: lutcrim glass windows missing from office in chtbhouse. Latest pleas specifies windows n two locations that are not fiamed fox acceptance ofdtese windows. ITEMS 1'0 vERTFy: None IIvTFOKMATTON OR ACTION REQUMM; Re-frame interim partitions in clubhouse to accept windows as noted in obscvatiotl5 abuv ATTACHNENTS;None Daniell Garthe,Project J Manager.The Martin Architectural Croup,Inc, AIA QUI11TEC ENT 6711 HI'I'FX'T'S PIEI.p REPORT-OCTOBER 19'32 EOI'noN ..AIA -COPYRIGHT 1971 -THE AMT.RICAN TNBi'1"I'l1TE OF ARCHITECTS,ns5 New Y AVENUE N.W.,WASHINGTON.D.C.,;0006-5292..WARNING;Uniwtaiacd eubioct to lctd!prnmuaNt Thi'dpeunYnt was eleehonipally pNdumd with We I rrprodu"d withoulest U.S. ot,wtit laws and is expiration ae noted below. �rn]ISalt4r of the ATA and can be reproduced willwut violadpn until the date�f Electronic Format G711.1972 User Document:G711.GON-5/1512001.AIA License Number 106817,which expinas on 2/7/2002-- Page#1 , FIELD REPORT Pagel ABERJONA ENGINEERING INC. BATE July 16,2001 JOB NO. One Mt. Vernon St. 01088 Winchester,MA 01890 PROJECT Hawthorne Commons Ph: 781-729-6188 Fax: 781-729-7960 LOCATION 205 Highland Ave., Salem MA CONTRACTOR plumb House OWNER TO: Plumb House j 58 George Leven Dr. JUL �, b' � WEATHER TEMP N.Attleboro MA 02760, Sunny OAT AM _ 800 AT 3:15 PM Attn.: Dave Boucher,PrOct-Mauager PRESENT AT SITE Je John Anderson/Plumb House Ivanna A. Moore/AEI THE FOLLOWING WAS NOTED: Visited the site to review construction progress. Framing at the clubhouse and the two garages is complete.No problems were noted First and second floor framing are in place at building#4. First floor framing is in place at building#5. Foundations and first floor slab are in place at building#3. Foundations are in place at building#2, and rebar is in place for the first floor slab,scheduled to be poured tomorrow. Foundations are in place at building#1. Regarding the framing around the stairs, a 2-2x4 post is acceptable between the second and third floor.Between the first and second floor, use a 3-2x4 post or a 3-1/2"x3-1/2" PSL post.The proposed RTC44 rigid ties are not suitable to attach the framing around the stair to the supporting post. Use a Simpson ECC44 column cap with an HW hanger. See 2 pages attached. Stamped truss layout shop drawings have not been received at our office yet. Please forward as soon as possible,along with details for any field modifications to the wood trusses. No other issues were noted at this time. The comments in this field report are a record of transactions that occurred at the site between those present. If there are any errors or omissions please notify Aberjona Engineering in writing or all comments and directives shall be considered factual and acceptable by all parties. COPIES TO:File SUBMITTED: -TOal.,,,.✓._0. Ivanna A. Moore Looney, PE MEMECCUOPT/ONSTE There are cost vw '•—Lr w ` effectiveafterri ,r hreplacing for replacinging o F/ column caps by ` ^X using a combina tion of connectors al +�, "gym ®' o y o� •"m J� ® o, o Here are same examples. °" CCC o CCT p9z r ECCLL STIRWP xe 4 6n'MI For more into, p1°` °s .0 6.-MIx.Xy PW., ° Q D; 6'h'MIN.Ra t—} ®. ® A�fL CeaQf request Form T-CC. ya. ° '_ (3ti FOR CCC441 [F � ` ,"0 faa'Pon CCT44f I { y ° V ) 0: '�,4, STIRRUP 7 G4WE TGAUGE �j InP(NP M., STIRRUP Instead the column Order each Order ea caps,usea these connector ° combinations. connector connector "0 separately. separatel 0 Tho:.6Se s'iirrup v.ill be welded ° IIucL with the top of fhe rosin cap. CC and WD 4 �- CC and GLT ECC and HW COLUMN CCQ/ECCQ CAPS -- .: "'w\a• �• r� NEW!This design uses SDS screws to provide faster installation and maintain the wood cross section.The SDS screws provide for a lower profile compared to standard through bolts. MATERIAL:CCO51/.and ECCQ51/-39a;all others-7 ga.FINISH:Simpson gray Paint. m - . INSTALLATION:Fastenersrovided,See General Notes. f; CODE:Submitted to ICSO 10/99 . ECC046 Dimensions Nm.of Simpson Allowable Loads ` Model L SOS'/4"x2" CC�46 ys No. W1 W2 N2 Wood Screws UPIift CCIKCCD Down Down Typical ° ' CCD ECCD Beam Post (133) (160) CCO(100) ECCO(100) ,v L Installation ° CC03144-4-SDS2 3h 3'/e 1t7h 16 14 5955 7145 19250 6125 CCD3%4-6-SDS2 3Vi 5'fe 1 16 14 5955 7145 19250 9625W44-SDS2 3% 3% 7 14 14 5955 7145 15310 7655CCQ46-SDS2 3% 5'/z 1 . 16 14 5955 7145 24060 12030 P7ri fit. #S 131305'/4-4-SDS2 514 3E/eZN, 1V 13 91/2 8 16 14 5955 7145 37310 10045 r; 131305144-6-SDS2 5Y4 Th 13 91h 8 16 14 5955 7145 37310 15785 r Pti'�' r' .c r• n ,,."v'�4i z CCDS'/-B-SDS2 5'/4 Th 13 9Yz '8 16 14 5955 7145 37310 21525 !i r'!""w�1 A ' `'" '� 1313066-SDS2 5% 51h 11 Th 6'h 16 14 5955 7145 37810 18905 Ory )•7 '�a 'r +. 1.ECC044 has only 12-SDS Ya'x2 into the beam.The uplift load is 5105 at 133 and 6125 at 160. �� - . 2.Downloads are determined using Fcl equal to:560 psi for glulam sizes and 625 psi for all others; w=� CCOQ46 z reduce where end bearing value of post,UR of post,or other criteria are limiting. CC046 LCCLALLY COLUMN CAPS ° s Lally column caps provide adequate bearing length for larger girder reactions. ° ?. ,_ 4` h MATERIAL:12 gauge FINISH:Simpson gray paint F' INSTALLATION:•Use all specified fasteners. See General Notes. LCC5.25.3.5 •Fit the(ally column cap over the tally column and attach to the girder. 'e Lally Allowable Loads 1.Loads may not be increased t Model Column for short-term loading. Fl No W Girder Nails Download F O Outside 2.Allowable loads are determined using Dia DF/SP/SPF LVL/PSL (133) (160) ! the lowest of the bearing loads using LCC4.5-3.5 4/ Triple 2x10/12 8-16d 3y 15820 — 1345 1615 Fc equal to 425 psi for SPF,625 psi for DF and 700 for LVUPSL,or the 8' LCC4.5-4 4e/6 Triple 2x10/12 8-16d 4 20670 — 1345 1615 j lally column capacity. - LCC63.5 6yy° Quad 2x10/12 8-16d 3y 15820 — 1345 1615 3.Loads are for a continuous beam. LCC6-4fiy, Quad 2x10/12 8-16d 4 20670 — 1345 1675 4.Spliced conditions must he detailed by the specifier to transfer tension LCC3.5-3.5 3% 3.5 LVUPSL 8-16d, 3y — 15820 1345 1615 loads between spliced members by LCC3.5-4 1 3% 3.5 LVUPSL 8-16d 4 ( — 220670 1345 1615 means other than the tally column. LCC5.25-3.5 56/° 5.25 LVUPSL 6-16d 3y 15820 1345 1615 The splice condition load is 6750 Ids Typical LCC5.25-3.5 per beam side and the[ally cap must Installation connecting LCC5.25-4 5% 5.25 LVUPSL 8-t6d 4 — 20670 1345 1615 be evenly loaded. 9 LCC7-3.5 7y 7 LVUPSL B-16tl 3y — 15820 1345 1615 1 5.To achieve lateral loads.LCC pipe a 3 ply LVL and a 31/2" y 7 LVUPSL 8-16d 4 — 20670 1345 1615 must be welded to the column with an diameter steel column LCC7-4 7Ye'fillet weld around the entire pipe. 39 Jul le U1�� //U4': ,4��1/P dumb House 978-741 -0752 p. l �. DAVE ib HouSe 3HER 'VEN DRIVE �j CCs`+RJ D �aCl� Sopa. MA 02760-3580 - p (508) 695-7397 P BU1L1T teas �os-r �3/y�q�ILLVL. 