2026-02-25 Meeting MinutesDRB
February 25, 2026
Page 1 of 7
City of Salem Massachusetts
Public Meeting Minutes
Board or Committee: Design Review Board, Regular Meeting
Date and Time: Wednesday, February 25, 2026 at 6:00 pm
Meeting Location: Virtual Zoom Meeting
DRB Members Present: Chair Paul Durand, Kate Martin, Marc Perras, and Catherine
Miller
DRB Members Absent: Elizabeth Murray, and Sarah Tarbet
Others Present: Stephanie Owens, Senior Planner
Recorder: Christine Petryszyn
The meeting was called to order at 6:02pm. Roll call was taken.
Signs in the Urban Renewal Area
1. 26 New Derby Street: The Neighborhood Tavern
Adam Knauer, with SRP Signs, was present to discuss the project:
• Mr. Knauer shared the proposed signs. The letters are to be 15 inches tall and whole word
just over 32 feet long.
• The build was shared. A rendering of the front façade was shared.
• Each of the letters will be lit.
• Ms. Owens noted that lighted lettering is permitted with internal illumination features. She
added that the DRB usually also has preference for color variation.
• Mr. Knauer noted that the sign is set between two pieces of molding where there is a sign
band. He said it was the only spot where there is a 20-inch-high spot.
• Ms. Miller felt the 15 inches for the lettering for that space was reasonable.
• The whole storefront is black.
• Mr. Durand noted that they should review the paint color, but this application just covers
the sign.
There were no comments or questions from the public.
VOTE: Ms. Miller made a motion approve with the caveat that the owner come back and
present the design of the whole façade. Seconded by Martin.
Roll Call: Martin, Miller, Perras, and Durand. 4-0 in favor.
Projects in the Urban Renewal Area
1. 50 Washington Street: Schematic Design Review – Review of proposed adaptive reuse of the
Salem Tabernacle Congregational Church into 48 studios that are, 100% affordable, permanent
supportive housing units for at-risk veterans, with space retained for ongoing use by the church
congregation.
DRB
February 25, 2026
Page 2 of 7
Christina Granese from Tinti & Navins, Courtney Koslow and Calvin Anton from Beacon
Communities, Thad Siemasko and Krista Broyles from SV Design, and Danny Turgeon from
Bohler, were present to discuss the project:
• Ms. Granese noted that the project site fronts on three streets; Federal Street, Washington
Street, and Lynde Sreet. The existing site includes a historic church and two parking lots. The
existing church will remain, and two additions are proposed within the existing parking lots
which will house 48 studio apartments. A two-car parking lot is proposed off Federal Street
and a larger seven car lot off Washington Street.
• Ms. Koslow noted that the church building itself is roughly 100 years old and that the
congregation size has dramatically decreased in size to about 50 active members.
• Through a visioning process, the church members came up with four goals; to continue
worship, be a mission in the community, find a way to remain financially stable for the next
100 years, and preserve and restore the building. By partnering with Soldier On, they should
be able to achieve these goals.
• Beacon Communities will purchase the building outright, with a ROFR going to the
congregation for the sanctuary space.
• The apartments will be deed restricted for affordable housing. Federal and state historic tax
credits will be used to preserve and restore the building.
• Mr. Anton described the church use which will include the exclusive dedicated use of the
office, storage for the piano, historic artifacts and other items, as well as two parking spaces.
The sanctuary will be accessible via Washington Street.
• The deed restricted affordable housing will include permanent rental housing for veterans
(48 studio apartments). Solider On will provide supportive services. Beacon Resident
Management will provide onsite property management. Amenity spaces include a
community room with kitchenette, fitness center, a wellness office and laundry room.
• Soldier On will provide fully furnished units, case management, transportation at no cost to
residents, daily meals, health care navigation, wellness services, community building, and
legal and end of life planning.
• Mr. Siemasko said they started by revisiting the National Park Service Historic Design
Standards, and in this case the Salem Historic District Guidelines and SRA commercial
building guidelines.
• A rendering of the site was shared with a review of the additions and new main entry.
Renderings of the existing and proposed conditions from an aerial angle view were shared
and reviewed. The church remains the most prominent and the additions work their way
back to the neighborhoods.
• Images of the first-floor plan were shared and reviewed including the main sanctuary, areas
for public use, management offices, etc.
• Each unit will have a kitchenette and bathroom. There will be community spaces sprinkled
around to help foster the community. There is a maintenance and mechanical area in the
rear of the building.
• Images of the second-floor plan were shared and reviewed. Bike storage is included.
• The balcony of the sanctuary space will be used for storage. There is a vaulted ceiling that
they are working with a historic consultant to preserve as best they can.
• The third level is the attic of the parish house and the floor plan was shared.
• The only part of the building that has a fourth floor is on the Lynde Street side. The floor
plan was shared.
DRB
February 25, 2026
Page 3 of 7
• Exterior elevations/renderings from each side were shared.
