10 Ropes Street ZBA Final Decision
DOMINICK PANGALLO
MAYOR
CITY OF SALEM
ZONING BOARD OF APPEALS
CITY HALL ANNEX 2ND FLOOR, 98 WASHINGTON STREET SALEM MA 01970
February 2, 2026
Decision
City of Salem Zoning Board of Appeals
The petition of ERIC M. EASLEY D/B/A CIRE REALTY TRUST at 10 ROPES STREET (Map 34, Lot 0294)
(R3 Zoning District) for a Variance per Section 4.1.1 Dimensional Requirements and a Finding per
Section 3.2.8 Accessory Dwelling Units (ADUs) of the Salem Zoning Ordinance to add an ADU to a
nonconforming five-unit building and construct two three-story staircases. The Variance would
allow an increase from 49.6% to 51.4% lot coverage and a rear setback decrease from nine feet
to six feet.
On January 21, 2026, the following members of the Salem Zoning Board of Appeals were present:
Nina Vyedin (Chair), Hannah Osthoff, Peter Habib, Christa McGaha, Stephen Larrick, and Ellen
Simpson.
Statements of Fact:
1. In the petition date-stamped November 19, 2025, the petitioner requested a Variance per
Section 4.1.1 Dimensional Requirements and a Finding per Section 3.2.8 Accessory
Dwelling Units (ADUs) of the Salem Zoning Ordinance.
2. Eric M. Easley d/b/a Cire Realty Trust owns 10 Ropes Street and was the petitioner.
Attorney William F. Quinn and Eric M. Easley presented on January 21, 2026.
3. 10 Ropes Street is in the R3 Zoning District (Map 34, Lot 0294).
4. On January 21, 2026, Mr. Quinn stated that the building was constructed 110 years ago
on a small lot. He noted that the multifamily structure was a three-story, flat-roof
building.
5. The Affordable Homes Act of 2024 authorizes the Executive Office of Housing and Livable
Communities to establish rules and standards for administering the Act. Regulation 760
CMR 71.03 (2.d.) Unit Caps & Density states that “protected use ADUs shall not be
counted in any density calculations.”
6. The proposal decreased the property’s lot area per dwelling unit from 597 to 497 square
feet per dwelling unit. The Board determined that relief for the protected use ADU’s
density calculations under Section 4.1.1 Dimensional Requirements of the Salem Zoning
Ordinance was not required. The Applicant consented to remove the lot area per dwelling
unit request from the proposal.
City of Salem Zoning Board of Appeals
February 2, 2026
Page 2 of 4
7. The City received zero public comments on the proposal before the January 21, 2026
public hearing. Two members of the public commented on the proposal at the public
hearing. The members who offered comments at the hearing were: Jeff Cohen, 12
Hancock Street; Ana Nuncio, 20 Winter Street.
The Salem Zoning Board of Appeals, after carefully considering the evidence presented at the
public hearings, and thoroughly reviewing the petition, application narrative, and plans, makes
the following findings that the proposed project meets the provisions of the City of Salem Zoning
Ordinance:
Variance Findings:
1. Special conditions and circumstances especially affect the land, building, or structure
involved, generally not affecting other lands, buildings, and structures in the same district.
The Applicant owns a large structure on a small lot, requiring dimensional relief for
external property changes.
2. Literal enforcement of the provisions of the Ordinance involves substantial hardship to
the Applicant in attempting to put the property to productive use. The Applicant would
be unable to provide a safe means of egress for the existing five-unit building and the
allowed ADU without the requested relief.
3. Desirable relief may be granted without substantial detriment to the public good, and
without nullifying or substantially derogating from the intent of the district or purpose of
the Ordinance. The Applicant proposes an ADU that would increase the variety of housing
amenities for the City of Salem. The proposal allows for a safe means of egress while
preventing undue overcrowding of the lot.
Findings:
The Board finds that the reconstruction, extension, alteration, or change for the ADU will not be
substantially more detrimental than the existing nonconforming structure to the neighborhood
for the following reasons:
The proposal creates an additional, naturally affordable housing unit in the City of Salem.
The proposal does not change the location or number of parking spaces on the property.
The addition of an ADU does not change the structure’s footprint or location.
The proposal will increase the property’s tax base and value while providing the owner
with additional income to maintain the existing building.
Based on the above statements of fact and findings, the Salem Zoning Board of Appeals voted
five in favor, (Nina Vyedin (Chair), Hannah Osthoff, Peter Habib, Christa McGaha, and Stephen
Larrick) and zero opposed, to grant ERIC M. EASLEY D/B/A CIRE REALTY TRUST at 10 ROPES
STREET (Map 34, Lot 0294) (R3 Zoning District) a Variance per Section 4.1.1 Dimensional
Requirements and a Finding per Section 3.2.8 Accessory Dwelling Units (ADUs) of the Salem
City of Salem Zoning Board of Appeals
February 2, 2026
Page 3 of 4
Zoning Ordinance to add an ADU to a nonconforming five-unit building and construct two three-
story staircases. The Variance will allow an increase from 49.6% to 51.4% lot coverage and a rear
setback decrease from nine feet to six feet.
Standard Conditions:
1. Petitioner shall comply with all city and state statutes, ordinances, codes and regulations.
2. All construction shall be done as per the plans and dimensions submitted to and approved
by the Building Commissioner.
3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be
strictly adhered to.
4. Petitioner shall obtain a building permit prior to beginning any construction.
5. Exterior finishes of the new construction shall be in harmony with the existing structure.
6. A Certificate of Occupancy is to be obtained.
7. A Certificate of Inspection is to be obtained.
8. Petitioner is to obtain approval from any city board or commission having jurisdiction
including, but not limited to, the Planning Board.
9. Petitioner shall obtain street numbering from the City of Salem Assessor’s Office and shall
display said number so as to be visible from the street.
10. Unless this Decision expressly provides otherwise, any zoning relief granted does not
empower or authorize the Petitioner to demolish or reconstruct the structure(s) located
on the subject property to an extent of more than fifty percent (50%) of its floor area or
more than fifty percent (50%) of its replacement cost at the time of destruction. If the
structure is demolished by any means to an extent of more than fifty percent (50%) of its
replacement cost or more than fifty percent (50%) of its floor area at the time of
destruction, it shall not be reconstructed except in conformity with the provisions of the
Ordinance.
11. All construction shall be done per the plans and dimensions submitted to and approved
by this Board. Any modification to the plans and dimensions must be approved by the
Board of Appeals unless such changes are deemed a minor field change by the Building
Commissioner in consultation with the Chair of the Board of Appeals.
12. Petitioner shall schedule Assessing Department inspections of the property, at least
annually, prior to project completion and a final inspection upon project completion.
__________________________
Nina Vyedin, Chair
Zoning Board of Appeals
A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK.
City of Salem Zoning Board of Appeals
February 2, 2026
Page 4 of 4
Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts
General Laws Chapter 40A, and shall be filed within 20 days of filing of this decision in the office
of the City Clerk. Pursuant to the Massachusetts General Laws Chapter 40A, Section 11, the
Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing
the certificate of the City Clerk has been filed with the Southern Essex Registry of Deeds.