53 FORT AVENUE - BUILDING INSPECTION 53 Fort Ave. ted. CDMCAMP DRESSER & McKEE INC. environmental engineers,scientists, Ten Cambridge Center planners,&management consultants Cambridge, Massachusetts 02142 6172528000 November 4, 1993 Mr. Leo Trembly Public Project Director Building Department 1 Salem Green Salem, Massachusetts 01970 Subject: South Essex Sewerage District Contract No. 93-1 Wastewater Treatment Plant Upgrade Dear Mr. Trembly: On behalf of the South Essex Sewerage District, we are submitting herewith, two copies of the Contract Documents for Contract No. 93-1 Wastewater Treatment Plant Upgrade. These documents are for your information during their review period. We would advise you that we anticipate having to make monor revisions to them as a result of review by regulatory agencies when these matters have been completed, we will furnish you with three copies of the final documents for permit purposes. If we can be of any further assistance,please contact us. Very truly yours, CA D SE cKEE INC. r � Alvin irmin, P.E. Senior Vice President oc John E. Darling, Esq. Serafini, Serafini, Darling Pagel of 2 WEEKLY CONSTRUCTION PROGRESS REPORT Project Title: SESD Site Preparation Contract Contract No: 93-3 Owner: SESD State Project No. BMF 20-843-02 Location: 50 Fort Ave., Salem, MA Contractor: D&C Construction Co. Work Period: From: 6/13/94 To: 6/18/94 Dste of Repo:*: 6"Y'/ A -- -- --- Work Completed Contract Time Amount of Contract $5,230,000.00 Time of Contract 328 days Change Orders $779,515.77 Extensions 0 Total Contract Amount $6,009,515.77 Total Contract Time 328 days *Completed to Date $4,649,645.94 Time to Date 290 days Percent Complete 77.4% Percent of Time 88.4 % Change Orders Approved Pending #1 BD Flow Meter Piping #2 Sign, Fencing. elect. work #3 North rock face stabilization 44 Credits, sewer work,generator rental *Less retainage Page 2 of 2 Progress Report Brief Description of Work This Week The Contractor excavated blasted rock and overburden at the future sites for the Chlorine Contact Chamber, Oxygen Reactor Area and Effluent Pump Station. The Contractor loaded hired trucks with the product for offsite removal. The Contractor completed excavation for the new duct bank which will run from the Effluent Pump Station area to the Air Release Building. The Contrauor-coinpieted excavation and installed ut;?;ties for the relocated the District.Engineering trailers at the NEPCO staging area. The Contractor assisted subcontractors SWP and Stocks, with rigging and excavation. Stocks Blasting continued production and presplit blasting along the 66" plant effluent line at the proposed Chlorine Contact Chamber and Effluent Pump Station. Stocks also continued to hoe-ram small protrusions along the excavation perimeter and bottom. Spencer White and Prentis completed installation of tiebacks 2A, 17, 20, 22, 23, 35A, and 37A. They also worked proof testing installed tiebacks #34 and 35. Lagging was installed by SWP between soldier piles at various locations. SWP bolted reinforcement dowels along the north wall stabilization area and installed chain containment mesh at the same locations. Annese Electric was onsite and completed electric feeders and telephone lines to the relocated SESD Engineering trailers. They also worked installing conduit for the duct bank run to the Air Release Building. General Comments Spencer, White, and Prentis has encountered extensive down time due to equipment failure. James T. Maher Project Manager - Field Camp Dresser& McKee Inc. pONO f } City of 6alem,...........................May...1.1.........19.9.4... Ia TO THE CITY COUNCIL: MMC CQ The undersigned hereby applies for a permit to move a building through the streets of the city, according to the following specifications:- 1. Location of Building No...................53 Fort Avenue......................................_..................... Street ................. . 2. Size of Building—length........50.1..........................width........2V......................heighth.......1Q!........................ 3. Material ......Wood..Frame.........................................................................................................I.......................... 4. Location or the lot upon which the building is to be placed—No......3 Maverick Court.._.,,gWt Marblehead, MA 5. Route over which it is to be moved.....Fort..Avenue... o._Webb_.Street..to..Ro..ute...1.A...to............. Route 114 (Lafayette Street) ........................................................................................................................................................................................ ........................................................................................................................................................................................ 