Loading...
34 Chestnut Street_CofNA_front column alem Historical Commission 98 WASHINGTON STREET SALEM,MASSACHUSETTS 01970 (978)619-5685 -• cy CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: 0 Construction ❑ Moving x Reconstruction ❑ Alteration ❑ Demolition x Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch.40C)and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 34 Chestnut Street Name of Record Owner: Historic New England Description of Work Proposed: • Repair a localized area of deterioration, specifically rot and/or insect damage,on a plinth of a portico column of the Phillips House. o The treatment plan is expected to include removing deteriorated wood and splicing in new wood(possibly Spanish cedar instead of pine as it tends to be more rot resistant). o The plinth would then be painted to match existing. o The repair will be completed in-situ and the need for temporary support to be in place while the repair is underway is not anticipated.The repair will be completed in-house. Non-au licable due to beine in-kind painting and repairs. *NOTE:Historic materials and details must be retained and repaired except where material is not salvageable and must be replaced. If replacement is necessary, new elements must replicate existing details, dimensions and materials. Should am chances to materials design or outward appearance be determined necessary.Applicant must submit a new application for review. Upon completion of the above work,please notify Historical Commission staff as final sign-off is required to document compliance with this Certificate and approved plans. Dated: Jul 1. 2026 SALEM HISTORICAL COMMISSION: By: -- - The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation).All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT.Please be sure to obtain the appropriate permits from the Inspector of Buildings(or any other necessary permits or approvals)prior to commencing work.