Loading...
15 Willow Avenue Floor Plan and Elevation PlanSTRUCTURAL STEEL S-1 STEEL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST AISC MANUAL. STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING ASTM STANDARDS:- W BEAM AND COLUMNS : A572/A992-GRADE50 (Fy = 50 KSI) STEEL PLATE, CHANNELS AND ANGLES : A36 (Fy = 36 KSI) STRUCTURAL PIPES AND TUBES : A500-GRADE "B"(Fy = 46 KSI) ANCHOR BOLTS : F1554 GRADE 36 OR A307 HIGH STRENGTH BOLTS : A325 ALL CONNECTIONS SHALL BE WELDED OR BOLTED. SHOP AND FIELD FASTENERS SHALL BE ASTM A-325 HSB (HIGH STRENGTH BOLTS). IN FRICTION TYPE CONNECTIONS USE "TURN-OF-NUT" METHOD IN TIGHTENING ALL BOLTS. HOLES SHALL NOT BE CUT THROUGH BEAMS UNLESS INDICATED OR APPROVED BY THE STRUCTURAL ENGINEER. PROVIDE STANDARD ANGLE WALL ANCHORS FOR BEAMS RESTING ON MASONRY. SHOP CONNECTIONS TO BE WELDED OR BOLTED. FIELD CONNECTIONS TO BE BOLTED UNLESS OTHERWISE SHOWN. BOLT HOLES TO BE STANDARD ROUND HOLES (d+1/16") UNLESS OTHERWISE NOTED. SHORT SLOTS SHALL BE PERMITTED NORMAL TO THE LOAD DIRECTION IN SLIP CRITICAL AND BEARING TYPE CONNECTIONS AS PER AISC REQUIREMENTS. ALL WELDING WORK SHALL BE PERFORMED PER SPECIFICATIONS AND GUIDELINES OF AMERICAN WELDING SOCIETY. S-2 S-3 S-4 GENERAL NOTES G-1 G-2 THE GOVERNING CODE IS INTERNATIONAL RESIDENTIAL CODE (IRC)-2021 EDITION AS AMENDED BY MASSACHUSETTS BUILDING CODE 10TH EDITION. ANY REVISION INITIATED BY THE OWNER, GENERAL CONTRACTOR AND/OR THE SUBCONTRACTOR THAT DIRECTLY INFLUENCES OR CHANGES STRUCTURAL ELEMENTS INCLUDING, BUT NOT LIMITED TO FLOOR JOIST, BEAM OR HEADER SPANS; WALL HEIGHTS; BEAM OR HEADER SIZES; RELOCATION OF BEARING WALLS, FOOTING SIZES, ETC. AS INDICATED ON THESE DRAWINGS SHALL BE NOTIFIED IN WRITING INDICATING THE PROPOSED CHANGES FOR REVIEW. ANY REQUIRED REVIEW, CALCULATION, AND/OR DRAWING MODIFICATION NECESSARY TO ACCURATELY REPRESENT THE PROPOSED CHANGES SHALL BE CHARGED AS AN ADDITIONAL SERVICE. THESE DRAWINGS ARE NOT TO BE SCALED FOR CONSTRUCTION PURPOSES. DIMENSIONS NOTED TAKE PRECEDENCE OVER SCALE. ALL DIMENSIONS ARE FOR REFERENCE ONLY & ALL DIMENSIONS SHALL BE TAKEN FROM LATEST ARCHITECTURAL PLANS. NO STRUCTURAL OBSERVATION(S) WILL BE MADE BY GELINAS STRUCTURAL ENGINEERING LLC. UNLESS A COUNTY APPROVED SET OF PLANS IS PRESENT AT THE JOB SITE WHERE REQUIRED BY LOCAL AUTHORITIES. ALL DIMENSIONS SHOWN ARE TO FACE OF STUD (F.O.S.), UNLESS OTHERWISE NOTED. DIMENSIONAL ADJUSTMENTS MAY INCLUDE, BUT ARE NOT LIMITED TO: CENTER LINE (℄), FACE OF CONCRETE (F.O.C.) AND FACE OF MASONRY (F.O.M.) COMMENCEMENT OF WORK BY THE CONTRACTOR AND/OR ANY SUBCONTRACTOR SHALL INDICATE A KNOWLEDGE AND ACCEPTANCE OF ALL CONDITIONS DESCRIBED IN THESE CONSTRUCTION DOCUMENTS WHICH COULD AFFECT THEIR WORK. IN CASE OF CONFLICT BETWEEN THE GENERAL NOTES, SPECIFICATIONS AND DRAWINGS REGARDING STRUCTURAL ISSUES, THE MOST STRINGENT REQUIREMENTS SHALL GOVERN. WORK NOT INDICATED ON A PART OF THE DRAWINGS, BUT REASONABLY IMPLIED TO BE SIMILAR TO THAT SHOWN AT CORRESPONDING PLACES, SHALL BE REPEATED. THE CONTRACTOR IS RESPONSIBLE FOR MEANS AND METHODS OF CONSTRUCTION AND CONSTRUCTION PROCEDURES, FABRICATION PROCESS, COORDINATION OF WORK WITH OTHER TRADES AND JOB SITE SAFETY. TEMPORARY BRACING, SHEATHING, SHORING, ETC., REQUIRED TO INSURE THE STRUCTURAL INTEGRITY/ STABILITY OF THE EXISTING BUILDINGS, SIDEWALLS, UTILITIES, ETC., DURING CONSTRUCTION IS THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE DESIGNED BY A REGISTERED PROFESSIONAL ENGINEER EMPLOYED BY CONTRACTOR. SUBMIT DESIGN TO ARCHITECT ENGINEER FOR A VIEW . VERIFY IN FIELD ALL DIMENSIONS & CONDITIONS. NOTIFY ARCHITECT & ENGINEER IF ANY DISCREPANCY IS FOUND. G-3 G-4 G-5 G-6 G-7 G-8 G-9 G-10 G-11 ALL CONCRETE FOR FOOTINGS, FOUNDATION WALLS, AND FLOOR SLABS ON GRADE SHALL ATTAIN A MINIMUM 28-DAY ULTIMATE COMPRESSIVE STRENGTH AS FOLLOWS: BASEMENT/FOUNDATION WALLS : 3,000 PSI FOOTINGS : 3,000 PSI SLABS : 4,000 PSI CONCRETE STRENGTH AT 28 DAYS WITH 1.5#/ CUBIC YARD FIBER MESH IN MIX. ALL CONCRETE EXPOSED TO THE WEATHER AND SUBJECT TO FREEZING AND THAWING IN A MOIST WET CONDITION OR DEICING CHEMICALS SHALL BE AIR ENTRAINED, THE TOTAL AIR CONTENT (PERCENT BY VOLUME OF CONCRETE) SHALL NOT BE LESS THAN 5 PERCENT (5%) OR MORE THAN 7 PERCENT (7%) WITH f'c AT 28 DAYS : 4,500 PSI & MAXIMUM WATER CEMENT RATIO OF 0.45. ALL CONSTRUCTION JOINTS SHALL BE ROUGHENED AND KEYS PROVIDED WHERE REQUIRED OR INDICATED ON THE DRAWINGS. CONSTRUCTION JOINTS, OTHER THAN THOSE SHOWN ON THE DRAWINGS, MAY BE PROPOSED BY THE CONTRACTOR. HOWEVER, THE LOCATIONS ARE SUBJECT TO REVIEW BY THE ARCHITECT AND/OR STRUCTURAL ENGINEER. ALL VERTICAL CONSTRUCTION, CONTROL AND CONTRACTION JOINTS SHALL LIE IN TRUE VERTICAL PLANE. ALL FORMWORK AND PLACING OF CONCRETE SHALL BE PLUMB, LEVEL, AND SQUARE. THE STRUCTURAL ENGINEER SHALL OBSERVE ANY PROPOSED FORMWORK DESIGN DIFFERENT FROM INDUSTRY STANDARD PRACTICES. EXTERIOR SLAB AREAS SHALL BE BROOM FINISHED, UNLESS OTHERWISE SPECIFIED BY THE ARCHITECT. THE STROKES SHALL MAINTAIN THE SAME DIRECTION AT ADJACENT SURFACES. NO RIPPLES, BUMPS, OR ANY OTHER IRREGULARITIES WILL BE ACCEPTABLE. SLAB PROVIDE CONTROL JOINTS 25'-0" O.C. AND AT RE-ENTRANT CORNERS WITHIN 8 HOURS OF POUR. ANCHOR BOLT PLACEMENT U.N.O. ON PLANS: 1'-0" OFF CORNERS , 4'-0" O.C. REMINDER: 1 2"Ø 12" LONG 8" EMBEDMENT 4" PROJECTION WITH NUT AND WASHER AT TOP AND BOTTOM. DO NOT BACKFILL AGAINST FOUNDATION WALL UNTIL THE FIRST FLOOR FRAMING IS IN PLACE WITH SHEATHING AND ANCHOR BOLTS AND BASE SLAB IS IN PLACE OR UNTIL WALL ARE BRACE TO WITHSTAND THE PRESSURE OF BACKFILLING OPERATIONS. CONCRETE C-1 C-2 C-3 C-4 C-5 C-6 C-7 C-8 IN ABSENCE OF SOIL REPORT, FOOTING SHALL BE DESIGNED FOR 3000 PSF MINIMUM SOIL BEARING CAPACITY AS INDICATED ON THE DRAWINGS. PROVIDE A FOUNDATION DRAIN TILE ON THE EXTERIOR SIDE OF FOUNDATION WALL AND DISCHARGE TO DAYLIGHT; OR PROVIDE 2" DIAMETER PVC BLEEDER LINES THROUGH THE FOOTINGS AT 8'-0" O.C. AND DISCHARGE TO A SUMP PIT AS INDICATED ON THE ARCHITECTURAL DRAWINGS. SUMP PIT AND SUMP PUMP(S) SHALL BE INSTALLED BY THE CONCRETE SUBCONTRACTOR AND LOCATED AT THE BUILDER'S DISCRETION ON THE ARCHITECTURAL DRAWINGS. REMOVE EXISTING FILL, LOOSE SOIL AND STANDING WATER FROM FOUNDATION EXCAVATIONS PRIOR TO PLACING CONCRETE. THE GEOTECHNICAL ENGINEER SHALL INSPECT ALL EXCAVATIONS, SOIL COMPACTION WORK PRIOR TO PLACEMENT OF ANY REBAR OR CONCRETE, SHORING INSTALLATIONS, BACKFILL MATERIALS AND BACK FILLING PROCEDURES. