Loading...
Decision STAMPED Avalon (2) CITY OF SALEM PLANNING BOARD"'" 1 _ '� � � 09 Decision Smart Growth Overlay District Plan Review, C-ROD Site Plan Review, and Stormwater Management Permit 8 Harrison Road (Map 31,Lot 327), 9 Harrison Road (Map 31,Lot 340),262 Loring Ave (Map 31,Lot 1), and 266 Loring Ave (Map 31,Lot 341) -Phase 1 (Avalon) April 24,2026 Re: Application of Joseph Correnti, Esq. f/b/o AvalonBay Communities, Inc. for the property located at 8 Harrison Road (Map 31, Lot 327), 9 Harrison Road (Map 31, Lot 340), 262 Loring Ave(Map 31, Lot 1), and 266 Loring Ave(Map 31, Lot 341)in the R1 (Residential One Family), RC (Residential Conservation), SGO(Smart Growth Overlay District),ECOD(Entrance Corridor Overlay District), and C-ROD (Coastal Resiliency Overlay District) Zoning Districts for Smart Growth Overlay District Plan Review and C-ROD Site Plan Review in accordance with the following sections of the Salem Zoning Ordinance: Section 7.4 Smart Growth Overlay District, Section 8.9 Coastal Resiliency Overlay District Site Plan Review, and Section 37 of the Salem Code of Ordinances, Stormwater Management Permit. Specifically, the applicant proposes to construct a residential building consisting of 340 units, an above-level parking garage with 524 parking spaces, and two enclosed outdoor courtyards. The proposed work also includes an approximately half-acre central landscaped common, extension of the existing Harrison Road,and connection to the Forest River Conservation Trailhead. This project is the first phase of a multi- phase project known collectively as the Forest River Residences, to be located at 8 Harrison Road (Map 31, Lot 327), 9 Harrison Road(Map 31, Lot 340),262 Loring Ave(Map 31,Lot 1), and 266 Loring Ave (Map 31, Lot 341). Procedural History 1. An application for a Smart Growth Overlay Plan review under Section 7.4 and C-ROD Site Plan Review under Section 8.9 of the City of Salem Zoning Ordinance was made by Joseph Correnti and filed with the Planning Board on January 7, 2026. 2. The notice of public hearing was first issued on January 22, 2026. 3. The Planning Board of the City of Salem opened the public hearing on February 5, 2026 and continued to February 19, 2026, March 5, 2026, March 26, 2026, April 9, 2026, and April 23, 2026. 4. On April 5, 2026 the City contracted with New England Civil Engineering (NECE) to provide an independent peer review of the proposed development plans including stormwater management and drainage for all discharged and connections to the City of Salem MS4 drainage system, and onsite engineering issues covered by the City of Salem "Engineering Rules and Regulations for Site Plan Review and Building Permit Routing Planning Board Decision 8 Harrison Road(Map 31,Lot 327),9 Harrison Road(Map 31,Lot 340),262 Loring Ave(Map 31,Lot 1),and 266 Loring Ave (Map 31,Lot 341)-Phase 1 (Avalon) April 24,2026 Slip sign off checklist' per the tasks identified in the revised proposal dated March 21, 2026. 5. A Joint Public Hearing was held with the Design Review Board on February 19,2026. The project continued to the Design Review Board meeting on February 25, 2026 and March 25, 2026. The Design Review Board provided recommendations to the Planning Board on March 27, 2026. 6. The Planning Board closed the public hearing on April 23, 2026. 7. The plans and other submission materials were reviewed by the Planning Board. Throughout its deliberations, the Planning Board has been mindful of the statements of the applicants and their representatives, and the comments of the general public, all as made at the public hearing. Findings Smart Growth Overlay District Plan Review Criteria The Planning Board considered all review criteria as identified in 7.4.8 and determined the Plan meets the following criteria as conditioned: a. The applicant has submitted the required fees and information as set forth in applicable regulations; b. The proposed development project as described in the application meets all requirements and standards set forth in Section 7.4 of the Salem Zoning Ordinance unless a waiver from them has been granted by the Planning Board including the Housing and Housing affordability requirements of Section 7.4.6. c. Any extraordinary adverse potential impacts of the development project on nearby properties can be adequately mitigated. d. All requirements for the project subject to the affordability requirements of Section 7.4.6 have been satisfied. C-ROD Site Plan Review Criteria The Planning Board finds that the proposed project as conditioned complies with all review criteria as identified in, Sec. 8.9.10. The Plan meets accepted site planning standards and promotes standards such that the development takes place in a manner which shall in all aspects be an asset to the