47 CONGRESS STREET - BOH PROJECT CONDITIONS LETTER CITY OF SALEM, MASSACHUSETTS
BOARD OF HEALTH
98 WASHINGTON STREET,3""FLOOR
SALEM,MA 01970
TEL. (978)741-1800
DOMINICK PANGALLO health(u saletnxom DAVID GRl?ENBAUM,RS,CHO
MAYOR HEALTH AGI?NT
September 15, 2026
Kirt Reider, Chair
Salem Planning Board
98 Washington Street
Salem, Massachusetts 01970
Dear Mr. Reider:
On behalf of the Salem Board of Health, I have conducted the Site Plan Review for the
proposed project at 47 Congress Street. Based on the limited information in the application,
the Board of Health places the following conditions on this project:
1. The individual presenting the plan to the Board of Health must notify the Health Agent of
the name, address, and telephone number of the project (site) manager who will be on
site and directly responsible for the construction of the project.
2. If a DEP tracking number is issued for this site under the Massachusetts Contingency
Plan, no structure shall be constructed until the Licensed Site Professional responsible for
the site meets MA DEP standards for the proposed use.
3. A copy of the Licensed Asbestos Inspector's Report must be sent to the Health Agent.
4. A copy of the Licensed Lead Inspector's Report must be sent to the Health Agent.
5. A copy of the Demolition Notice sent to MA DEP, Form BWPA06, must be sent to the
Health Agent.
6. The developer shall adhere to a drainage plan as approved by the City Engineer.
7. The developer shall employ a licensed pesticide applicator to exterminate the area prior to
construction, demolition, and/or blasting and shall send a copy of the exterminator's
invoice to the Health Agent.
8. The developer shall submit a plan for rodent control and maintain the area free from
rodents throughout construction.
9. The developer shall submit to the Health Agent a written plan for dust control and street
sweeping which will occur during demolition and construction.
10. The developer shall submit to the Health Agent a written plan for containment and
removal of debris, vegetative waste, and unacceptable excavation material generated
during demolition and/or construction.
11. The Fire Department must approve the plan regarding access for firefighting.
12. Noise levels from the resultant establishment(s) generated by operations, including but
not limited to refrigeration and HVAC systems, shall not increase the broadband sound
level by more than 10 dB(A) above the ambient levels measured at the property line.
13. The developer shall disclose in writing to the Health Agent the origin of any fill material
needed for the project.
14. Any restaurant resulting from this development shall be reviewed and approved by the
Health Agent prior to the construction of said restaurant.
15. Any pool that may be affiliated with this development shall be reviewed and approved by
the Health Agent prior to construction.
16. The developer shall notify the Health Agent when the project is complete for final
inspection and confirmation that the above conditions have been met.
17. The applicant shall file a Form C with the Salem Board of Health in accordance with the
Subdivision Regulations.
If I may be of any assistance to your Board, please feel free to call me.
Sincerely 'ours,
For the and of Health,
avid Green aum
Health Agent
Cc: Salem Board of Health