Loading...
430-436 ESSEX ST - PLANNING (3) i Form A.Decision i CITY OF SALEM PLANNING BOARD Al n_ 4.I1 �-� Form A — Decision rn m T IV Vi cn IV y or- ern Wayne Scott m3 140 Humphrey Street o ID Swampscott, MA 01907 (Ir Dear Mr. Scott: The Salem Planning Board voted on September 15, 2005 to endorse "Approval Under Subdivision Control Law Not Required"on the following described plan: 1. Applicant: Wayne Scott, Charles River Properties, 140 Humphrey Street., Swampscott, MA 01907 2. Location: These parcels are located at 430-436 Essex Street, assessors map 25, parcel 30. 3. Project Description: This Form A combines the two lots into one contiguous lot with an area of 24,418 sq. ft. Sincerely, Walter B. Power, III Chairman Cc: Cheryl LaPointe Cc: Scott Patrowicz 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 •TEL: 978.745.9595 FAx: 978.740.0404 ♦ WWW.SALEM.COM CI 1Y 0SALEM, MA CITY OF SALEM CLERK'S OFFICE PLANNING BOARD 2905 SEP 12 P 3: 03 DECISION September 12, 2005 Charles River Properties C/o Scott Patrowicz Y. 10 Derby Square,4s'floor Salem, MA 01970 RE: 430-436 Essex Street, Chestnut Square Site Plan Review Special Permit At a regularly scheduled meeting of the Planning Board of the City of Salem held on September 1, 2005, the Board voted to approve with conditions and by a vote of six (6) in favor and none opposed,the Site Plan Review application of Charles River Properties for the project at 430-436 Essex Street, also know as Chestnut Square, for demolition of the existing two-story garage and the construction of a new 4,200 square-foot building with twelve (12)new residential units. The Public Hearing was opened on July 7, 2005, continued on July 21, 2005, and closed on September 1,2005. The approval is subject to the following conditions: 1. Conformance with the Plan Work shall conform with the plans entitled, "Site Plan for Chestnut Square, 12 New Residential Units at#430-436 Essex Street, Salem, Mass.,"prepared by Patrowicz Land Development Engineering, 10 Derby Square, Salem, MA 01970, dated July 7, 2005 and revised July 20, 2005, including pages 1-6; and the elevations entitled,"Front Elevation (A-4), Right Elevation(A-5), Rear Elevation(A-6), Left Elevation(A-7),"prepared by CAS Partners, 37 Water Street, Wakefield, Mass 01880, dated June 13, 2005. 2. Amendments Any amendments to the site plan shall be reviewed by the City Planner and if deemed substantial by the City Planner, shall be brought to the Planning Board for a vote. Any waiver of conditions contained within shall require the approval of the Planning Board. 3. Landscaping a. Any proposed landscaping shall be done in accordance with the approved set of plans. b. The applicant shall coordinate with the City of Salem Cemetery& Shade Tree Department for the selection of street trees. The selection and placement of street trees shall be reviewed and approved by the Department of Planning& Community 120 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 • TEL: 978.745.9595 FAx: 978.740.0404 ♦ WWW.SALEM.COM Development prior to installafion.The final landscaping plan shall be approved by the City Planner prior to the issuance of a building permit. 4. HVAC If an HVAC unit is located on the roof or site, it shall be visually screened. The method for screening the unit shall be submitted to the City Planner for review and approval prior to installation. 5. Easement on Abutting Parcel The applicant shall obtain an easement from the abutting landowner(Map 25,Lot 19)to allow emergency access to the proposed building, grading and snow storage on the abutting land. The agreement shall be submitted to the DPCD; determined to be satisfactory; and recorded at the Registry of Deeds prior to the issuance of a building permit. Grading plan to be submitted to DPCD and the City Engineer for approval prior to any work and the issuance of a building permit 6.Essex Street Wall The existing stone and masonry retaining wall on Essex Street shall be removed. The area shall be regraded and the applicant shall install a four-foot fence inside the property line. The fence to be a continuation of the same type of fence as at CVS. The applicant shall extend the city concrete sidewalk to the property line. The location and specifications for the fence shall be submitted to the DPCD for review and approval prior to the issuance of a building permit. The specifications for the city concrete sidewalk shall be submitted to the Office of the City Engineer and the DPCD for review and approval prior to the issuance of a building permit. 7. Dumpster The dumpster to be relocated to the other side of the property and screened. Revised plans showing the new location of the dumpster and the proposed screening to be submitted to DPCD for approval and determined satisfactory prior to issuance of a building permit. 8. Right Turn Only Right turns only are allowed from the site and the applicant to install a right tum only sign and pavement marking at the end of the driveway. 9. Stockade Fence A stockade fence to be constructed on the property line with 14 Highland Avenue subject to the approval of the abutter N/F Ronald Czarnecki. Revised plans to be submitted to DPCD for approval showing location and type of fencing, and fence to be constructed prior to issuance of certificate of occupancy. 10. Fire Lane The applicant shall install pavers in the fire lane that are rated to support a fire truck. The specifications for the pavers shall be submitted to the DPCD and Fire Prevention for review and approval prior to the issuance of a building permit. 11. Master Box The applicant shall install a fire Master box on the building. 2 1_. 12. Sewer a. The applicant shall locate and inspect the existing sewer service with CCTV. The results shall be submitted to the DPCD and the Office of the City Engineer for review and approval. Additional improvements may be required depending on the condition of the utilities. b. The old sewer service, if abandoned, shall be cut and capped at the City's main. 13. Noise Following occupancy of the building, if the Department of Planning&Community Development receives any complaints concerning noise emanating from the air conditioner units,the applicant shall be required to show that the decibel level is no higher than the pre-development level and if not, shall submit a plan for review and approval by the City Planner to make any improvements necessary. 14. Form A Plan combining the two lots to be submitted for Planning Board endorsement prior to issuance of the building permit. 15. Signage All proposed signage shall be reviewed and approved by the City Planner prior to the issuance of a sign permit. 