4>�j I DEA Sent By: Martin Architectural Group; 2155615064; Jul-2-01 10:36AM; Page 113 IN HNtµ;Ft•WJ;rr1N 1-AUE9.wI.:N12-GLUU)iso THE MARTIN ARCHIL (ITURAL GROUP ARC.1 ml-4.LTS ANI)I ArNO RANNFRS 216.666-logo FAX 4l6.6ga-7818.216.681-5W4 24O NOIUH 22ND.S'IttFFT PHx-q3l A PH1A, PA I H 103 RANSMM-ALl To: Pate Strout Per Request Of: Company: City of Salem- Bldg.Dept, Immediate Attention Requested: I Fax#: 918-740-9846 Far Review Arid Comment L For Your use: C project! Hawthome commons Number of Pages: (Including Cover) Re: Field Reports#6& #7 Date: 7/2/01 Mail Time: 1Q:39 AM comments: Mi. Strout, A#ached are copies of field reports #I6&#7 for the Hawtllnme commons project, foi your files. I Please call me with any questions. J v (P L? i a I 3 r EE __..._....- _ -..._._....__...__ ............. ....... �._....._ �i i From: Mn Garthe Sent By: Martin Architectural Group; 2155615064; Jul-2-01 10:38AM; Page 2/3 °1-16- T�°•9�4to Architect's Field Report Owner {x} Architect { } AIA Document 0711 — Consultant { } Electronic Forrrlat Field {x} THIS DOCUMENT HAS IMJORTANT f.HCiAL CONSEQUENCES:CONSIII.TATION WITH AN ATTORNEY IS ENCOURAGED WITII RESPECT TO ITS COMPLETION OR MODIFICA'r1ON,AUTITENTTCATION OH'PHIS ELECTRONICALLY DRAFI'EJ) AIA DOCUMENT MAYBE MADIi NY USINU AIA DOCUMENT D40I, PROJECT. Hewn me Commons -205 Highland Avenue FIELD REPORT NO: 6 Salem,Massachusetts 01970 John RG Corcoran Co.•Owner ARCFIiI IS PROJECT NO:21.0723-03 CDATP Junz $,2001 TIME: 10:30 A.M. WEATHER:Sunnv TEMP.RANGE:82F. PRESENT AT SITE: Davie Boucher Plumb House,Itx;. John Anderson-Plumb How,Inc. Ton¢Albert-J.M.Como nm Cu.,Inc:_ JuhmRobichaud-...J.M.Corcomn Co.,1w. WORK 1N PROGRESS: A. Building#1 footings Sind foundations 60%complete R. Building#2 underground plumbing carmlete,ready for inspection C. Building#3 fmmdatirtil completed and bsckfilled,ready for underground Plumbing D. Buikl g#d wall panda&loose materials on site,ready for framing. E. Building#5 slab in p1Ace. F. Clubbousa-Framing lmprogress-60%wmplctc G. 8 Bay game,framing:complete,she-afhbtg Installed,ready fur finish&roof. OBSERVATIONS: None/ ITEMS TO VERIFY:Nonp INFORMATION OR ACTION REQUIRED:none ATTACHMENTS:Nome i REPORT BY. Daniel Garthq Project Manager, The Martin Architectural Group.Inc. i AIA DOCUMENT G711 —AiCHITECTS FIELD REPORT'—(xTOHE.R 1972 EDITION—AIA —COPYRIGHT 1972 -'INE AMERICAN TN$TTrum OF ARCHITECTS,1735 NEW YpRK AVENUE N.W.,WASHINGTON,D.C„20006-5292..WARNING:Unlicensed phutcrvpying vinlates t1-S_mpyri`hl luwv end is subject to legal ptn awtiun.US daumenl w electronically produced with the perrnisalm of the AIA and.mer he sepmduccd without violation until the date of capmaion as nota,]below. Electronic Format 0711-1972 User Document,G71 1.00N-5/1612001. AIA License Number 106817,which expires on 2/7/2002-- Page#1 Sent By: Martin Architectural Group; 2155615064; Jul-2-01 10:34AM; Page 2/5 427& 740 4-(- Architect's Field Report Owner {X} Archited { } AIA Document 6711 — Consultant { } Electronic Format Field {x} PHIS DOCUMENT HAS IMPORTANTI.HUAL CONSEQUGNC.ES;CONSULTATION WITH AN AT10KNEY IS"(,.OURACi617 WITII RESPF(-r TO 1.1.5 COMPLETION OR M(101rICATx)N. AUrFIFNTJCAI K)N OF THIS hLhCTRONICALLY DRAFTED AIA DOCUMENT MAYBE MADE RY USING AIA X CUMENT[401. PROJECT. Hawthorne Commons -205 Highland Avenue FIELD REPORT NO: 6 Salem„Massachusetts 01970 Jobn M.Coiconm Co.-Owns ARc.HntcT,s PROJECT NO:21-0723-03 DATE June 14,2001 TIME; 10:30 A.M. WEATRFR;Sunny TEW.RANGE:82F. PRHSENC AT SITE: Dale Boucher—Plmnb House,Inc. Jolap Anderson—Plumb House,Inc. Torp Albet—J.M.Careotou Co.,Inc, John Robichaud—J.M.Corcomn Co.,Inc. WORK IN PROGRESS: A. BWlding#1 footings and foundations 60% complete B. Building#2 tmdergmtind pluinbing complete,ready for inspecl on C. Building#3 foundapolu completed and backfilled,ready foruudergmund plumbing D. Building 04 WallpanC4&loose materials an site,ready for framing. E. Building#5 slab in pltice. F. Clubhouse—Framing 6 progress—60%complete G. 8 Day garage,rramingoarcplete,slreatl=g isaudW.ready for finish&roof. OBSERVATIONS: None! ITEMS TO VERIFY:Non i TNFORMATION OR ACl'ION REQUIRED:nolle ATTACHMENTS:None REPORT BY: Daniel Garthc,Project Maniagcr, The Martin Atchireetural Gawp,Inc. AIA DOCUMENT(1711 -Ail 14r f•.(T7'S FIELD REPORT OCTOBER 1972 EDITION-AIA COPYRIGHT 1972 - THE AMP.RTCAN INS7n't7TF.Or ARCHITECTS, 1733 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,20006-5292..WARNING;Unliceneol photocopying Viclatea U.S.WI)Ynebt laws and is sabimt m legal proaecution.'Dris doeus:mnL was ciccuonically pmduccd with Ilm permission of the AIA and can be repnrduwd without Vi431&tJm undl use d&Ie of cspin ian n nokd below. Electronic format G711-1972 User Document: G71 LOON—5/15/2001-AIA License Number 106817,which expires on 2/7/2002— Page#1 Sent By: Martin Architectural Group; 2155615064; Jul-2-01 10:35AM; Paye 4/5 Architect's Meld Report Owner {x} Architect {x} AIA Document 0711 — Consultant {x } Electronic Format Field {x} THIS WCUMENT[IAS IMOORTANf LKAL CONSEQUENCES; CONSUIJA'I'IUN WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION,AUTIIBNTICA1'I0N OF TWS ELECTRONICALLY DRAHrHD AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. PROJECT. Hawthorne Commons -205 Highland Avenue FIELD REPORT NO: 7 Salem,Massuchustyta 01970 John S�Corcorart Co.-Owner ARCHITECT'SPROJECT NO 21.0723.03 DATE June 14,2001 T[ME: 10:30 A.M. WEATHER,Sunny TBtv1P.RANGF:92F. PRESENT AT SPIE: Daae Boucher-Plumb Hou cq line. Jobet Anderson-Plumb House,Inc. Toill Albert-LM,Cn,ontnCo-,Inc. Johd Robichaud-J.M.Comomn Co.,Inc. Jnn Zcgowitz The WO Gmoup,Inc. WORK IN PROGRESS: A. Building til feelings:sud foundations 100•!.complete D. Building#2 wldergroarid plumbing complete,inspection complete,ready for slab C. Budding#3 foundation complete,undergnrmd plumbing underway. D. Building#4 fietumg underway,V floor elderior walls approx.60°/.complete E. Buiilding#5ready forhurning. F. Clubhouse Exterior inti roof framing complete,interior fivice s begun. Roof ebiriglca being installed,20e/u complete. G. 8 Bay garage,fondnf;comPlete,sheathing installed,roof finishes congrlem,exterior vapor barrier installed. Electrical rough-iu walraway. OBSERVATIONS: Not an roof mzsc s in clubhouse have hold-down clips. Revised locations of clubhouse kitehat sink does not line up with previously roughed sanitary tine location. Switching location of sink with cookeep will he acceptable. ITEMS TO VERIFY:None INFORMATION OR ACtlON REQU RED:Verify that clubhouse roof trusses do or du rot rcytmc clips at all locations. ATTACIIMENTS:Now RF.JK]RTBY: - Daniel Garlhe,Project Manager, The Martin Architectural Group,Ina AIA DOCUMENT(371t -A C11=7'S FIELD REPORT-OCTOBER 1972 EDInON-AIR -COPYR10117 1972 - THE AMERICAN INSTRUTL• ON ARCHITECTS,17.15 NEW YORK AVENUE N.W.,WAWWOTON,D.C.,20000-7292..WARNING;unlicensed photocopying Violates U.S.copyright laws and is subject to legal proseculioti.Wa docurnmt was electronically prodwed with the permission of elm AIA and can be reproduced without violation until the dam of expiation as toted below. Electronic Format G711-1972 User Document G71 IJ -5115/2001. AIA License Number 106817,which expires On 2/7/2002-- Page#1 i Sent By: Martin Architectural Group; 2155615064; Jul-2-01 10:35AM; Page 515 11ris list is based upon rho Architects observations ahrbfg a brief site visit and should not be considered to be a complete inspection of the Project nor to he a cmVl*and exhaustive list of deficiencies.