Loading...
17 GREENWAY ROAD - BUILDING INSPECTION o��c� � ° 17 C�I�F� �A y 12v� , LE PT 34 Barr Street Salem, MA 01970 OCT 5 October 3, 1989 ROCU 56 �� '89 Cl Ty OF S4IEMDM�SS." Mr . William Munroe SALEM BUILDING INSPECTOR 1 Salem Green Salem,MA 01970 Dear Mr. Munroe: I am writing to you concerning two (2) carpentry jobs contracted by my uncle , Mr . Phillip J. Brown, of X17 Greenway Road, with Mr . Ted Mistretta, Construction Unlimited, 386 Rantoul St . , Beverly, phone : 921-1525. (Home address: 73 South Elm St . , Lynn - Soc . Sec . # 034-36-5445. ) The first complaint is about having his back stairs replaced. Mr . Mistretta extremely overcharged Mr . Brown for this job. I have enclosed copies of all documents pertaining to this situation . Mr . Brown paid $3,716.53 to have his 4'x4'4" deck with horizontal railings and 5 steps replaced. The enclosure underneath was not changed, nor were the rotting 41'x4" support posts. Even if the quality of work was as it should be (see page 2 of the enclosed letter from K & M Builders for details) , this price still would be exorbitant . Mr . Mistretta could not have spent even as much as $200 for the materials he used (see page 2, option #1 (not replacing the enclosure underneath the deck] ) , however, Mr . Brown was charged $586.68 for EXTRA materials. Here is a list of cancelled checks paid by Mr. Brown for the "Porch" job, (which total even higher than the proposal ) : (11310) $420.00 8/21/89 (#311) 500.00 8/23/89 (#313) 650.00 8/25/89 (#316) 500.00 8/26/89 (#317) 250.00 8/29/89 (#318) 1.396.53 9/06/89 TOTAL $3,716.53 Mr. Munroe Page 2. October 3, 1989 The second complaint is about the roof job. Again , a sloppy job was performed, and again, he overcharged Mr. Brown for the work he performed. He also charged Mr . Brown almost $500 for work that he did NOT even do! There was no work done to the gutters or the flashing, as stated in the letter from K & M Builders. (Also, no building permits were attained, as far as we know. ) Mr . Brown is a very knowledgeable Senior Citizen , but he has no prior experience in dealing with contractors, so therefore he trusted Mr . Mistretta. Mr. Mistretta, who was aware of this, used scare tactics to pressure Mr . Brown into doing needless work. My father , Mr. Robert Day , and I became involved In this after learning about how much money my uncle has been paying out to Mr . Mistretta. He has been paid a total of $11 ,464.85 altogether . Mr. Mistretta was stopped from beginning more work , (this time on " leaking" pipes that weren' t leaking) . Mr . Brown is still waiting for his $200 deposit to be returned for this job. We feel that Mr . Mistretta would have continued on and on, finding more things that " needed to be done" , whether or not they actually needed doing. We are concerned that Mr . Brown may not be the only person who has been or will be " taken in" by Mr . Mistretta, and want to be sure that no further damages will take place . Mr . Brown , Mr . Day , and I appreciate you taking the time to look Into this matter . You may reach either Bob Day at 744-6788, or me, Patty Dumond, at 745-7203. Thank you very much . Respectfully yours`,, ^p `�C�/f,l�.�.U� &A--vy �Y Patricia Dumond PROPOSAL Construction Unlimited 386 Rantoul Street Beverly, MA 01915 , a (617) 921-1525 _ r •, Sheat,N proposal itted To: ��9 Work-To Be Performed At: Name ----- _.. Street /7-- ��-e��a-� �i D Street -- City- city_. .__ scare _ State .. .. '9"0-a-OJ . Date of Plans _ -._-- _ _- Phone__7yy/ . /7�y _..__. _... Architect T-,"... __ .. .- ._ .. ..-_ _....... __ We hereby propose to furnish the materials and perform the labor necessary for the completion of ------ ---- __ _ All material is g to be es specified, and the above, work to be performed in accordance with the drawings and specifications submitted for. above work and completed in a 'substantial workmanlike manner for the sum of o ars ( I. /, 3sv �� D ll - Do with p yments to be made as follows - ------ 00 Oyr - '- ---- , -.. Any alteratim or deviation from above epecifkatio Involving extra y/ p mseayai®w6yeee only uyon t er ,and Wi I bee a an Respectfully submitted �/ /. -�! extre IPg dhen f"be me mgenC - -._ . -.--- upm atnkea aCCi Ca or a eys yoM ur car � .._._._......_.---.-_--.