155 WASHINGTON ST, 26 NEW DERBY, 31 FRONT ST - PLANNING Decision 155wubh� Nh &}— ace � �� 1 I o CITY OF SALEM PLANNING BOARD Site Plan Review Decision January 7, 2008 - Washington at Derby LLC, c/o RCG LLC `> CD 17 Ivaloo Street,Suite 100 > Somerville,MA y. RE: 155 Washington St, 26 New Derby St, & 31 Front St (Map 34, Lots 423, 425,(426) (The Former Salem News Property) On Thursday, December 20, 2007,the Planning Board of the City of Salem opened a Public Hearing regarding the application of RCG LLC under Site Plan Review for rehabilitation of the second and third floors of two of the interconnected existing buildings on the property for residential use, and the construction of a new four-story connected mixed-use building along Washington and New Derby Streets. The project will retain approximately 6,000 sq ft of existing retail use and add an additional 7,500 sq ft of new retail. The project will also include the construction of 31 new residential dwellings;seven of the dwelling units will be in the renovation component and 24 dwelling units will be in the new construction component. The public hearing was continued to January 3, 2008. The Public Hearing was closed on January 3, 2008 and the Board voted at this meeting by a vote of eight (8) in favor (Puleo, Power,Kavanaugh, Hanscom, Sullivan,Collins,Lombardini, and Ready) and none opposed,to approve the application as complying with the requirements of Site Plan Review subject to the following conditions: 1. Conformance with the Plan Work shall conform with the plans entitled; "Washington at Derby LLC's Mixed-Use Facility Salem,MA" prepared by Opechee Construction Corporation, dated November 29, 2007 and revised December 28, 2007 sheets Cl-C11. 2. Amendments Anyamendments to the site plan shall be reviewed bythe City Planner and if deemed substantial by the City Planner, shall be brought to the Planning Board for a vote. Any waiver of conditions contained within shall require the approval of the Planning Board. 3. Landscaping a. Any proposed landscaping shall be done in accordance with the approved set of plans. 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 • TEL: 978.745.9595 FAx: 978.740.0404 0 WWW.SALEM.COM b. After such landscaping is completed, the developer will add further landscaping if such is requested by the City Planner. c. A commercial grade wrought iron style fence, a minimum of four feet in height, shall be installed at the edge of the property line between the northeast corner of the property and the most northwesterly building in Artist's Row (currently the Lobster Shanty). 4. HVAC If an HVAC unit is located on the roof or site, it shall be visually screened. The method for screening the unit shall be submitted to the City Planner for review and approval prior to installation. Approved method for screening shall be constructed and installed prior to the issuance of a Certificate of Occupancy. 5. Parking a. Thirty-six (36) parking spaces are to be provided on site as shown on the approved plans, and seven (7) parking spaces are to be leased at 76 Lafayette Street. Off-site parking spaces are to be marked or signed as reserved for residents of 155 Washington Street. Documentation of this shall be submitted for review and approval by the City Planner prior to the issuance of a Certificate of Occupancy. b. The location of off-site parking spaces maybe changed to a different facility within 1,000 feet of the development at the discretion of the Department of Planning and Community Development. 6. Parking Contribution The applicant has voluntarily agreed to contribute $5,000 to be used toward downtown traffic and parking signage. Funds are to be contributed prior to issuance of a Building Permit. 7. Washington and New Derby Plaza The applicant has agreed to assist the City and the Department of Planning and Community Development in developing a new design for the green space on the corner of Washington Street and New Derby Street. A proposed design will be submitted prior to the issuance of a building permit for the new construction component of the redevelopment. 8. Salem Redevelopment Authority All work shall comply with the requirements of the Salem Redevelopment Authority and the proposal is subject to final approval of the Salem Redevelopment Authority, specifically including approval of final design details. 9. Signage All proposed signage shall be reviewed and approved by the City Planner prior to the issuance of a sign permit. 10. Lighting a. No light shall cast a glare onto adjacent parcels or adjacent rights of way. 2 b. A final lighting plan shall be submitted to the City Planner and the City Electrician for review and approval prior to the issuance of a building permit. The plan shall include a schedule for night lighting specifically in the parking lot area. c. After installation, lighting shall be reviewed bythe City Planner and the CityElectrician prior to the issuance of a Certificate of Occupancy. 11. Construction Practices All construction shall be carried out in accordance with the following conditions: a. The operation of tools or equipment used in construction or demolition work shall occur in accordance with Salem Ordinance Section 22-2 (5): Construction and Blasting and between the hours of 8:00 AM and 5:00 PM on weekdays and Saturdays. No work shall take place on Sundays or holidays. The Planning Board will agree to changes in the starting time, at the request of the applicant and if approved by a formal vote of the City Council, as per the ordinance. b. Any blasting, rock crushing,jack hammering, hydraulic blasting, or pile driving shall occur in accordance with Salem Ordinance Section 22-2 (5): Construction and Blasting and be limited to Monday-Friday between the hours of 8:00 AM and 5:00 PM. There shall be no blasting, rock crushing,jack hammering, hydraulic blasting, or pile driving on Saturdays, Sundays, or holidays. c. Blasting shall be undertaken in accordance with all local and state regulations. d. All reasonable action shall be taken to minimize the negative effects of construction on abutters. Advance notice shall be provided to all abutters in writing at least 72 hours prior to commencement of construction of the project. The notice shall state that: "A copy of the plans and construction management plan and schedule are on file and available for review during normal business hours at the office of the Salem Department of Planning and Community Development,located on the Third Floor of 120 Washington Street, 978-619-5685." e. All construction vehicles and equipment shall be cleaned prior to leaving the site so that they do not leave dirt and/or debris on surrounding roadways as they exit the site. f. The applicant shall abide by any and all applicable rules, regulations and ordinances of the City of Salem g. All construction vehicles and equipment left ovemight at the site must be located completely on the site. h. No street shall be closed without prior approval of the Department of Planning and Community Development,unless deemed an emergency by the Salem Police Department. 