RE: Amendment to Site Plan Review Decision-Highlander Realty Trust
10 Traders Way, Salem, MA
On June 5, 2003 the Salem Planning Board opened a public hearing on behalf of Petsmart Inc.,to
discuss an amendment to the original Site Plan Review Decision dated May 31, 1996 for
improvements to the Highlander Realty Trust, located at 10 Traders Way, Salem MA. The plan
to improve a portion of the plaza to include a Petsmart store was presented at the regularly
scheduled meeting of the Planning Board of the City of Salem held May 15, 2003.
The Public Hearing closed on May 15, 2003. At a regularly scheduled meeting of the Planning
Board held on May 15, 2003, the Board voted by a vote of(9) in favor(Power, Puleo,
Moustakis, Durand, Sullivan,Weiner, Cullen, Lombardini, and Collins), (0)opposed,to approve
the amendment as complying with the requirements of Site Plan Review pursuant to Section 7-18
of the Salem Zoning Ordinance. The decision to approve this amendment to the original site
plan decision approved on May 31, 1996, does not eliminate any of the conditions or
requirements of that decision. All conditions and requirements of that decision are still in
effect.
One Salem Green, Salem, Massachusetts 01970 (978) 745-9595 ext.311 Fax (978) 740-0404
1 Petsmart, Inc.
May 27,2003 -2
The approval of the Board subject to the following conditions:
1. Conformance with the Plans
Work shall conform to the amended plan entitled, "Former Sears Hardware, 10 Trade Way,
Salem, Massachusetts,' prepared by Appledore Engineering Inc., Pease International 3
Tradeport, 15 Rye Street, Suite 305, Portsmouth,NH, 03801 and dated April 18, 200T__
2. Amendments
Any additional amendments to the site plan shall be reviewed by the City Planner andw m3
deemed necessary by the City Planner, shall be brought to the Planning Board. Any w rver v
of conditions contained within shall require the approval of the Planning Board.
3. Utilities
a. Utility installation shall be reviewed and approved by the City Engineer prior to the
issuance of a Building Permit.
b. Drainage shall be reviewed and approved by the City Engineer prior to the issuance of a
Building Permit.
4. Signage
a. Proposed signage shall be reviewed and approved by the City Planner and the Sign
Review Committee.
b. Signage shall be in keeping with the approved plans.
5. Traffic Circulation
Because of the concerns expressed by the Planning Board,within six months from the date of
the Petsmart Store opening, the Department of Planning and Community Development will
review the current traffic circulation to and from the site. Currently both access points allow
two-way traffic flow. If the Department of Planning and Community Development
determines that two-way traffic flow is not safe, they will request the applicant to change the
egress to allow for one-way flow.
6. Storage Area
Petsmart Inc. will be responsible for the maintanance and appearance of the 3,000 sq. ft.
"storage area" located on the west end of the building until this space.is demolished or leased
to a new tenant.
7. Lighting
a. No light shall cast a glare onto adjacent parcels or adjacent rights of way.
c. After installation, lighting shall be reviewed by the Planning Department,prior to the
issuance of a Certificate of Occupancy.
8. Construction Practices
All construction shall be carried out in accordance with the following conditions:
f I
y Petsmart,Inc.
May 27,2003-3
a. Work shall not be conducted between the hours of 5:00 PM and 8:00 AM the following
day on weekdays and Saturdays or at any time on Sundays or Holidays.
b. All reasonable action shall be taken to minimize the negative effects of construction on
abutters. Advance notice shall be provided to all abutters in writing at least 72 hours prior to
commencement of construction of the project.
c. Drilling and blasting shall be limited to Monday-Friday between 8:00 AM until 5:00 PM.
There shall be no drilling or blasting on Saturdays, Sundays, or holidays. Blasting shall be
undertaken in accordance with all local and state regulations.
d. All construction vehicles shall be cleaned prior to leaving the site so that they do not
leave dirt and/or debris on surrounding roadways as they leave the site.
e. All construction shall be performed in accordance with the Rules and Regulations of the
Planning Board, and in accordance with any and all rules,regulations and ordinances of the
City of Salem.
f. All construction vehicles left overnight at the site, must be located completely on the site.
9. Clerk of the Works
A Clerk of the Works shall be provided by the City, at the expense of the applicant,his
successors or assigns, as is deemed necessary by the City Planner.
10. Board of Health
All work shall comply with the requirements of the Salem Board of Health.
11. Fire Department m
All work shall comply with the requirements of the Salem Fire Department. r.) N
J o➢
12. Conservation Commission
All work shall comply with the Order of Conditions issued by the Salem Conservation; ren
Commission, if applicable. N v
J
13. Building Inspector
All work shall comply with the requirements of the Salem Building Inspector.
14. Utilities
a. Underground utility installation shall be reviewed and approved by the City Engineer
prior to the issuance of a Building Permit.
15. Maintenance
a. Refuse removal, ground maintenance and snow removal shall be the responsibility of the
developer, his successors or assigns.
• Petsmart, Inc.
May 27,2003 -4
b. Winter snow in excess of snow storage areas on the site shall be removed off site.
16. As-built Plans
As-built plans, stamped by a Registered Professional Engineer, shall be submitted to the
Planning Department and Engineering Department prior to the issuance of the final
Certificate of Occupancy.
17. Violations
Violations of any condition shall result in revocation of this permit by the Planning Board,
unless the violation of such condition is waived by a majority vote of the Planning Board.
I hereby certify that a copy of this decision and plans has been filed with the City Clerk and
copies are on file with the Planning Board. The Special Permit shall not take effect until a copy
of this decision bearing the certification of the City Clerk that twenty(20) days have elapsed and
no appeal has been filed or that if such appeal has been filed, and it has been dismissed or
denied, is recorded in the Essex South Registry of Deeds and is indexed under the name of the
owner of record is recorded on the owner's Certificate of Title. The owner or applicant,his
successors or assigns, shall pay the fee for recording or registering.
wjt,�..,a Q
Walter B Power, III
Chairman
N C:
O
O n-.
a zc
N U
J �y
C-
Tj
�7
mz
Date JUN 2 U 2003 J m
thereby certify that 20 days haw ew
it+om the date this instrument was►ec"A
#Md that NO APPEAL has been filed in gye
adfice.
AZ
copy
4-
, -, em, Mass.