41 FRANKLIN STREET - BUILDING INSPECTION lc�
rsupbe
90%LargerLabelArea�
/// I SMEAD
KEEPING YOU ORGANIZED
No. 10301
PMWPE M
Tor vQLaara»®
MADE IN USA
GET ORGANIZED AT SMEAD.COM
Certificate Number: B-15-1141 Permit Number: B-15-1141
Commonwealth of Massachusetts
City of Salem
This is to Certify that the .................................................................Two Family Building.......................................................... located at
Building Type
41 FRANKLIN STREET -................................ in the City of Salem
................................................................................... .................................. .................................................
Address Town/City Name
IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY
Final ok for left side unit(from the Street)
DEREK STOUT& CHRISTINA STOUT
This Permit is granted in conformity with the Statutes and Ordinances relating thereto, and
expires ...............................Not Applicable................_...._-.... unless sooner suspended or revoked.
E)piration Date
Issued On: Monday, July 11, 2016
Commonwealth of Massachusetts
f l Citv of Salem
! o• } . . 120 Washington St,3rd Floor Sale,,MA 01970(978).745-95951 x5641
Return card to Building Division for Certificate of Occupancy -
-
structure CITY OF SALEM BUILDING PERMIT
Excavation 1
PERMIT TO BE POSTED IN THE WIND-OW f {
Footing INSPECTION RECORD ..
Foundation r - � ., �. -' sy,
Framing ' .. a ss „n« . .
.. • ars *• 9+ .
:Mechanical "-� : _ f A � -
Insulation INSR:ECTION:- .,,�+ gy�r, _ - -
�. DATE
Chimney/Smoke Chamber que
Final
�J k !/
Plumbing/Gas ' -
'Rough Plumbing.,
a
s
Rough:Gas ,r" .. r« m .. *o .t
�..� n
Final .• 3
Electrical
'
,.Service
Rough . t t .
Final .+
Fire epartment
Preliminary c :,r .. a .., wry.w rv»a:m �V°.m °s
l F
Final - , - u ,
iv4. r 5 g -r ``} Al,
N�,
Health Department
Preliminary .. _
Final"
s �"
Certificate Number: B-16-221 Permit Number: B-16-221
Commonwealth of Massachusetts
City of Salem
This is to Certify that the .........I........................................................Two Family Building.......................................................... located at
Building Type
41 FRANKLIN STREET...................................................................... in the ...............,.....................City of Salem
....................................................................................................................-.......... .................................................
Address Town/City Name
IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY
Right side unit
DEREK& CHRISTINA STOUT
This Permit is granted in conformity with the Statutes and Ordinances relating thereto, and
expires ...............................Not Applicable unless sooner suspended or revoked.
E)pirabon Date
Issued On: Tuesday, June 28, 2016
• w�wls
f I►A` DIVITI`' �
maith,ofiMassachusetts,
a_
tv, of Salem
` - - 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641. _
Return card to Building Division for Certificate of Occupancy I
Permit :No.
$4 B-16-221 PERMIT TO BUILD
FEE PAID: $49.00 s
DATE ISSUED: 3/16/2016
- i
This certifies that STOUT DEREK'J STOUT CHRISTINA E'
has permission to erect, alter, or demolish a_1:uilding,41,.F.RANKLIN.STREET Map/Lot: 270453-0
as follows: Repair/Replace ,REMODEL BATHROOM IN RIGHT-SIDE APARTMENT
Contractor Name: WARREN PEARSON yi
DBA: Pearson Builders `��m "4
Contractor License No: 40996.
3/16/2016. _
~ Building Official ' Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request. -
All work authorized by this permit shall conform to the approved applicabon and'the aapproved consUucbon documents for which this.permit has been granted.
All construction,alterations and changes of use of any:building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road,and shall be maintained openn for public inspection for the entire duration of the
work until the completion of the same.
The certificate of Occupancy will not be issued until alt applicable signet es by the Building and Fire Officialsre provided on this permit.
HIC#: 107999 "Persons contracting with unregistered contractors do not have access to the guaranty nd"(as set forth in MGL c.142A).