`Ibis list is based upon visual obsefvation only and is not the mwltof any testing,nor does it contain ny hidden defects and the Architect shall not be tcsponslble for such.The Architect reserves the right to re-observe portions of the Project and may find additional deficiencies.This list does not relieve the Contractor from compliance to comet defraimacLw from any otherobservatic4 written or verbal,or the resuhs from any previsim testing that may have been performed Compliance with tate desigpt dociatients is solely Contractors responsibility.(Alservation on sik is only for conformance with Ike desigrn concept of the Project.Tbiil Contractor is respatsible solely for the fabrication processes and to Ste moms,methods,tecliniyues,sequences and Procedures;of xnstnlctionl and fur coordination of the Work of all aides.In addition on inspection,observation,certificate or approval by Owner or Architect will many way relieve tho Contractor of its obligation to pedorm its work hilly in accordance with tlac plata and spccificatioas and all of the project requirements. AIA txxrlMF.NT A201•INS;CRUCTIONS I0 EIODERS—FORTH ELATION-AIA-COPYIUGHT 1997—THE AMERICAN INSTn'UTL•'08 AKCHrrMTs, 1735 NEW YORK AVLNUL'N:W..WASHINGTON,D.C.,20006-5292.;Unlicensed photncntrying violates U.S.Copyright laws and is subject to lege]prosecution. 'I hos datum t was Cneetionkally ptudumd with the pemtlsslon of the AIA and Cin he reproduced without viulmhun until the date ofexpiration as nuted below. Electronic Format A201-1987 User Document;A201.PON—1/8/2001.AIA License Number 106817, Which expires on 271 ONQQZ p�np g7 Sent By: Martin Architectural Group; 2155615064; Jul-2-01 10:34AM; Page 1 IN I L-JWZR•MN1'rWSi'AINFR•NtifYIZ•CL11tUiN[l THE MARTIN ARCHITECTURAL GROUP ARI NT rFL"['S AMD I.AN)PLANNFRS 31a•o( -1050 FAR 318.869-78I$.31G•3o t-5064 240 IORTI 122141)SrRGE i F1111ADPIPHIA. NA 1x11:13 IFAX TRANSIt117 TAI, To: Pite Strout Per Request Of: company: City of Salem-Bldg.L)cpt. Immediate Attention Requested: Fax#: 978-740.9846 For Review And Comment: For Your Use; ❑: Project: Hawthorne Commons Number of Pager; (Including Cover) Re: Fikld Reports#6&#7 Date: 7/2101 Mail ❑ Time: 101:39 AM Comments: Mi Strout, A4ached are copies of field reports#6&#7 for the Hawthorne commons project, for your files. Please call me with any questions. 1 i I From: Dan Cralthe ... .-.____._..5.__ __.....,,.W_.._._...—.,....._M...._...... --------- ,............... .._... _.._,..........._.... . ........_....---._........._. Sent By: Martin Architectural Group; 2155615064; Jul-2-01 10:34AM; Page 315 This list is based upon rite; cliteces observations during a brief sitc visit and should notbe considered tube a complete inspection of the Project nor to be a complete and exhaustive list of deficiencies,This liar is based upon visual observation only and is not the result of any testing nor does it conteinany bidden dofccis and the Art hirect shall not be responsible for such.The Architect resmes the right to re-observe potdona of the Project andmay,£rod additional deficiencies.This list docs not felieve the Contractor ftom compliance to correct deficiencies from any uthcr cbsm"nogt,written of verbal,or the rmhs fl'om arty previous testing that may have bo un performed. Compliance with the rl,si*l documents is solely Contracl&s responsibility.Observation on site is only for confomwnce with the&,sign concept of the Project.IM Contractor i9 tusponffible solely fro the fabrication processes and to the means,metlmds,techniques,sequences and Procedures of coustrueticxi;and for coordination of the Work of all trades.In addition,no inspection,observation,cortif"te or approval by Owner or Architect will in.any way relieve the Contractor of its obligatirm to perform its work fitlly in accordance with the plans and specifications and all of the projoct requirements. i i AIA DO CT1MENTA20l•LNS}RUCTTONS TO BILHJI•XS—FURTU EDITION-AIA—COPYRIOH'1IWl7—THE AMERICAN INSTITCrrE OF ARCHITECTS, 1735 NEW YORK AVENVF,IY.W.,WASHINGTON,D.C.,2000h-3292.;Untie+ nd photocopying violates U.S.copyright laws dad is aubjuct In legal prosecution. ' Thio ducumcw was electtmticallY produced with the pertrimimh of the AIA and c;m be reproduced without viuladun until the date ofaaplradeo an noted below. Ldcrtronic Format A201-1987 User Document: A201.60N—11812001.AIA License Number 106817,Which expires on 2/16/2002 Page#2 1 Se ,It By: Martin Architectural Group; 2155615064; _ Jun-15-01 2:191310; Page 1 1 IAHKI'.It•MARnN-STM.T.9•Nti�1]L•L:IAHI IIN(1 THE MARTIN ARCIfITEC 'URAL GROUP Arx:1 ITF,(-rs AND LAND PI ANNFRS 21 G-68G•l U8U FAX 215-583-7818.213.661.8064 240 NOFTPI 1221417)STREET H IILADL•LPHIA. PA 19103 L-AX TFWNSMrrfAL To: Salem Building Department Per Request Olt Company: Immediate Attention Requeated: I I Fax N: 918.740-9846 For Review And Comment: D Far Your Use: . protect Fiuwthome Commons Number of pages: (Including Cover) Re: Field kWurts Date: 6115/01 Mail Time: 3E04 PM Comments: Attached are field reports 94 and#5 for the Hawthorne Commons Project for your files. Flease call with any questions. 3 4� j} 1 From: Daniel Garthe .......... —_....... . —.._.__..._, _ ._,_. ,.._ _... Sent By: Martin Architectural Group; 2155615064; Jun-15-01 2:20PM; Page 2/5 Architect's I`ield Report Owner {x} Architect { } AIA Document 0711 — Consultant { } Electronic Format Field {x} -IRIS DOCUMENT HAS 14ORTANI'LEGAL CONRFOE I1,NCI5;CONSUUI AIION WITH ANA I'T'ORNEY IS ENCOURAGED WITH RESPECT TOY['$ COMPLETION OR MODIFICATION.AUTHt;.S ICATIGN OF THI$ ELECTROMCAUN DRAFTED AJA DOCUMENT MAY 6E MADE BY OSrNO AIA 1)OCl1MENT D401. PROJECT: Hawthorne Commons -205 Highland Avenue FIELD REPORT NO: 4 Salem,Massachusetts 01970 John lVi,Corcoran Co--Owner ARCHITECT'S PROJECT NO:21-0723-03 DATE: June 7,2001 TIME: 10:30 AAL WBATHHR,overcast/rain, TEMP.RANGE:70F. PRESLiN'f AT SITE: Dave Boucher-Plumb House,Inc- Jolut Alderson-Pluncb Housc,Inc. Dare Faiokson-Plumb House,Inc. Tont Albert J M.Cnrcomn Co.,Inc. John Robichaud-J.M.Corcoran Co.,Inc. Da*cl Gardte-TMA G 14 M.CoicoTml-Corcoran,Co. Claude McKeel-Architect Anilrew Copehotfi-Plumb House,Inc. Joel Mucin-Plumb House,Inc. WORK IN PROGRESS:i A. Builft#1Fouadalionexcavatedmgadolevel. H. Building 92 Fooxi[lg;nd Poundation in pmgess. Apply.501A canplete. C. Building 43 foundatjrm excavation in progress. D. Building#4 foundation,underground piping,and slab complete.Caulking underway at slab/foundioint. E. Building#5 