City. Decision In view of these criteria,the Planning Board decided at a regularly scheduled meeting on April 23, 2026, by a vote of seven (7) (Chair Kirt Rieder, Jonathan Berk, Tom Furey, Carole Hamilton, Graham Wing, Helen Sides, and Josh Turiel) in favor, and none (0) opposed to approve the proposed project subject to the following conditions: 1. Conformance with the Plan 2 Planning Board Decision 8 Harrison Road(Map 31,Lot 327),9 Harrison Road(Map 31,Lot 340),262 Loring Ave(Map 31,Lot 1),and 266 Loring Ave (Map 31,Lot 341)-Phase 1 (Avalon) April 24,2026 a. Work shall conform to"Salem State South Campus Redevelopment Avalon Salem" and "Avalon Salem 8 Harrison Road Sale, MA Application for 40R Development Plan Approval—Architectural Drawings"with the sheets listed below(the"Plans"). 2. Endorsement of the Plans a. The applicant shall submit updated architectural plans showing the following changes: i. Removal of the signage at the high point of the building in the drawing Titled Exterior Elevations sheet A4.01 and A5.01. ii. Incorporation of signage right above the entrance of the building in the drawing titled Exterior Elevations sheet A4.01. iii. Include a total of 5 standard designated trailhead parking signs where one is a handicap parking space in drawing titled Site Plan South, Sheet C107. Drawing Title Sheet Prepared By Issued Revised No. Cover Sheet C000 Weston& Sampson 1/08/26 4/20/26 Abbreviations, C001 Weston & Sampson 1/08/26 4/20/26 Notes, & Legends Environmental C002 Weston& Sampson 9/3/24 4/20/26 Constraints Plan Erosion, C100 Weston& Sampson 1/8/26 4/20/26 Sedimentation control, and Demolition Plan Erosion, C101 Weston& Sampson 1/8/26 4/20/26 Sedimentation control, and Demolition Plan (North) Erosion, C102 Weston& Sampson 1/8/26 4/20/26 Sedimentation control, and Demolition Plan (South) Erosion, C 103 Weston & Sampson 1/8/26 4/20/26 Sedimentation control, and Demolition Plan (East) Overall Site Plan C104 Weston& Sampson 1/8/26 4/20/26 3 Planning Board Decision 8 Harrison Road(Map 31,Lot 327),9 Harrison Road(Map 31,Lot 340),262 Loring Ave(Map 31,Lot 1),and 266 Loring Ave (Map 31,Lot 341)-Phase 1 (Avalon) April 24 2026 Site Plan West C105 Weston& Sampson 1/8/26 4/20/26 Site Plan North C 106 Weston& Sampson 1/8/26 4/20/26 Site Plan South C107 Weston & Sampson 1/8/26 4/24/26 Site Plan East C 108 Weston& Sampson 1/8/26 4/20/26 Utility Plan West C109 Weston& Sampson 1/8/26 4/20/26 Utility Plan North C110 Weston& Sampson 1/8/26 4/20/26 Utility Plan South C111 Weston& Sampson 1/8/26 4/20/26 Utility Plan East C112 Weston& Sampson 1/8/26 4/20/26 Utility Plan South C113 Weston & Sampson 1/8/26 4/20/26 Additional Scope) Grading and Cl 14 Weston& Sampson 1/8/26 4/20/26 Drainage Plan West Grading and C115 Weston& Sampson 1/8/26 4/20/26 Drainage plan North Grading and C116 Weston & Sampson 1/8/26 4/20/26 Drainage Plan South Grading and C 117 Weston& Sampson 1/8/26 4/20/26 Drainage Plan East Drainage Schedule C118 Weston& Sampson 1/8/26 4/20/26 Details C500 Weston& Sampson 1/8/26 4/20/26 Details C501 Weston & Sampson 1/8/26 4/20/26 Details C502 Weston& Sampson 1/8/26 4/20/26 Details C503 Weston& Sampson 1/8/26 4/20/26 Details C504 Weston& Sampson 1/8/26 4/20/26 Details C505 Weston& Sampson 1/8/26 4/20/26 Details C506 Weston & Sampson 1/8/26 4/20/26 Details C507 Weston& Sampson 1/8/26 4/20/26 Key plan-AVB L100 Klopfer Martin Design Group 1/8/26 4/20/26 Materials & Layout L101 Klopfer Martin Design Group 1/8/26 4/20/26 —AVB - 1 Materials & Layout L102 Klopfer Martin Design Group 1/8/26 4/20/26 —AVB-2 Materials & Layout L103 Klopfer Martin Design Group 1/8/26 4/20/26 —AVB - 3 Materials &Layout L104 Klopfer Martin Design Group 1/8/26 4/20/26 —AVB -4 Grading—AVB - 1 L201 Klopfer Martin Design Group 1/8/26 4/20/26 Grading—AVB - 2 L202 Klopfer Martin Design Group 1/8/26 4/20/26 Grading—AVB - 3 L203 Klopfer Martin Design Group 1/8/26 4/20/26 Grading—AVB - 4 1 L204 Klopfer Martin Design Group 1/8/26 4/20/26 Planting Schedule— L300 Klopfer Martin Design Group 1/8/26 4/20/26 AVB 4 Planning Board Decision 8 Harrison Road(Map 31,Lot 327),9 Harrison Road(Map 31,Lot 340),262 Loring Ave(Map 31,Lot 1),and 266 Loring Ave (Map 31,Lot 341)-Phase 1 (Avalon) April 24 2026 Planting Schedule— L301 Klopfer Martin Design Group 1/8/26 4/20/26 AVB -1 Planting Schedule— L302 Klopfer Martin Design Group 1/8/26 4/20/26 AVB -2 Planting Schedule— L303 Klopfer Martin Design Group 1/8/26 4/20/26 AVB- 3 Planting Schedule— L304 Klopfer Martin Design Group 1/8/26 4/20/26 AVB- 4 Details—paving, L401 Klopfer Martin Design Group 1/8/26 4/20/26 Curbs, and Walls Details— L402 Klopfer Martin Design Group 1/8/26 4/20/26 Furnishings Details—Planting L403 Klopfer Martin Design Group 1/8/26 14/20/26 Details—Paving, L501 Klopfer Martin Design Group 4/17/26 4/20/26 