1
Restrictions:
r
Building plans are to be available on site. ' l
All Permit Cards are the property of the.PROPERTY OWNER.
i
Commonwealth of Massachusetts 1
s
City of Salem
� 120 Washington St,3rd Floor Salem,M4 01970(978)745-9595 25841'
y 4 Return card to Building Division for Certificate of Occupancy
9
Structure CITY OF SALEM BUILDING'PERMIT
PERMIT TO BE POSTED IN THE WINDOW t
Excavation
Footing . INSPECTION RECORD`..
Foundation
Framing rV \ ;°.;Vytti' i
..Mechanical 4 -
Insulation ! INSPECTION:3 BY DATE
Chimney/Smoke Chambery - a
Final
Plumbing///G//asp
Rough:Plumbing
..3
Rough:Gas
e
Final Iry
Electrical
Service
] d kkk
Rough_..
Final-Oda I
-
I Fire Deparltment
Preliminary
Final '
4
Health.Department . ^'
i Preliminary'" -
k
Fir
f
Certificate Number: B-15-1141 Permit Number: B-15-1141
Commonwealth of Massachusetts
City of Salem
This is to Certify that the Two Family.Building.......................................................... located at
. Building Type
41 FRANKLIN STREET...................................................................... in the City of Salem
............................................. ............................. ...............................................
Address Tmn/City Name
IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY
Final ok for left side uniti(from the Street)
DEREK STOUT& CHRISTINA STOUT
This Permit is granted in conformity with the Statutes and Ordinances relating thereto, and
expires ...............................Not Applicable . , unless sooner suspended or revoked.
Expiration Date
Issued On: Monday, July 11, 2016 ff
Nis
a
PTO
oivrn`'"'O�
P'A`S �
cnr. EEl
Com-monwealih of Massachusetts
' City of Salem
120 Washington St,3rd Floor Salem,MA 01970'(978)745-9595 x5841
Return card to Building Division for Certificate of Occupancy
FI8-15-1141 PERMIT TO BUILDFEEEPAPAID:: $8$84.00
DATE ISSUED: 10/20/2015
This certifies that STOUT DEREK J STOUT CHRISTINA E
has permission to erect, alter, or demolish a budding 41,FRANKLIN STREET Map/Lot: 270453-0
as follows: Renovation KITCHEN RENOVATION J�
Contractor Name:
I DBA: �
Contractor License No:
�V
10/20/2015
X L '
« Building Officla „ Date
AI
This permit shall be deemed abandoned and invalid unless the work authoriied by this perm l s commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved constru ion documents for which',this permit has been granted.
^!.
All construction,alterations and changes of use of any bmlding and structures shall be in compliance with the l
A.- 4I o�eka�tl zoning by lawsteind codes. -
This permit shall be dispfayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire d4
tion of the
work until the completion of the same. a-! ry,0..`
The Certificate of Occupancy will not be issued until all applicable signs res by the Building and Fire Officials,We provided on this.permit. \
bs ♦' te
H IC#. 'Parsons contracling with�unregistered contractors do not liyawz access to the guaranty fund"(as set forth in MGL 042A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
Commonwealth of Massachusetts`'
h i City of Salem AV_120 Washington St,3rd Floor Salem,MA 01970(978)745 9595 x5641 -
• - - - Return card to Building Division for Certificate of Occupancy -
„ Structure CITY OF SALEM BUILDING'PERMIT M "
:Excavation
-PERMIT TO BE POSTED IN THE WINDOW
Footing INSPECTION RECORD
Foundation �..
Framing
Mechanical
Insulation
INSPECTION: .. BY "" '".� ''` DATE _ -
Chimney/Smoke Chamber - _
�y igI
Final /40
C Plumbing Gas a ,
_
Rough:Plumbing a • f
Rough:Gas
Final ✓.`' _ -
Electrical, r k N t
Service
Rough
Final a r 1
Fire ffepartment 4
Preliminary
Final s , n» a, r g .r•;� `,. ..
Health Department + I
Preliminary
Final . ,