foundation complete,underground piping underway,approx.75%complete. F. Clubhouse Foundatipn,underground prying and slab complete. Ready for Flaming. G. 8 Hay Camp building fout"cia completq slab preperabOn complete,ready for pour. H. Building Mock-up with materials color choices ready for owner selection. OBSERVATIONS: Notie ITEMS TO VERIFY:None INFORMATION OR.ANION REQUIRED: Nate A'i'I'Al.IWENTS:None i AIA DOCUMENT 0711 -ARCWIILC'f% TIL•LD RRPDRT-OCTOBER 1972 EDITION-AIA- CY)rMl(-,HT 1972 -TM, AMERICAN It4SnTl1TE OF ARCHIT'EC15,1775 NFW YORK AVENUE N.W.,WASHINOTON,D.C.,2006&5292..WA RNINQ Unlicensed photOWPying violates U.S.copyright lawn and is subject to legal ti amtim.1his docuulent was electromi;oEy produced with the pennigaien of die AIA nd can be reptvduccd witlxnd violation m6l dhc date of expindim"noted below. Electronic Format 0711-1972 User Document:G711.CON-5/15/2001.AIA Ucense Number 106817,which expires on 2/7/2002-- Page#1 ' Sent By: Martin Architectural Group; 2155615064; Jun-15-01 2:20PM; Page 3/5 REPORT BY: Daniel Crarihe,Project Manager, Tbc Manny Amhixctlral C=W,hnc. This list is based upon theiAxchiteet's observations during a brief site visit and should rmt he considered to be a complete inspection of the Project nor to be a complete and exhaustive list of deficiencies.'Ibis list is based upon visual observation only and m not the result of any testing,for docs it contairi any hidden defects and the AwN met shall not be respmts1ke fm such.The Architect reserves the right to r"Issetve porficim of the Prvjecl anti may ford additional defidmcies.TU list Jim not=hirvo the Coutractorfmm compliance to correct deficiencies from any oil=observatiolt,writmt car vmbd,or the results Som any previous testing that may have bcctt perfo®od. Compliance with the deem docuirtents is solely Camractofs responsibility.Observation on site is only for conformmucc with dw design concept of the Project.Tho Contractor is responsible solely for the fabrication processes and to the meads,mMhoda,techniques,sequences mid procedures of con*uetiud;and for coordination of the Work mall trades.in addition,no inspection,abservatitm,certificate or approval by Owner or Architect willlta any way relieve the Contractor ofits obligation to perform its work fully in accordance wills the plans and specification and all of the project requirements. AIA mcumLNT A201•INSTRUCTIONS TO AIDOP.RS-FORTH W1'I'IUN-ALA-COPYRIGHT 1967 TILE AMERICAN INSTITUTE OP ARCIETECTS, 1735 NRw YORK AVENUA N W,WASIOVGTON.D.C.,300W5292.;Unlicensed phomenpyina violates U.S.copyfiaht laws and is n*dmt t1 Ill ptweculion. This davnrent war clarronidally pmdumd with the pemdssim of the AIA and can be m produccd wlthttut vhdadon until the date of expiration as notal bdmr. Electronic Format A20I-1987 User Document:A201.CON—1/8f2001. AIA License Number 100817,which expires on 2/1=002 Page#2 Sent By: Martin Architectural Group; 2155615064; Jun-15-01 2:20PM; Page 4/5 Architect's Meld Report Owner {X} Architect { } AIA Document 0711 - Consultant { } Electronic Format Feld {x} THIS 110C.UMENr HAS WOORTANT LEGAL CONSEQ11L•NCES;CONSULTATION WITH AN ATTORNEY IS ENCOLIRAOBI] WITH RESPECT TO ITS COMPLETION OR MODIFICATION,AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENTMAY BE MADE;NY USING AIA DOCUMENT D401. PROJECT: Haut M Commons -205 Highland Avenue FIELD REPORT NO: 5 Salem,Massachusetts 01970 John NL Corcoran Co.-Owner ARCHITECT'S PROJECSFNO:21-0723-03 DATE June 14,2001 TIME: 10:30 AM. WEATHER:Sunny TEMP.RANGE:82F. PRESENT AT Sri t: OaVe Boucher—Plumb House,Inc. Iola Andawn—PhunbHmw,nuc. fain Albert—J.Iv Corcoran Co.,Inc. loll Robichaud—J.M.Corcoran Co.,Inc. Daniel Garthe—TMAG WORK IN PRCGRFMS:1 I A. Building#1 Foundation staked and marked,ready for rooting excavation. 13. Budding#2 Footing Ind foundation complete;unckwo ud plumbing underway. C. Building#3 fuundatitiu underway, 1 poor nmaitwlg for completion D. %ild-nig 44 reedy foi fiernmg.Panels expected dtis wreck. E. Building#3 ladergroud phunbing conwIcm,slab preparation aunplcte,ready for slab pour. F. Clubhouse wall panals deli verod,ready for framing. G. 9 Bay Garage fcmned&roof tmsses 800/o imialled. Roof sheathing beutg imwlled. IL Budding Mack-up aiithmaterials color choices ready for owner selection. OBSERVATIONS: Now ITEMS TO VERIFY:None INFORMATION OR ACnow REQUIRED:Hold-down clips at garage roof Trusses need to he insulted. ATrACIQNENTS:N= REPORT BY: AIA Dw..tjmmi 6711 --j RCIrrTFCTI S FIELD REPORT OCTOBER 1977 HDIIION- AIA -COPYRIGHT 1972 - SNE AMERICAN INSTITUTE OP ARCHITE.CfR.1735 NEW YORK AVENUEN.w.,WASHINGTON.D.C.,2M,-5247-WAaNINC;UigiCPPSed Plwttrupying yidalea U.5.cnpyrighl laws nd is subject to legal prosecuem.!I his drrument was electmnicaily praJuCed wish the ponnissicm of the AIA and cap he repnxluced without NiNatim until the doe of expiration as noted below. Electronic Format C711-1972 User Document:G7 il.CON—5/115/2001 AIA License Number 106817,which expires on 2/7/2002-- Page#1 .. • •Sent By: Martin Architectural Group; 2155615064; Jun-15-01 2:21PM; Page 5/5 i Daniel Garthe,Project Macager, The Mamn Arclttecaaal Group,Inc. 111is list is bayed upon Ike Architect's observations during a brief site visit and should not be considered to be a camplete inspection of the Project nor to be a conpl*and exhaustive list of deficiencies This list it based upon visual observation only and is not the result of any testir%nor dnes it containany!ridden defects and the Architect shall not be responsible for such.'fhe Architect reserves the right to re-observe portions of the Project and tray fid additional deficiencies.This list does not relieve the Connector from cowlimece to correct deficiencies from any other observation,written ar verbal,or the results from any previous testing that may have heen perfnmrcd Cumpliance with the desio documents is solely Contractors respoavin3ty.Observation on site is only for conformance with the design concept of the project.Thai Contractor Is responsible solely fm the fabrication processes and to ll>c means,methods,techniques,sequences and procedures ofconstructiog and for coordinariea of the Wmtr of all trades,En addition,no inspection,obsrvatio,certificate or approval by Owner or Architect will marry way relievethe Contractor of its obligation In perform its work filly in acuadatux wish de plans and specifications and an of the project requuenents. j AIA DOCUM04'1 A201•I ISTRUCTIONS TO BIDDERS—FORTH EDITION-AIA—CW YRIGHT 1987 ITIS AMP.RICAN INs,ri nrtC 6F ARCI13TECTS, 1735 N5W YORK AVENtJg N.W.,WASHINGTON,D.C.,200DG529L Unbcoscd photr=pying vicmles U.S.copyright laws and is subject to cgel poseuufiun. This document was electr molly produced with the permission of the AIA and can be reproduced wlaWut vinladon wttiI the date of erphti m as noxd below. Electronic Format A201-1987 User Document: A201_CON—1/8/2001. AIA License Number 