- men's Compensa�orTe�i d u i iSYi i InBg�e•bwe work be � take"oat by Beverly, MA 01915 e—This prop�I may be withdrawn by us if not accepted days. 10 N DFPRDPOAL� 3� The above prices,specifications and conditions ere satisfactory and hereby accepted_ eu`are authorized do,the work asspeclfied; Payment will be made as" Maki Mad a6ov " :- `� °• x r...,c a#• xC'E slgn0LU1e . . gn®Cure [ottz fi TOPsIVFOAM 3890 ORIGINAL LIMINUSA • f aCG •J ♦ 1 i . . . . ... ,gib .. PROPOSAL 'I Construction Unlimited 386 Rantoul Street u " Beverly, MA 01915 '. (617). 921.1520 S " - 01 Proposal S,illbrpltteq To: Work To Be performed At: Name StreetStreet ._- - _ ... City � 7. �d State .._ sty State ... .. _ _ . Date of PI ..-- __ Phone .� y � r —_. _ _. Architect We hereby propose to furnish the materials and perform the labor necessary for the completion of — (2T _ Gifl :_. 1 4_3 All material is guaranteed tQ,be as s cified. and the above work performed in accordance wi drawings and ,specifications submitted for 'above work and completed in a.._ sfEtintiaai workmanlik n for the sum of \ l ($ 1. with payments to be made as follows .__. Any alteration or deviation from above specification Involving extra costs.will be executed only upon written orders.and will bccome an Respectfully submitted j-. ` ...-.. ... ----- extra charge war and above the astimets.All agreements contingent upon strikes,accidents or delays beyond our control Owner to carry gra tornado er0hh�nege�sse uupa Per .-.._....._X __..."�'L__ _.-_-_—_.-._-------- Men's Compen til �W taken out M 386 Rantoul Street Note—This proposal may be withdrawn by us if not accepted within---..__. days. ACCEPTANCE OF PROPOSAL The above prices,specifications and' Itlons are satisfactory and are hereby accep ou ere Fi ad to do the work as epeclhed r r a Payment will be made as outlined ahoy ' f> Date+ Toas9wannaae0 ORIGINAL u ioIN USA t� I Al -, l 4,t" pry —-——-—--——- PROPOSAL 'Sthee,tion Unlimited 386 Rantoul --------- Strii!4 No- Beverly. MA 01915 Data r-- Sheet NcL-1/ ------ gal -J-6 0.5 rk Proposal Submitted To: rk T;�be'Performed At: Name., Street /;p t4-A.4 ------- 0Street— City-%S.cl�' 1—------- City- State ------- ------ State Date of Plans ,-Phone.. We hereby propose to furnish the materials and perform the labor necessary for the completion of ------------- --------- ............... All material is guaranteed to be 'aSr specified, and the above work to be performed in accordance with the drawings and specifications submitted for above work and completed in a substantial workmanlike manner for the sum of Dol ars 113 3Y,0-0 1. with payments to be made as follows: Any alteration or deviation from above epecificetione tra cost-%will be executed only upon written orders,and will became an Respectfully submitted extra charge over and above the estimate.All agreements contingent Upon strikes,accidents or delays beyond our control.Owner to carry 6M r CftUMT(W r — (In'Dn. lInTftHW%drk- Perl—eil be taken out by 386 Rantoul Street Note—This prop I may be withdrawn by us if not accepted 921 logs days. ACCEPTANCE OF PROPOSAL The above prices,specifications and conditions are satisfactory and are hereby accepted.You are authorized to do the work as specified. Payment will be made as outlined above. Signature Data i CARCELLED Iia l oC , 3 3rJ,� �Jnawmut� `'/aU I , OCO.CC C,* 0 � ,335.Cc� 44-- L41510.00 300 �,e, . W Co ( *aG 3) s�.r�v � � (Doc �3� �, 3M.cC) 8'3 1 ) a , q (#aq8) `7ga. qco- WIC) LI q 0 5 (*S&�) (000.0 C#3o5) LICO.CO � 8) 8/1 Q 35 3.CO( Qlilt hawm ut) a, a 350.Oo El'a i ti a0 . CXD C 310) 1 , 95O, 00 0/a3 5CO ,o0 (4 ?)ID 5go , (D` ) 8105- _ b5o' o 01313) Va q a 50.CCS (03`x) cpm ; any V1r1 [�1 S Q-On fi 51 , VD Do.00 'Re�urne�, i I I i i i i I , ' 8� ??Z 3uiedeza 7 BURLEY FARM ROAD DANVERS. MASSACHUSETTS 01923 JAMES M. KIERAN 774-5530 WILLIAM D. McKENZIE 774.0129 9/27/89 Mr. Philip J. Brown 17 Greenway Rd. Salem,Ma.01970 Dear Sir : As requested , I have inspected the roof ,gutters ,chimney flashing and rear porch at 17 Greenway Rd . in Salem. I am enclosing cost estimates for the roof and rear porch . I am also reporting my observations as noted below. ROOF On the roof I found several cases of poor workmanship.There were many places where the shingle exposure was far greater than the 5 inches recommended by the manufacturers . I measured places where the exposure was as great as 5 3/4 inches .The seams or "brick lines" varied between k inch to overlapping.This seems to indicate some difficulty in laying out the roof .Along the edge of the roof , there was a strip approximately 3/4inches wide where the old roof could be seen.The roofing had been cut too short. These instances of poor workmanship are likely to reduce the life of the roof and void any manufacturers ' guarantee. As shown in my proposal ,an overlay application of shingles over a single existing layer of shingles should cost approximately $250 . 