Curbs, and Walls Details—Walls and L502 Klopfer Martin Design Group 4/17/26 4/20/26 Stairs Details - Furnishing L503 Klopfer Martin Design Group 4/17/26 4/20/26 Details—Planting L504 Klopfer Martin Design Group 4/17/26 4/20/26 Site Lighting LT101 Klopfer Martin Design Group 1/8/26 4/20/26 Photometrics -AVB Project cover T0.01 The Architectural Team, Inc 1/8/26 4/21/26 Drawing T0.10 The Architectural Team, Inc 1/8/26 4/21/26 List/Building& Garage Information Building gross TO.11 The Architectural Team, Inc 1/8/26 Square Footage Building Gross TO.12 The Architectural Team, Inc 1/8/26 Square Footage Architectural Site A0.01 The Architectural Team, Inc 1/8/26 4.21.26 Plan Overall Floor Plan— A1.00 The Architectural Team, Inc 1/8/26 Level 0.5 Overall Floor Plan A1.01 The Architectural Team, Inc 1/8/26 4.21.26 Level 1 Overall Floor Plan A1.02 The Architectural Team, Inc 1/8/26 Level 2 Overall Floor Plan A1.03 The Architectural Team, Inc 1/8/26 Level 3 Overall Floor Plan A1.04 The Architectural Team, Inc 1/8/26 Level 4 Overall Floor Plan A1.05 The Architectural Team, Inc 1/8/26 Level 5 Overall Floor Plan A 1.06 The Architectural Team, Inc 1/8/26 4.21.26 Roof 5 Planning Board Decision 8 Harrison Road(Map 31,Lot 327),9 Harrison Road(Map 31,Lot 340),262 Loring Ave(Map 31,Lot 1),and 266 Loring Ave (Map 31,Lot 341)-Phase 1 (Avalon) Almil24 2026 Exterior Elevations A4.01 The Architectural Team, Inc 1/8/26 4.24.26 Exterior Elevations A4.02 The Architectural Team, Inc 1/8/26 4.16.26 Overall Building A5.01 The Architectural Team, Inc 1/8/26 4.24.26 Sections Boundary, 1 of 10 Control Point Associates, Inc. 12/16/25 topographic& Utility Survey Boundary, 2 of 10 Control Point Associates, Inc. 12/16/25 Topographic& Utility Surve Boundary, 3 of 10 Control Point Associates, Inc. 12/16/25 Topographic& Utility Survey Boundary, 4 of 10 Control Point Associates, Inc. 12/16/25 Topographic& Utility Survey Boundary, 5 of 10 Control Point Associates, Inc. 12/16/25 Topographic& Utility Survey Boundary, 6 of 10 Control Point Associates, Inc. 12/16/25 Topographic& Utility Survey Boundary, 7 of 10 Control Point Associates, Inc. 12/16/25 Topographic & Utility Survey Boundary, 8 of 10 Control Point Associates, Inc. 12/16/25 Topographic& Utility Survey Boundary, 9 of 10 Control Point Associates, Inc. 12/16/25 Topographic& Utility Survey Boundary, 10 of 10 Control Point Associates, Inc. 12/16/25 Topographic& Utility Survey 3. Amendments a. Any proposed future changes to the site plan shall be submitted to the City Planner for their review, prior to any changes in the field. The submission shall include a plan sheet with all changes from the plans approved by the Planning Board bubbled, noted, and stamped by a licensed professional engineer or architect. This submission shall also include a brief narrative explaining the proposed changes. If deemed necessary by the City Planner, these amendments shall be brought to the Planning Board. Any waiver of conditions contained within shall require the approval of the Planning Board. 6 Planning Board Decision 8 Harrison Road(Map 31,Lot 327),9 Harrison Road(Map 31,Lot 340),262 Loring Ave(Map 31,Lot 1),and 266 Loring Ave (Map 31,Lot 341)-Phase 1 (Avalon) April 24,2026 4. Transfer of Ownership a. In the event of the transfer of the site as a whole, within five (5) days of such transfer, the Owner shall notify the Board in writing of the new owner's name and address. The terms, conditions, restrictions, and/or requirements of this decision shall be binding on the Owner and its successors and/or assigns. 5. Site Specific Conditions a. If an HVAC unit is located on the roof or at grade on site, it shall be visually screened. The method for screening the unit shall be submitted to the City Planner for review and approval prior to installation. Approved method for screening shall be constructed and installed prior to the issuance of a final Certificate of Occupancy. b. Any dumpsters and compactors located on the site shall be visually screened. The method for screening the unit shall be submitted to the City Planner for review and approval prior to installation. Approved method for screening shall be constructed and installed prior to the issuance of a final Certificate of Occupancy. c. Prior to the issuance of a Building Permit, the applicant shall provide a final statement, signed and sealed by a state licensed architect or engineer, that all covered building spaces below the SLR BFE are designed to be floodproof in compliance with the requirements of Section 8.9.8 of the Salem Zoning Ordinance. d. The applicant shall fulfill conditions laid out in the decision to be provided by the Conservation Commission. e. Prior to issuance of Final Certificate of Occupancy, Applicant shall remove any construction debris and/or stockpiled building materials between the Forest River Conservation area and the paved parking on the perimeter of lot 4. 