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR EXCAVATION PROCEDURES INCLUDING LAGGING, SHORING, UNDERPINNING AND PROTECTION OF EXISTING CONSTRUCTION. SLOPE HEIGHT, SLOPE INCLINATION, OR EXCAVATION DEPTHS (INCLUDING UTILITY TRENCHES) SHOULD NOT EXCEED THOSE SPECIFIED IN THE OSHA HEALTH & SAFETY STANDARDS FOR EXCAVATIONS, 29CFR PART 1926. FOUNDATION & FOUNDATION WALLS F-1GRAVITY LOAD ROOF DEAD LOAD = 15 PSF ROOF LIVE LOAD = 20 PSF GROUND SNOW LOAD (Pg) = 50 PSF (AS AMENDED BY MASSACHUSETTS BUILDING CODE 10TH EDITION) EXPOSURE FACTOR (Ce) = 1.00 THERMAL FACTOR (Ct) = 1.10 IMPORTANCE FACTOR (I) = 1.00 CEILING LOAD DEAD LOAD = 10 PSF LIVE LOAD = 40 PSF FLOOR LOAD DEAD LOAD = 10 PSF LIVE LOAD = 40 PSF DECK LOAD DEAD LOAD = 10 PSF LIVE LOAD = 40 PSF SNOW DRIFT = 57 PSF ALLOWABLE DEFLECTION FACTOR FOR ROOF WITHOUT PLASTER @ CEILING OR INHABITABLE ATTIC BELOW LIVE LOAD = L/240 TOTAL LOAD = L/180 ROOF WITH PLASTER @ CEILING OR HABITABLE ATTIC BELOW LIVE LOAD = L/360 TOTAL LOAD = L/240 FLOORS & DECKS LIVE LOAD = L/360 TOTAL LOAD = L/240 FLOORS I - JOIST LIVE LOAD = L/480 TOTAL LOAD = L/360 WIND LOAD ULTIMATE WIND SPEED = 119 MPH (AS AS AMENDED BY MASSACHUSETTS BUILDING CODE 10TH EDITION) WIND EXPOSURE = C (REFER TO SECTION 26.7, ASCE-7-16) DESIGN CRITERIA F-2 F-3 F-4 SHEET NO. JOB NO. RE V DA T E DE S C R I P T I O N PR O J E C T N A M E : 26051 IS S U E D F O R C O N S T R U C T I O N 04 . 1 7 . 2 0 2 6 0 AD U A D D I T I O N A T , 15 W I L L O W S T R E E T , S A L E M , M A PR E P A R E D F O R : AN T H O N Y H U N T L E Y , 15 W I L L O W S T R E E T , S A L E M , M A SEAL: RE V I S E D T H U S R E V 04 . 2 4 . 2 0 2 6 1 1 SG-0.1 2 Rev 2, May 6, 2026, Sheet SG1.1 Only Revised 2 Re v 2 , M a y 6 , 2 0 2 6 , S h e e t S G 1 . 1 O n l y R e v i s e d 6May 2026 Job 26051 24 April 2026 L-10 L-11 L-12 L-13 STRUCTURAL LUMBER STRUCTURAL LUMBER SHALL BE IN ACCORDANCE WITH THE NATIONAL DESIGN SPECIFICATIONS FOR WOOD CONSTRUCTION (NDS) 2018 EDITION, PUBLISHED BY THE NATIONAL FOREST PRODUCTS ASSOCIATION. ALL STRUCTURAL FRAME MEMBERS SHALL BE ONE OF THE FOLLOWING MINIMUM VALUES. UNLESS OTHERWISE NOTED. ALL FRAMING LUMBER TO BE MINIMUM, UNLESS NOTED OTHERWISE (U.N.O.) ON DRAWINGS: SAWN LUMBER, (SPF) SPRUCE PINE FIR NO. 2, E = 1,400,000 psi; Fb = 875 psi; Fc = 1,150 psi; Fv = 135 psi a. SPRUCE PINE FIR STUD, E = 1,200,000 psi; Fb = 675 psi; Fc = 725 psi; Fv = 135 psi; Ft = 350 psi b. PRESSURE TREATED LUMBER (PT) SOUTHERN PINE NO. 2, E = 1,600,000 psi c. VERSA LAM LUMBER LVL (BY BOISE CASCADES) E = 2,000,000 psi, Fb = 3,100 psi, Fc = 3,000 psi, Fv = 285 psi d. PSL POSTS, E = 1,800,000 psi; Fb = 2,400 psi ; Fc = 2,500 psi ; Fv = 190 psi WALL SHEATHING 7 16" (15 32") THICK, ROOF SHEATHING 5 8" (20 32") THICK & FLOOR SHEATHING 3 4" (23 32") THICK NAILED WITH 8d (PENNY) @ 6" O.C., PERIMETER OF SHEET AND 12" O.C. FIELD/INTERMEDIATE UNLESS NOTED OTHERWISE (U.N.O) L-4 DECKS i.ALL LUMBER MUST BE PRESSURE TREATED SPRUCE PINE NO.2; ALL CONNECTIONS SHOULD BE GALVANIZED OR STAINLESS STEEL, PROVIDE POSITIVE CONNECTION AT ALL FRAMING MEMBER EXAMPLE JOIST ii. HANGERS OR SIMPSON H2.5A iii. HANDRAILS BY OWNER AND CONTRACTOR iv. THE GENERAL CONTRACTOR SHALL PROVIDE A CONTINUOUS LOAD PATH FROM UPPER LEVEL POSTS/COLUMN/FRAMING TO THE FOUNDATION. IF PLATFORM FRAMING IS UTILIZED, BLOCK AS REQUIRED REQUIRED POST SIZES FROM POINT LOADS AT GIRDER TRUSS BEAM AND/OR HEADER END LOCATIONS SHALL BE CONTINUOUS, BEARING ONTO BEAMS OR CONTINUOUS TO FOOTINGS AS INDICATED. PROVIDE SQUASH BLOCKS BETWEEN FLOOR FRAMING AS NECESSARY OR REQUIRED. STRUCTURAL CONNECTORS INDICATED ON THESE DOCUMENTS SHALL BE PROVIDED BY SIMPSON STRONG-TIE COMPANY, INC., PROVIDE JOIST HANGERS AT EACH END OF ALL FLOOR JOISTS, AND/OR BEAMS FLUSH WITH ADJACENT BEAMS, HEADERS. PROVIDE COLUMN CAPS AND POST BASES AT ALL STRUCTURAL LOAD BEARING WOOD BEAMS, INCLUDING EXTERIOR DECKS. STRUCTURAL MEMBERS INDICATED ARE REQUIRED MINIMUM SIZES AND MAY BE INCREASED TO ALIGN WITH ADJACENT FRAMING MEMBERS AS NECESSARY OR REQUIRED WITHOUT ADDITIONAL STRUCTURAL ENGINEERING AT THE GENERAL CONTRACTOR/OWNER'S DISCRETION. FLUSH BEAMS INDICATED MAY BE DROPPED AT THE GENERAL CONTRACTOR/OWNER'S DISCRETION. VERIFY AND COORDINATE WITH ARCHITECTURAL, ELECTRICAL AND MECHANICAL DRAWINGS FOR COMPATIBILITY PRIOR TO INSTALLATION. LAMINATED VENEER LUMBER (LVL) AND PARALLEL STRAND LUMBER (PSL) LEVEL BY BOISE CASCADE. IF THE SPECIFIED MATERIAL IS SUBSTITUTED WITH ANOTHER PRODUCT IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THAT THE SUBSTITUTED PRODUCT STRUCTURALLY MEETS OR EXCEEDS THE ORIGINALLY SPECIFIED PRODUCT. NOTCHES IN THE TOP AND BOTTOM OF DIMENSIONAL LUMBER JOISTS SHALL NOT EXCEED 1/6 OF THE DEPTH OF THE JOIST, AND SHALL NOT BE LOCATED IN THE MIDDLE ONE THIRD (1/3) OF THE SPAN. NOTCHES AT THE JOIST ENDS SHALL NOT EXCEED 1/4 OF THE JOIST DEPTH. HOLES THROUGH THE JOISTS SHALL NOT BE WITHIN 2" OF THE TOP AND BOTTOM OF THE JOIST. THE HOLE DIAMETER SHALL NOT EXCEED 1/3 OF THE JOIST DEPTH. INSTALL SOLID BLOCKING BETWEEN FLOOR JOISTS @ 8'-0" O.C. MAXIMUM AS REQUIRED BY CODE OR THE FLOOR JOIST MANUFACTURER. ALL WOOD SHALL BE MINIMUM 8" ABOVE FINISH GRADE, OR SHALL BE PRESSURE TREATED. ALL HARDWARE, FASTENERS, CONNECTOR, NAILS, SCREW, ETC. USED WITH PRESSURE TREATED LUMBER (P.T.) SHALL BE, AS RECOMMENDED BY THE PRESSURE TREATED WOOD INDUSTRY FOR USE WITH TREATED WOOD: a. HOT-DIPPED (HDG) OR STAINLESS STEEL TYPES 304 OR 316 (SS). b. DO NOT MIX AND MATCH SS AND WITH HDG FASTENERS, THEY ARE CONSIDERED DIS-SIMILAR MATERIALS c. ELECTROPLATED / ELECTRO GALVNIZED AND MECHANICAL GALVNIZED COATINGS SHOULD NOT BE CONSIDERED GREATER. NOTE HOWEVER HDG OR SS IS PREFERRED. L-1 L-2 L-3 L-4 L-5 L-6 L-7 L-8 L-9 ALL REINFORCING STEEL SHALL BE ASTM A-615, GRADE 60. ALL REINFORCING BAR DIMENSIONS SHOWN ON THE DRAWINGS ARE TO THE CENTER LINE OF BARS, UNLESS OTHERWISE NOTED. ALL CONCRETE AND REINFORCING STEEL SHALL BE FURNISHED, FABRICATED AND ERECTED IN ACCORDANCE WITH ACI STANDARD BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE STRUCTURES, (ACI 318-14). REINFORCED STEEL SHALL BE DETAILED IN ACCORDANCE WITH THE ACI MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES (ACI 315). UNLESS OTHERWISE INDICATED ON THE DRAWINGS, THE CLEAR CONCRETE COVER PROVIDED FOR REINFORCEMENT SHALL BE: A.CAST AGAINST EARTH AND PERMANENTLY EXPOSED TO EARTH :3" B.EXPOSED TO EARTH OR WEATHER #6 THROUGH #18 BARS :2" #5 BARS AND SMALLER :1.5" C.NOT EXPOSED TO WEATHER OR IN CONTACT WITH THE GROUND (SLABS AND WALLS):0.75" D.BEAMS, GIRDERS, COLUMNS, PRIMARY REINFORCEMENT, TIES, STIRRUPS, SPIRALS :1.5" STEEL REINFORCING REQUIREMENTS IN CONCRETE FLOOR SLABS SHALL BE AS REQUIRED BY CODE AND/OR LOCAL JURISDICTIONS, OR PER SITE CONDITIONS. PROVIDE MATCHING CORNER DOWELS TO HORIZONTAL REINFORCING @ CORNERS 90° 45° ETC., MINIMUM LAP 50 BAR DIA. U.N.O. REINFORCING STEEL R-1 R-2 R-3 R-4 DIAPHRAGM SHEATHING NAILS OR OTHER APPROVED SHEATHING CONNECTORS SHALL BE DRIVEN SO THAT THEIR HEAD OR CROWN IS FLUSH WITH THE SURFACE OF THE SHEATHING. NAILING SCHEDULE a.NAILS SPACED AT 6 " AT INTERMEDIATE SUPPORTS WHERE SPANS ARE 48 " OR MORE. FOR NAILING OF WOOD STRUCTURAL PANEL AND ORIENTED STRAND BOARD DIAPHRAGMS AND SHEAR WALLS, REFER TO SECTION 2305. NAILS FOR WALL SHEATHING ARE PERMITTED TO BE COMMON, BOX OR CASING. b.SPACING SHALL BE 6 " ON CENTER ON THE EDGES AND 12 " ON CENTER AT INTERMEDIATE SUPPORTS FOR NONSTRUCTURAL APPLICATIONS. PANEL SUPPORTS AT 16 " (20 " IF STRENGTH AXIS IN THE LONG DIRECTION OF THE PANEL, UNLESS OTHERWISE MARKED.) c.WHERE A RAFTER IS FASTENED TO AN ADJACENT PARALLEL CEILING JOIST IN ACCORDANCE WITH THIS SCHEDULE AND THE CEILING JOIST IS FASTENED TO THE TOP PLATE IN ACCORDANCE WITH THIS SCHEDULE, THE NUMBER OF TOENAILS IN THE RAFTER SHALL BE PERMITTED TO BE REDUCED BY