12. Construction Traffic &Phasing 3 a. All construction will occur on site; no construction will occur or be staged within City right of way. Any deviation from this shall be approved by the Department of Planning &Community Development prior to construction. b. A construction traffic/phasing management plan and schedule shall be submitted to the Department of Planning &Community Development for review and approval prior to the issuance of a building pemnit. c. Any roadways,driveways, or sidewalks damaged during construction shall be restored to their original condition by the applicant. d. The applicant shall clean construction vehicles before they exit the construction site, and clean and sweep all streets affected by their construction truck traffic as necessary. 13. Clerk of the Works A Clerk of the Works shall be provided by the City, at the applicant, his successors or assigns'expense, as is deemed necessary by the CityPlanner. 14. Salem Health Department All work shall comply with the requirements of the Salem Health Department. 15. Board of Health The owner shall complywith the following specific conditions issued bythe Board of Health: a. The individual presenting the plan to the Board of Health must notify the Health Agent of the name, address, and telephone number of the project (site) manager who will be on site and directly responsible for the construction of the project. b. If a DEP tracking number is issued for this site under the Massachusetts Contingency Plan, no structure shall be constructed until the Licensed Site Professional responsible for the site meets the DEP standards for the proposed use. c. The developer will give the Health Agent a copy of the 21E report. d. The developer shall adhere to a drainage plan as approved by the City Engineer. e. The developer shall employ a licensed pesticide applicator to exterminate the area prior to construction, demolition, and/or blasting and shall send a copy of the exterminator's invoice to the Health Agent. f. The developer shall maintain the area free from rodents throughout construction g. The developer shall submit to the Health Agent a written plan for dust control and street sweeping which will occur during construction. 4 h h. The developer shall submit to the Health Agent a written plan for containment and removal of debris,vegetative waste, and unacceptable excavation material generated during demolition and/or construction. i. The Fire Department must approve the plan regarding access for fire fighting. j. Noise levels from the resultant establishment(s) generated by operations,including but not limited to refrigeration and heating, shall not increase the broadband sound level by more than 10 dB(A) above the ambient levels measured at the property line. IL The developer shall disclose in writing to the Health Agent the origin of any fill material needed for the project. 1. The resultant establishment shall dispose of all waste materials resulting from its operation in an environmentally sound manner as described to the Board of Health. in. The developer shall notify the Health Agent when the project is complete for final inspection and confirmation that above conditions have been met. 16. Office of the City Engineer The applicant,his successors or assigns shall comply with all requirements of the City Engineer. 17. Fire Department a. All work shall complywith the requirements of the Salem Fire Department. b. Prior to the issuance of a Building Permit , revised plans shall be submitted to the Department of Planning and Community Development showing an eighteen(18) foot wide entrance on Front Street as required by the Salem Fire Department. c. The applicant shall seek approval from the City of Salem Cemetery& Shade Tree Department to remove the street tree on the right side of the entrance, which would prohibit an 18-foot entrance in this location. The applicant shall be responsible for any costs and meetings associated with this process, as well as the cost of tree replacement if required. 18. Office of the Building Commissioner All work shall comply with the requirements of the office of the Salem Building Commissioner. 19. Utilities Any utility installation shall be reviewed and approved by the City Engineer prior to the issuance of a Building Permit. 20. Maintenance a. Refuse removal, ground maintenance and snow removal shall be the responsibility of the applicant,successors, and assigns. 5 b. Winter snow in excess of snow storage areas on the site shall be removed off site. c. Maintenance of any landscaping shall be the responsibility of the applicant, his successors or assigns. The applicant, his successors or assigns, shall guarantee all trees and shrubs for a two-year period. d. The owner and/or condominium association shall be responsible for trash pickup. 21. As-built Plans As-built plans, stamped by a Registered Professional Engineer,shall be submitted to the Department of Planning and Community Development and City Engineer prior to the issuance of the final Certificate of Occupancy both in hard copy and in electronic file format suitable for the City's use and approved bythe City Engineer 22. Violations Violations of any condition shall result in revocation of this permit by the Planning Board, unless the violation of such condition is waived by majority vote of the Planning Board. I hereby certify that a copy of this decision and plans has been filed with the City Clerk and copies are on file with the Planning Board. The Decision shall not take effect until a copy of this decision bearing the certification of the City Clerk that twenty(20) days have elapsed and no appeal has been filed or that if such appeal has been filed, and it has been dismissed or denied, is recorded in the Essex South Registry of Deeds and is indexed under the name of the owner of record is recorded on the owner's Certificate of Title. The owner or applicant, his successors or assigns, shall pay the fee for recording or registering. Charles NL Puleo Chair N Cc: Cheryl LaPointe, City Clerk X11-c -'T- J D D -q n-, ca C7l 6