00 per square(100 SQ.FT. ) .There are 9 squares of roofing on your house. It is probably possible to find less expensive cost estimates for this job. Section 073-104 on page 156 of MEANS BUILDING CONSTRUCTION COST DATA lists a price of $80 .00/square . CHIMNEY FLASHING The c imney flashing has not been touched.The lead and mortar do not show any signs of replacement .The mortar was old and the lead is weathered.The new roofing shingles have been tarred in place ON TOP OF the existing lead flashing. ALUMINUM GUTTERS & FASCIAS- The ASCIAS=T e existing gutters looked in good shape.They were not new because there was evidence of weathering.There were no marks or dents as if they had been removed.The hangers showed signs of weathering. there was no evidence that they had been newly installed . The fascias & soffits are covered in aluminum. In order for anyone to do work on the fascias , the aluminum would have to be removed & replaced.The fascias & soffits I saw were not new.They looked like they have not been tampered with for a long time.The aluminum was dirty & showed signs of weathering. 7 BURLEY FARM ROAD DANVERS, MASSACHUSETTS 01923 JAMES M. KIERAN 774-5530 WILLIAM D. McKENZIE 774-0129 (2) REAR PORCH The rear porch has not been completely replaced.One 4X4 post is so rotted at the bottom, that I was able to easily insert the 2k inch long blade of my knife all the way into the post in several places . Another post has been spliced at the bottom 16 inches up. The workmanship is rather sloppy.The deck does not pitch away from the house. On the day that I looked at the porch(9/26/89) , it had rained during the day.Water was pooled on the house side of the deck .The bottom riser of the stairs was 3/4 inch greater than the rest of the stairs . The Massachusetts State Building Code only allows a flinch variance in the height of risers in the same flight . As noted on the bottom of my proposal , it is not recommended to paint pressure treated wood until 6 months after installation.The wood is very wet when it comes from the lumber yard and it needs this time to dry out before paint or stain can be applied. Below, I have listed my calculations for both options for the rear porch : OPTION #1 OPTION #2 2X6 PT 3/8 $17 .64 2X6 PT 3/8 $17 .64 2X12 PT 1/16 24. 90 2X12 PT 1/16 24. 90 1X4 PT 15/8 34. 80 1X4 PT 15/8 34. 80 4X4 PT 1/8, 1/12 16 . 35 4X4 PT 1/8, 1/12 16 . 35 2X4 PT 3/8 , 1/10 16 . 00 2X4 PT 6/8, 2/10 32 .00 1X8 PT 1/8 , 1/12 13 . 60 1X8 PT 1/8, 1/12 13 .60 1X8 #2 pine 3/8 15 . 35 1X8 #2 pine 3/8 15 .35 1X6 PT 10/10 48 .00 Hardware(hinges etc . ) 30.00 Subtotal $138 .64 Subtotal $232.64 5% Tax 6 . 93 5% Tax 11.63 Subtotal (Materials 5 . 57 Subtotal (Materials) 4 .27 Trash removal 25 .00 Trash removal 25 .00 Labor 500.00 Labor 600.00 Subtotal $-6-7-= Subtotal $$6F-27 15% 0&P 100 . 59 15% 0&P 130.39 Total 1. 6 Total $'q� Misc. (Nails etc . ) 28 . 84 Misc . (Nails etc) 30. 34 . Total job TWO. 0 Total job $1 ,0'303 * Round figure down to $1,000.00 � ' & ??2 3uiedeza 7 BURLEY FARM ROAD DANVERS. MASSACHUSETTS 01923 JAMES M. KIERAN 774-5530 WILLIAM D. McKENZIE 774-0129 (3) I hope this information is helpful to you. If I can be of further assistance ,please feel free to call on me. Sincerely yours , �� James M. Kieran p � tt( Page No. of Pages' -- x & 412 3ui2ders 7 Burley Farm Rd. DANVERS, MASS. 01923 James M. Kieran William D. McKenzie 774-5530 774.0129 PROPOSAL SUBMITTED TO PHONE DATE Mr. Philip J. Brown 744-1764 9/27/89 STREET JOB NAME 17 Greenway Rd. Rear Porch -Option #1 CITY, STATE AND ZIP CODE JOB LOCATION - -- Salem,Ma.01970 Same ARCHITECT DATE OF PLANS JOB PHONE We hereby submit specifications and estimates for: 1) Remove exist .ng_ rear .por1h_ & dispose of ..trash.._ (retain__.skirting) , Build new 4 ' -0"...X 4 ' -_0" deck_ with.....6 risers using : a) 2X6 ,pressure treated SouthernYellow_ Pin..e. _ joists_ spaced 16" b) 2X12 " _ stair stringers . c) 4X4 -_post's .