ONE NAIL. TABLE 602.3 (1) (IRC 2021) SPACING AND LOCATIONDESCRIPTION OF BUILDING ELEMENTS NUMBER AND TYPE OF FASTENER ROOF BLOCKING BETWEEN CEILING JOISTS, RAFTERS OR TRUSSES TO TOP PLATE OR OTHER FRAMING BELOW BLOCKING BETWEEN RAFTERS OR TRUSS NOT @ THE WALL TOP PLATE, TO RAFTER OR TRUSS 3-8d COMMON 2-8d COMMON EACH END, TOENAIL EACH END, TOE NAIL 2-16d COMMON END NAIL FLAT BLOCKING TO TRUSS AND WEB FILLER 16d COMMON 4. RAFTER OR ROOF TRUSS TO TOP PLATE (SEE SECTION 2308.7.5, TABLE 2308.7.5) 3-10d COMMON TOE NAIL WALL 6. STUD TO STUD (NOT @ BRACED WALL PANELS) @ 24" O.C. FACE NAIL 10d BOX @ 16" O.C. FACE NAIL 7. STUD TO STUD AND ABUTTING STUDS @ INTERSECTING WALL CORNERS (@ BRACED WALL PANELS) 16d COMMON @ 16" O.C. FACE NAIL 16d COMMON 8. BUILT-UP HEADER (2"TO 2" HEADER)16d COMMON @ 16" O.C. EACH EDGE, FACE NAIL 10. TOP PLATE TO TOP PLATE 16d COMMON @ 16" O.C. FACE NAIL 11. TOP PLATE TO TOP PLATE, @ END JOINTS 8-16d COMMON EACH SIDE OF END JOINT, FACE NAIL (MINIMUM 24" LAP SPLICE LENGTH EACH SIDE OF END JOINT) 12. STUD TO TOP OR BOTTOM PLATE 4-8d COMMON TOE NAIL 2-16d COMMON END NAIL 2-16d COMMON FACE NAIL13. TOP PLATES, LAPS @ CORNERS AND INTERSECTIONS PER JOIST TOE NAIL 3-8d COMMON2. CEILING JOISTS TO TOP PLATE 3. COLLAR TIE TO RAFTER 3-10d COMMON FACE NAIL 5. ROOF RAFTERS TO RIDGE VALLEY OR HIP RAFTERS; OR ROOF RAFTER TO 2-INCH RIDGE BEAM 2-16d COMMON END NAIL 9. CONTINUOUS HEADER TO STUD 4-8d COMMON TOE NAIL FLOOR 14. JOIST TO SILL, TOP PLATE, OR GIRDER 3-8d COMMON TOE NAIL 15. RIM JOIST, BAND JOIST, OR BLOCKING TO TOP PLATE, SILL OR OTHER FRAMING BELOW 8d COMMON @ 6" O.C., TOE NAIL 16. LEDGER STRIP SUPPORTING JOISTS OR RAFTERS 3-16d COMMON EACH JOIST OR RAFTER, FACE NAIL 17. BAND JOIST OR RIM JOIST TO JOIST 3-16d COMMON END NAIL 18. BRIDGING OR BLOCKING TO JOIST, RAFTER OR TRUSS 2-8d COMMON EACH END, TOE NAIL @ 6" O.C. FACE NAIL SHEET NO. JOB NO. RE V DA T E DE S C R I P T I O N PR O J E C T N A M E : 26051 IS S U E D F O R C O N S T R U C T I O N 04 . 1 7 . 2 0 2 6 0 AD U A D D I T I O N A T , 15 W I L L O W S T R E E T , S A L E M , M A PR E P A R E D F O R : AN T H O N Y H U N T L E Y , 15 W I L L O W S T R E E T , S A L E M , M A SEAL: RE V I S E D T H U S R E V 04 . 2 4 . 2 0 2 6 1 1 SG-0.2 Job 26051 24 April 2026 FOUNDATION PLAN SCALE : 3 16" = 1'-0" GENERAL NOTES ON SG-0.1 & SG-0.2 ARE PART OF THIS DESIGN DOCUMENT, COORDINATE FOR ADDDITIONAL REQUIREMENTS NOTES: 1.IN ABSENCE OF SOIL REPORT, FOOTING SHALL BE DESIGNED FOR 3000 PSF MINIMUM SOIL BEARING CAPACITY. 2.F'c 4000 PSI SLAB, 3000 PSI FOUNDATION CONCRETE @ 28 DAYS. ALL REINFORCING SHALL BE DEFORMED BARS CONFORMING TO ASTM A615 GRADE 60 Fy = 60,000 PSI 3.DO NOT BACKFILL FOUNDATION WALLS UNTIL FIRST FLOOR FRAMING & FLOOR SHEATHING ARE IN PLACE. 4.SLAB 4000 PSI @ 28 DAYS, 1.5# CUBIC YARD FINER MESH IN MIX OR WELDED WIRE FABRIC OVER 6 MIL POLY VAPOR BARRIER. 5.FOUNDATION WALLS WITH SLAB ON GRADE, GENERALLY GARAGE BACKFILL AGAINST WALL EVENLY WITHIN 1'-0" ON EACH SIDE OF WALL DO NOT CREATE AN UNBALANCED FILL WITH TOP OF WALL UN-RESTRAINED/UN-BRACED FLOOR SYSTEM. 6.PROVIDE 48" MINIMUM FROST DEPTH FOR ALL FOOTING BEARINGS. A DRAWING LEGEND DRAWN AS DESCRIPTION EXISTING CMU WALL NEW STUD WALL NEW SIMPSON HANGER NEW LEDGER FRAMING DIRECTION FOOTING SCHEDULE MARK SIZE & REINFORCEMENT BF24 12" Ø SONOTUBE WITH 24" Ø BIGFOOT FOOTING, REFER DETAIL - 1 1 40'-11 2" 10'-11 2" 2 3 15'-4"14'-8" A 10 ' - 5 1 2" 24 ' - 8 " B C D 10 ' - 2 1 2" 4' - 0 " 4 ALL DIMENSIONS ARE FOR REFERENCE ONLY & FINAL DIMENSIONS SHALL BE TAKEN FROM LATEST ARCHITECTURAL PLANS. AL L D I M E N S I O N S A R E F O R R E F E R E N C E ON L Y & F I N A L D I M E N S I O N S S H A L L B E T A K E N FR O M L A T E S T A R C H I T E C T U R A L P L A N S . ST R E E T P.T. U P P1-6 6 P.T. U P P1-6 6 P.T. U P P1-6 6 P.T. U P P1-6 6 P.T. U P P1-6 6 P.T. U P P1-6 6 B F 2 4 P. T . U P P 1 - 6 6 P.T. U P P1-6 6 BF2 4 B F 2 4 B F 2 4 B F 2 4 B F 2 4 B F 2 4 B F 2 4 STHD14 STHD14 BF24 12" Ø SONOTUBE WITH 24" Ø BIGFOOT FOOTING, REFER DETAIL - 1 18" WIDEx12" THICK STAIR PAD FOOTING, REFER TYPICAL DETAIL - 2 P.T . U P P1- 6 6 B F 2 4 4 J H EXISTING CMU WALL & FOOTING TO REMAIN, TYPICAL 48 " M I N . B E L O W G R A D E OR T O B E A R I N G S O I L WH I C H E V E R I S G R E A T E R 24" Ø BIGFOOT FOOTING 2" CLEAR 3" CLEAR3" CL E A R 3" CL E A R 8" M I N I M U M 18 " M A X I M U M DETAIL OF SONOTUBE WITH BIGFOOT FOOTING (BF-24)1 SCALE: 1/2"=1'-0" 12" Ø CONCRETE SONOTUBE (4) #4 VERTICAL REINFORCING WITH HOOK AT BOTTOM - TIE 18" O.C. WITH WIRE OR - #3 OR #4 STIRRUP SIMPSON RAISED POST BASE WITH ONE 1 2" Ø EXPANSION BOLT WITH 312" MINIMUM EMBEDMENT POST UP - SEE PLAN BACKFILL 12" HOOK DENOTES 12" Ø CONCRETE SONOTUBE ON 24" Ø BIGFOOT FOOTINGS TO 48" BELOW GRADE FINISH GRADE SHEET NO. JOB NO. RE V DA T E DE S C R I P T I O N PR O J E C T N A M E : 26051 IS S U E D F O R C O N S T R U C T I O N 04 . 1 7 . 2 0 2 6 0 AD U A D D I T I O N A T , 15 W I L L O W S T R E E T , S A L E M , M A PR E P A R E D F O R : AN T H O N Y H U N T L E Y , 15 W I L L O W S T R E E T , S A L E M , M A SEAL: RE V I S E D T H U S R E V 04 . 2 4 . 2 0 2 6 1 1 SG-1 Job 26051 24 April 2026 1'-6" 1' - 0 " 73 4" MA X I M U M 10" MINIMUM SIMPSON A35 @ BOTH SIDES OF STRINGERS STEPS FINISH PER ARCHITECTURAL DRAWINGS 2x6 P.T. KICKER PLATE WITH 1 2" Ø ANCHOR BOLTS @ 16" O.C. & 4" FROM BOTH ENDS & WITH 8" MINIMUM EMBEDMENT 6" MINIMUM EFFECTIVE DEPTH (2) #4 CONTINUOUS REBAR @ BOTTOM DETAIL @ STAIR PAD FOOTING2 SCALE: 1/2"=1'-0" 3" CLEAR 3" CL E A R NOTE: RISE & TREAD SHOWN AS PER IRC CODE LIMITATIONS. CO-ORDINATE WITH ARCHITECTURAL DRAWINGS 3 4" THICK MARINE (P.T.) SHEATHING SIMPSON H2.5A OR A35 OR HGA10 2x_ BLOCKING WITH TWO ROWS OF 12d NAILS @ 4" O.C. NOT STAGGERED OR ONE ROW OF TRUSS LOCK SCREWS @ 4" O.C. HEADER PER PLAN 2x_ P.T. PLATE SIMPSON LSCZ HANGER HEADER PER PLAN TWO ROWS OF 12d NAILS @ 4" O.C. NOT STAGGERED OR ONE ROW OF TRUSS LOCK SCREWS @ 4" O.C. TO HEADER TOP OF LANDING TWO ROWS OF 12d NAILS @ 4" O.C. NOT STAGGERED OR ONE ROW OF TRUSS LOCK SCREWS @ 4" O.C. TO HEADER OPTION - 1 OPTION - 2 STRINGER PER PLAN 3 4" THICK MARINE (P.T.) SHEATHING STRINGER PER PLAN TOP OF LANDING TYPICAL DETAIL @ STAIR STRINGER TO BEAM CONNECTION SCALE: 1/2"=1'-0" NOTE: MARINE PLY APPLICABLE ONLY FOR EXTERIOR STAIRS 3 DECKING PER ARCHITECTURE J21 2x8 P.T DECK JOIST @ 16" O.C 2x8 LEDGER BOARD WITH (2)-1 2" Ø LAG SCREWS @ 16" O.C. SIMPSON "DTT1Z" (MINIMUM 4) WITH 3 8" HDG SCREW WITH HDG WASHER OR SDWH TIMBER-HEX HDG SCREW INTO TOP PLATE & (6) #10 SCREWS TO NEW FLOOR FRAMING DETAIL @ DECK CONNECTION5 SCALE: 1/2"=1'-0" SIMPSON LUS28 HANGER EACH JOIST, TYPICAL REFER DETAIL - 1 FOR SONOTUBE FOOTING FLOOR JOIST PER FRAMING PLAN FLOOR SHEATHING PER STRUCTURAL NOTES 2x_CONTINUOUS SILL PLATE WITH (2) 16d NAILS @ EACH STUD 2x_ STUD WALL PER FRAMING PLAN EXISTING CMU WALL & FOOTING TO REMAIN, TYPICAL RAILING PER ARCHITECTURE SIMPSON RAISED POST BASE WITH ONE 1 2" Ø EXPANSION BOLT WITH 31 2" MINIMUM EMBEDMENT SIMPSON CCQ4.62-5.50SDS2.5 POST CAP EXISTING CMU WALL REMAIN, TYPICAL EXISTING 12" WIDEx8" THICK CONCRETE FOOTING TO