6. Design Review Board a. Prior to issuance of a building permit, the applicant shall submit revised plans and materials to the Design Review Board for recommendation to the City Planner for review and approval that includes more variation on the red brick proposed along with specificity of grout color. 7. Pre-Construction Conference a. Prior to mobilizing equipment on site for the start of work, a pre-construction conference as necessary shall be scheduled with the City Planner,the City Engineer (or their designee), the Building Commissioner, the Health Agent, Tree Warden and any other departments that may be necessary. The Owner shall submit a construction schedule at the time of the pre-construction conference. The schedule shall include a description of how construction will be phased and staged and what the impacts will be to the sidewalks and roadways. 8. Traffic& Circulation a. A transportation coordinator shall be assigned to the development before the final Certificate of Occupancy(CO) is issued. 7 Planning Board Decision 8 Harrison Road(Map 31,Lot 327),9 Harrison Road(Map 31,Lot 340),262 Loring Ave(Map 31,Lot 1),and 266 Loring Ave (Map 31,Lot 341)-Phase 1 (Avalon) April 24,2026 b. Information regarding public transportation services, maps, schedules, and fare information shall be posted in a central location before CO is issued. c. An example of a "welcome packet" shall be developed and provided to the City Planner before CO is issued. This packet shall include information for new residents detailing available public transportation services,bicycle and walking alternatives, and other commuting options. d. The applicant must demonstrate to the Transportation Director that best efforts have been be made to coordinate with a car-share provider to stage car-share vehicles within the project site before CO is issued. e. Short-term parking/loading shall be designated with signage in proximity to building lobbies to accommodate rideshare service providers and deliveries before CO is issued. f. A central maildrop shall be provided within each building and a package delivery station must be provided before final CO is issued. g. 34 electric vehicle(EV) charging spaces shall be provided within the project site in compliance with the City of Salem's EV guidelines before final CO is issued with electrical capacity to increase the amount as demand increases. h. Before issuance of final CO, 170 secure long term bicycle parking spaces with space allocated to increase another 170 spaces if demand increases over time. i. A transit screen or equivalent display in the lobby to display real-time traffic and bus location information shall be installed before final CO is issued. j. To ensure that safe vehicle, bicyclist, and pedestrian circulation is maintained throughout construction, the applicant shall submit to the City Planner,prior to issuance of a Building Permit, a plan detailing site access for construction vehicles,material delivery, debris removal, and any other vehicular activity associated with the project's construction. k. The developer shall contribute $340,000 ($1,000 per dwelling unit)to the City of Salem Transportation Enhancement Fund (TEF), commensurate to the project's impact on the City's transportation network,prior to issuance of the final Certificate of Occupancy. The TEF will be used by the city for transportation network services relating to the Salem Skipper. 1. Prior to issuance of the Final Certificate of Occupancy the applicant shall request an amendment from the Transportation commission for any proposed changes to the parking ordinance outlined in the Salem Traffic Ordinance Section 74 on Harrison Road. m. Loring Avenue, adjacent to the Project, is under MassDOT jurisdiction, and any work done within their right-of-way will require MassDOT coordination and permits. n. The applicant will allow for up to 5 additional vehicles to park in shared visitor parking spaces in non-business hours for trailhead use. 9. Landscaping a. An as-built landscaping plan accompanied with a letter from a Registered Landscape Architect or certified arborist certifying compliance of the landscaping with the approved plan shall be submitted to the City Planner prior to issuance of the Final Certificate of Occupancy. 8 Planning Board Decision 8 Harrison Road(Map 31,Lot 327),9 Harrison Road(Map 31,Lot 340),262 Loring Ave(Map 31,Lot 1),and 266 Loring Ave (Map 31,Lot 341)-Phase 1 (Avalon) April 24,2026 b. Maintenance of all landscaping on the site shall be the responsibility of the Applicant indefinitely, its successors or assigns, and any tree or shrub that does not survive shall be replaced. 