• The gable roof facing the street has punched openings using the same window and sill
heights, trying to be complimentary without copying. This was the preferred approach from
National Park Service.
• The church is being restored to National Park Service standards as part of this process.
• The material board was shared and reviewed. It is a traditional, but lower maintenance
palette.
• Renderings of the Federal Street addition was shared. They worked to transition between
the civic architecture and religious gathering space.
• Renderings of the view from Lynde Street were shared.
• Mr. Turgeon reviewed the landscape plan. The goal of which was to create an inviting
recreational space integrated with the downtown.
• The primary entrance becomes an inviting recreational space for residents. There is a
seating area near the main entrance anchored by a shade structure. A radial bench seating
area is anchored by an ornamental tree. Concrete unit pavers are proposed to soften the
palette and add visual interest.
• A six-foot-high timber fence will buffer the view from Lynde Street. The historic iron fence
along the parking lot side will be retained.
• A stone veneer on the seat wall will tie back into the stone veneer of the tabernacle.
• The materials and planting palettes were shared. Native plantings with robust visual interest
and complimentary flower colors were chosen. The planting plan was shown.
• The site lighting was reviewed and includes two 16’ high light poles. Light bollards along the
main entry and pedestrian connection and wall mounted fixtures at building entrances are
proposed. All site lighting is dark sky compliant and has been located with light justice
guidelines in mind.
• This population of low-income veterans are not expected to have or need cars. The
residents will have on demand transportation. The two parking spots on Federal Street are
dedicated to church use.
• Egress from the garden level apartments have been fully researched. There are code
requirements for the distance from the well and the heights of the floor. They are
conforming to all codes.
• It was difficult to find a location for the one elevator, so a second was not considered. Ms.
Koslow noted that they are using Livable Community and Low Income Housing Tax Credits
for the project and don’t have the budget to pay for two elevators. She said a second
elevator would also decrease the number of units they could provide.
• Mr. Perras said he was more concerned about the distance from the elevator and navigating
through other spaces in cold weather.
• Mr. Perras thought the Lynde Street elevation appeared overly complex. He thought the size
of the building didn’t warrant that kind of breaking it up. Mr. Siemasko appreciated the
comment and said he would look at it. He did not disagree that it looked complicated.
• Mr. Perras thought the primary entry off Washington Street looked a bit complex and
wondered if it could be simplified. It was suggested that they could probably enhance it
through the landscape design.
• Mr. Perras suggested that multiple roof lines made it look like there were too many
competing things and suggested they take another pass of that.
DRB
February 25, 2026
Page 4 of 7
• Mr. Perras requested that the actual materials for the palette be delivered to City Hall for
review.
• Ms. Miller inquired about the three-story addition being the transition to the orientation to
Federal Street. Mr. Siemasko said they did look at that, and that the historic consultant did
not want them to carry the line and not bend it to follow the line of the federal homes. Ms.
Broyles said they tried to keep the addition secondary in view. Ms. Miller requested that the
applicant take a second look at that issue.
• Ms. Miller asked if the lawn could be replaced with a perennial mix or ground cover. Mr.
Turgeon said they could look at that. Ms. Miller said she likes most of the plants, with the
exception of the Florida Dogwood and Kousa.
• Ms. Miller noted most spaces in Salem have red brick paving and that it could add beautiful
element to the project.
• Ms. Miller said she loved the color palette and how it lets the church be the more important
building.
• Mr. Durand expressed concerns about the transitions to the additions. He suggested that
they grab too much attention by being darker, and perhaps more glazing or black painted
glazing could make that transition fade away. He believes the SRA had the same comment.
Mr. Siemasko said he thinks they are maxed out on glazing but could look at the coloration
and have it blend more.
• Mr. Durand said he likes the elevation of the three gables. Mr. Siemasko said they would
look at it again.
• Polly Wilbert, 7 Cedar Street, commented on kitchenette in the community room and noted
that in her experience a kitchenette may not be sufficient to offer the tenants an
opportunity for a larger gathering. She also questioned the need for such tall light poles and
felt that something lower would be more appropriate.
VOTE: Ms. Miller made a motion to continue. Seconded by Perras.
Roll Call: Martin, Miller, Perras, and Durand. 4-0 in favor.
Projects Outside the Urban Renewal Area
1. 8 Harrison Road, 9 Harrison Road and 262 Loring Ave, 266 Loring Ave: Smart Growth Overlay
District -Design review of the proposed first phase of a multi-phase project known collectively as
the Forest River Residences. The first phase includes a residential building consisting of 340
units, an above-level parking garage with 524 parking spaces, and two enclosed outdoor
courtyards. The proposed work also includes an approximately half-acre central landscaped
common, extension of the existing Harrison Road, and connection to the Forest River
Conservation Trailhead.
Ed Bradford and Mark Klopfer were present to discuss the proposal:
• Ms. Owens noted that this project was before the DRB and Planning Board joint meeting on
February 19th.