REMAIN, TYPICAL1'-0" 8" 2"2" EXISTING SLAB TO REMAIN, TYPICAL FLOOR JOIST PER FRAMING PLAN FLOOR SHEATHING PER STRUCTURAL NOTES 2x_CONTINUOUS SILL PLATE WITH (2) 16d NAILS @ EACH STUD 2x_ STUD WALL PER FRAMING PLAN 8' - 1 0 " (V E R I F Y I N F I E L D ) DETAIL @ EXISTING FOUNDATION WALL CONNECTION SCALE: 1/2"=1'-0"4 (2) 13 4"x14" LVL RIM BOARD WALL SHEATHING PER SHEARWALL SCHEDULE WHERE OCCURS, REFER SHEET SWL SHEETS FOR SILL PLATE TO CMU WALL CONNECTION, REFER DETAIL - 6 FOR SILL PLATE TO CMU WALL CONNECTION, REFER DETAIL - 6 DETAIL @ SILL PLATE TO CMU WALL CONNECTION SCALE: 3/4"=1'-0"6 CONTINUOUS 2x8 P.T. SILL PLATE 1 2" Ø EPOXY ANCHOR BOLTS @ 48" O.C. WITH NEW GROUT IN EXISTING CMU BLOCK @ 48" O.C. CONTINUOUS 2x8 P.T. SILL PLATE WITH 1 2" Ø EXPANSION ANCHOR BOLT @ 48" O.C. REMOVE THE TOP LAYER OF CMU & POUR 3000 PSI CONCRETE BLOCK EXISTING CMU WALL TO REMAIN EXISTING CMU WALL TO REMAIN OPTION - 1 OPTION - 2 (2) 13 4"x14" LVL RIM BOARD SHEET NO. JOB NO. RE V DA T E DE S C R I P T I O N PR O J E C T N A M E : 26051 IS S U E D F O R C O N S T R U C T I O N 04 . 1 7 . 2 0 2 6 0 AD U A D D I T I O N A T , 15 W I L L O W S T R E E T , S A L E M , M A PR E P A R E D F O R : AN T H O N Y H U N T L E Y , 15 W I L L O W S T R E E T , S A L E M , M A SEAL: RE V I S E D T H U S R E V 04 . 2 4 . 2 0 2 6 1 1 SG-1.1 Job 26051 24 April 2026 2 2 Ex i s t i n g Re v 2 , M a y 6 , 2 0 2 6 , R e v i s e d T h u s 2 6May 2026 GENERAL NOTES ON SG-0.1 & SG-0.2 ARE PART OF THIS DESIGN DOCUMENT, COORDIANTE FOR ADDITIONAL REQUIREMENTS FLOOR NOTES: F1.FLOOR SHEATHING 3 4" (23 32") TONGUE & GROOVE GLUED & NAILED 8d (PENNY) @ 6" O.C. PERIMETER & 12" O.C. FIELD /INTERMEDIATE. F2.FLOOR JOISTS, SEE PLAN. DOUBLE RIM JOIST @ FIRST FLOOR FRAMING OVER CASEMENT WINDOWS. FOR HEADER, EXTEND PIECE DOUBLE 2x_ 6" BEYOND WINDOW F3.LIVE LOAD = 40 PSF; DEAD LOAD = 10 PSF F4.ALL EXTERIOR STUD WALLS UNLESS NOTED OTHERWISE (U.N.O.): a. CONTINUOUS FROM FLOOR DIAPHRAGM TO CEILING/FLOOR/ROOF DIAPHRAGM. b. PLATFORM FRAMING NOT ALLOWED WHERE THERE IS NO PLATFORM @ INTERSECTING JOINT/PLATES IN SHORT STUDS. c. 2x6 @ 16" O.C. @ TALL WALLS/GREAT ROOMS/HIGH CEILINGS SEE PLAN &/OR SECTIONS FOR ADDITIONAL INFORMATION d. ALL EXTERIOR WALLS SHEATHING IS A CONTINUOUSLY SHEATHED "BLOCKED" SHEAR WALL, UNLESS NOTED OTHERWISE (U.N.O.), 7 16" SHEATHING NAILED 8d - 6 12, i.e, 8 PENNY NAILS @ 6" O.C. PERIMETER, 6" O.C. BLOCKING PERIMETER HORIZONTAL SEAMS, 12" O.C. @ INTERMEDIATE/FIELD/VERTICAL STUDS. SEE PLANS & ELEVATIONS FOR CLOSER NAILING SCHEDULES WHERE IT IS APPLICABLE. NOTE " BLOCKED" 8d - 6 12 IS THE CODE MINIMUM FOR EXTERIOR SHEAR WALLS. F5.U.N.O. DOUBLE THE JOIST @ ALL PARTITIONS. F6. ALL EXTERIOR WALLS SHALL BE 2x6 SPF #2 OR BETTER @ 16" O.C. UNLESS OTHERWISE NOTED & ALL PARTITION WALLS SHALL BE 2x4 SPF #2 OR BETTER @ 16" O.C. UNLESS OTHERWISE NOTED. F7. ALL HEADERS IN BEARING WALLS SHALL BE MIN. (2) 2x8 SPF #2 OR BETTER IN 2x4 STUD WALLS & (3) 2x8 SPF #2 OR BETTER IN 2x6 STUD WALL UNLESS OTHERWISE NOTED. F8. SPACING OF JOISTS UNDER CERAMIC/ MARBLE TILE FINISHES SHALL NOT BE MORE THAN 16" O.C. SECOND FLOOR & DECK FRAMING PLANBSCALE : 3 16" = 1'-0" LEDGER SCHEDULE MARK DESCRIPTION LGR-1 2x_ LEDGER WITH (2)-12" Ø EXPANSION ANCHOR BOLTS @ 16" O.C. POST SCHEDULE MARK DESCRIPTION 5.25x5.25 PSL 51 4"x51 4" PSL P1-66, P.T.6x6 P.T. P3-26 UPP_OR C _ NUMBER OF STUDS IF APPLICABLE SIZE OF STUD OR DIMENSION OF SOLID POST P-POST, DNP_OR C _ POST ABOVE/UP FRAMING LEVEL POST BELOW/DOWN FRAMING LEVEL LEGEND 1 40'-11 2" 10'-11 2" 2 3 15'-4"14'-8" A 10 ' - 5 1 2" 24 ' - 8 " B C D 10 ' - 2 1 2" 4' - 0 " 4 ALL DIMENSIONS ARE FOR REFERENCE ONLY & FINAL DIMENSIONS SHALL BE TAKEN FROM LATEST ARCHITECTURAL PLANS. AL L D I M E N S I O N S A R E F O R R E F E R E N C E ON L Y & F I N A L D I M E N S I O N S S H A L L B E T A K E N FR O M L A T E S T A R C H I T E C T U R A L P L A N S . ST R E E T DN UP 5.25 x 5 . 2 5 P S L NE W H - 2 1 PO R T A L F R A M E H E A D E R (3 ) 1 3 4"x 1 4 " L V L DN5.25x5. 2 5 P S L DN 5. 2 5 x 5 . 2 5 P S L EXISTING HEADER TO REMAIN, TYPICAL SF J - 1 14 " A J S 2 0 OR 1 1 7 8" B C I 9 0 - 2 . 0 S E C O N D F L O O R J O I S T @ 1 6 " O . C . SIMPSON DTT1Z @ 6'-0" O.C (MINIMUM 4), TYPICAL DN 2x12 P.T. STRINGER @ 12" O.C. REFER DETAIL - 3 FOR STRINGER CONNECTION DB-2 (2) 2x8 P.T. DB-2 (2) 2x8 P.T. DB-2 (2) 2x8 P.T. DJ - 1 DB - 1 (3 ) 2 x 8 P . T . DB - 1 (3 ) 2 x 8 P . T . DJ-1 2x8 P.T. DECK JOIST @ 16" O.C. DJ-1 LG R - 1 LGR-1 P . T . D N P 1 - 6 6 P . T . D N P 1 - 6 6 P . T . D N P 1 - 6 6 P . T . D N P 1 - 6 6 P.T . D N P1- 6 6 DB - 1 (3 ) 2 x 8 P . T . DB-1 (3) 2x8 P.T. DB - 1 DB - 1 P.T. D NP1-6 6 P. T . D N P1 - 6 6 5 4 P. T . D N P1 - 6 6 P.T. D N P1-6 6 DB - 1 (3 ) 2 x 8 P . T . 8'-0" DB-1 J H DB - 1 (3 ) 2 x 8 P . T . 4 7A FLOOR JOIST PER FRAMING PLAN FLOOR SHEATHING PER STRUCTURAL NOTES 2x_CONTINUOUS SILL PLATE WITH (2) 16d NAILS @ EACH STUD 2x_ STUD WALL PER FRAMING PLAN EXISTING CMU WALL & FOOTING TO REMAIN, TYPICAL (2) 13 4"x14" LVL RIM BOARD WALL SHEATHING PER SHEARWALL SCHEDULE WHERE OCCURS, REFER SHEET SWL SHEETS DETAIL @ NEW WALL TO EXISTING CMU WALL CONNECTION SCALE: 1/2"=1'-0" FOR SILL PLATE TO CMU WALL CONNECTION, REFER DETAIL - 6/SG-1.1 SHEET NO. JOB NO. RE V DA T E DE S C R I P T I O N PR O J E C T N A M E : 26051 IS S U E D F O R C O N S T R U C T I O N 04 . 1 7 . 2 0 2 6 0 AD U A D D I T I O N A T , 15 W I L L O W S T R E E T , S A L E M , M A PR E P A R E D F O R : AN T H O N Y H U N T L E Y , 15 W I L L O W S T R E E T , S A L E M , M A SEAL: RE V I S E D T H U S R E V 04 . 2 4 . 2 0 2 6 1 1 SG-2 Job 26051 24 April 2026 CEILING FRAMING PLANCSCALE : 3 16" = 1'-0" GENERAL NOTES ON SG-0.1 & SG-0.2 ARE PART OF THIS DESIGN DOCUMENT, COORDIANTE FOR ADDITIONAL REQUIREMENTS FLOOR NOTES: F1.FLOOR SHEATHING 3 4" (23 32") TONGUE & GROOVE GLUED & NAILED 8d (PENNY) @ 6" O.C. PERIMETER & 12" O.C. FIELD /INTERMEDIATE. F2.FLOOR JOISTS, SEE PLAN. DOUBLE RIM JOIST @ FIRST FLOOR FRAMING OVER CASEMENT WINDOWS. FOR HEADER, EXTEND PIECE DOUBLE 2x_ 6" BEYOND WINDOW F3.LIVE LOAD = 40 PSF; DEAD LOAD = 10 PSF F4.ALL EXTERIOR STUD WALLS UNLESS NOTED OTHERWISE (U.N.O.): a. CONTINUOUS FROM FLOOR DIAPHRAGM TO CEILING/FLOOR/ROOF DIAPHRAGM. b. PLATFORM FRAMING NOT ALLOWED WHERE THERE IS NO PLATFORM @ INTERSECTING JOINT/PLATES IN SHORT STUDS. c. 2x6 @ 16" O.C. @ TALL WALLS/GREAT ROOMS/HIGH CEILINGS SEE PLAN &/OR SECTIONS FOR ADDITIONAL INFORMATION d. ALL EXTERIOR WALLS SHEATHING IS A CONTINUOUSLY SHEATHED "BLOCKED" SHEAR WALL, UNLESS NOTED OTHERWISE (U.N.O.), 7 16" SHEATHING NAILED 8d - 6 12, i.e, 8 PENNY NAILS @ 6" O.C. PERIMETER, 6" O.C. BLOCKING PERIMETER HORIZONTAL SEAMS, 12" O.C. @ INTERMEDIATE/FIELD/VERTICAL STUDS. SEE PLANS & ELEVATIONS FOR CLOSER NAILING SCHEDULES WHERE IT IS APPLICABLE. NOTE " BLOCKED" 8d - 6 12 IS THE CODE MINIMUM FOR EXTERIOR SHEAR WALLS. F5.U.N.O. DOUBLE THE JOIST @ ALL PARTITIONS. F6. ALL EXTERIOR WALLS SHALL BE 2x6 SPF #2 OR BETTER @ 16" O.C. UNLESS OTHERWISE NOTED & ALL PARTITION WALLS SHALL BE 2x4 SPF #2 OR BETTER @ 16" O.C. UNLESS OTHERWISE NOTED. F7. ALL HEADERS IN BEARING WALLS SHALL BE MIN. (2) 2x8 