108817,which expires on 2/16/2002 Page#2 phimb•House, Inc TRANSMITTAL No. 00171 58 George Leven Drive Phone: 508-699-7155 North Attleboro, MA 02760 Fax: 508-695-7397 PROJECT: Hawthorne Commons DATE: 5/24/01 TO: John M. Corcoran and Company REF: Field Report# 1 100 Grandview Road Suite 203 Braintree, MA 02184 ATTN: Tom Albert WE ARE SENDING: SUBMITTED FOR: ACTION TAKEN: ❑ Shop Drawings ❑ Approval ❑ Approved as Submitted ❑ Letter [Z Your Use ❑ Approved as Noted ❑ Prints ❑ As Requested ❑ Returned After Loan ❑ Change Order ❑ Review and Comment ❑ Resubmit ❑ Plans ❑ Submit ❑ Samples SENT VIA: ❑ Returned ❑ Specifications Attached ❑ Returned for Corrections ❑ Other: ❑ Separate Cover Via: ❑ one Date ITEM NO. COPIES DATE iTEM NUMBER REV.NO. DESCRIPTION STATUS 1 5110101 Field Report# I Remarks: CC:Salem Bldg. Dept, Peter Strout; John Anderson, PHI Signed: Dave Boucher Expedition Architect's Field Report Owner {X} Architect { } AIA Document G711 — Consultant { } Electronic Format Field {x} THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. PROJECT: Hawthorne Commons - 205 Highland Avenue FIELD REPORT NO: 1 Salem,Massachusetts 01970 John M.Corcoran Co.-Owner ARCHITECT'S PROJECT NO:21-0723-03 DATE: May 10,2001 TIME: 11:00 A.M. WEATHER:Sunny TEMP.RANGE:70f. PRESENT AT SITE: Dave Boucher—Plumb House,Inc. John Anderson—Plumb House,Inc. Tom Albert—J.M.Corcoran Co.,Inc. Rick High—J.M.Corcoran Co.,Inc. WORK IN PROGRESS: A. Building#4 footing and foundation walls poured and curing. Formwork being stripped. B. Excavation for Building#5 in progress. C. Excavation complete for clubhouse building,site ready for footing and foundation formwork. D. Stormwater retention tank installation complete.,backfilling nearly complete. E. Sitework and excavation nearing completion. Excess cut material being trucked off site. Approx. 12,000 yards remain to be removed. OBSERVATIONS: None ITEMS TO VERIFY:None INFORMATION OR ACTION REQUIRED: None ATTACHMENTS:None REPORT BY: Daniel Garthe,Project Manager, The Martin Architectural Group,hrc. AIA DOCUMENT G711 — ARCHITECT'S FIELD REPORT — OCTOBER 1972 EDITION — AIA — COPYRIGHT 1972 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,20006-5292.,WARNING;Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. This document was electronically produced with the permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format G711-1972 User Document: G711.CON —5/15/2001. AIA License Number 106817, which expires on 2/7/2002 -- Page#1 w I This list is based upon the Architect's observations during a brief site visit and should not be considered to be a complete inspection of the Project not to be a complete and exhaustive list of deficiencies.This list is based upon visual observation only and is not the result of any testing,nor does it contain any hidden defects and the Architect shall not be responsible for such.The Architect reserves the right to re-observe portions of the Project and may find additional deficiencies.This list does not relieve the Contractor from compliance to correct deficiencies from any other observation,written or verbal,or the results from any previous testing that may have been performed. Compliance with the design documents is solely Contractors responsibility.Observation on site is only for conformance with the design concept of the Project.The Contractor is responsible solely for the fabrication processes and to the means,methods,techniques,sequences and procedures of construction;and for coordination of the Work of all trades.In addition,no inspection,observation,certificate or approval by Owner or Architect will in any way relieve the Contractor of its obligation to perform its work fully in accordance with the plans and specifications and all of the project requirements. AIA DOCUMENT A201 •INSTRUCTIONS TO BIDDERS—FORTH EDITION-AIA—COPYRIGHT 1987—THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W., WASHINGTON, D.C.,20006-5292.;Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. This document was electronically produced with the permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A201-1987 User Document: A201.CON — 1/8/2001. AIA License Number 106817, which expires on 2/16/2002 Page#2 i Plumb House, Inc TRANSMITTAL ' ' No. 00179 58 Geolge Leven Drive Phone: 508-699-7155 North Attleboro,MA 02760 Fax: 508-695-7397 PROJECT: Hawthorne Commons DATE: 5/30/01 TO: John M. Corcoran and Company REE: Engineers Field Report 100 Grandview Road Suite 203 Braintree, MA 02184 ATTN: Tom Albert WE ARE SENDING: SUBMITTED FOR: ACTION TAKEN: ❑ Shop Drawings ❑ Approval ❑ Approved as Submitted ❑ Lettei Your Use ❑ Approved as Noted ❑ Prints ❑ As Requested ❑ Returned After Loan ❑ Change Order ❑ Review and Comment ❑ Resubmit ❑ Plans ❑ Submit ❑ Samples -SENT VIA: ❑ Returned ❑ Specifications Q Attached ❑ Renuned for Corrections ❑ Other: ❑ Separate Cover Via: ❑ Due Date: ITEMNO. COPIES DATE ITEM NUMBER REV.NO. DESCRIPTION STATUS 1 5/10/01 Engineer's Field Report Remarks: CC:Salem Bldg. Dept,Peter Strout; John Anderson,PHI; Dan Garthe, TMAG Signed: p j3 Dave Boucher Expeditlon •i , FIELD RE --------------------- PORT r'agc l ABEPJONA I•;NGINI{ERINL' INC.'. El h1ay, 1p >0�I uf)0 rvo. Onc Mt. vcrnon Sl. —Winchester, MA 01890 'r 01(188Ph: 781-7291 6188 Fax• 781-729-796,0Hawthorne(.'ornmogs — —ory �0S Highland Ave., Salem MATO; Plumb House :u:'lOR Phimhllousc uwNt;g — 58 C.'eorge I,evcn Dr, �_N.Attleboro MA U2760 1_rt rt:w� — uy ,A]. AMAlto.: Dave Bouchert Project Manager r,k1.tial: SO" A'r _ . ?:1 PMnderson, Dave Roucllcr,.loei Plumb HouseA. Mourc i Alit; Mike Panldis,Christine 1 1!Itratec 1'11E FOLLOWING WAS NOTED: Visited the site to review construction prugrem,Ind Iilr a site nleeline Willi Plumnh I louse and ultratec. lxleriM'Wall footings and ttn"st of the exterior frost wall are in place at Building#4,su 1'r in accordance•.with cunlruet documents. Site work coon.to s elsawhcre. Plump hoose and Llltratec have determined that it would he more efffcit•ut in tet•els oleos!and case nfcOnstruction,to redesign the floor frnrning with the fluor trusses spamling hctwecn the party walls and most otthe interior walls. We will proceed with the change nlld reissue the dr,•lwings as soon as l'eady. Also, the floor trusses it, the 111;1(1 floor will he '0" deep. with the second fluor trusses remaining 18" deep. We will look into design Opliuns for the neve tvtaining wall at the buck of the site, with minitnalri disturbance to the sidewalk. No other issue%were noted at this time I he comments in this field repor(are a record of transactions tIL'rt occurred at the site hetween those present. I f there are any crr ors or omissions plensc notify Abnjona LnBineering in Writlno. Or all ennlincnts and directives shall be considered lhctunl and acceptable by all parties. C.'OPIF.S TO; John Anderson:Piumh House File Ivannu A. Mome ,' _ on ney. PF; TO'd db£ = £0 10-6Z–SEW V , 111 