10. Maintenance a. Refuse removal,ground maintenance, and snow removal shall be the responsibility of the applicant. "Refuse removal" includes recycling, which shall be the responsibility of the owner, successors, or assigns. The owner shall provide adequate facilities to ensure all users are able to recycle their trash. Owner is to enter into a contract with a company of the owner's choice to arrange pick-up of recyclable material. A copy of this contract is to be submitted to the City Engineer. b. Winter snow in excess of snow storage areas on the site shall be removed off- site. 11.Affordable Housing a. In Accordance with Section 7.4.8, In SGO-2 Subzone 1, ten (10) percent of units shall be made affordable to households within incomes at or below eighty (80) percent Area Median Income(AMI); and ten(10)percent of the units will be made available to eligible households with incomes at or below sixty (60)percent AMI. b. The applicant shall place an Affordable Housing Restriction on the affordable housing units required in condition 10.a.in the form acceptable to the City of Salem and EOHLC. The restrictions shall be in accordance with the Section 7.4.6, with a sales or rental price affordability to"Eligible Households,"for the maximum period allowed by law or regulation. EOHLC shall be the final authority on the terms of the Affordable Housing Restriction. The Affordable Housing Restriction(s) shall be registered with the Essex South Registry of Deeds. c. The Affordable Housing Units must be constructed and ready for occupancy at a proportion of one (1) affordable unit for every five (5) certificates of occupancy released for the market rate units. Ready for occupancy means that 1. The affordable units have a certificate of occupancy, 2. The Affordable Housing Restriction has been registered with the Essex South Registry of Deeds, and 3. The lottery has been completed pursuant to Section III of the EOHLC Comprehensive Permit Guidelines. d. The applicant shall comply with all requirements of Section 7.4.6 of the City of Salem Zoning Ordinance. e. The applicant shall request the maximum local preference allowable by law, including the regulations of the Executive Office of Housing and Livable Communities (EOHLC). 12. Fire Department a. All work shall comply with the requirements of the Salem Fire Department. 13. Building Inspector 9 Planning Board Decision 8 Harrison Road(Map 31,Lot 327),9 Harrison Road(Map 31,Lot 340),262 Loring Ave(Map 31,Lot 1),and 266 Loring Ave (Map 31,Lot 341)-Phase 1 (Avalon) April 24,2026 a. All work shall comply with the requirements of the Salem Building Department under the Massachusetts State Building Code and the Ordinances of the City of Salem. 14. Board of Health The owner shall comply with the following specific conditions issued by the Board of Health: a. The individual presenting the plan to the Board of Health must notify the Health Agent of the name, address, and telephone number of the project (site) manager who will be on site and directly responsible for the construction b. of the project. c. If a DEP tracking number is issued for this site under the Massachusetts Contingency Plan, no structure shall be constructed until the Licensed Site Professional responsible for the site meets the DEP standards for the proposed use. d. A copy of the Licensed Asbestos Inspector's Report must be sent to the Health Agent. e. A copy of the Licensed Lead inspectors' Report must be sent to the Health Agent. f. A copy of the Demolition Notice sent to MA DEP, Form BWPAO6, must be sent to the Health Agent. g. The developer shall adhere to a drainage plan as approved by the Planning Board. h. The developer shall employ a licensed pesticide applicator to exterminate the area prior to construction, demolition, and/or blasting and shall send a copy of the exterminator's invoice to the Health Agent. i. The developer shall maintain the area free from rodents throughout construction. j. The developer shall submit to the Health Agent a written plan for dust control and street sweeping which will occur during construction. k. The developer shall submit to the Health Agent a written plan for containment and removal of debris, vegetative waste, and unacceptable excavation material generated during demolition and/or construction. 