__ ..... I d) 2X4 " rail ings....to match existing e) 1X4 " decking,. f) 1X8 " t.rm_boar.ds . _... _ g) 1X8.__��2 Pine, risers . 3 Re-install existing skirting, MATERIALS_ & LABOR $8.0.0100 .... Q 1�4) Foran additional cost of $200 . 00 K& M will paint the deck with one.. ... coat of_..Cabot ' s ..stain... * Note : Its._r.. . mmended-.,to wait for a_ period of 6_ months to elapse before applying We FroPOSP hereby to furnish material and labor — complete in accordance with above specifications, for the sum of, it One Thousand and 00/100 11000.00 Payment to be made as follows: dollars($ Payment in full upon completion i �I All material is guaranteed to be as specified.All work to be completed in a workmanlike /f manner affording to standard practices.Any alteration or deviation from above specifics SI Iazecl l lions involving extra costs will be executed only upon written orders,and will becontUorim extra charge over and above the estimate.All agreements contingent upon strikes,accidents me an Sig or delays beyond our control.Owner to carry fire,tornado and other necessary insurance. e:This proposal may be i Our workers are fully covered by Workmen's Compensation Insurance. withdrawn by US if not accepted within— 30 A days. f Of 1rQ iA'Sat—The above prices, specifications re satisfactory and are hereby accepted. You are authorized Signature specified.Payment will be made as outlined above. ce: Signature FORM 1169 COPYRIGHT 19N- Available from Inc.Grolon,Mesa 010W - �pN� tt1 Page No. Of Pages x & 'l�2 t3uiBilezd 7 Burley Farm Rd. DANVERS, MASS. 01923 James M. Kieran William D. McKenzie 7745530 7740129 PROPOSAL SUBMITTED TO PHONE DATE Mr. Phili J. Brown STREET JOB NAME 17 Greenwa Rd. _ CITY, STATE AND ZIP CODE Option #2 JOB LOCATION Salem Ma.01 70 Same ARCHITECT DATE OF PLANS JOB PHONE We hereby submit specifications and estimates for: 1).Remove__existing_ rear._porch....& dispose-o£..--trash. --. 2).Build_ new 4 ' -0"--X 4..`O!' deck--with--6 risers.. and--skirting using: -- a).__2X6....pressur.e__treated... Southern- Yellow....Pine- joists--spaced -16" -o.c. - b) 2X1.2._" _ __ stairstringers, c) c) 4X4 . . " __ _ posts_,.......... d) _.2X4....._ " _ ... _ " railings to match _. __ _ .... existing ..andframework for....skirting. . -_ -. e) 1X4 .pres.sure._treated- Southern ..Yellow--Pine decking f) 1X8.....__" It trim boards, _ g) 1X6 ripped to to 2k11......for new skirting....material. __. ..................--_............... h) 1X8.._#2 .Pine.. risers. . ...... I).... New....hardware for -access--to area--under-porch. (hinges , latches etc . )- - ...__............___..................... MATERIALS & LABOR _ $110000 :.00. *3)__.For- an--additional-cost-of-$200-.00,K & -M--will-paint -the- deck-with -one cnar ion #1 proposal ) Or PrII}tUfff hereby to furnish material and labor — complete in accordance with above specifications, for the sum of: One Thousand Two Hundred and 00/100 dollars($ 1 ,200. 00 Payment to be made as follows: ). Payment in full upon completion. All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices.Any alteration or deviation from above specifica- Authorized ! tions involving extra costs will be executed only upon written orders,and will become an Signature extra charge over and above the estimate.All agreements contingent upon strikes,accidents or delays beyond our control.Owner to carry fire,tornado and other necessary insurance. %nI e:This proposal maybe Our workers are fully covered by Workmen's Compensation Insurance. withdrawrfby us if not accepted within 30 days. Ar.�.�'�pi tanrit at f roposal—The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized Signature to do the Work as specified.Payment will be made as outlined above. Date of Acceptance: Signature FORM 118-0 COPYRIGHT 1880- Avellable from®Inc.Grotor,Maes.O105O Proposal Page No. of Pages & 'h2 c3uiBdeza 7 Burley Farm Rd. DANVERS, MASS. 01923 James M. Kieran William D. McKenzie 774.5530 774-0129 PROPOSAL SUBMITTED TO PHONE DATE STREET Mr- Pbilip J. Brown 7AA-1 66 JOB NAME 17 Greenway Rd . CITY, STATE AND ZIP CODE JOB LOCATION ARCHITECT DATE OF PLANS JOB PHONE We hereby submit specifications and estimates for: -- -..Re-roof overexistingroof.