SPF #2 OR BETTER IN 2x4 STUD WALLS & (3) 2x8 SPF #2 OR BETTER IN 2x6 STUD WALL UNLESS OTHERWISE NOTED. F8. SPACING OF JOISTS UNDER CERAMIC/ MARBLE TILE FINISHES SHALL NOT BE MORE THAN 16" O.C. POST SCHEDULE MARK DESCRIPTION P2-26 (2) 2x6 5.25x5.25PSL 51 4"x51 4" PSL P3-26 UPP_OR C _ NUMBER OF STUDS IF APPLICABLE SIZE OF STUD OR DIMENSION OF SOLID POST P-POST, DNP_OR C _ POST ABOVE/UP FRAMING LEVEL POST BELOW/DOWN FRAMING LEVEL LEGEND 1 40'-11 2" 10'-11 2" 2 3 15'-4"14'-8" A 10 ' - 5 1 2" 24 ' - 8 " B C D 10 ' - 2 1 2" 4' - 0 " 4 ALL DIMENSIONS ARE FOR REFERENCE ONLY & FINAL DIMENSIONS SHALL BE TAKEN FROM LATEST ARCHITECTURAL PLANS. AL L D I M E N S I O N S A R E F O R R E F E R E N C E ON L Y & F I N A L D I M E N S I O N S S H A L L B E T A K E N FR O M L A T E S T A R C H I T E C T U R A L P L A N S . ST R E E T CJ - 1 11 7 8" A J S 2 5 C E I L I N G J O I S T @ 1 6 " O . C . OPEN PORCH BELOW H-32 (3) 2x8 H- 3 1 (3 ) 1 3 4"x 7 1 4" L V L ALL EXTERIOR HEADER POSTS ARE P2-26, U.N.O. J H H-32 (3) 2x8 H- 3 2 (3 ) 2 x 8 H- 3 2 (3 ) 2 x 8 UP P2- 2 6 UPP2-2 6 VAULTED CEILING TYPICAL DETAIL @ BLOCKED SHEAR WALL SCALE: 1/2"=1'-0"27 2x4 BLOCKING @ PLYWOOD SEAM 8d PENNY NAILS @ XX" O.C. INCLUDING HORIZONTAL BLOCKED JOINTS (SEE SHEAR WALL NAILING SCHEDULE ON SWL SHEETS IF NONE) PLYWOOD SEAM STUD STUD NOTE: ALL EXTERIOR WALLS ARE BLOCKED SHEAR WALL XX = FOR SPACING SEE SHEAR WALL SHEET, IF NONE BASEMENT WALK OUT = 3" O.C. FIRST TO SECOND FLOOR = 4" O.C. SECOND TO ATTIC FLOOR = 6" O.C. EXTERIOR SHEATHING SHEET NO. JOB NO. RE V DA T E DE S C R I P T I O N PR O J E C T N A M E : 26051 IS S U E D F O R C O N S T R U C T I O N 04 . 1 7 . 2 0 2 6 0 AD U A D D I T I O N A T , 15 W I L L O W S T R E E T , S A L E M , M A PR E P A R E D F O R : AN T H O N Y H U N T L E Y , 15 W I L L O W S T R E E T , S A L E M , M A SEAL: RE V I S E D T H U S R E V 04 . 2 4 . 2 0 2 6 1 1 SG-3 Job 26051 24 April 2026 2" MI N I M U M EQ . EQ . EQ . EQ . EQ . EQ . 2" MI N I M U M 2" MI N I M U M 2" MI N I M U M 2" MI N I M U M 2" MI N I M U M GYPSUM BOARD INSTALLED IN ACCORDANCE WITH BUILDING CODE OR SHEAR WALL SCHEDULE WALL SHEATHING PER SHEARWALL SCHEDULE WHERE OCCURS, REFER SHEET SWL SHEETS DEPTH 117 8" AND LESS, 2 ROWS TRUS LOC SCREWS 16" O.C. NOT STAGGERED GREATER 117 8" DEPTH , 3 ROWS SCREWS MAY BE FROM ONE SIDE DEPTH 117 8" AND LESS, 2 ROWS TRUSS LOCK SCREWS 12" O.C. NOT STAGGERED GREATER 117 8" DEPTH , 3 ROWS SCREWS MAY BE FROM ONE SIDE EDGE NAILING PER SHEARWALL SCHEDULE EDGE NAILING PER SHEARWALL SCHEDULE WALL SHEATHING PER SHEARWALL SCHEDULE WHERE OCCURS, REFER SHEET SWL SHEETS TYPICAL DETAIL @ MULTIMEMBER CONNECTION SCALE: 1/2"=1'-0" TYPICAL DETAIL @ CORNER WALL SCALE: 1/2"=1'-0" GYPSUM BOARD INSTALLED IN ACCORDANCE WITH BUILDING CODE OR SHEAR WALL SCHEDULE ASSEMBLY- CASSEMBLY- BASSEMBLY- A OUTSIDE CORNER DETAIL (PLAN) INSIDE CORNER DETAIL (PLAN) 7 8 SIMPSON CCQ OR CC COLUMN CAP SIZED FOR POST AND ANCHOR PER MANUFACTURER'S SPECIFICATION U.N.O. ON FRAMING PLAN BEAM PER FRAMING PLAN BEAM PER FRAMING PLAN SIMPSON ACE POST CAP EACH SIDE -SIZED FOR POST AND ANCHOR PER MANUFACTURER'S SPECIFICATION U.N.O. ON FRAMING PLAN WOOD POST PER FRAMING PLAN WOOD POST PER FRAMING PLAN TYPICAL DETAIL @ BEAM TO POST CONNECTION SCALE: 1/2"=1'-0"9 WALL SHEATHING PER SHEARWALL SCHEDULE WHERE OCCURS, REFER SWL SHEETS PORTAL FRAME HEADER PER FRAMING PLAN CONTINUOUS 2x_ DOUBLE TOP PLATE WITH (2) 16d NAILS @ EACH STUD 2x_ STUD WALL PER FRAMING PLAN 2x_ CONTINUOUS BOTTOM PLATE WITH (2) 16d NAILS @ EACH STUD FLOOR SHEATHING PER STRUCTURAL NOTES FLOOR JOIST PER FRAMING PLAN EXISTING CMU WALL TO REMAIN SIMPSON IUS3.56/14 HANGER TO EACH JOIST EXISTING OPENING TO REMAIN DETAIL @ JOIST TO PORTAL FRAME HEADER CONNECTION SCALE: 1/2"=1'-0"7A SHEET NO. JOB NO. RE V DA T E DE S C R I P T I O N PR O J E C T N A M E : 26051 IS S U E D F O R C O N S T R U C T I O N 04 . 1 7 . 2 0 2 6 0 AD U A D D I T I O N A T , 15 W I L L O W S T R E E T , S A L E M , M A PR E P A R E D F O R : AN T H O N Y H U N T L E Y , 15 W I L L O W S T R E E T , S A L E M , M A SEAL: RE V I S E D T H U S R E V 04 . 2 4 . 2 0 2 6 1 1 SG-3.1 Job 26051 24 April 2026 RB-1 (4) 13 4"x16" LVL OR (3) 13 4"x18" OR W12x26 OR W14x22 STEEL BEAM ROOF FRAMING PLAN SCALE : 3 16" = 1'-0" GENERAL NOTES ON SG-0.1 & SG-0.2 ARE PART OF THIS DESIGN DOCUMENT, COORDIANTE FOR ADDITIONAL REQUIREMENTS ROOF NOTES: R1.ROOF SNOW LOAD = 50 PSF (Pg, GROUND SNOW); DEAD LOAD = 15 PSF R2.WIND = 119 MPH (ULTIMATE), EXPOSURE B R3.ROOF SHEATHING 5 8" (19 32") SHEATHING NAILED 8d (PENNY) @ 6" O.C. PERIMETER, 12" O.C. FIELD/INTERMEDIATE. R4.RAFTER TO WALL PLATE CONNECTION, U.N.O. ON DRAWINGS/SECTIONS/DETAILS, SIMPSON H2.5A CLIP, & BLOCK BAYS/EAVE WITH 2x_, TOE NAILS (3) 12d R5.APEX OF ALL HIPS/VALLEYS & RIDGE BEAMS SHALL BE POSTED DOWN UNLESS NOTED OTHERWISE (U.N.O.), HOLDOWN UPLIFT FORCE WITH MINIMUM CS18 DETAIL, USE SIMPSON STRAP @ ROOF BEAM TO POST & POST TO FLOOR CONNECTION. R6.ALL HIPS & VALLEYS TO WALL PLATE CONNECTION INSTALL (2) SIMPSON HGA10 WITH SCREWS. R7. ALL EXTERIOR WALLS SHALL BE 2x6 SPF #2 OR BETTER @ 16" O.C. UNLESS OTHERWISE NOTED & ALL PARTITION WALLS SHALL BE 2x4 SPF #2 OR BETTER @ 16" O.C. UNLESS OTHERWISE NOTED. R8. ALL HEADERS IN BEARING WALLS SHALL BE MIN. (2) 2x8 SPF #2 OR BETTER IN 2x4 STUD WALLS & (3) 2x8 SPF #2 OR BETTER IN 2x6 STUD WALL UNLESS OTHERWISE NOTED. R9. ALL MULTI JACKS/STUDS TO BE NAILED WITH TWO ROWS OF 12d NAILS @ 12" O.C. D 1 40'-11 2" 10'-11 2" 2 3 15'-4"14'-8" A 10 ' - 5 1 2" 24 ' - 8 " B C D 10 ' - 2 1 2" 4' - 0 " 4 ALL DIMENSIONS ARE FOR REFERENCE ONLY & FINAL DIMENSIONS SHALL BE TAKEN FROM LATEST ARCHITECTURAL PLANS. AL L D I M E N S I O N S A R E F O R R E F E R E N C E ON L Y & F I N A L D I M E N S I O N S S H A L L B E T A K E N FR O M L A T E S T A R C H I T E C T U R A L P L A N S . 5 8" PLYWOOD SHEATHING WITH 8d COMMON NAILS @ 6" O.C. PERIMETER OF SHEET & 12" O.C. FIELD/INTERMEDIATE, TYPICAL RR - 1 2x 1 0 R O O F R A F T E R @ 1 6 " O . C . 12 10C ST R E E T DN, C S 1 8 5.25x5 . 2 5 P S L D N , C S 1 8 5 . 2 5 x 5 . 2 5 P S L POST SCHEDULE MARK DESCRIPTION P2-26 (2) 2x6 5.25x5.25PSL 51 4"x51 4" PSL P3-26 UPP_OR C _ NUMBER OF STUDS IF APPLICABLE SIZE OF STUD OR DIMENSION OF SOLID POST P-POST, DNP_OR C _ POST ABOVE/UP FRAMING LEVEL POST BELOW/DOWN FRAMING LEVEL LEGEND RIDGE BEAM TO POST CONNECTION, REFER DETAIL - 10 & 10A 2x_ OUTRIGGERS @ 16" O.C. (TURN 90° TO RAFTERS), REFER DETAIL - 11, TYPICAL 13A 13B 13C JRR - 1 2x 1 0 R O O F R A F T E R @ 1 6 " O . C . H RH - 1 (3 ) 1 3 4"x 7 1 4" L V L TYPICAL DETAIL @ BLOCKED SHEAR WALL SCALE: 1/2"=1'-0"27 2x4 BLOCKING @ PLYWOOD SEAM 8d PENNY NAILS @ XX" O.C. INCLUDING HORIZONTAL BLOCKED JOINTS (SEE SHEAR WALL NAILING SCHEDULE ON SWL SHEETS IF NONE) PLYWOOD SEAM STUD STUD NOTE: ALL EXTERIOR WALLS ARE BLOCKED SHEAR WALL XX = FOR SPACING SEE SHEAR WALL SHEET, IF NONE BASEMENT WALK OUT = 3" O.C. FIRST TO SECOND FLOOR = 4" O.C. SECOND TO ATTIC FLOOR = 6" O.C. EXTERIOR SHEATHING SHEET NO. JOB NO. RE V DA T E DE S C R I P T I O N PR O J E C T N A M E : 26051 IS S U E D F O R C O N S T R U C T I O N 04 . 1 7 . 