1-IARKER•MARTIN• ENTZ•GIARDINO THE MARTIN ARCHITECTURAL GROUP ARCHITECTS AND LAND PLANNERS 215-665-1080 FAX 215-563-7818.215-561-5064 240 NORTH 22ND STREET PHILADELPHIA, PA 19103 TRANSMITTAL TO: Pete Strout DATE 6/1/01 Building Official City of Salem Massachusetts CLIENT Corcoran Co. Building Department 120 Washington Street PROJECT Hawthorne Commons Salem, Mass. 01970 978-745-9595 JOB NUMBER 21-0723-03 R X P S S M 0 R 5 D DESCRIPTION N R P P P L H W H HETT NO OF NO E TOTAL T 0 E I I A O G E SHEETS NO AMOUNT S X R A A R P S R Field Reports#1-3 ❑ ❑ ❑ ❑ ❑ W 6 1 6 ❑ ❑ ❑ ❑ ❑ ❑ 0 0 0 ❑ ❑ ❑ ❑ ❑ ❑ 0 0 0 ❑ ❑ ❑ ❑ ❑ ❑ 0 0 0 ❑ ❑ ❑ ❑ ❑ ❑ 0 0 0 ❑ ❑ ❑ El El F10 0 0 Ll ❑ L:] 71 1-1 ❑ 0 0 0 Hand ❑ Delivered ❑ Picked Up ❑O Mail ❑ Fax #of Pages 0 ❑ OTHER (Including Transmittal) ❑ Mail ❑ FEDERAL EXPRESS# OVERNIGHT ❑ AM ❑ PM ❑ FEDERAL EXPRESS # Comments: SECOND DAY Respectfully, - Daniel Garthe THE MARTIN ARCHITECTURAL GROUP Architect's Field Report Owner {x} Architect { } AIA Document G711 — Consultant { } Electronic Format Field {x} THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES;CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. PROJECT: Hawthorne Commons -205 Highland Avenue FIELD REPORT NO: 1 Salem,Massachusetts 01970 John M.Corcoran Co.-Owner ARCHITECT'S PROJECT NO:21-0723-03 DATE: May 10,2001 TIME: 11:00 A.M. WEATHER:Sunny TEMP.RANGE:7011 PRESENT AT SITE: Dave Boucher—Plumb House,Inc. John Anderson—Plumb House,Inc. Tom Albert—J.M.Corcoran Co.,Inc. Rick High—J.M.Corcoran Co.,Inc. John Robichaud—J.M.Corcoran Co.,Inc. Daniel Garthe—The Martin Architectural Group,Inc. WORK IN PROGRESS: A. Building#4 footing and foundation walls poured and curing. Formwork being stripped. B. Excavation for Building#5 in progress. C. Excavation complete for clubhouse building,site ready for footing and foundation formwork. D. Stornawater retention tank installation complete.,backfilling nearly complete. E. Sitework and excavation nearing completion. Excess cut material being trucked off site. Approx. 12,000 yards remain to be removed. OBSERVATIONS: None ITEMS TO VERIFY:None INFORMATION OR ACTION REQUIRED: None ATTACHMENTS:None REPORT BY: Daniel Garthe,Project Manager, The Martin Architectural Group,Inc. AIA DOCUMENT G711 — ARCHITECT'S FIELD REPORT— OCTOBER 1972 EDITION— AIA — COPYRIGHT 1972 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,20006-5292..WARNING;Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. This document was electronically produced with the pertnission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format G711-1972 User Document: G711.00N —5/15/2001. AIA License Number 106817, which expires on 2/7/2002 -- Page#1 This list is based upon the Architect's observations during a brief site visit and should not be considered to be a complete inspection of the Project nor to be a complete and exhaustive list of deficiencies.This list is based upon visual observation only and is not the result of any testing,nor does it contain any hidden defects and the Architect shall not be responsible for such.The Architect reserves the right to re-observe portions of the Project and may find additional deficiencies.This list does not relieve the Contractor from compliance to correct deficiencies from any other observation,written or verbal,or the results from any previous testing that may have been performed. Compliance with the design documents is solely Contractor's responsibility.Observation on site is only for conformance with the design concept of the Project.The Contractor is responsible solely for the fabrication processes and to the means,methods,techniques,sequences and procedures of construction;and for coordination of the Work of all trades.In addition,no inspection,observation,certificate or approval by Owner or Architect will in any way relieve the Contractor of its obligation to perform its work fully in accordance with the plans and specifications and all of the project requirements. AIA DOCUMENT A201 •INSTRUCTIONS TO BIDDERS—FORTH EDITION-AIA—COPYRIGHT 1987—THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,20006-5292.; Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. This document was electronically produced with the percussion of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A201-1987 User Document: A201.CON— 1/8/2001. AIA License Number 106817, which expires on 2/16/2002 Page#2 Architect's Field Report Owner {x} Architect { } AIA Document G711 — Consultant { } Electronic Format Field {x} THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. - PROJECT: Hawthorne Commons -205 Highland Avenue FIELD REPORT NO: 2 Salem,Massachusetts 01970 John M.Corcoran Co.-Owner ARCHITECT'S PROJECT NO:21-0723-03 DATE: May 24,2001 TIME: 11:00 A.M. WEATHER:Partly sunny. TEMP.RANGE:70f. PRESENT AT SITE: Dave Boucher—Plumb House,Inc. John Anderson—Plumb House,Inc. John M.Corcoran—JM Corcoran Co,hic. Tom Albert—J.M.Corcoran Co.,hic. Rick High—J.M.Corcoran Co.,hic. John Robichaud—J.M.Corcoran Co.,Inc. Daniel Garthe,The Martin Architectural Group,Inc. WORK IN PROGRESS: A. Building#4 foundation and footings complete,underground plumbing underway. B. Building#5 foundation and footing poured. Formwork being stripped. C. Clubhouse foundation footing poured,formwork for found wall being installed D. 8 unit garage building foundation wall being poured. E. Sitework and excavation nearing completion. Excess cut material being trucked off site. Approx.9,000 yards remain to be removed. OBSERVATIONS: None ITEMS TO VERIFY:None INFORMATION OR ACTION REQUIRED: None ATTACHMENTS:None REPORT BY: Daniel Garthe,Project Manager, The Martin Architectural Group,Inc. AIA DOCUMENT G711 — ARCHITECT'S FIELD REPORT—OCTOBER 1972 EDITION —AIA — COPYRIGHT 1972 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,20006-5292..WARNING;Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. This document was electronically produced with the permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format G711-1972 User Document: G711.CON —5/15/2001. AIA License Number 106817,which expires on 2/7/2002 -- Page#1 This list is based upon the Architect's observations during a brief site visit and should not be considered to be a complete inspection of the Project nor to be a complete and exhaustive list of deficiencies.This list is based upon visual observation only and is not the result of any testing,nor does it contain any hidden defects and the Architect shall not be responsible for such.The Architect reserves the right to re-observe portions of the Project and may find additional deficiencies.This list does not relieve the Contractor from compliance to correct deficiencies from any other observation,written or verbal,or the results from any previous testing that may have been performed. Compliance with the design documents is solely Contractor's responsibility.Observation on site is only for conformance with the design