Loading...
47 CONGRESS ST Bldg 2 Ste 2120-Permit Revoked CITY OF SALEM, MASSACHUSETTS BUILDING DEPARTMENT 98 WASHINGTON STREET,2ND FLOOR TEL. (978)745-9595 STAVROULa ORFANOS DOMINICK PANGALLO MAYOR BUILDING COMMISSIONER/DIRECTOR OF PUBLIC PROPERTY ZONING ENFORCEMENT OFFICER BUILDING PERMIT REVOKED PROPERTY LOCATION: 47 Congress Street, Bldg 2, Ste. 2120 July 6°i,2026 Structure Tone Attn: Alessandro Mazzotta 40 Broad Street Boston,MA 02109 Dear Mr.Mazzotta, It has come to the Building Department's attention that the Building Permit issued on May 18,2026 for Building Permit number B-26-355,was issued to a use and scope of work that appears to have considerably changed.Accordingly,and including for the reasons set forth herein,Building Permit number B-26-255 is hereby revoked.This Building Permit was issued based upon an application and plan review for a tenant interior fit-out of an existing tenant suite,Unit 2120,located in Building 2 of Shetland Park. The initial scope of work submitted and reviewed in the application documents identified a project of the following caliber: Work Description: "The project consists of the tenant interior build-out of an existing suite for use by an IT Services Company,including installation of equipment and associated mechanical,electrical,and plumbing systems.Interior work includes renovation of office and staff areas,including offices,restroom, security,and kitchenette.Exterior work includes installation of a generator and rooftop mechanical equipment." In addition to the initial submitted Work Description,the submitted Construction Documents dated March 16'b,2026 identified the following project scope highlights: • An interior tenant fit-out for a tenant suite 8,691 square feet in total size,where 1,861 square feet is dedicated to the IT digital infrastructure(ie."Racks")floor area. • The Floor Plan identified 4,645 square feet of"Future Tenant Space"that is located within the tenant suite but was not included under the proposed fit-out scope of work. • The existing accessible parking spaces and ramp leading up to the existing"Common Vestibule"found on plan north was to remain as is and was identified as being outside the Limit of Work. a CITY OF SALEM, MASSACHUSETTS y � BUILDING DEPARTMENT r 98 WASHINGTON STREET,2ND FLOOR TEL. (978) 745-9595 DOMINICK PANGALLO STAVROULA ORFANOS MAYOR BUILDING COMMISSIONER/DIRECTOR OF PUBLIC PROPERTY ZONING ENFORCEMENT OFFICER • The(1)proposed generator was identified to be placed on an existing concrete pad housing existing mechanical equipment for other tenant suites located in the same building. • The(1)proposed generator was identified to be capable of producing 1,000 Kilowatts of power supply to the IT Services Company. • No major alterations were proposed for the basement nor to the structure of the first floor assembly. After the Building Permit's issuance on May 181,2026,the Site Superintendent contacted the Building Department to request an on-site Pre-Construction Walk-Through meeting to introduce the project to the Building Inspectors. The Pre-Construction Walk-Through meeting was held June 231, 2026 at 9:30 am.During the meeting,the Site Superintendent informed the Building Inspectors that the project will be for an Artificial Intelligence Data Center company and will have some modifications from what was initially approved with the issuance of the Building Permit.He confirmed a revised version of the Construction Documents would be submitted under the initial Building Permit application for review. The revised Construction Documents dated April 271,2026,prior to issuance of the Building Permit, were submitted on June 291,2026 and identify the following project scope changes: • The interior tenant fit-out for the tenant suite increased to 12,690 square feet in total size, where 4,014 square feet is dedicated to the IT digital infrastructure(ie."Racks")floor area. • The area identified on the original Floor Plan as being 4,645 square feet of"Future Tenant Space"is now included in the proposed fit-out project,and that space is programmed as a larger"Racks"room and a"Pump Room". • The existing accessible parking spaces and ramp leading up to the existing"Common Vestibule"found on plan north is now proposed to be demolished and rebuilt shifted plan west,which could encroach upon any required turning radii for vehicles using the loading ramp leading down into the building's basement.Note:No information was provided on this potential issue in the revised Construction Documents. • The(1)proposed generator that was identified to be placed on an existing concrete pad has changed to become(2)proposed generators ihat are much larger in size.Due to the increased footprint of the equipment,the existing concrete pad is also proposed to be expanded,thus requiring the rebuilding of the adjacent accessible parking spaces and ramp. • An additional(1)proposed generator is now identified to be placed on the plan south side of the building in a location that does not currently have an equipment pad.This additional(1) proposed generator is also large in size. • The(3)proposed generators in total are identified to be capable of producing 6-Megawatts of power supply to the IT Services Company. • There are now(2)new proposed 3,000 gallon Chilled Water Thermal Energy Storage Tanks to be located in the basement of the building,and many structural steel beam,column and footing modifications to the existing first floor assembly to support the increased weight of the expanded IT digital infrastructure(ie."Racks")floor area. CITY OF SALEM, MASSACHUSETTS BUILDING DEPARTMENT r 98 WASHINGTON STREET,2ND FLOOR ]" ' 'i TEL. (978)745-9595 STAVROULd ORFiNOS DOMINICK PANGALLO MAYOR BUILDING COMMISSIONER/DIRECTOR OF PUBLIC PROPERTY ZONING ENFORCEMENT OFFICER These changes, as found on the revised Construction Documents,are considered significant as compared to the initially permitted scope of work and would typically require the submission of a new Building Permit application to capture the"new"version of a project from an"older"proposed version.The new Building Permit application could then undergo a new plan review to ensure the submitted changes are compliant with the 2021 780 CMR Building Code. That said,in addition to the reasons detailed above,the Building Permit is being revoked because the project as now proposed is a data center use which is not a permitted use of the property in the Industrial or Waterfront Industrial Overlay District under the City's Zoning Ordinance. Section 3.1 of the City's Zoning Ordinance provides that"except as provided by law or in this Ordinance in each district,no building or structure shall be constructed,used or occupied,nor shall land be used or occupied,except for the purposes permitted as set forth in the accompanying Table of Principal and Accessory Use Regulations.". As originally permitted,the proposed"IT Services Company",was considered a"Business or Professional Office"use,which is an allowed use of the Property. A data center,however, is different type of use,with different resource demands and impacts,and is not a permitted use of the Property. This Building Permit would not have been issued if the original permitting documents had accurately shown the now proposed use. It is because of these newly identified Building Code issues and Zoning Ordinance violation that the Building Permit issued on May 181,2026,under Building Permit application B-26-355,is revoked. Under the provisions,of 780 CMR Section 105.6:Permits-Suspension or Revocation,it is my opinion the Building Permit was issued on the basis of incorrect,inaccurate,and incomplete information that did not accurately reflect the proposed project.As of July 1st,2026,no construction work on this project shall begin under Building Permit B-26-355. If you have any questions regarding the information contained in this letter,please contact the Building Department at(978) 619-5641. If you feel you are aggrieved by this order,your appeal is to the Building Code Appeals Board in Boston and to the Zoning Board of Appeals in the City of Salem. Respectfully, Gail Kubik Local Building Inspector cc: Stavroula Orfanos(Building Commissioner) Laserfiche and File