16. Lighting a.No light shall cast a glare onto adjacent parcels or adjacent rights of way. b. The applicant shall install four light fixtures consistent with the light fixtures on the adjacent CVS property that will be owned and maintained by the Condominium Association. The final location of the lights shall be reviewed and approved by the Department of Planning&Community Development prior to the issuance of a building permit. c.A final lighting plan shall be submitted to the City Planner and the City Electrician for review and approval prior to the issuance of a building permit. d. After installation, lighting shall be reviewed by the City Planner and the City Electrician prior to the issuance of a Certificate of Occupancy. 17. Construction Practices All construction shall be carried out in accordance with the following conditions: a. The operation of tools or equipment used in construction or demolition work shall occur in accordance with Salem Ordinance Section 22-2 (5): Construction and Blasting and between the hours of 8:00 AM and 5:00 PM on weekdays and Saturdays. No work shall take place on Sundays or holidays. The Planning Board will agree to changes in the starting time, at the request of the applicant and if approved by a formal vote of the City Council, as per the ordinance. 3 b. Any blasting,rock crushing,jack hammering,hydraulic blasting,or pile driving shall occur in accordance with Salem Ordinance Section 22-2(5): Construction and Blasting and be limited to Monday-Friday between the hours of 8:00 AM and 5:00 PM. There shall be no blasting,rock crushing,jack hammering,hydraulic blasting, or pile driving on Saturdays, Sundays, or holidays. c. Blasting shall be undertaken in accordance with all local and state regulations. d. All reasonable action shall be taken to minimize the negative effects of construction on abutters. Advance notice shall be provided to all abutters in writing at least 72 hours prior to commencement of construction of the project. e. All construction vehicles and equipment shall be cleaned prior to leaving the site so that they do not leave dirt and/or debris on surrounding roadways as they exit the site. f The applicant shall abide by any and all applicable rules,regulations and ordinances of the City of Salem. g. All construction vehicles and equipment left overnight at the site must be located completely on the site. h.No Street shall be closed without prior approval of the Department of Planning and Community Development, unless deemed an emergency by the Salem Police Department. 18. Construction Traffic& Phasing a. All construction will occur on site;no construction will occur or be staged within City right of way. Any deviation from this shall be approved by the Department of Planning& Community Development prior to construction. b. A construction traffic/phasing management plan and schedule shall be submitted to the Department of Planning&Community Development for review and approval prior to the issuance of a building permit. c. Any roadways, driveways, or sidewalks damaged during construction shall be restored to their original condition by the applicant. I The applicant shall clean construction vehicles before they exit the construction site, and clean and sweep all streets affected by their construction truck traffic as necessary. 19. Clerk of the Works A Clerk of the Works shall be provided by the City,at the applicant,his successors or assigns' expense, as is deemed necessary by the City Planner. 20. Board of Health All work shall comply with the requirements of the Salem Board of Health. 4 `i. 21. Salem Health Department All work shall comply with the requirements of the Salem Health Department, if applicable. 22. Office of the City Engineer The applicant, his successors or assigns shall comply with all requirements of the City Engineer. 23. Fire Department All work shall comply with the requirements of the Salem Fire Department. 24. Office of the Building Commissioner All work shall comply with the requirements of the office of the Salem Building Commissioner. 25. Utilities Any utility installation shall be reviewed and approved by the City Engineer prior to the issuance of a Building Permit. 26. Drainage a. The applicant shall submit(1)calculations for 10,25 and 100-year storm events and(2)a capacity analysis of the proposed new storm pipe from the City's DMH to the site, including peak flows from each of the above noted storm events and flow reductions from the proposed on-site infiltration chambers to the DPCD and Office of the City Engineer. Present runoff from the embankment to be directed to Essex Street through the storm drain system. Drainage system to be deemed satisfactory by the City Engineer based on this information prior to the issuance of a building permit. b. The proposed stormwater system shall be privately owned and maintained by the condominium association. This is to be so noted on the design plans and any plans of record prior to the issuance of a building permit. 27. Maintenance a. Refuse removal, ground maintenance and snow removal shall be the responsibility of the applicant,his successors or assigns. In. Winter snow in excess of snow storage areas on the site shall be removed off site. The applicant, his successor or assigns shall ensure that snow storage does not block emergency access from abutting parcel. c. Maintenance of any landscaping shall be the responsibility of the applicant, his successors or assigns. The applicant,his successors or assigns, shall guarantee all trees and shrubs for a two-year period. 28. As-built Plans As-built plans, stamped by a Registered Professional Engineer, shall be submitted to the 5 Department of Planning and Community Development and Department of Public Works prior to the issuance of the final Certificate of Occupancy. 29. Violations Violations of any condition shall result in revocation of this permit by the Planning Board,unless the violation of such condition is waived by a majority vote of the Planning Board. I hereby certify that a copy of this decision has been filed with the City Clerk and copies are on file with the Planning Board. The Special Permit shall not take effect until a copy of this decision bearing the certification of the City Clerk that twenty(20)days have elapsed and no appeal has been filed; or that if such appeal has been filed, it has been dismissed or denied; is recorded in the Essex South Registry of Deeds and is indexed under the name of the owner of record as recorded on the owner's Certificate of Title. The owner or applicant,his successors or assigns, shall pay the fee for recording or registering. e fIH ter B Powep� Chairman 0 6