6. Length of time required to move the same.......four...R)...h.ours............................................................. 7. Will it be necessary to remove any shade trees or branches thereof?........NO................................................. ........................................................................................................................................................................................ 8. Bond filed.............................................................. . . �cLtic (Signature) ...!.:...: ....... .. . ....... ..............:....:.p......... .......... ................................. Phlli Mc Cart 12 Maverick Court, Marbleh ad, MA (Residence) No................................................................. . . ...........St.reet I hereby certify that I have examined the building described above, and consider the same to be in proper condition for removal and the new location a proper one for said building to be placed upon. . � / . . Inspector of Buildings. I hereby certify that I have examined the route over which the above described building is to be moved and approved the same. . 1 Superz'tendent ofSErbets. l V�� 661- ok4 o' May 12, 1994 Mr. Philip McCarthy 12 Maverick Court Marblehead, Ma. Dear Mr. McCarthy: At a regular meeting of the City Council held in the Council Chamber on Wednesday, May 11, 1994, the Council voted to grant you permission to move a Wood Frame house located at 53 Fort Avenue subject to the following conditions : 1 . All necessary permits and permissions must be obtained from the Electric Co. , Telephone, Co. , Cable T. V. Co. , Shade and Tree Department, Street Department, Mass . State Department of Public Works, and any other agents that may have an interest. 2 . Copies of Insurance Certificates must be presented, filed in the City Clerk' s Office and must contain hold harmless clauses that will absolve the city from any and all liability. 3 . On the day of the move all of the City Departments must be notified. i .e. - Fire, Electric, Building, Police, Board of Health, etc. 4 . A copy of a Purchase and Sales Agreement must also be presented to the Building Inspector. Very truly yours, DEBORAH E. BURKINSHAW CITY CLERK CC: Police Chief Fire Chief Building Inspector Electrical Dept. Board of Health Shade & Tree Dept. Engineer CITY OF SALEM n tQ.Aa �PO��nvsoo�' In City Council, May 11, 1994 Ordered: That the City Council approve the application for moving a house at 53 Fort Avenue subject to the filing of the necessary bonds and securing the appropriate signatures and that the Ward 7 and Ward 1 Councillors meet with all the proper departments to work out the details . In City Council May 11, 1994 Adopted as amended A motion for immediate reconsideration in the hopes it would not prevail was denied ATTEST: DEBORAH E. BURKINSHAW CITY CLERK _ a— ar BUILDINGf - PERMIT �qJOB WEATHER CARO . y DATE ¢' A^y 19 94 PERMIT NO. 393—I6 APPLICANT Groat W41.�yC�barn Dow ADDRESS 14, B09tya At* xyk!retts ftes. ES.. p�1,.����t�1 1X0.1 (STREET) ICONTR'S UCENSEI PERMIT TO - +</�RFd� .'Qtt (_1 STORY jVaj'jtV* _ NUMBER OF i DWELLING UNITS (TYPE OF IMPROVEMENT) NO. �s a 99 (PROPOSED USE) AT (LOCATION( L 's ,� 11V 4 ZONING DISTRICT (MO:Ia---- +`� 19TREETI _ BETWEEN AND (CROS. STREET) (CROSS STREET) SUBDIVISION OT LOT BLOCK SIZE BUILDING IS TO BE - FT. WIDE BY FT. LONG BY FT. IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE - USE GROUP BASEMENT WALLS OR FOUNDATION fnS ww� .1 y 1 family q♦t (TYPE) REMARKS: P4=it co dekml�ah otw 13Cily dv*11.1•Qty. AREA OR PERMIT VOLUME I ESTIMATED COST $ FEE c CUBIC/SOUARE FEETI OWNER South m4a • 3"OrSX& anoBESs 50 Il&rt AV** SAIBRo notes BBuy uLD6I.NGAAEP1 kR$blEx . THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY 09 SIDEWALK OR ANY PART THEREOF. EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY. NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE AP- PROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL APPROVED PLANS MUST BE RETAINED ON JOB AND THIS WHERE APPLICABLE SEPARATE INSPECTIONS REQUIRED FOR CARD KEPT POSTED UNTIL FINAL INSPECTION HAS BEEN PERMITS ARE REQUIRED FOR ALL CONSTRUCTION WORK: ELECTRICAL, PLUMBING AND 1. FOUNDATIONS OR FOOTINGS. MADE. WHERE A CERTIFICATE OF OCCUPANCY IS RE- MECHANICAL INSTALLATIONS. 