Loading...
84 Federal Street_CofNA_WindowsSalem Historical Commission 98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978) 619-5685 CERTIFICATE OF NON-APPLICABILITY HCA-26-48 It is hereby certified that the Salem Historical Commission has determined that the proposed: Type of Work: Other , Replacing windows on sides and rear of home as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: Address of Property: 84 FEDERAL STREET , SALEM, MA 01970 Name of Owner at time of Submission: GARCIA JOSEFINA BIANCA;MCGUIRE STEVEN Applicant's Description of Work: As part of a larger interior renovation, we are replacing windows on the side and rear of the home. There are no windows being replaced on the front face of the home on Federal St. The homeowner would like to use Andersen windows instead of Jeldwen. In the attachments you will see a picture of how set back the home is as well as a full set of plans that show the existing window locations and which are being replaced. Statement of Conditions: · Demolition of several minor existing architectural elements including windows on the west, north and east facades  · Demolition of siding and window trim to make way for new work, · Demolition of one historic column on the west side of the covered porch. ·  The proposed work will include the installation of several new windows and the replacement of several windows on the west, north and east facades.  o The windows will be Jeldwen Siteline  Anderson windows with simulated divided lite grille bars in a two over one grille pattern.  o Patch and repair clapboard siding where necessary (which shall match existing in profile and exposure).  o Where applicable, new window trim will match the existing profile and will include a fatstock piece of trim with a moulding band.  · On the west side of the covered porch we are enclosing part of the covered porch.    Non-applicable due to the proposed work not being visible from a public way named in the district. 5/18/26, 3:29 PM about:blank about:blank 1/2 *NOTE: Historic materials and details must be retained and repaired except where material is not salvageable and must be replaced. If replacement is necessary, new elements must replicate existing details, dimensions and materials. Should any changes to materials, design or outward appearance be determined necessary, Applicant must submit a new application for review. Upon completion of the above work, please notify Historical Commission staff as final sign-off is required to document compliance with this Certificate and approved plans.   Upon completion of above work, please notify Historical Commission staff through permitting system as final sign-off is required to document compliance with this Certificate and approved plans. Dated: April 30, 2026 SALEM HISTORICAL COMMISSION By: This certificate will expire: April 30, 2027 The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work. 5/18/26, 3:29 PM about:blank about:blank 2/2