Loading...
5 FRONT STREET - BUILDING INSPECTION } i V 5 FRONT STREET • f i Vitols Associates Architects/Planners 1230 Statler Office Building Boston, MA 02116 617-482-1990 E � V. Victors Vitols, AIA ff Liviu Brill, AIA P.11f4'f J 7 0 Marquis G. Major, AIA Ty 77jg, Bailey S. Silbert, AIA William B. Fitzpatrick Andrew Melton H. Martin Stockman Hiroshi Yoneyama December 4 , 1987 Al Valley THE WELCH GROUP 15 Front Street Salem, MA 01970 Dear Al: As per your request I have contacted City officials concerning two issues in the Essex Court Project: _ a) fire treated blocking requirements, and b) pool drain line tie-ins. Regarding the first issue, Mr. Bill Monroe of the Salem Building Department informed me that we will need fire-treated blocking only at the townhouse elevation along the 23 line, at all openings and behind any trimwork. Other than this area, the remainder of the project does not require fire-treated blocking. Regarding the second issue, Mr . Dennis Ross (Plumbing Inspector) informed me that pool drain line tie-ins will have to be made to storm lines either at Church Street or in the courtyard. Bob Carter of H . W. Moore confirmed this possibility and suggested a tie-in be made to the courtyard drainage system as this precludes the need for an additional sump. An SK will be generated and forwarded to you as soon as possible showing this new condition. Sincerely, VITOLS ASSOCIATES Denise Carcia cc: Richard Ness, Development Group William Monroe, Building Inspector, City of Salem Dennis Ross, Plumbing Inspector, City of Salem fit# ofttlem, tt�s�zcl#use##s ff4rr Irpwamrnt Fr0quurtrrs Tames X- Armmm QIhief June 20, 1974 John Powers Building Inspector Rei Front St. Property City of Salem J. J. Welch, Owner Five Broad street Salem, Mass. 01970 Sirs As provided for in the Salem Fire Code, I have this date reviewed project plans for the proposed Front Street Property Development. The following recommendations are hereby made in the interest of fire prevention and/or to correct conditions that are or may become dangerous as a fire hazard or are in violation of law. 1.Plan R-2s Second floor plan-Bldg. R-6 section-It appears that the door to the hall leading to the third floor opens inward, and should open outward in the direction of egress. 2. Plan R-2s Second floor plan-Bldg. R-8 section-It appears that the door to the hall leading to the third floor opens inward, and should open outward in the direction of egress. 3.Plan R-2s First floor plan-Bldgs. R-6 and R-8 sections-It appears that both basement stairway doors at top of stairs open into base- ment and should open outward in direction of egress. 4. 2taxxRxkxxkixs:txftmnzxpixRxBj:r;gxxkiiaxsm:tim"xi txappxaxaxt :tkaxi2aaxmtRftxttfaixxjtXxtdmmxxnplxxxinxxxtxmiixa3amxttxmpaanxmn:tw a" iRx6tft*1t*ilaj1xfafx*gltlamx. Voided. 5. Plan R-2s First floor plan-Bldg R-8 section-Four rear egress doors open inward and should open in direction of egress. 6. Plan R-3s Third floor plan-Bldg. R-6 section-It appears that the stairway door down opens inward to third floor and .should open in the direction of egress. 7. Plan R-3s Basement floor plan-Bldgs. R-6 and R-8 sections- It appears that both basement stairway doors open inward and should open in direction of egress. 8. Plan R-6s First floor plan-Bldg. R-6 section-Same as Item #3. 9. Plan R-7s Second floor plan-Bldg. R-6 section-Item #1 above has been corrected in this plan. ,10. Plan R-6s First floor plan-Bldg. R-6 section-Front doors shown opening inward, and different than shown on Plan R-2. Your atten- tion is called to note concerning occupancy load. Page #2-Front Street Property (J. J. Welch, Owner) 11. Plan R-13s First floor. plan-Bldg. R-8 section-All four rear doors appear to open inward, and should open in the direction of egress. 12. Plan H-Iii Basement floor plan- It shall be noted that the boiler room shall conform to all pertinent provisions for enclosure in commercial structures. 13. It shall be noted that all air conditioning and duct work shall comply fully with the conditions as set forth in N.F.P.A. Standard # 90A as to installation and fire protection. 14. This structure being used as a three story occupancy shall comply completely with the provisions of Section 7A1`tYa 7A2 of the Salem Fire code, relating to installation of Sprinklers and fire alarm equipment. As of this date no plans have been submitted to the Fire Prevention Bureau for approval as per Section 8 of the Salem Fire Code. ;R a Lieut. David J. G gin Salem Fire Marshal cc% James H. Ballou. A. I.A. J.J. Welch, owner prJiL:�1NC f��f'� ��a 9 �p`l � RrCENEOff SS. CItY 0V SAI aCANCELLATION NOTICE THE (ETNA CASUALTY AND SURETY COMPANY THE STANDARD FIRE INSURANCE COMPANY UFE&CA,SUALT Hartford, Connecticut 06115 Office at Boston Date August 7 1985 CERTnUED MAIL - RETURN RBCEM REWWrM F City of Salem 1 Mob 6 C City Rall Salem, Massachusetts You are hereby notified that this Company elects to cancel: a) Individual Bond No. covering (Name & Address) Goo& Bond or Policy No. nF s An%nM James J. Welsh & Co., 15 Front Streetr Salem, P r ❑ c) Coverage under Bond or Policy No. insofar as the acts of are concerned. ❑ d) Insuring Agreement(s) of Policy No. This cancellation is to take effect on the 7th day of Oct ober 1Y .1,,,198E in accordance with the terms of said Bond or Policy. 1•: .• cc C.H. Soucy Insurance Agency QZ-] THE (ETNA CASUALTY" �Wf�ETY COMP:d�JV 4060 ..;; );r ❑ THE STANDARD FIRE I�Ff"RANC.L'}2UMPANYt By Brian Begg ° 7p�7.ttorCaKyiA=Fact .1F-129-P) 3-76 CAT. 415634 COPY PRINTED IN U.S.A. I' :�w . . .� i ,: . �lw;..%`�f c �-� , � � .