12 Conners Road ZBA Final Decision
DOMINICK PANGALLO
MAYOR
CITY OF SALEM
ZONING BOARD OF APPEALS
CITY HALL ANNEX 2ND FLOOR, 98 WASHINGTON STREET SALEM MA 01970
June 3, 2026
Decision
City of Salem Zoning Board of Appeals
The petition of WORKS BY JD at 12 CONNERS ROAD (Map 36, Lot 0326) (R1 Zoning District; Coastal
Resiliency Overlay District) for a Special Permit per Section 3.3.5 Nonconforming Single- and Two-
Family Residences of the Salem Zoning Ordinance to construct a half-story addition on both sides
of a nonconforming two-story, single-family house, creating a 2.5-story house. The addition
would be 4.6 feet from the side property line where ten feet are required.
On May 20, 2026, the following members of the Salem Zoning Board of Appeals were present:
Nina Vyedin (Chair), Christa McGaha, Hannah Osthoff, Peter Habib, Elena Eimert, and Ellen
Simpson. Stephen Larrick was absent.
Statements of Fact:
1. In the petition date-stamped April 22, 2026, the petitioner requests a Special Permit per
Section 3.3.5 Nonconforming Single- and Two-Family Residences of the Salem Zoning
Ordinance.
2. Courtney Porcella owns 12 Conners Road. Works by JD is the petitioner and
representative. Domenico Eramo, architect with PatternBook Architecture and Design,
LLC, presents on behalf of Works by JD on May 20, 2026.
3. 12 Conners Road is in the R1 Zoning District and Coastal Resiliency Overlay District (C-
ROD).
4. At the May 20, 2026 hearing, the Board requests a special condition requiring the
submission of revised elevation plans showing a base flood elevation, corrected proposed
height, and corrected dimensional table height. The representative consents to the
proposed special condition.
5. The City receives two public comments on the proposal before the May 20, 2026 public
hearing. The public comments are from Aiden Church, 10 Conners Road; and Cindy Tobin
and Kevin Tobin, 14 Conners Road. Zero members of the public comment on the proposal
at the public hearing.
The Salem Zoning Board of Appeals, after carefully considering the evidence presented at the
public hearings, and thoroughly reviewing the petition, application narrative, and plans, makes
City of Salem Zoning Board of Appeals
June 3, 2026
Page 2 of 3
the following findings that the proposed project meets the provisions of the City of Salem Zoning
Ordinance:
Special Permit Findings:
1. Community needs are served by the proposal. The proposal creates additional living space
for the reasonable use of a single-family structure.
2. The proposal has a negligible impact on traffic flow and safety. The proposal does not
impact access to and from the property.
3. The proposal has negligible impacts on utilities and other public services. Adequate
utilities and other public services already serve the structure.
4. The proposal has minimal impacts on neighborhood character. The proposal requests an
appropriately designed addition in scale with the surrounding houses.
5. The proposal has minimal impacts on the natural environment, including greenhouse gas
emissions and view. The proposal does not increase the structure’s footprint.
6. The proposal has a positive potential economic and fiscal impact, including impacts on
the City’s services, tax base, and employment. The proposal will increase the property’s
tax base while providing a temporary positive impact on City employment.
Based on the above statements of fact and findings, the Salem Zoning Board of Appeals voted
five in favor, (Hannah Osthoff, Peter Habib, Elena Eimert, Nina Vyedin (Chair), and Christa
McGaha) and zero opposed, to grant WORKS BY JD at 12 CONNERS ROAD (Map 36, Lot 0326) (R1
Zoning District; Coastal Resiliency Overlay District) a Special Permit per Section 3.3.5
Nonconforming Single- and Two-Family Residences of the Salem Zoning Ordinance to construct a
half-story addition on both sides of a nonconforming two-story, single-family house, creating a
2.5-story house. The addition will be 4.6 feet from the side property line where ten feet are
required.
Standard Conditions:
1. Petitioner shall comply with all city and state statutes, ordinances, codes and regulations.
2. All construction shall be done as per the plans and dimensions submitted to and approved
by the Building Commissioner.
3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be
strictly adhered to.
4. Petitioner shall obtain a building permit prior to beginning any construction.
5. Exterior finishes of the new construction shall be in harmony with the existing structure.
6. A Certificate of Occupancy is to be obtained.
7. A Certificate of Inspection is to be obtained.
8. Petitioner is to obtain approval from any city board or commission having jurisdiction
including, but not limited to, the Planning Board.
9. Unless this Decision expressly provides otherwise, any zoning relief granted does not
empower or authorize the Petitioner to demolish or reconstruct the structure(s) located
City of Salem Zoning Board of Appeals
June 3, 2026
Page 3 of 3
on the subject property to an extent of more than fifty percent (50%) of its floor area or
more than fifty percent (50%) of its replacement cost at the time of destruction. If the
structure is demolished by any means to an extent of more than fifty percent (50%) of its
replacement cost or more than fifty percent (50%) of its floor area at the time of
destruction, it shall not be reconstructed except in conformity with the provisions of the
Ordinance.
10. All construction shall be done per the plans and dimensions submitted to and approved
by this Board. Any modification to the plans and dimensions must be approved by the
Board of Appeals unless such changes are deemed a minor field change by the Building
Commissioner in consultation with the Chair of the Board of Appeals.
11. Petitioner shall schedule Assessing Department inspections of the property, at least
annually, prior to project completion and a final inspection upon project completion.
Special Conditions:
1. The petitioner shall revise the elevation plans dated April 22, 2026, by PatternBook
Architecture and Design, LLC, to depict the property’s base flood elevation, show a
corrected proposed height, and reflect the corrected proposed height on the submitted
dimensional table. The revisions shall be consistent with Section 4.1.1 Dimensional
Requirements of the Salem Zoning Ordinance and submitted prior to the issuance of a
building permit from the Inspectional Services Department.
__________________________
Hannah Osthoff, Secretary
Zoning Board of Appeals
A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK.
Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts
General Laws Chapter 40A, and shall be filed within 20 days of filing of this decision in the office
of the City Clerk. Pursuant to the Massachusetts General Laws Chapter 40A, Section 11, the
Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing
the certificate of the City Clerk has been filed with the Southern Essex Registry of Deeds.