Loading...
BPA-17-164 A The Commonwealth of Massachusetts 2011 MAR 13 Board of Building Regulations and Standards Massachusetts State Building Code,780 CMR SAI1-!ar 3Q11 ENI Building Permit Application To Construct,Repair, Renovate Or Demolish a Revised j One-or Two-Fam/Ijo Dwelling This Section For Official Use Onl Building Permit Number: Date plied: Building Orficial([Tint Nnmc) Signature Date l i SECTIO,2 1:SITE INFORMATION 1.1 Property Address: 1.2 Assessors i11ap & Parcel Numbers l.1 a Is this an accepted street?yes no MtLp Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq 11) Frontage(fl) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Nater Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: 7-one: _ outside Flood Zone?Puhlic El Private❑ Check ifyes❑ Municipal G on site disposal system ❑ SECTION r: PROPERTI'01VNERSIIIP' 2.1 ON er'of Rec r 0 J J Naaic Print) / City,State,ZIP No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF V110POSED WORK2(check all that appl-. New Construction❑ Existing Building Owner-Occupied Repairs(s) ❑ Alteration(s) ❑ Addition ❑ Demolition ❑ Accessory Bldg.❑ 1 Number of UnitsOther 0 Specify: Brief Description of Proposed Work2: h A// n LIvU ' SECTION 4:ESTINIA`I'1 U CONSTRUCTION COSTS l Item Estimated Costs: Official Use Only (Labor and iviateriais) 1.Building $ U 1, Building permit Fee:S Indicate how fee is determined: ❑Standard City/Town Application Fee 2.Electrical $ 3 O Total Project Cost (Item 6)x multiplier_.x 3.Plumbing $ 2. Other Fees: $ T 4.Mechanical (HVAC) $ List: 5.Mechanical (Fire $ Suppression 'total All Fees;$ Check No, Check Amount: Cash Amount: 6.Total Project Cost: S 3 �d ❑Paid in Pull ❑Outstanding Balance Due: I