2. PRIOR TO COVERING STRUCTURAL QUIRED,SUCH BUILDING SHALL NOT BE OCCUPIED UNTIL MINAL INSPECTION TI TO LATHI. E FINAL INSPECTION HAS BEEN MADE. 3. FINAL INSPELTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVAL$ PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 1 1 1 T 2 Z /Li BOARO OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT,INSPECTING APPROVALS 1 1 OTHER CITY ENGINEER Y 2 WORK SHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS WORK IS NOT STARTED WITHIN SIX MONTHS OF DATE THE CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. PERMIT IS ISSUED AS NOTED ABOVE. OR WRITTEN NOTIFICATION. mwwi.� lM4Bf•:.Grnrn.Ya Or, -e OOPPfO'ETU_:T:-0RilSfyi 4t%P,&cor merC nM t•t4%POEUfamo COm Pesst Corntroi ziervice Ag., e; DEvrVIS THE MEWS PEST CONTROL CO., NC. 2050 TERMITE & CARPENTER ANT SPECIALISTS I WOBURN LOWELL BOSTON LYNN PEABODY NEWTON LAWRENCE 435-DEAD 4592950 $76.2038 592-0023 532.3443 3325853 589-0697 CUSTOMER SERVICE WcO rON , GRT,ETATEaay 2�P PERSON as CON fiEfiViCE RHOry "ONE OP MOPER, TO U.SEMIC�O .. 87- ARVICK 9EGIN6 � ATION A t REmE AL SERVICE To 89 PER Q MONTHLY ` ❑ OUARTI*RLY r�G't"HEa RFf'ISN EE LONTROLLED: - Li '17 $PECMLINLiRUCRON91 / - .Sf . .-..—_.-._--_-. TEtMEANDOOXDRtOMi: SERVICE GUARANTEE:We agree to apply chemicals to control above-named posts in accordance with terns and conditions of this Service Agreement All labor and materials will be furnished to provide the most efficient pest control and maximum safety required by _federal,state and city regulations. SERVICE RENEWAL:This agreement shall be for an initial period of one year,and will renew itself annually unless either party oanools this agreement by giving thirty days written notice before any expiration date. ANNUAL AGREEMENT CHARGE $ By COMPANY X R LHaNATURfl DA INITIAL SERVICE CHARGE MONTHLY/QUARTERLY PAYMENTS $ FOR DATE---- CUSTOMER . "' (AUTHORIZED 8IGNA REI , ------------------ ----••-•__--- •---- --_ $ P.'CC0."I In i�4L Eeh'An.>✓^—A14 i.9Y::b�acitu---e,bhm.e'u. "�pNWT� (situ of FlottlEm, massar4usetts jJublir Fropertg Department Nuilbing Department (One bnlem (5reen 5110-ht5-9595 txt. 3B0 Leo E. Tremblay Director of Public Property Inspector of Building Zoning Enforcement Officer Section 116.0 DEMOLITION OF STRUCTURES Structures over fifty (50) years old must have approval of the SALEM HISTORICAL COMMISSION UTILITIES DISCONNECTIONS REQUIRED Authorized Arent Date of Disconnection Te ATER: "5 ' I ELECTRIC: GAS: l/�8 SEWER: DIG SAFE NUMBER: / aJ• EST CONTROL: ***DOCUMENTATION OF ALL THE ABOVE MUST BE ATTACHED BEFORE PERMIT CAN BE ISSUED =ee for Demolition: $5.00 for application plus $2.00 per 100 sq. it. gross area, minimum $15.00 ly Y t f ctLitp Of ea1Pm, Aa!5garbugett!5 -Fire Department j1)eabquarttr5 48 1afapette street fbalem. Sala. 01970 Joseph F. Sullivan Chief Salem Fire Prevention Regulation #29C DEMOLITION OPERATIONS In accordance with the provisions of the General Laws of the Commonwealth of Massachusetts and the Salem Fire Code, the following regulation governing the demolition of structures within the City of Salem shall be followed. This regulation is made in the interest of fire prevention, to prevent conditions which are or may become dangerous as a fire hazard, or may otherwise be in violation of law. 1. Before a structure can be demolished, the Salem Fire Department requires the filing of an application for permit form #29C, and shall conduct a preliminary demolition inspection to ascertain any conditions which may require a fire watch or other preventive measures to be taken before, during and/or after said demolition process. 2. A permit to demolish or remove a building or structure shall not be issued until said inspection has been conducyed, and any requirements necessary for prevention of fire and life safety hazards shall be shown on the permit, which bmust be shown to the Building Inspector. 3. The requirements outlined in the permit shall become a part of the restrictions portion of the demolition permit issued by the Building Inspector, for compliance with the Code. 4. Tha permit may include, but not necessarily be restricted to the following: (a) Welding and cutting permit required. (b) Fire watch to be maintained by a professional off-duty fire fighter with such equipment as determined by the Head of the Fire Department.