2 0 2 6 0 AD U A D D I T I O N A T , 15 W I L L O W S T R E E T , S A L E M , M A PR E P A R E D F O R : AN T H O N Y H U N T L E Y , 15 W I L L O W S T R E E T , S A L E M , M A SEAL: RE V I S E D T H U S R E V 04 . 2 4 . 2 0 2 6 1 1 SG-4 Job 26051 24 April 2026 DETAIL @ RIDGE BEAM TO POST CONNECTION SCALE: 1/2"=1'-0" RIDGE BEAM PER FRAMING PLAN SIMPSON CS18 STRAP WITH (22) 8d COMMON NAILS BOTH SIDE PROVIDE COIL STRAP AROUND BEAM 10 A A ELEVATION SECTION A-A OR RIDGE BEAM PER FRAMING PLAN ROOF RAFTERS PER FRAMING PLAN 5 8" PLYWOOD SHEATHING WITH 8d COMMON NAILS @ 6" O.C. PERIMETER OF SHEET & 12" O.C. FIELD/INTERMEDIATE, TYPICAL POST PER FRAMING PLAN SIMPSON CCQ7.1-6SDS2.5 POST CAP SIMPSON LSSR210Z HANGER TO EACH RAFTER MI N . 1 2 " L A P SIMPSON CS-18 HOLD DOWN STRAP INSTALL WITH 8d NAILS FILL ALL HOLES SIMPSON POST BASE HGA10 WITH SCREWS OR USE CS-18 STRAP WHERE POSTS ARE STACKED TO POSTS/BEAMS BELOW MI N . 1 2 " L A P POST PER FRAMING PLAN POST CAP CONNECTION CS18 STRAP CONNECTION CS-18 POST CS-18 BEAM RIDGE BEAM CS-18 OR HGA10 WITH SCREWS CS-18 FLOOR FRAMING INFILL THE GAP IF COLUMN WIDTH IS LESS THAN BEAM PLATELINE 2x_ STUD WALL PER FRAMING PLAN WALL SHEATHING PER SHEARWALL SCHEDULE WHERE OCCURS FASCIA PER ARCHITECTURE ROOF RAFTERS PER FRAMING PLAN SOLID BLOCKING @ 16" O.C. STAGGERED IN LAST 3 BAYS SIMPSON H2.5A TO CONNECT EACH RAFTER TO DOUBLE TOP PLATE TYPICAL DETAIL @ OUTRIGGER CONNECTION SCALE: 1/2"=1'-0" 2x_ RAFTERS TURN 90° TO FRAMING, TYPICAL 11 6 12 DETAIL @ RAFTER TO STEEL BEAM CONNECTION SCALE: 1/2"=1'-0"12 DETAIL @ STEEL BEAM TO PSL POST CONNECTION SCALE: 1/2"=1'-0"10A 51 4"x51 4" PSL POST TYPICAL14" 1 4" W12x26 OR W14x22 STEEL BEAM PER FRAMING PLAN CL SECTION ELEVATION 11 2" TY P I C A L 3" EQ.EQ. 3 8" THICK STEEL BRACKET WITH (2)-12" Ø THRU BOLTS SEE SECTION CL EQ.EQ. SEE SECTION TYPICAL14" 1 4" W12x26 OR W14x22 STEEL BEAM PER FRAMING PLAN L6x4x5 16" THICK STEEL ANGLE LONG LEG VERTICAL SECTION Z-Z 11 2" TYPICAL 12" Ø THRU BOLT WITH WASHERS & NUT (2)-12" Ø A307 BOLTS WITH MINIMUM NUTS & WASHERS, 5/8" Ø HOLES IN ANGLE LEG OPTION - 2 51 4"x51 4" PSL POST 2" TY P I C A L OPTION - 1 ROOF RAFTER PER FRAMING PLAN SOLID WOODEN BLOCKING WITH (2) 1 2" Ø THRU BOLTS @ 12" O.C. STAGGERED, IF REQUIRED SIMPSON LSSR210Z HANGER TO EACH RAFTER W12x26 OR W14x22 STEEL BEAM PER FRAMING PLAN SHEET NO. JOB NO. RE V DA T E DE S C R I P T I O N PR O J E C T N A M E : 26051 IS S U E D F O R C O N S T R U C T I O N 04 . 1 7 . 2 0 2 6 0 AD U A D D I T I O N A T , 15 W I L L O W S T R E E T , S A L E M , M A PR E P A R E D F O R : AN T H O N Y H U N T L E Y , 15 W I L L O W S T R E E T , S A L E M , M A SEAL: RE V I S E D T H U S R E V 04 . 2 4 . 2 0 2 6 1 1 SG-4.1 Job 26051 24 April 2026 PLATELINE AIR VENT MINIMUM 11 2" & MAXIMUM 2" FASCIA PER ARCHITECTURE SIMPSON A34 PER BLOCK/JOIST WITH (8) #9x11 2" SD SCREWS (SIMPSON SELF DRIVEN), 4 SCREWS EACH LEG, TYPICAL BLOCKING WITH (3) 12d TOE NAILS TO RAFTER 2x_ STUD WALL PER FRAMING PLAN WALL SHEATHING PER SHEARWALL SCHEDULE WHERE OCCURS, REFER SWL SHEETS ROOF RAFTERS PER FRAMING PLAN SIMPSON H2.5A TO CONNECT EACH RAFTER TO DOUBLE TOP PLATE 2x_CONTINUOUS DOUBLE TOP PLATE WITH (2) 16d NAILS @ EACH STUD 5 8" PLYWOOD SHEATHING WITH 8d COMMON NAILS @ 6" O.C. PERIMETER OF SHEET & 12" O.C. FIELD/INTERMEDIATE, TYPICAL HEADER WHERE OPENING OCCURS PER PLAN 6 12 TYPICAL DETAIL @ RAFTER TO DOUBLE TOP PLATE CONNECTION SCALE: 1/2"=1'-0"13 PLATELINE AIR VENT MINIMUM 11 2" & MAXIMUM 2" FASCIA PER ARCHITECTURE SIMPSON A34 PER BLOCK/JOIST WITH (8) #9x11 2" SD SCREWS (SIMPSON SELF DRIVEN), 4 SCREWS EACH LEG, TYPICAL BLOCKING WITH (3) 12d TOE NAILS TO RAFTER 2x_ STUD WALL PER FRAMING PLAN WALL SHEATHING PER SHEARWALL SCHEDULE WHERE OCCURS, REFER SWL SHEETS ROOF RAFTERS PER FRAMING PLAN SIMPSON H2.5A TO CONNECT EACH RAFTER TO DOUBLE TOP PLATE 2x_CONTINUOUS DOUBLE TOP PLATE WITH (2) 16d NAILS @ EACH STUD 5 8" PLYWOOD SHEATHING WITH 8d COMMON NAILS @ 6" O.C. PERIMETER OF SHEET & 12" O.C. FIELD/INTERMEDIATE, TYPICAL HEADER WHERE OPENING OCCURS PER PLAN 6 12 CEILING JOIST PER FRAMING PLAN (5) 12d NAILS TO CONNECT CEILING JOIST TO RAFTER PLATELINE AIR VENT MINIMUM 112" & MAXIMUM 2" FASCIA PER ARCHITECTURE SIMPSON A34 PER BLOCK/JOIST WITH (8) #9x11 2" SD SCREWS (SIMPSON SELF DRIVEN), 4 SCREWS EACH LEG, TYPICAL BLOCKING WITH (3) 12d TOE NAILS TO RAFTER ROOF RAFTERS PER FRAMING PLAN SIMPSON H2.5A TO CONNECT EACH RAFTER TO DOUBLE TOP PLATE 2x_CONTINUOUS DOUBLE TOP PLATE WITH (2) 16d NAILS @ EACH STUD 5 8" PLYWOOD SHEATHING WITH 8d COMMON NAILS @ 6" O.C. PERIMETER OF SHEET & 12" O.C. FIELD/INTERMEDIATE, TYPICAL HEADER WHERE OPENING OCCURS PER PLAN 6 12 OPENING PER ARCHITECTURE AIR VENT MINIMUM 11 2" & MAXIMUM 2" FASCIA PER ARCHITECTURE SIMPSON A34 PER BLOCK/JOIST WITH (8) #9x11 2" SD SCREWS (SIMPSON SELF DRIVEN), 4 SCREWS EACH LEG, TYPICAL BLOCKING WITH (3) 12d TOE NAILS TO RAFTER 2x_ STUD WALL PER FRAMING PLAN WALL SHEATHING PER SHEARWALL SCHEDULE WHERE OCCURS, REFER SWL SHEETS ROOF RAFTERS PER FRAMING PLAN SIMPSON SDWC15600KT SCREW TO CONNECT EACH RAFTER TO DOUBLE TOP PLATE 2x_CONTINUOUS DOUBLE TOP PLATE WITH (2) 16d NAILS @ EACH STUD 5 8" PLYWOOD SHEATHING WITH 8d COMMON NAILS @ 6" O.C. PERIMETER OF SHEET & 12" O.C. FIELD/INTERMEDIATE, TYPICAL HEADER WHERE OPENING OCCURS PER PLAN A 6 12 AIR VENT MINIMUM 11 2" & MAXIMUM 2" FASCIA PER ARCHITECTURE SIMPSON A34 PER BLOCK/JOIST WITH (8) #9x11 2" SD SCREWS (SIMPSON SELF DRIVEN), 4 SCREWS EACH LEG, TYPICAL BLOCKING WITH (3) 12d TOE NAILS TO RAFTER 2x_ STUD WALL PER FRAMING PLAN WALL SHEATHING PER SHEARWALL SCHEDULE WHERE OCCURS, REFER SWL SHEETS ROOF RAFTERS PER FRAMING PLAN 2x_CONTINUOUS DOUBLE TOP PLATE WITH (2) 16d NAILS @ EACH STUD 5 8" PLYWOOD SHEATHING WITH 8d COMMON NAILS @ 6" O.C. PERIMETER OF SHEET & 12" O.C. FIELD/INTERMEDIATE, TYPICAL HEADER WHERE OPENING OCCURS PER PLAN C 6 12 CEILING JOIST PER FRAMING PLAN (5) 12d NAILS TO CONNECT CEILING JOIST TO RAFTERAIR VENT MINIMUM 112" & MAXIMUM 2" FASCIA PER ARCHITECTURE SIMPSON A34 PER BLOCK/JOIST WITH (8) #9x11 2" SD SCREWS (SIMPSON SELF DRIVEN), 4 SCREWS EACH LEG, TYPICAL BLOCKING WITH (3) 12d TOE NAILS TO RAFTER ROOF RAFTERS PER FRAMING PLAN 2x_CONTINUOUS DOUBLE TOP PLATE WITH (2) 16d NAILS @ EACH STUD 5 8" PLYWOOD SHEATHING WITH 8d COMMON NAILS @ 6" O.C. PERIMETER OF SHEET & 12" O.C. FIELD/INTERMEDIATE, TYPICAL HEADER WHERE OPENING OCCURS PER PLAN B 6 12 OPENING PER ARCHITECTURE SIMPSON SDWC15600KT SCREW TO CONNECT EACH RAFTER TO DOUBLE TOP PLATE SIMPSON SDWC15600KT SCREW TO CONNECT EACH RAFTER TO DOUBLE TOP PLATE OPTION 1 - SIMPSON H2.5A OPTION 2 - SIMPSON SDWC 15600KT SCREW SG-4.2 SHEET NO. JOB NO. RE V DA T E DE S C R I P T I O N PR O J E C T N A M E : 26051 IS S U E D F O R C O N S T R U C T I O N 04 . 1 7 . 2 0 2 6 0 AD U A D D I T I O N A T , 15 W I L L O W S T R E E T , S A L E M , M A PR E P A R E D F O R : AN T H O N Y H U N T L E Y , 15 W I L L O W S T R E E T , S A L E M , M A SEAL: RE V I S E D T H U S R E V 04 . 2 4 . 