Loading...
6-8 CLARK AVE - PLANNING 1 1 u of PlatiltitV Puarl Ciry One Oult t (16rerri r(f R�SS/FFA H,4 SS DECISION bft SPECIAL PERMIT t WETLANDS AND FLOOD HAZARD DISTRICT I# NICHOLAS FIORE CLARK AVENUE SALEM, MA 01970 RE: CLARK AVENUE l On Thursday, July 15, 1993, the Planning Board of the City of Salem held a public hearing regarding the application of Nicholas Fiore for a Special Permit under Section 7-16, Wetlands and Flood Hazard Districts of the Salem Zoning Ordinance, with respect to a proposal to regrade the existing slope and associated work within a Buffer Zone at 6-8 Clark Avenue, Assessor ' s Map 3, Lots 117 & 118 . At a special scheduled meeting of the Planning Board held on Thursday, July 29, 1993, the Board voted by a vote of seven (7 ) in favor , none opposed, to approve the application as complying with the requirements of a Special Permit, subject to conditions: 1 . Conformance with Plan Work shall conform to plan entitled, "Exhibit F, Notice of Intent Plan in Salem, Ma For Nicholas Fiore" , dated August 27, 1992, revised September 22, 1992 prepared by Landmark Engineering & Survey, Inc. Michael J. Dononvan, Professional Engineer 2. Conservation Commission Work shall comply with all requirements of Order of Conditions issued by the Salem Conservation Commission on September 24, 1992 - DEP File #64-209. 3 Board of Health Work s -all comply with all requirements of the Board of Health approval dated July 12, 1993 .. 4 . Construction Practices All construction shall be carried out in accordance with the following Conditions: a. No work -shall commence before 8 : 00 a.m. on weekdays and 8 : 00 a.m. on Saturdays. No work shall continue beyond 5: 00 p.m. There shall be; no work conducted on Sundays or holidays. b. All reasonable action shall be taken to minimize the negative effects of construction on abutters. Advance notice shall be provided to all abutters in writing at least 72 hours prior to commencement of construction. 5. Violations Any violation of these conditions shall result in revocation of this permit by the Planning Board. This Special Permit shall not take effect until a copy of the decision bearing the certification of the City Clerk that twenty days have elapsed and no appeal has been filed or that if such appeal has been filed, and it has been dismissed or denied, is recorded in the Essex County Registry of Deeds and is indexed in the grantor index under the name of the owner of record or is recorded and noted on the owner ' s certificate of title. The fee for recording or registering shall be paid by the owner or applicant . Walter B. Power , III Chairman EX\DH\PB072993 r - - R/P RAP DETA/L RIP RAP DETAIL Section View Section View NTS NTS 1 /2"RCP DRAIN MAP 2 L O T 7 MAP 3 L O T/29 �.---- 5' ---� EDGE OF VEGETA TED WETLANDS STONE TO BE UNDERLA/N BY EX/ST/NG GROUND /2"'RCP M/RAF/ /4ON FABRIC .r Ire M/RAF//4ON FABRIC (OR -0U(VALENT) O �q "(MIN) STONES 6" GRA VEL a� 13�yy 6'"(MIN.)STONES OQo 5 ,I 45,348+ S.F. 1.041 AC ASSESSORS MAPS LOT1/6 MAP3L0TS 1178118 hoc`„ —� � \ MAR 3L0T/20 6 P •- /, ROP ? RCP - R F�PRED ENO a I iv 114.0 arr.0•••WETLANDS _ I14 EX/ST. SC TAT/ON 113.1 \ \� . //4 1��' FENCE. i. 1.\ .: • 111, /20 SL OPE STAB/L/ZA TION DE TAIL '2O=—�� � • , • • f � ' s ~ �•• - - -'AREA OF PROPOSED WORK NTS /2s --122 - i PROPOSED SL OPE 2Y /a0 ` 12a ` -- . —124 EX/ST/NG GROUND EX/ST/NG SL OPE 4"LOAM 8 SEED `� }� 130\ i EDGE OF VEGETATED EROS/ON CONTROL BLANKET (INSTALL AS PER MANUFACTURERS/NSTRUCT/ON) \ EX/sT/2"RCP WETLANDS /NV.=//4.68 BLANKET SHALL BE PH/LL/PS 758 SUPERGRO. A. I 130 Q HA YBALE'S I v NO TES. /. /NFORMA TION/S FROM AN ACTUAL LEGEND SIL TA TION FENCE I \ •. •,��. y GROUND INSTRUMENT SURVEY /30.6 EX/ST/NG SPOT ELEVA TION 13-9.3 PPERFORMED ON ✓UL Y 28, /992. /38 EXISTING CONTOUR GRADE ! a ,• X30.6 �' 2. BENCH MARK/S THE RIM OF THE C.B. CA TCH 9A SIN SEWER MANHOLE A T THE EXIST/NG WETLANDS /00 FOO T BUFFER LINE END OF CLARK A VENUE= /36.9/: 3COUNTOURS AREON 2INTERVAL S / 20 ) PROPOSED CONTOUR 4. HAY BALES WILL BE MAINTAINED j \ \ DURING ANY CONSTRUCT/ON ACT/V/TY ;l \ ON SITE.- I r.3 136 I PROPOSED WORK WITHIN BUFFER ZONE INSTALL LINE OF HA Y BALES A T EDGE OF QI BORDERING VEGETA TED WETLANDS, p 1g8,8 \ /37.9 / 2. WITHIN THE LIMITS O 4I � � F THF PROPERTY 349.05 TO CLARK ST. L/NES CUT BA CK EX/STING SL OPES TO 2,7 I /00.00 FINE GRADE AND COMPACT, L OAM AND SEED EXH/B/T F BIT. SIDEWALK A MINIMUM 4" THICK AND INSTALL EROS/ON CONTROL/VEGETA TIONBLANKET NO TICE OF /N TEN T PL AN :--� GRAN/TE CG�7B 3. REMOVE SEDIMENT DEPOS/TS ALONG TOE 72 IN I,vv=i34 e7 OF EX/S TING SL OPE. CLARK A VENUE SAL EM, MA 4. INSTAL L SIL TA TION FENCE AS PER SL OPE S TAB/L IZA TION DETAIL FOR MAP 3 L 0 T /14TMAPJLO7 113 NICHOL AS FIORE SCALE /" - 30' AUGUS T 27, /992 REVISED SEPT. 22, /992 L ANDMARK ENG/NEER/NG 8 x ' '� €�♦r SURVEY/NG, INC 583 CHES TNUT S TREET hid.•'Qt'4w„ ,. ,;'N,. .L� •`' °T k L YNN, MA i