-using .GAF,Owens-Corning,Bird..-or--equal -. ..20 year fiberglass- strip....shingles (215#-235#/square) . .... . __. .... ...__.............__.. ._................ _................................. ......... _.._............_............................. ....... ..........._................. ..........._.... ............ ................................__............. I i We proplI3P hereby to furnish material and labor — complete in accordance with above specifications, for the sum of: I Two thousand Two Hundred Fifty and 00/100 dollars($ 2 . 250. 00 �. Payment to be made as follows: li I All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices.Any alteration or deviation from above specifca- Authorized tions involving extra costs will be executed only upon written orders,and will become an Signature extra charge over and above the estimate.All agreements contingent upon strikes,accidents or delays beyond our control.Owner to carry fire,tornado and other necessary insurance. Ote:This proposal may be 3 0 Ou r workers are fully covered by Workmen's Compensation Insurance. withdrawn by us if not accepted within - days. ta ur of prepos'al—The above prices, specifications dins are satisfactoryand are hereby accepted. You are authorized Signature e work as specified.Payment will be made as outlined above. Acceptance: Signature I Ctv of --5ulrm, 4&55achu5ett8 M • 3 M o� 9 `4l 'c �ottrb of peal JUL 2i �0 20 w ,6 c ct 1rF DECISION OF THE PETITION OF LEO J. HIGGINS JR. REQUESTING VARIANCE FOR THE PROPERTY LOCATED AT 17 GREENWAY ROAD R-1) A hearing on this petition was held JuLY 17, 1996 with the following Board members present: Gary Barrett, Chairman, Nina Cohen, Albert Hill, Joseph Ywuc and Richard Dionne. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. Petitioner, requests a Variance from side yard setbacks to construct an addition and a deck for the property located at 17 Greenway Road. The Variance which has been requested may be granted upon a finding of this Board that: 1. Special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other land, buildings, or structures in the same district. 2. Literal enforcement of the provisions of the Zoning Crdinance would involve substantial hardship, financial or otherwise, to the petitioner. 3. Desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogation from the intent of the district or the purpose of the Ordinance. The Board of Appeal, after careful considerations the evidence presented at the hearing, makes the following findings of fact: 1. Petitioner was represented by his father. Leo Higgins Sr. 2. Petitioner requests a variance to construct a 14 x 16 deck and to add an addition. 3. There was no opposition to the petition. On the basis of the above findings of fact, and on the evidence presented at the hearings, the Board of Appeal concludes as follows: 1. Special conditions exist which especially affect the subject property and not the district in general. 2. Literal enforcement of the provisions of the Zoning Crdinance would involve substation hardship to the petitioner. 3. Desirable relief can be granted without substantial detriment to public good and without nullifying and substantially derogating from the intent of the district or purpose of the Ordinance. On the basis of the above findings of fact, and on the evidence presented at the hearing, the Zoning Board of Appeal voted unanimously, 5-0 to grant the variance requested. subject to the following conditions: DECISION OF THE PETITION OF LEO J . HIGGINS REQUESTIING A VARIANCE FOR THE PROPERTY LOCATED AT 17 GREENWAY ROAD (R-1 ) page two 1 . Petitioner shall comply with all city and state statures., ordinances, codes and regulations. JUL L 2u gi;i 2. All requirements of the Salem Fire Department relative to smoke, a"hd fire safety shall be strictly adhered to. ' :,',. ; `C 3. Petitioner shall obtain building permit prior to beginning any construction. 4. All construction shall be done as per the plans and dimensions submitted. 5. A Certificate of Occupancy is to be obtained. 