concept of the Project.The Contractor is responsible solely for the fabrication processes and to the means,methods,techniques,sequences and procedures of construction;and for coordination of the Work of all trades.In addition,no inspection,observation,certificate or approval by Owner or Architect will in any way relieve the Contractor of its obligation to perform its work fully in accordance with the plans and specifications and all of the project requirements. AIA DOCUMENT A201 •INSTRUCTIONS TO BIDDERS-FORTH EDITION-AIA-COPYRIGHT 1987-THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,20006-5292.;Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. This document was electronically produced with the permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A201-1987 User Document: A201.CON — 1/8/2001. AIA License Number 106817, which expires on 2/16/2002 Page#2 r i JA,rchitect's Field Report Owner {x} Architect { } AIA Document G711 — Consultant { } Electronic Format Field {x} THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. PROJECT: Hawthorne Commons -205 Highland Avenue FIELD REPORT NO: 3 Salem,Massachusetts 01970 John M.Corcoran Co.-Owner ARCHITECT'S PROJECT NO:21-0723-03 DATE: May 31,2001 TIME: 10:30 A.M. WEATHER:Partly sunny. TEMP.RANGE:60F. PRESENT AT SITE: Dave Boucher—Plumb House,Inc. John Anderson—Plumb House,hrc. Dave Erickson—Plumb House,hlc. Tom Albert—J.M.Corcoran Co.,Inc. John Robichaud—J.M.Corcoran Co.,Inc. Daniel Garthe—TMAG WORK IN PROGRESS: A. Building#4 underground plumbing complete,slab sub-grade prepared and compacted,ready for slab pour. B. Building#5 underground piping underway,approx.30%complete. C. Clubhouse foundation complete,excavation for underground piping near completion.Underground plumbing started. D. 8 unit garage building foundation complete,slab sub-grade prepared and compacted,ready for slab pour E. Site excavation approx.99%complete. Excess cut material being trucked off site. Approx.3,000 yards remain to be removed. OBSERVATIONS: None ITEMS TO VERIFY:None INFORMATION OR ACTION REQUIRED: None ATTACHMENTS:None REPORT BY: Daniel Garthe,Project Manager, The Martin Architectural Group,Inc. AIA DOCUMENT G711 —ARCHITECT'S FIELD REPORT— OCTOBER 1972 EDITION— AIA — COPYRIGHT 1972 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,20006-5292..WARNING;Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. This document was electronically produced with the permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format G711-1972 User Document: G711.CON —5/15/2001. AIA License Number 106817,which expires on 2/7/2002 -- Page#1 Ir This list is based upon the Architects observations during a brief site visit and should not be considered to be a complete inspection of the Project nor to be a complete and exhaustive fist of deficiencies.This list is based upon visual observation only and is not the result of any testing,nor does it contain any hidden defects and the Architect shall not be responsible for such.The Architect reserves the right to re-observe portions of the Project and may find additional deficiencies.This list does not relieve the Contractor from compliance to correct deficiencies from any other observation,written or verbal,or the results from any previous testing that may have been performed. Compliance with the design documents is solely Contractor's responsibility.Observation on site is only for conformance with the design concept of the Project.The Contractor is responsible solely for the fabrication processes and to the means,methods,techniques,sequences and procedures of construction;and for coordination of the Work of all trades.In addition,no inspection,observation,certificate or approval by Owner or Architect will in any way relieve the Contractor of its obligation to perform its work fully in accordance with the plans and specifications and all of the project requirements. AIA DOCUMENT A201 •INSTRUCTIONS TO BIDDERS—FORTH EDITION-AIA—COPYRIGHT 1987—THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,20006-5292.;Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. This document was electronically produced with the permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A201-1987 User Document: A201.CON — 1/8/2001. AIA License Number 106817,which expires on 2/16/2002 Page#2 Plumb House, Inc TRANSMITTAL No. 00192 58 George Leven Drive Phone: 508-699-7155 North Attleboro, MA 02760 Fax: 508-695-7397 PROJECT: Hawthorne Commons DATE: 6/6/01 TO: John M. Corcoran and Company REF: Arch. Field Rep. 2 & 3 100 Grandview Road Suite 203 Braintree, MA 02184 ATTN: Tom Albert WE ARE SENDING: ' SUBMITTED FOR:; :ACTION TAKEN: ❑ Shop Drawings ❑ Approval ❑ Approved as submitted ❑ Letter [Z Your Use ❑ Approved as Noted ❑ Prints ❑ As Requested ❑ Returned After Loan ❑ Change Order ❑ Review and Comment ❑ Resubmit ❑ Plans ❑ Submit ❑ Samples SENT VIA: ❑ Returned ❑ Specifications Rl Attached ❑ Returned for Corrections ❑ Other: ❑ separate Cover Via: ❑ Due Date: ITEM NO. COPIES DATE ITEM " NUMBER REV. NO. DESCRIPTION - STATUS I Architects Field Reports 2 and 3 Remarks: CC:Salern Bldg. Dept, Peter Strout; John Anderson, PHI Signed: Dave Boucher expeaitioo � 9 � ,,Architect's Field Report Owner {x} Architect { } AIA Document G711 — Consultant { } Electronic Format Field { x} THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. PROJECT: Hawthorne Commons -205 Highland Avenue FIELD REPORT NO: 2 Salem,Massachusetts 01970 John M.Corcoran Co.-Owner ARCHITECT'S PROJECT NO:21-0723-03 DATE: May 24,2001 TIME: 11:00 A.M. WEATHER:Partly sunny. TEMP.RANGE:70f. PRESENT AT SITE: Dave Boucher—Plumb House,Inc. John Anderson—Plumb House,Inc. John M.Corcoran—JM Corcoran Co,Inc. Tom Albert—I.M.Corcoran Co.,Inc. Rick High—J.M.Corcoran Co.,Inc. John Robichaud—J.M.Corcoran Co.,Inc. Daniel Garthe,The Martin Architectural Group,Inc. WORK IN PROGRESS: A. Building#4 foundation and footings complete,underground plumbing underway. B. Building#5 foundation and footing poured. Formwork being stripped. C. Clubhouse foundation footing poured,formwork for found wall being installed D. 8 unit garage building foundation wall being poured. E. Sitework and excavation nearing completion. Excess cut material being bucked off site. Approx.9,000 yards remain to be removed. OBSERVATIONS: None ITEMS TO VERIFY:None INFORMATION OR ACTION REQUIRED: None ATTACHMENTS:None REPORT BY: Daniel Garthe,Project Manager, The Martin Architectural Group,Inc. AIA DOCUMENT G711 —ARCHITECT'S FIELD REPORT—OCTOBER 1972 EDITION— AIA — COPYRIGHT 1972 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,20006-5292..WARNING;Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. This document was electronically produced with the permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format G711-1972 User Document: G711.CON—5/15/2001. AIA License Number 106817, which expires on 2/7/2002 -- Page#1 This list is