2 0 2 6 1 1 SG-4.2 Job 26051 24 April 2026 LATERAL SECTIONHSCALE : 1 8" = 1'-0" FIRST FLOOR LEVEL SECOND FLOOR LEVEL ROOF RIDGE LEVEL TOP OF WALL 10 ' - 0 " 9' - 0 " 5' - 8 1 4" FOUNDATION LEVEL 4' - 0 " FIRST FLOOR LEVEL SECOND FLOOR LEVEL ROOF RIDGE LEVEL TOP OF WALL 10 ' - 0 " 9' - 0 " 5' - 8 1 4" 4' - 0 " 5 8" PLYWOOD SHEATHING WITH 8d COMMON NAILS @ 6" O.C. PERIMETER OF SHEET & 12" O.C. FIELD/INTERMEDIATE, TYPICAL FOUNDATION LEVEL RR-1 2x10 ROOF RAFTERS @ 16" O.C. 12 6 OPENING PER ARCHITECTURE 2x6 STUD WALL @16" O.C. EXISTING CMU WALL TO REMAIN RB-1 (4) 13 4"x16" LVL OR (3) 13 4"x18" OR W12x26 OR W14x22 STEEL BEAM SFJ-1 14" AJS 20 OR 117 8" BCI 90-2.0 SECOND FLOOR JOIST @ 16" O.C. FLOOR SHEATHING PER STRUCTURAL NOTES, TYPICAL EXISTING SLAB TO REMAIN EXISTING 12" WIDEx8" THICK CONCRETE FOOTING TO REMAIN, TYPICAL RR-1 2x10 ROOF RAFTERS @ 16" O.C. RB-1 (4) 13 4"x16" LVL OR (3) 13 4"x18" OR W12x26 OR W14x22 STEEL BEAM CJ-1 117 8" AJS25 CEILING JOIST @ 16" O.C. VAULTED CEILING SFJ-1 14" AJS 20 OR 117 8" BCI 90-2.0 SECOND FLOOR JOIST @ 16" O.C. FLOOR SHEATHING PER STRUCTURAL NOTES, TYPICAL 10A 10 4 5 1 DJ-1 2x8 P.T. DECK JOIST @ 16" O.C. RAILING PER ARCHITECTURE EXISTING SLAB TO REMAIN EXISTING OPENING TO REMAIN LONGITUDINAL SECTIONJSCALE : 1 8" = 1'-0" 13A 10 NEW H-21 (3) 1 3 4"x14" LVL PORTAL FRAME HEADER 7A SHEET NO. JOB NO. RE V DA T E DE S C R I P T I O N PR O J E C T N A M E : 26051 IS S U E D F O R C O N S T R U C T I O N 04 . 1 7 . 2 0 2 6 0 AD U A D D I T I O N A T , 15 W I L L O W S T R E E T , S A L E M , M A PR E P A R E D F O R : AN T H O N Y H U N T L E Y , 15 W I L L O W S T R E E T , S A L E M , M A SEAL: RE V I S E D T H U S R E V 04 . 2 4 . 2 0 2 6 1 1 SG-5 Job 26051 24 April 2026 SHEET NO. JOB NO. RE V DA T E DE S C R I P T I O N PR O J E C T N A M E : 26051 IS S U E D F O R C O N S T R U C T I O N 04 . 1 7 . 2 0 2 6 0 AD U A D D I T I O N A T , 15 W I L L O W S T R E E T , S A L E M , M A PR E P A R E D F O R : AN T H O N Y H U N T L E Y , 15 W I L L O W S T R E E T , S A L E M , M A SEAL: RE V I S E D T H U S R E V 04 . 2 4.2 0 2 6 1 1 SWL-1 GROUND LEVEL SECOND FLOOR LEVEL ROOF RIDGE LEVEL TOP OF WALL FRONT ELEVATIONDSCALE : 3 16" = 1'-0" 5' - 8 1 4" 9' - 0 " 10 ' - 0 " GROUND LEVEL LEFT SIDE ELEVATIONESCALE : 3 16" = 1'-0" GROUND LEVEL SECOND FLOOR LEVEL ROOF RIDGE LEVEL TOP OF WALL 5' - 8 1 4" 9' - 0 " 10 ' - 0 " REAR ELEVATIONFSCALE : 3 16" = 1'-0" GROUND LEVEL SECOND FLOOR LEVEL ROOF RIDGE LEVEL TOP OF WALL 5' - 8 1 4" 9' - 0 " 10 ' - 0 " GROUND LEVEL SECOND FLOOR LEVEL ROOF RIDGE LEVEL TOP OF WALL 5' - 8 1 4" 9' - 0 " 10 ' - 0 " RIGHT SIDE ELEVATIONGSCALE : 3 16" = 1'-0" WOOD FLOOR ALLOWABLE SHEAR (PLF) CONCRETE 1 @ 16" O.C. @ CONTINUOUS RIM BOARD & (2) PER BLOCKING THUS @ 16" O.C. 329 1 2" Ø A.B. @ 48" O.C. 16d @ 6" O.C.P1 SHEAR WALL SCHEDULE (2021 IRC - 2018 AF&PA SDPWS - TABLE 4.3A) MARK WOOD STRUCTURAL PANELS (PLYWOOD OR OSB) NUMBER OF SIDES EDGE (E.N.) NAILING SILL P ATTACHMENT U.N.O. FIELD (F.N.) SHEAR CLIPS (A34) L 8d @ 12" O.C. 8d @ 6" O.C.1716" PLYWOOD SHEATHING (ONE SIDE OF WALL) 2x4 BLOCKING @ PLYWOOD SEAM 8d PENNY NAILS @ XX" O.C. INCLUDING HORIZONTAL BLOCKED JOINTS (SEE SHEAR WALL NAILING SCHEDULE ON SWL SHEETS IF NONE) PLYWOOD SEAM STUD STUD NOTE: ALL EXTERIOR WALLS ARE BLOCKED SHEAR WALL XX = FOR SPACING SEE SHEAR WALL SHEET, IF NONE BASEMENT WALK OUT = 3" O.C. FIRST TO SECOND FLOOR = 4" O.C. SECOND TO ATTIC FLOOR = 6" O.C. EXTERIOR SHEATHING TYPICAL DETAIL @ BLOCKED SHEAR WALL SCALE: 1/2"=1'-0"27 8d-6/12 NAILING PATTERN 8d-4/12 NAILING PATTERN P1 P2 7 ( P2 8d-6/12 8d-6/12 8d-6/12 8d-6/12 8d-6/12 8d-6/12 8d-6/12 8d-6/12 PORTAL FRAME HEADER REFER SWL - 3 & 4 SHEET FOR PORTAL FRAME DETAILS Job 26051 24 April 2026 TYPICAL DETAIL @ BEARING WALL/SHEAR WALL FRAMING SCALE: 1/2"=1'-0" OUTSIDE ELEVATION SIDE ELEVATION 1.FOR SHEAR WALL WITH SHEAR CAPACITY PER SCHEDULE EXCEEDING 350 #/FT FRAMING MEMBERS AT ADJOINING PANEL EDGES INCLUDING WALL STUDS AND BLOCKING SHALL BE 3" MIN. UNLESS THICKER MEMBERS ARE SPECIFIED ON PLANS. PROVIDE STAGGERED NAILING AT ALL PANEL EDGES. 2.WHERE PANELS ARE APPLIED ON BOTH FACES OF WALL STUDS ADJACENT PANEL EDGES SHALL BE OFFSET TO FALL ON DIFFERENT FRAMING MEMBERS. 3.NAILS SHALL BE PLACED NOT LESS THAN 3 INCH FROM PANEL EDGES & 3 INCH FROM THE EDGE OF THE CONNECTING MEMBERS. ALL SHEAR WALL NAILING SHALL UTILIZE COMMON NAILS OR GALVANIZED BOX. 4.FOR HOLD-DOWNS TYPE AT THE END OF THE SHEAR WALL SEE PLANS AND HOLDOWN TYPICAL DETAILS AND SCHEDULE. 5.FOR ALL WALLS, PROVIDE MINIMUM TWO ANCHOR BOLTS PER PIECE OF SILL PLATE & ONE LOCATED WITHIN 12" AND NOT LESS THAN 7 BOLT DIAMETER OR 3" OF EACH END OF EACH SILL PLATE 6.WOOD SCREWS SHALL BE SIMPSON SDS25600 FOR SILL |P CONNECTED TO WOOD RIM JOIST OR BLOCKING. PROVIDE SDS25412 FOR SILL PLATE CONNECTED TO TOP NAILER IN STEEL BEAMS 7.HOLD DOWNS SHALL BE AS MANUFACTURED BY THE SIMPSON STRONG-TIE COMPANY. 8.ALL NAILS ARE COMMON NAILS, UNLESS NOTED OTHERWISE. 9.AT LOCATIONS WHERE HOLD DOWNS ARE ATTACHED TO MULTIPLE 2x VERTICAL STUDS NAIL SHEAR WALL SHEATHING TO EACH VERTICAL STUD WITH FASTENERS SPECIFIED IN SHEAR WALL SCHEDULE @ 6" O.C.; STAGGER FASTENERS IN ADJOINING STUDS UNLESS NOTED OTHERWISE. 10.IF QUANTITY OF POSTS IN TABLE DIFFER FROM KING POSTS SHOWN ON PLAN, PROVIDE GREATER QUANTITY OF STUDS. 11.HOLD DOWNS MAY BE LOCATED WITHIN 8" OF SHEAR WALL SEGMENT END TO AVOID CONFLICTS. HOLD DOWNS MUST BE ALIGNED FLOOR TO FLOOR UNLESS SPECIFICALLY DETAILED OTHERWISE. SHEAR WALL SCHEDULE NOTES: 22 1' - 4 " PE R A R C H 1' - 4 " PER ARCH EXTENT OF HEADER (ONE BRACED WALL SEGMENT) NO H O R I Z O N T A L O R VE R T I C A L S P L I C E S I N TH I S A R E A , T Y P I C A L HEADER SHALL BE FASTENED TO THE KING STUD WITH 6-16d SINKER NAILS MINIMUM (2) 2x_ FRAMING COVERED WITH MIN.3 8" THICK WOOD STRUCTURAL PANEL SHEATHING WITH 8d COMMON OR GALVANIZED BOX NAILS @ 3" O.C. IN ALL FRAMING (STUDS, BLOCKING, & SILLS) TYPICAL HOLDOWN PER SHEAR WALL PLAN (SWL-1, 2 & 3 SHEET) WOOD STRUCTURAL PANEL STRENGTH AXIS FOR A PANEL SPLICE (IF NEEDED), PANEL EDGES SHALL BE BLOCKED, AND OCCUR WITHIN 24" OF MID-HEIGHT, ONE ROW OF TYPICAL SHEATHING-TO-FRAMING NAILING IS REQUIRED IN EACH PANEL SIMPSON MSTC40 STRAP WITH 16dx31 4" NAILS PER SIMPSON MANUAL, TYPICAL FASTEN SHEATHING TO HEADER WITH 8d COMMON NAILS IN 3" GRID PATTERN AS SHOWN (3) 13 4"x117 8" LVL CONTINUOUS HEADER FASTEN TOP PLATE TO HEADER WITH 16d SINKER NAILS IN 2 ROWS @ 3" O.C. (3) 13 4"x117 8" LVL CONTINUOUS HEADER 24" MINIMUM LENGTH FOUNDATION WALL PER PLAN 7 16" THICK PLYWOOD SHEATHING WITH 8d COMMON NAILS @ 6" O.C. EDGES & 12"O.C. FIELD FASTEN TOP PLATE TO HEADER WITH 16d SINKER NAILS IN 2 ROWS @ 3" O.C. 24" MINIMUM LENGTH SIMPSON MSTC40 STRAP WITH 16dx31 4" NAILS PER SIMPSON MANUAL @ INTERIOR & EXTERIOR SIDE, TYPICAL CONTINUOUS (2) 2x_ P.T. SILL PLATE WITH 1 2" Ø ANCHOR BOLT @ 48" O.C. 24 " 24 " 4" - 0 " 1 2" GA P 4" - 0 " 5 8" PLYWOOD SHEATHING WITH 8d COMMON NAILS @ 6" O.C. PERIMETER OF SHEET & 12" O.C. FIELD/INTERMEDIATE, TYPICAL 4'-0" WIDE SHEATHING FROM TOP PLATE DOWN BLOCKING @ 4'-0" O.C. VERTICAL SPACING ON ENTIRE WALL HEIGHT 4'-0" WIDE SHEET CENTERED @ FLOOR FULL 4'-0" WIDE SHEATHING FROM BOTTOM PLATES UP WITH STANDARD BOTTOM OVERLAP @ FOUNDATION WALL 2x4 BLOCKING @ PLYWOOD SEAM 2x4 BLOCKING NAIL 8d (PENNY) 3" O.C. INCLUDING HORIZONTAL BLOCKED JOINTS CL 7 16" WALL PLYWOOD WITH 8d NAILS (PENNY) SEE SCHEDULE FOR PERIMETER & FIELD NAILING, TYPICAL ALL WALL SHEATHING, U.N.O WOOD FLOOR ALLOWABLE SHEAR (PLF) CONCRETE 1 @ 16" O.C. @ CONTINUOUS RIM BOARD & (2) PER BLOCKING THUS @ 16" O.C. 329 1 2" Ø A.B. @ 48" O.C. 16d @ 6" O.C.P1 SHEAR WALL SCHEDULE (2021 IRC - 2018 AF&PA SDPWS - TABLE 4.3A) MARK WOOD STRUCTURAL PANELS (PLYWOOD OR OSB) NUMBER OF SIDES EDGE (E.N.) NAILING SILL P ATTACHMENT U.N.O. FIELD (F.N.) SHEAR CLIPS (A34) L 8d @ 12" O.C. 8d @ 6" O.C.1716" PLYWOOD SHEATHING (ONE SIDE OF WALL) SHEET NO. JOB NO. RE V DA T E DE S C R I P T I O N PR O J E C T N A M E : 26051 IS S U E D F O R C O N S T R U C T I O N 04 . 