• The focus of the presentation is to respond to comments received at the joint meeting.
DRB
February 25, 2026
Page 5 of 7
• The comments received from the DRB and Planning Board were shared. A uniform comment
was in regard to the contrast of coloration, depth of windows, brick detailing, coloration of
the white coping, brick at the entry, and materials.
• The proposed adjustment to the white coping and brick coloration was shared. The model
was updated to show the relationship of the window to the brick and then the window to
the siding.
• A building sign has been added to the top at the cornice line so that it is visible from
Harrison Street. Another primary sign would be added to indicate the primary entrance.
• The second rendering shared was of the main entry and the adjustments to the coloration
that were made. The brick was a deeper, richer color and less contrast with the siding.
• A view of the rendering from the conservation area looking back across the common area.
• The exterior building material palette was shared and the changes reviewed.
• An aerial rendering and elevation of the existing conditions and proposed changes were
shared, with the vertical and horizontal distance shared.
• Mr. Klopfer noted that Weston and Sampson will present on the site at the next meeting
and will include circulation, roadway, etc. and the whole site will be reviewed in total.
• Mr. Perras noted that the walking paths were brought up multiple times.
• Mr. Perras thought the color and material updates were very good. He asked whether there
was a consistent attitude about how the different layers of the box were coming together.
Mr. Bradford said the change happens at the actual break in the façade.
• Mr. Perras said he prefers the glassier version of the amenity spaces and asked if they do go
with brick that they continue to be set back.
• Mr. Perras said he feels like the blade sign feels out of place. He thinks there is too much
surface area for a blade sign. He encouraged the applicant to find a place on the building
that is more appropriate, a different location.
• Ms. Miller asked that the fiber cement lap side by smooth and not textured. She also did not
like the blade sign and found it to be out of place.
• Ms. Miller asked that the sample materials be brough to the City Hall Annex Building for
review.
• In terms of the public space, Ms. Miller said that it should be made more pedestrian
because it feels like a lot of asphalt as it is currently designed. Her biggest concern is the
entrance/exit to the structured parking near the crosswalk.
• She expressed concern about how they are going to take a deserted wilderness area in
Salem and put so many square feet of housing next to it without changing it’s character.
• Mr. Klopfer said they will look at the structured parking connection. He also noted the
driveway of the Win Harrington Building is one way. They are trying to avoid having all of
Avalon’s traffic go across Winn Harrington’s front door.
• Ms. Martin noted that the change in brick colors is very successful.
• Mr. Durand said that all his comments from the previous meeting were addressed.
• Polly Wilbur, 7 Cedar Street, asked the DRB to look at what equipment, EV panels, etc. end
up on the top of garage. She said it is going to be significant change for the abutting
homeowners and what they may end up looking at. She expressed concern over using the
term “common” for the green space and that the garage is almost two-thirds the capacity of
the MBTA garage. She expressed concern that kids could be tempted to go running across
there. She said there is a lot of traffic in that area.
DRB
February 25, 2026
Page 6 of 7
• Mr. Perras said the comment on the mechanical equipment was helpful.
• Mr. Perras asked to hear more about the elevations that wrap around the side of the
building at the next meeting.
VOTE: Ms. Perras made a motion to continue. Seconded by Miller.
Roll Call: Martin, Miller, Perras, and Durand. 4-0 in favor.
New / Old Business
1. Approval of Minutes:
a. January 28, 2026
VOTE: Ms. Miller made a motion to approve. Seconded by Perras.
Roll Call: Martin, Miller, Perras, and Durand. 4-0 in favor.
2. Staff updates, if any
a. 288 Derby Street – Request to withdraw without prejudice
Ms. Owens notes that the applicant made a request to withdraw without prejudice so that they
could come back before the DRB at any time. This was the Salem Wax Museum and changes to
the rear of the building.
Ms. Miller noted that they seem to have permanent orange lights along the cornice of the
building. Ms. Owens said would look into that.
Ms. Owens reminded the Board about the required annual Conflict of Interest training which
they should have seen in their inbox.
She noted that the next joint meeting with the Planning Board is March 26th and the next DRB
meeting is March 25th.
Ms. Owens noted Ms. Leftwich unexpectedly had to step down from the DRB and to keep her in
their thoughts. They will be looking for experts in design/graphic review to fill her spot.
Mr. Perras noted that the pirate museum still had a vinyl banner up and that they now have
eight signs installed. Ms. Owens will reach out to them about that.
Upcoming Meetings
1. SRA: March 11
2. DRB: March 26
3. Joint Meeting with Planning Board: March 26
Adjournment
VOTE: Ms. Miller made a motion to adjourn. Seconded by: Perras. All in favor.
DRB
February 25, 2026
Page 7 of 7
The meeting adjourned at 7:41PM.
Know your rights under the Open Meeting Law M.G.L. c. 39 §23B and City Ordinance Sections 2-028
through 2-2033