BPA-18-829 Commonwealth of Massachusetts ,
Citv of Salem
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupancy
Permit No. 8-18-829 �
PERMIT TBUILD
FEE PAID: $495.00
DATE ISSUED: 8/31/2018
This certifies that MASS BAY COLONY PROPERTIES LLC
has permission to erect, alter, or demolish a building 30 CHURCH STREET Map/Lot: 350445-0
as follows: Other Building Permit DEMO TWO(2) EXISTING BATHROOMS. BUILD TWO (2) NEW ADA
BATHROOMS.
FURNISH & INSTALL CANOPY OVER PATIO.
Contractor Name: ROGER TREMBLAY
DBA: A&R CONSTRUCTION
Contractor License No: CS-053693
8/31/2018
Bilikling 4 ial Date
This permit shall be deemed abandoned and invalid unless the work authorized by this commenc9d within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the ?proved ction docUnm is for which this permit has been granted.
All construction,alterations and changes of use of any building and structureWshiiiin compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road"shall be maintained open for public inspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building Fire Officials are provided on this permit.
H I C#: 145375 "Persons contracting with unregistered aar actor'do not have access to the guaranty fund"(as set forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards ai�e the property of the PROPERTY OWNER.
Commonwealth of Massamusetts
^itv of Saiem
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupancy iF
Structure CITY OF SALEM BUILDING PERMIT
Excavation PERMIT TO BE POSTED IN THE WINDOW
Footing INSPECTION RECORD
Foundation
Framing
Mechanical
Insulation INSPECTION:
DATE
Chimney/Smoke Chamber „
Final f�„ ?_
l Plumbing/Gas
Rough:Plumbing
Rough:Gas
Final
Ao�1;1 h/491
Electrical K
Service
Rough
Final
07
Fire Department �d 7� '� G�'� �`/L�/ / -.✓/� /,� - `, d S
Preliminary09
Final
Health Department
r ,
Prelimina
Fi 4 T