1 7 . 2 0 2 6 0 AD U A D D I T I O N A T , 15 W I L L O W S T R E E T , S A L E M , M A PR E P A R E D F O R : AN T H O N Y H U N T L E Y , 15 W I L L O W S T R E E T , S A L E M , M A SEAL: RE V I S E D T H U S R E V 04 . 2 4 . 2 0 2 6 1 1 SWL-2 Job 26051 24 April 2026 WA L L H E I G H T WALL SHEATHING PER SHEARWALL SCHEDULE WHERE OCCURS, REFER SHEET SWL SHEETS EDGE NAILING PER SHEARWALL SCHEDULE WHERE OCCURS, REFER SHEET SWL SHEETS 2x_ MID BRACING FIELD NAILING PER SHEARWALL SCHEDULE WHERE OCCURS, REFER SHEET SWL SHEETS 2x_ STUD WALL PER FRAMING PLAN 2x_ PLATE (TYPICAL) 6" MIN EDGE DISTANCE STUD HOLDOWN ANCHOR BOLTS; SEE HOLD DOWN SCHEDULE DOUBLE NUT WASHER HOLDOWN; SEE HOLDOWN SCHEDULE TYPICAL DETAIL @ HOLDOWN IN FOUNDATION SCALE: 1/2"=1'-0" HEADER (3)16d END NAILS PER STUD, TYPICAL 2x_ BLOKING, TYPICAL SHEATHING PER SHEARWALL SCHEDULE (2) 24" LONG CS18 STRAP @ EXTERIOR ONLY CENTERED ACROSS THE JOINT WITH 10 NAILS IN THE END OF EACH STRAP AND INTO THE FRAMING MEMBER THAT IS BEING BRIDGED (TYPICAL @ TOP AND BOTTOM OF WINDOW OPENING) CS18 STRAP WRAP AROUND TOP PLATE & CONNECT TO HEADER, TYPICAL CS18 STRAP WRAP AROUND HEADER & CONNECT TO JACK STUD, TYPICAL MINIMUM (2) 2x_ KING STUDS, TYPICAL CS18 STRAP WRAP AROUND BOTTOM PLATE & CONNECT TO KING STUD, TYPICAL (2) 2x_ WINDOW SILLS TYPICAL DETAIL @ BLOCKED SHEAR WALL SCALE: 1/2"=1'-0" TYPICAL DETAIL @ OPENING IN SHEARWALL SCALE: 1/2"=1'-0" 8" M I N I M U M EM B E D M E N T TYPICAL DETAIL @ ALTERNATE ANCHOR BOLTS SCALE: 1/2"=1'-0" TYPICAL DETAIL @ WALL SHEATHING NAILING PATTERN SCALE: 1/2"=1'-0" A A SECTION A-A 23 WINDOW OPENING 26 27 24 25 2x4 BLOCKING @ PLYWOOD SEAM 8d PENNY NAILS @ XX" O.C. INCLUDING HORIZONTAL BLOCKED JOINTS (SEE SHEAR WALL NAILING SCHEDULE ON SWL SHEETS IF NONE) PLYWOOD SEAM STUD STUD NOTE: ALL EXTERIOR WALLS ARE BLOCKED SHEAR WALL XX = FOR SPACING SEE SHEAR WALL SHEET, IF NONE BASEMENT WALK OUT = 3" O.C. FIRST TO SECOND FLOOR = 4" O.C. SECOND TO ATTIC FLOOR = 6" O.C. MI N I M U M E M B E D M E N T PE R R E S P E C T I V E AP P L I C A B L E H O L D O W N NOTES : 1.ALTERNATIVE ANCHORS APPLY TO INTERIOR THICKNED SLABS ONLY, SEE HOLD DOWN AND FOUNDATION DETAILS FOR ANCHORS IN EXTERIOR FOUNDATIONS. 2.PROVIDE ALTERNATIVE ANCHOR @ SAME SPACING AS CAST-IN-PLACE ANCHOR. 3.INSTALL ANCHORS PER MANUFACTURERS SPECIFICATIONS. 4.USE HAS STANDARD ASTM A36 RODS WITH HIT HY 200 ADHESIVE. EXTERIOR SHEATHING SHEET NO. JOB NO. RE V DA T E DE S C R I P T I O N PR O J E C T N A M E : 26051 IS S U E D F O R C O N S T R U C T I O N 04 . 1 7 . 2 0 2 6 0 AD U A D D I T I O N A T , 15 W I L L O W S T R E E T , S A L E M , M A PR E P A R E D F O R : AN T H O N Y H U N T L E Y , 15 W I L L O W S T R E E T , S A L E M , M A SEAL: RE V I S E D T H U S R E V 04 . 2 4 . 2 0 2 6 1 1 SWL-3 Job 26051 24 April 2026 EXTENT OF HEADER MA X . H E I G H T 1 0 ' - 0 " EQ U A L EQ U A L 3" O.C.3" O.C. NAILING GRID DOUBLE PLATE, NUTS, WASHERS UP THRU 2ND PLATE MINIMUM 2"x2"x3/16" PLATE WASHER SIMPSON PRODUCT NO. BP 1/2 USE SIMPSON CS-18 COIL STRAP 22" LONG & (12) 8d NAILS ON BOTH SIDES OF OPENING INSTALL ON BACKSIDE AS SHOWN ON SIDE ELEVATION IF PLYWOOD IS SPLICED, SPLICE SHALL BE LOCATED @ MIDPOINT OF WALL HEIGHT & BLOCKED & NAILED 3" O.C. FOUNDATION PER PLAN TOP PLATE CONTINUITY NAIL 2 ROWS 12d - 6" O.C. LVL'S CONTINUOUS OVER INTERIOR SUPPORT 16d SINKER NAILS (0.148"x31 4") IN 2 ROWS 3" O.C. SIMPSON CS18 COIL STRAP 22" LONG (12) 8d NAILS ON BOTH SIDES OF OPENING 15 32" MINIMUM THICKNESS WOOD STRUCTURAL PANEL SHEATHING FASTEN SHEATHING TO HEADER WITH 8d COMMON NAILS (0.131"x21 2") IN 3" GRID PATTERN AS SHOWN & 3" O.C. IN ALL FRAMING (STUDS & SILLS) TYPICAL. ELEVATION VIEW @ LVL/SHEATHING PORTAL FRAME @ GARAGE DOORS OR LARGE WALL OPENINGS SCALE: 1/4"=1'-0" DRILL 1 2" Ø HILTI HY 200 EPOXY ANCHOR WITH 5" EMBEDMENT WITH 5" PROJECTION WITH 2"x2"x3 16" WASHER PLATE OR SIMPSON BEARING PLATE (LBP-5/8) OR CAST IN PLACE 1 2" Øx8" EMBEDMENT, 4" PROJECTION, 12" ANCHOR OPTION - CAST IN PLACE SIMPSON STHD14 SHEATHING NAILING 2 ROWS 8d @ 6" O.C.3" O.C. NAILING GRID 3 PLY LVL HEADER CONTINUOUS EXTERIOR TO EXTERIOR, SEE PLAN FOR SIZE OPEN STUD INTERIOREXTERIOR NAILING GRID NAILING GRID EX T E R I O R F A C E O F S T U D IN T E R I O R F A C E O F S T U D 28 SHEET NO. JOB NO. RE V DA T E DE S C R I P T I O N PR O J E C T N A M E : 26051 IS S U E D F O R C O N S T R U C T I O N 04 . 1 7 . 2 0 2 6 0 AD U A D D I T I O N A T , 15 W I L L O W S T R E E T , S A L E M , M A PR E P A R E D F O R : AN T H O N Y H U N T L E Y , 15 W I L L O W S T R E E T , S A L E M , M A SEAL: RE V I S E D T H U S R E V 04 . 2 4 . 2 0 2 6 1 1 SWL-4 Job 26051 24 April 2026 EQ U A L EQ U A L WALL SHEATHING MUST EXTEND UP OVER HEADER WALL SHEATHING MUST EXTEND OVER HEADER SHEATHING JOINT @ APPROXIMATE MID HEIGHT DOUBLE PLATE BLOCKED JOINT EXTEND HEADER TO KING STUD EXTEND HEADER TO KING STUD NAIL SCHEDULE 8d COMMON NAILS @ 3" O.C. NAIL TOP PLATE TO HEADER WITH 2 ROWS 16d NAILS @ 3"O.C. SIMPSON CS18 COIL STRAP 22" LONG & (12)-8d NAILS BOTH SIDES OF OPENING DRILL (2) 1 2" Ø HILTI HY200 ANCHOR BOLTS 5" EMBEDMENT 5" PROJECTION & 2"x2"x3 16" PLATE OR SIMPSON BEARING PLATE LBP 5 8" WASHER @ CONCRETE & WOOD BEAM WITH 1 2" Ø THRU BOLT & WASHER PLATES @ UNDERSIDE OF BEAM TOP OF FOUNDATION NAIL SCHEDULE 8d COMMON @ 3"O.C. 8d NAILS @ 3"O.C. 8d NAILS @ 3"O.C. 2 ROWS OF 16d NAILS @ 24"O.C. STUD OPTIONAL TO SUPPORT INTERIOR FINISHING GYPSUM OPTIONAL PORTAL FRAME CONNECTION SCALE: 1/4"=1'-0" PORTAL FRAME CONNECTION SCALE: 1/4"=1'-0" PORTAL FRAME CONNECTION SCALE: 1/4"=1'-0" PORTAL FRAME CONNECTION SCALE: 1/4"=1'-0" PORTAL FRAME CONNECTION SCALE: 1/4"=1'-0" PORTAL FRAME CONNECTION SCALE: 1/4"=1'-0" PORTAL FRAME CONNECTION SCALE: 1/4"=1'-0" OR EXTERIOR VIEW OF OPENING ELEVATION VIEW - EXTERIOR SHEATHING INTERIOR VIEW OF OPENING ELEVATION VIEW - INTERIOR FRAMING DOUBLE PLATE NAIL CORNER STUDS TOGETHER (PLAN VIEW OF CORNER DETAIL) 33 35 29 29 30 31 31 31 31 32 32 34 34 30 30 30 SHEET NO. JOB NO. RE V DA T E DE S C R I P T I O N PR O J E C T N A M E : 26051 IS S U E D F O R C O N S T R U C T I O N 04 . 1 7 . 2 0 2 6 0 AD U A D D I T I O N A T , 15 W I L L O W S T R E E T , S A L E M , M A PR E P A R E D F O R : AN T H O N Y H U N T L E Y , 15 W I L L O W S T R E E T , S A L E M , M A SEAL: RE V I S E D T H U S R E V 04 . 2 4 . 2 0 2 6 1 1 SWL-5 Job 26051 24 April 2026