6. Exterior finishes of the new construction shall be in harmony with the existing structure. Variance Granted July 17, 1996 /' Yh/xIG Ctc.h, Richard Dionne, Member Board of Appeal A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A, and shall be filed within 20 days after the date of filing of this decision in the office of the City Clerk. Pursuant to Massachusetts General Laws Chapter 40A, Section 11, the Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certification of the City Clerk that 20 days have elapsed and no appeal has been filed, or that, if such appeal has been filed, that it has been dismissed or denied is recorded in the South Essex Registry of Deeds and indexed under the name of the owner of record or is recorded and noted on the owner's Certificate of Title. Board of Appeal Y' e' n Titg of -'-5ttlem, � ttssttcl�usetts JUL Z,� `0 20 Gi 'S6 �nttra of �ppeztl i;K'`� DECISION OF THE PETITION OF LEO J. HIGGINS,JR._REQUESTING VARIANCE FOR THE PROPERTY LOCATED AT 17 GREENWAY R_ OA�D` (R-1) A hearing on this petition was held JuLY 17, 1996 with the following Board members present: Gary Barrett, Chairman, Nina Cohen, Albert Hill, Joseph Ywuc and Richard Dionne. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. Petitioner, requests a Variance from side yard setbacks to construct an addition and a deck for the property located at 17 Greenway Road. The Variance which has been requested may be granted upon a finding of this Board that: 1. Special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other land, buildings, or structures in the same district. 2. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship, financial or otherwise, to the petitioner. 3. Desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogation from the intent of the district or the purpose of the Ordinance. The Board of Appeal, after careful considerations the evidence presented at the hearing, makes the following findings of fact: 1. Petitioner was represented by his father, Leo Higgins Sr. 2. Petitioner requests a variance to construct a 14 x 16 deck and to add an addition. 3. There was no opposition to the petition. On the basis of the above findings of fact, and on the evidence presented at the hearings, the Board of Appeal concludes as follows: 1. Special conditions exist which especially affect the subject property and not the district in general. 2. Literal enforcement of the provisions of the Zoning Ordinance would involve substation hardship to the petitioner. 3. Desirable relief can be granted without substantial detriment to public good and without nullifying and substantially derogating from the intent of the district or purpose of the Ordinance. On the basis of the above findings of fact, and on the evidence presented at the hearing, the Zoning Board of Appeal voted unanimously, 5-0 to grant the variance requested, subject to the following conditions: DECISION OF THE PETITION OF LEO J. HIGGINS REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 17 GREENWAY ROAD (R-1) page two 1 . Petitioner shall comply with all city and state stat res. , ordinarices, codes and regulations. R LJ 113 20 9fj Yw 2. All requirements of the Salem Fire Department relat o2 to', smok:&I, did fire safety shall be strictly adhered to. 3. Petitioner shall obtain building permit prior to beginning any construction. 4. All construction shall be done as per the plans and dimensions submitted. 5. A Certificate of Occupancy is to be obtained. 6. Exterior finishes of the new construction shall be in harmony with the existing structure. Variance Granted July 17, 1996 Richard Dionne, Member Board of Appeal A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A, and shall be filed within 20 days after the date of filing of this decision in the office of the City Clerk. Pursuant to Massachusetts General Laws Chapter 40A, Section 11, the Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certification of the City Clerk that 20 days have elapsed and no appeal has been filed, or that, if such appeal has been filed, that it has been dismissed or denied is recorded in the South Essex Registry of Deeds and indexed under the name of the owner of record or is recorded and noted on the owner's Certificate of Title. Board of Appeal