Loading...
20 HATHORNE STREET_CofA_ROOF_PAINTCOLORS Salem Historical Commission 98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978) 619-5685 CERTIFICATE OF APPROPRIATENESS It is hereby certified that the Salem Historical Commission has determined that the proposed:  Construction  Moving √ Reconstruction  Alteration  Demolition √ Painting  Signage  Other work as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 20 Hathorne Street Name of Record Owner: Ruthy LLC Description of Approval of Work: • Replace roofing with the following conditions: o Existing natural slate roofing (all sides of lower mansard roof including sections of lower mansard roof where slate was recently removed and side walls of all roof dormers) to be replaced with DaVinci Single-Width faux Slate in “Slate Black” o All existing asphalt roofing and upper slopes of mansard roof to be replaced with GAF Timberline NS shingles in black to match color of faux slate. o All existing rubber roofing (excluding upper slopes of mansard roof) to be replaced in-kind. o Note: Commission recommends that removed natural slate be salvaged if possible. • New Benjamin Moore paint colors: o Body: HC-84 “Elmira White” in flat finish o Trim: HC-87 “Ashley Gray” in semi-gloss o Doors: HC-182 “Classic Burgundy” in semi-gloss • NOTE: Unapproved window replacement at this property is still outstanding. Applicant to work with Staff towards resolution of this violation before the Commission. Upon completion of work, please notify Historical Commission staff for final review and sign-off of Certificate. Dated: March 10, 2026 SALEM HISTORICAL COMMISSION By: The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work.