1. The Fire Department must approve the plan regarding access for firefighting. m. Noise levels from the resultant establishment(s)generated by operations,including but not limited to refrigeration and HVAC systems,shall not increase the broadband sound level by more than 10 dB(A) above the ambient levels measured at the property line. n. The developer shall disclose in writing to the Health Agent the origin of any fill material needed for the project. o. The resultant establishment shall dispose of all waste materials resulting from its operation in an environmentally sound manner as described to the Board of Health. p. The developer shall notify the Health Agent when the project is complete for final inspection and confirmation that above conditions have been met. q. Documents for the proposed pool must be submitted for review and approval prior to construction of the pool. r. In accordance with Board of Health Regulation #7, the developer shall ensure that the trash contractor offer mandatory recycling to the development. 15. City Engineer&Utilities 10 Planning Board Decision 8 Harrison Road(Map 31,Lot 327),9 Harrison Road(Map 31,Lot 340),262 Loring Ave(Map 31,Lot 1),and 266 Loring Ave (Map 31,Lot 341)-Phase I (Avalon) April 24,2026 a. All work shall comply with the Engineering Rules and Regulations. b. The applicant shall comply with all the recommendations from the civil peer review letter and the stormwater peer review letter dated March 15,2026 and updated April 14, 2026, issued by New England Civil Engineering. c. Prior to Demolition i. Prior to issuance of Demolition Permit, the applicant shall coordinate with Salem Water Dept. regarding removal of 8-inch gate valves on Loring at Harrison on sheet C 103 in the above mentioned approved plans and determine if an isolation valve is required within water main replacement segment (to abandon tee) as shown on sheet C112 in the above mentioned approved plans. ii. Prior to issuance of Demolition Permit the applicant shall provide additional information about maintaining water service to the Harrison Avenue homes and the Winn buildings during construction. iii. Prior to issuance of Demolition Permit and any soil disturbance, the applicant shall coordinate with the Salem Fire Department to determine if temporary fire hydrant required near the existing hydrant behind the Winn building,and if required install a temporary fire hydrant during construction until the existing hydrant is reconnected. iv. Prior to issuance of Demolition permit and any soil disturbance, the applicant shall provide all required construction dewatering details and documentation. v. Prior to issuance of Demolition Permit, the applicant shall obtain and provide a copy of the NPDES General Permit to the City of Salem. vi. Prior to issuance of Demolition Permit and any soil disturbance, the applicant shall provide all required information for proposed temporary water source during demolition and construction activities. vii. Prior to issuance of Demolition permit of any soil disturbance,the applicant shall provide all required information for proposed temporary water source during demolition and construction activities. viii. Prior to issuance of issuance of Demolition permit of any soil disturbance, the applicant shall provide confirmation that all required backflow preventor devices and water meters will be incorporated for the proposed temporary water source during demolition and construction activities. ix. Prior to issuance of Demolition Permit the applicant shall provide all required information for proposed temporary water source during demolition and construction activities. x. Prior to issuance of Demolition Permit the applicant shall obtain a Tree Permit from the City of Salem. d. Prior to Building i. Prior to issuance of Building Permit, the applicant shall provide existing and proposed water demand peak flows ii. Prior to issuance of Building Permit,the applicant shall provide calculations verifying that proposed hydrant services and fire service to the building have adequate flow and pressure 11 Planning Board Decision 8 Harrison Road(Map 31,Lot 327),9 Harrison Road(Map 31,Lot 340),262 Loring Ave(Map 31,Lot 1),and 266 Loring Ave (Map 31,Lot 341)-Phase 1 (Avalon) April 24,2026 iii. Prior to issuance of Building Permit, the applicant shall provide existing and proposed water demand peak flow calculations iv. Prior to issuance of Building Permit, the applicant shall provide plumbing plans meeting City of Salem water meter design requirements v. Prior to issuance of Building Permit, the applicant shall provide fire protection plans meeting City of Salem fire sprinkler system design requirements. vi. Prior to issuance of Building Permit, the applicant shall confirm if an irrigation system will be installed, and if an irrigation system is proposed, Applicant shall provide an irrigation system design meeting City of Salem . requirements. vii. Prior to issuance of Building Permit, the applicant shall submit a revised sheet number C111 from the above-mentioned plans to the City of Salem to include a 6"gate valve at connection to the existing Winn hydrant. viii. Prior to issuance of Building Permit, the applicant shall provide plumbing plans meeting City of Salem water meter design