based upon the Architects observations during a brief site visit and should not be considered to be a complete inspection of the Project nor to be a complete and exhaustive list of deficiencies.This list is based upon visual observation only and is not the result of any testing,nor does it contain any hidden defects and the Architect shall not be responsible for such.The Architect reserves the right to re-observe portions of the Project and may find additional deficiencies.This list does not relieve the Contractor from compliance to correct deficiencies from any other observation,written or verbal,or the results from any previous testing that may have been performed. Compliance with the design documents is solely Contractors responsibility.Observation on site is only for conformance with the design concept of the Project.The Contractor is responsible solely for the fabrication processes and to the means,methods,techniques,sequences and procedures of construction;and for coordination of the Work of all trades.In addition,no inspection,observation,certificate or approval by Owner or Architect will in any way relieve the Contractor of its obligation to perform its work fully in accordance with the plans and specifications and all of the project requirements. AIA DOCUMENT A201 •INSTRUCTIONS TO BIDDERS—FORTH EDITION-AIA—COPYRIGHT 1987—THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,20006-5292.;Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. This document was electronically produced with the permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A201-1987 User Document: A201.CON— 1/8/2001. AIA License Number 106817, which expires on 2/16/2002 Page#2 I �s Architect's Field Report Owner { X} Architect { } AIA Document G711 — Consultant { } Electronic Format Field {x} THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. PROJECT: Hawthorne Commons -205 Highland Avenue FIELD REPORT NO: 3 Salem,Massachusetts 01970 John M.Corcoran Co.-Owner ARCHITECT'S PROJECT NO:21-0723-03 DATE: May 31,2001 TIME: 10:30 A.M. WEATHER:Partly sunny. TEMP.RANGE:60F. PRESENT AT SITE: Dave Boucher-Plumb House,Inc. John Anderson-Plumb House,Inc. Dave Erickson-Plumb House,Inc. Tom Albert-J.M.Corcoran Co.,Inc. John Robichaud-J.M.Corcoran Co.,Inc. Darrel Garthe-TMAG WORK IN PROGRESS: A. Building#4 underground plumbing complete,slab sub-grade prepared and compacted,ready for slab pour. B. Building#5 underground piping underway,approx.30%complete. C. Clubhouse foundation complete,excavation for underground piping near completion.Underground plumbing started. D. 8 unit garage building foundation complete,slab sub-grade prepared and compacted,ready for slab pour E. Site excavation approx.99%complete. Excess cut material being tucked off site. Approx.3,000 yards remain to be removed. OBSERVATIONS: None ITEMS TO VERIFY:None INFORMATION OR ACTION REQUIRED: None ATTACHMENTS:None REPORT BY: Daniel Garthe,Project Manager, The Martin Architectural Group,Inc. AIA DOCUMENT G711 -ARCHITECT'S FIELD REPORT-OCTOBER 1972 EDITION- AIA - COPYRIGHT 1972 - THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,20006-5292.. WARNING;Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. This document was electronically produced with the permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format G711-1972 User Document: G711.CON -5/15/2001. AIA License Number 106817,which expires on 2/7/2002 -- Page#1 rt V 1 I . This list is based upon the Architeces observations during a brief site visit and should not be considered to be a complete inspection of the Project nor to be a complete and exhaustive list of deficiencies.This list is based upon visual observation only and is not the result of any testing,nor does it contain any hidden defects and the Architect shall not be responsible for such.The Architect reserves the right to re-observe portions of the Project and may find additional deficiencies.This list does not relieve the Contractor from compliance to correct deficiencies from any other observation,written or verbal,or the results from any previous testing that may have been performed. Compliance with the design documents is solely Contractors responsibility.Observation on site is only for conformance with the design concept of the Project.The Contractor is responsible solely for the fabrication processes and to the means,methods,techniques,sequences and procedures of construction;and for coordination of the Work of all trades.In addition,no inspection,observation,certificate or approval by Owner or Architect will in any way relieve the Contractor of its obligation to perform its work fully in accordance with the plans and specifications and all of the project requirements. AIA DOCUMENT A201 •INSTRUCTIONS TO BIDDERS—FORTH EDITION-AIA—COPYRIGHT 1987—THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE N.W.,WASHINGTON,D.C.,20006-5292.;Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution. This document was electronically produced with the permission of the AIA and can be reproduced without violation until the date of expiration as noted below. Electronic Format A201-1987 User Document: A201.CON— 1/8/2001. AIA License Number 106817, which expires on 2/16/2002 Page#2 c FROM :SALEM ELECTRICAL DEPT FAX NO. :9787454638 Oct. 14 2004 11:40AM P1 CITY OF SALEM9 MASSACHUSETTS _ ELECTRIC DEPARTMENT 44 LAFAYETTE STREET SALEM, MA 01 970 TEL. (978) 745-6300 FAx (978) 745.4638 STANLEY J. USOVICZ. JR. MARK ROCHON, WIRE INSPECTOR MAYOR OCTOBER 14, 2004 TO: JAMES E. BUCHANAN 740 QUAKER HIGHWAY OXBRIDGE, MA- 01569 OR P. 0. 13OX 544 SUTTON,MA, 01590 TELEPHONE: 508-865-3335 CERTIFIED MAIL: 7099 3400 0006 0188 9868 LICENSE: #A-15616 JOSEPH L. FORTIN SUBJECT: 201-205 HIGHLAND PHASE 11 BUILDING 6-7-8-9 4 FIRST ST. (ENTRANCE) DEAR MR. BUCHANAN: THE BUILDINGS YOU ARE WIRING EXCEEDS THREE FLOORS ABOVE GRADE, TYPE NM AND SER CABLE ARE NOT PERMITTED TO PASS THROUGH THE FLOORS IN THIS APPLICATION. BUILDING 8 AND 9 ARE IN VIOLATION OF 527 CMR 1.2:00 2002 MASSACHUSETTS ELECTRICAL CODE ARTICLE 334.10 (3) AND 338.10 (13) (4) (a). BUILDING 6 AND 7 ARE NOT WIRED AND UNDER CONSTRUCTION. THIS OFFICE HAS REVIEWED THE LETTER FROM MARTIN ARCHITECTURAL GROUP ADDRESSED TO RICH MURPHY AT J. M, CORCORAN& CO. ALONG WITH TETE F..XFCU"fTVE DIREC'T'OR OF THE BOARD OF STATE EXAMINERS OF ELECTRICIANS. YOU HAVE 10 DAYS TO RESOLVE THIS 1SSUL FROM THE DATE RECEIVED BY CERTIFIED MAIL. FAILURE TO COMPLY WITH THE REQUEST OF THIS OFFICE, WILL RESULT IN A COMPLAINT FORM BEING FILLED OUT AND SENT TO: THE DIVISION OF PROFESSIONAL LICENSURE FROM ':SALEM ELECTRICAL DEPT FAX NO. :9787454638 Oct. 14 2004 11:40AM P2 OFFICE OF INVESTIGATION 239 CAUSEWAY ST, SUITE 400 BOSTON,MA 02114 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ME AT MY OFFICE. YOURS TRULY, MARK ROCHON WIRE INSPEC'FOR CC, BUILDING DEPT: 978-740-9846 FIRE PREVENTION: 978-745-9402 WEALTH DEPT: 978-745-0343 i