Loading...
24 FORT AVENUE PIN, PHASE IV COMPLETION REPORT & PSWCS • RECEIVED ENVIRONMENTAL C O N E C O JAN 2 7 2026 ECOLOGICAL SURVEY Engineers & Scientists CITY OF SALEM CIVIL January 14,2026 BOARD OF HEALTH Coneco Project No. 5650.D.104 Sara Moore,Chair Salem Board of Health Salem City Hall 93 Washington Street Salem,Massachusetts 01970 RE: Public Involvement Notification Phase IV Completion Report and Permanent Solution with Conditions Statement Non-PCB Mineral Oil Dielectric Fluid Release 1 Bank A Transformer Salem Harbor No. 45 Substation 24 Fort Avenue Salem,Massachusetts Release Tracking Number 3-32689 Dear Ms.Moore: Pursuant to 310 CMR 40.1403 of the Massachusetts Contingency Plan(MCP),the following serves as written notification of the submittal of a Phase IV Completion Report and Permanent Solution with Conditions Statement. This submittal is regarding a release approximately 20 to 50 gallons of non-polychlorinated biphenyl(non-PCB)mineral oil dielectric fluid from an electrical power transformer at the above-referenced location. This letter follows notification to the Massachusetts Department of Environmental Protection (MassDEP)on January 14,2015, and the submittal of a Phase IV Completion Report and Permanent Solution Statement to the MassDEP on or about January 14, 2026. A copy of the above-referenced report is available for viewing at the MassDEP. A copy of this report may also be obtained by contacting the undersigned in writing. Actions have been conducted to assess the extent of and risks posed by the contamination and ensure that the disposal site does not pose a significant risk of harm to human health, safety, welfare or the environment, as required by the MCP. Information related to this Disposal Site is also available in files at the MassDEP and online at https://eeaonline.eea.state.ma.us/portai/dep/wastesite/viewer/3-0032689. For more information about the public involvement regulations that require this notice and a description of such public involvement activities available under the MCP, see https://www.mass.eov/lists/waste-site-cleanup-laws-and-regulations. This submittal is being made on behalf of New England Power Company,the party conducting response actions regarding this release. 4 First Street, Bridgewater,MA 02324 (508)697-3191 (800)548-3355 Coneco.com RTN 3-32689 24 Fort Avenue January 14,2026 Salem,Massachusetts Page 2 If you would like additional information regarding this notice,you may contact the undersigned. Sincerely, Coneco Engineers& Scientists, Incorporated 'I Azw 94"� Thomas R.Hunter Michael J.Philbin Environmental Scientist Senior Project Manager Bria lingler,PG,LSP Principal Geologist TRH:MJP:BFK jw S:\\5650.D.104 PSwC Notice BOH.docx cc: New England Power Company MassDEP