29 GROVE STREET - MACK PARK - BUILDING INSPECTION Supe ah
Orersieeddeb Folders
90%Larger Label Area A
/// S 1 d 1 G A®e
KEEPING YOU ORGANIZED
No. 10301
PATENT PENDING
SUSTAINABLE
FORESTRY MIN.RECYCLED
INITIATIVE CONTENT IO%
cewme ee�r soommp POST-CONSUMER
ww.vsli0ropram.ory
SfW124V
MADEIN USA
GET ORGANIZED AT SMEAD.COM
Certificate Number: B-17-648 Permit Number: B-17-648
Commonwealth of Massachusetts
City of-Salem
This is to Certify that the ..............................................................Dept Correct Building....................................................... located at
Building Type
29-b1dg2 GROVE STREET.................................................................. in the .....................................City.of Salem...............................................
Address Town/City Name
IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY
Mack Park
This Permit is granted in conformity with the Statutes and Ordinances relating thereto, and
expires ...............................Not Applicable unless sooner suspended or revoked.
Expiration Date -
Issued On: Friday, October 20, 2017
� ��
Commonwealth of Massachusetts
City of Salem IQ
T 9
s n 120 Washington St.3rd Floor Salem,MA 01970(978)745-9595 x5641 ki
Return card to Building Division for Certificate of Occupancy
Permit No. B-77-648 PERMIT TO BUILD
FEE PAID: $0.00
DATE ISSUED: 8/1/2017
This certifies that SALEM CITY OF MACK PARK
has permission to erect, alter, or demolish a building 29-bldg2 GROVE STREET Map/Lot: 160333-0
as follows: Repair/Replace RENOVATE BATHROOMS @ MACK PARK FOR THE CITY OF SALEM
Contractor Name: THOMAS E LEWIS, JR
DBA: BAYSTATE BUILDING & REMODELING _
Contractor License No: CS-062687
8/1/2017
Building Official Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request,
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
.work until the completion of the same.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit.
HIC#: 183863 "Persons contracting with unregistered contractors do not have access to the guarantyfund"(as set forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
_i
Commonwealth of Massachusetts
Citv of Salem
9'n 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
1P
Return card to Building Division for Certificate of Occupancy
Structure CITY OF SALEM BUILDING PERMIT
Excavation
PERMIT TO BE POSTED IN THE WINDOW r
Footing INSPECTION RECORD
Foundation
Framing
Mechanical
Insulation INSPECTION: BY DATE
Chimney/Smoke Chamber
Final
frIA Plumbing/Gas
Roug 'i
Rough:
Final
U Electrical
Service
Rough 6 IVl.s
i
Final /7
Fire partment
Preliminary
Final
Health Department
Preliminary
Final