requirements. ix. Prior to issuance of Building Permit, the applicant shall provide the City of Salem Engineer and Plumbing Inspector written certification from a Licensed Plumber stating if additional backflow prevention devices are required above what is required by City design requirements. x. Prior to issuance of Building Permit the applicant shall provide separate Backflow Prevention Device Design Data Sheets (with associated fees) for each proposed backflow device completed/submitted by a licensed plumber and/or Fire Protection Engineer. xi. Prior to the issuance of Building Permit, the applicant shall provide Fire Protection plans meeting City design requirements. xii. Prior to the issuance of Building Permit, the applicant shall provide additional information including roof drainage plans and plumbing plans. xiii. Prior to the issuance of Building Permit,the applicant shall submit a petition for grant of location through City Council for all relocation, size, increase or new electrical and telecommunications conduits within the City right-of- way. xiv. Prior to issuance of Building Permit the applicant shall obtain a Drainage Alteration Permit from the City of Salem Engineering Department. e. Prior to Certificate of Occupancy i. Prior to issuance of Final Certificate of Occupancy, the applicant shall provide documentation to City Engineering confirming that all backflow devices have passed required testing as soon as the water is turned on to the building. ii. Prior to the issuance of Final Certificate of Occupancy the applicant shall provide an O&M Manual for the stormwater system meeting City requirements. iii. Prior to issuance of Final Certificate of Occupancy the applicant shall provide all required as-built documentation. 12 Planning Board Decision 8 Harrison Road(Map 31,Lot 327),9 Harrison Road(Map 31,Lot 340),262 Loring Ave(Map 31,Lot 1),and 266 Loring Ave (Map 31,Lot 341)-Phase 1 (Avalon) April 24,2026 iv. Prior to issuance of Final Certificate of Occupancy the applicant shall provide completed tie cards reflecting all required information. v. Prior to issuance of Final Certificate of Occupancy the applicant shall provide written certification by the civil engineer of record meeting all City requirements. vi. Prior to issuance of Final Certificate of Occupancy the applicant shall provide documentation verifying that the Operation and Maintenance Manual has been recorded at the Registry of Deeds. 16. Engineering Clerk of the Works a. A Clerk of the Works shall be provided by the City,at the expense of the Applicant, their successors or assigns, as it is deemed necessary by the City Engineer to review the off-site infrastructure improvement and improvements that tie into City systems (i.e. water and sewer infrastructure) as well as stormwater, drainage and site improvements that result in grade modifications. Accordingly, it is the understanding of the Board,the City Planner,the City Engineer,and the Applicant, that the Clerk of the Works is expected to oversee and review all civil and site improvements related to the Project, including,but not necessarily limited to: i. All utility cut and caps related to the City's Demolition Permit; ii. All new water and sewer utility installations; iii. All connections to, extensions of, or improvements to publicly owned infrastructure both on the Applicant's site or withing the City's right of way and any on-site stormwater or wastewater systems; iv. All new installations or modifications to existing pavement, sidewalk, and curbing within the public right of way; v. All site grading modifications,particularly where grade changes are two(2) feet or more per Chapter 38, Article VI of the City Ordinance; and vi. All conditions placed on the project by an Order of Conditions from the Salem Conservation Commission. b. The Clerk of the Works shall review and approve all proposed, or approved, changes to the original Planning Board decision. c. The Applicant shall submit a construction plan that includes a detailed sequence and schedule of all construction activities related to the Clerk of the Works' purview. Once the construction plan is approved. it shall be used to create a Task Order for the Clerk of the Works. d. No work, including blasting, demolition, excavation, and grading shall start before an approved task order for the Clerk of the Works' services has been agreed upon and approved by all parties. 