6-8 CLARK AVE - PLANNING 1 1
u
of
PlatiltitV Puarl Ciry
One Oult t (16rerri r(f R�SS/FFA H,4 SS
DECISION
bft
SPECIAL PERMIT t
WETLANDS AND FLOOD HAZARD DISTRICT I#
NICHOLAS FIORE
CLARK AVENUE
SALEM, MA 01970
RE: CLARK AVENUE l
On Thursday, July 15, 1993, the Planning Board of the City of
Salem held a public hearing regarding the application of Nicholas
Fiore for a Special Permit under Section 7-16, Wetlands and Flood
Hazard Districts of the Salem Zoning Ordinance, with respect to a
proposal to regrade the existing slope and associated work within
a Buffer Zone at 6-8 Clark Avenue, Assessor ' s Map 3, Lots 117 &
118 .
At a special scheduled meeting of the Planning Board held on
Thursday, July 29, 1993, the Board voted by a vote of seven (7 ) in
favor , none opposed, to approve the application as complying with
the requirements of a Special Permit, subject to conditions:
1 . Conformance with Plan
Work shall conform to plan entitled, "Exhibit F, Notice
of Intent Plan in Salem, Ma For Nicholas Fiore" , dated
August 27, 1992, revised September 22, 1992 prepared by
Landmark Engineering & Survey, Inc. Michael J. Dononvan,
Professional Engineer
2. Conservation Commission
Work shall comply with all requirements of Order of
Conditions issued by the Salem Conservation Commission on
September 24, 1992 - DEP File #64-209.
3 Board of Health
Work s -all comply with all requirements of the Board of
Health approval dated July 12, 1993 ..
4 . Construction Practices
All construction shall be carried out in accordance with
the following Conditions:
a. No work -shall commence before 8 : 00 a.m. on weekdays
and 8 : 00 a.m. on Saturdays. No work shall continue
beyond 5: 00 p.m. There shall be; no work conducted on
Sundays or holidays.
b. All reasonable action shall be taken to minimize the
negative effects of construction on abutters. Advance
notice shall be provided to all abutters in writing at
least 72 hours prior to commencement of construction.
5. Violations
Any violation of these conditions shall result in
revocation of this permit by the Planning Board.
This Special Permit shall not take effect until a copy of the
decision bearing the certification of the City Clerk that twenty
days have elapsed and no appeal has been filed or that if such
appeal has been filed, and it has been dismissed or denied, is
recorded in the Essex County Registry of Deeds and is indexed in
the grantor index under the name of the owner of record or is
recorded and noted on the owner ' s certificate of title. The fee
for recording or registering shall be paid by the owner or
applicant .
Walter B. Power , III
Chairman
EX\DH\PB072993
r
-
-
R/P RAP DETA/L RIP RAP DETAIL
Section View Section View
NTS NTS
1
/2"RCP DRAIN MAP 2 L O T 7 MAP 3 L O T/29
�.---- 5' ---� EDGE OF VEGETA TED
WETLANDS
STONE TO BE UNDERLA/N BY
EX/ST/NG GROUND
/2"'RCP M/RAF/ /4ON FABRIC
.r Ire
M/RAF//4ON FABRIC
(OR -0U(VALENT) O �q "(MIN)
STONES
6" GRA VEL a� 13�yy
6'"(MIN.)STONES OQo
5
,I
45,348+ S.F.
1.041 AC
ASSESSORS
MAPS LOT1/6 MAP3L0TS 1178118
hoc`„
—� � \ MAR 3L0T/20
6
P •- /,
ROP ?
RCP -
R F�PRED ENO a
I iv 114.0
arr.0•••WETLANDS _ I14
EX/ST. SC TAT/ON 113.1 \ \� .
//4 1��' FENCE. i. 1.\ .: • 111,
/20
SL OPE STAB/L/ZA TION DE TAIL '2O=—�� � • , • • f � ' s ~ �•• - - -'AREA OF PROPOSED WORK
NTS /2s --122 -
i
PROPOSED SL OPE 2Y /a0 ` 12a ` --
. —124
EX/ST/NG GROUND
EX/ST/NG SL OPE 4"LOAM 8 SEED `� }� 130\
i
EDGE OF VEGETATED EROS/ON CONTROL BLANKET
(INSTALL AS PER MANUFACTURERS/NSTRUCT/ON) \ EX/sT/2"RCP
WETLANDS /NV.=//4.68
BLANKET SHALL BE PH/LL/PS 758 SUPERGRO.
A.
I 130 Q
HA YBALE'S I v NO TES.
/. /NFORMA TION/S FROM AN ACTUAL LEGEND
SIL TA TION FENCE I \ •. •,��. y GROUND INSTRUMENT SURVEY /30.6 EX/ST/NG SPOT ELEVA TION
13-9.3 PPERFORMED ON ✓UL Y 28, /992. /38 EXISTING CONTOUR GRADE !
a ,• X30.6 �' 2. BENCH MARK/S THE RIM OF THE C.B. CA TCH 9A SIN
SEWER MANHOLE A T THE EXIST/NG WETLANDS
/00 FOO T BUFFER LINE END OF CLARK A VENUE= /36.9/:
3COUNTOURS AREON 2INTERVAL S / 20
) PROPOSED CONTOUR
4. HAY BALES WILL BE MAINTAINED j
\ \
DURING ANY CONSTRUCT/ON ACT/V/TY ;l
\ ON SITE.-
I
r.3
136
I PROPOSED WORK WITHIN BUFFER ZONE
INSTALL LINE OF HA Y BALES A T EDGE OF
QI BORDERING VEGETA TED WETLANDS,
p 1g8,8 \ /37.9 / 2. WITHIN THE LIMITS O
4I � � F THF PROPERTY
349.05 TO CLARK ST. L/NES CUT BA CK EX/STING SL OPES TO 2,7
I /00.00 FINE GRADE AND COMPACT, L OAM AND SEED EXH/B/T F
BIT. SIDEWALK A MINIMUM 4" THICK AND INSTALL EROS/ON
CONTROL/VEGETA TIONBLANKET NO TICE OF /N TEN T PL AN
:--� GRAN/TE CG�7B
3. REMOVE SEDIMENT DEPOS/TS ALONG TOE
72 IN
I,vv=i34 e7 OF EX/S TING SL OPE.
CLARK A VENUE
SAL EM, MA
4. INSTAL L SIL TA TION FENCE AS PER
SL OPE S TAB/L IZA TION DETAIL FOR
MAP 3 L 0 T /14TMAPJLO7 113 NICHOL AS FIORE
SCALE /" - 30' AUGUS T 27, /992
REVISED SEPT. 22, /992
L ANDMARK ENG/NEER/NG 8
x ' '� €�♦r SURVEY/NG, INC
583 CHES TNUT S TREET
hid.•'Qt'4w„ ,. ,;'N,. .L� •`'
°T k L YNN, MA
i