17. Construction Practices a. All construction shall be carried out in accordance with the following conditions: i. All provisions in the City of Salem's Code of Ordinance, Chapter 22,Noise Control, shall be strictly adhered to. ii. All reasonable action shall be taken to minimize the negative effects of construction on abutters. Advance notice shall be provided to all abutters 13 Planning Board Decision 8 Harrison Road(Map 31,Lot 327),9 Harrison Road(Map 31,Lot 340),262 Loring Ave(Map 31,Lot 1),and 266 Loring Ave (Map 31,Lot 341)-Phase 1 (Avalon) April 24,2026 in writing at least 72 hours prior to commencement of demolition and construction of the project. iii. Drilling and blasting shall be limited to Monday-Friday between 8:00 AM until 5:00 PM. There shall be no drilling, blasting or rock hammering on Saturdays, Sundays, or state and federal holidays. Blasting shall be undertaken in accordance with all local and state regulations. iv. All construction and staging will occur on site. No construction will occur or be staged within City right of way unless shown on the approved plans. Any deviation from this shall be approved by the Department of Planning & Community Development prior to construction. v. Prior to issuance of a demolition, foundation, or building permit, the Applicant shall provide a detailed construction vehicle access, schedule, and traffic plan for review and approval by the Director of Traffic&Parking vi. Any roadways, driveways, sidewalks, or landscaping damaged during construction shall be restored to their original condition by the applicant. vii. All construction vehicles shall be cleaned prior to leaving the site so that they do not leave dirt and/or debris on surrounding roadways as they leave the site. viii. All construction shall be performed in accordance with any and all rules, regulations and ordinances of the City of Salem. ix. All construction vehicles left overnight at the site, .must be located completely on the site. x. Should contaminated materials be encountered onsite, all construction shall take place under the direction and supervision of a Licensed Site Professional in compliance with the rules and regulations of the Massachusetts Department of Environmental Protection. xi. The applicant shall promptly notify the Board of Health of any environmental condition encountered during construction that may adversely impact the abutters to the site. 18.As-built Engineering Plans a. As-built Plans, stamped by a Registered Professional Engineer, shall be reviewed and approved by the Clerk of the Works, then submitted to the Department of Planning and Community Development and Department of Public Services prior to the issuance of the final Certificate of Occupancy. b. The As-Built plans shall be submitted to the City Engineer in an electronic file format suitable for the City's use and approved by the City Engineer, prior to the issuance of the final Certificate of Occupancy. c. A completed tie card, a blank copy (available at the Engineering Department) and a certification signed and stamped by the design engineer, stating that the work was completed in substantial compliance with the design drawing must be submitted to the City Engineer prior to the issuance of the final Certificate of Occupancy; as well as, any subsequent requirements by the City Engineer. 19. Violations 14 Planning Board Decision S Harrison Road(Map 31,Lot 327),9 Harrison Road(Map 31,Lot 340),262 Loring Ave(Map 31,Lot 1),and 266 Loring Ave (Map 31,Lot 341)-Phase 1 (Avalon) April 24,2026 a. Violations of any condition contained herein shall result in revocation of this permit by the Planning Board unless the violation of such condition is waived by a majority vote of the Planning Board. 20. Lapse a. The Smart Growth Overlay Plan Review and C-ROD site plan review shall lapse after two years from the grant thereof if actual construction thereof has not sooner commenced except for good cause as approved by the Planning Board. Such approval may, for good cause, may be extended in writing by the Planning Board upon the written request of the applicant. Record of Vote The following members of the Planning Board voted seven (7) in favor and none (0) opposed to approve the Smart Growth Overlay Plan Review and C-ROD Site Plan Review application subject to the above-stated terms and conditions: Chair Kirt Rieder, Jonathan Berk, Tom Furey, Carole Hamilton, Graham Wing, Helen Sides, and Josh Turiel I hereby certify that a copy of this decision and plans has been filed with the City Clerk and copies are on file with the Planning Board. The Smart Growth Overlay Plan Review and C-ROD Site Plan Review shall not take effect until a copy of this decision bearing the certification of the City Clerk that twenty(20)days have elapsed and no appeal has been filed or that if such appeal has been filed,and it has been dismissed or denied,is recorded in the Essex South Registry of Deeds and is indexed under the name of the owner of record is recorded on the owner's Certificate of Title. The owner or applicant,his successors or assigns,shall pay the fee for recording or registering. 4A�Kw Kirt Rieder Chair 15