64-32 - Pickman Road, Pickman Park Condos - CONSERVATION COMMISSION r C�fc slC:r� ' S \ ��d�/` 1����- 3� � � �_ P �- s �� � \MI 11 CITY OF SALEM CONSERVATION COMMISSION May 29, 2013 Pickman Park Condominiums Board of Trustees C/O American Properties Team 500 West Cummings Park, Suite 6050 Woburn, MA 01801 Re: Certificate of Compliance - DEP #64-32 - Pickman Park Condominiums To Whom It May Concern: Enclosed, please find the certificate of compliance for the above-referenced property. This certificate must be recorded at the Southern Essex County Registry of Deeds, 45 Congress Street(Shetland Park) #4100 in Salem. Please fill out and return the Recording Information on page 3 of the certificate, which will indicate to the Salem Conservation Commission that the document has been recorded. If you have any further questions please feel free to contact me at 978-619-5685. Sincerely, Tom Dw e Conservation Agent/Staff Planner Enclosures CC: DEP Northeast Regional Office Richard A. Salvo, PE I Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 64-32 \ Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information Important: When filling out 1. This Certificate of Compliance is issued to: forms on the computer,use Pickman Park Board of Trustees only the tab key Name to move your c/o American Properties Team - 500 West Cummings Park Suite 6050 cursor-do not Mailing Address use the return key. Woburn Ma 01801 City/Town State Zip Code � This 2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to: Salem Acres, Inc. RN^ Name October 3, 1978 64-32 Dated DEP File Number 3. The project site is located at: Pickman Park Condos-Pickman Road Salem Street Address Cityf town MAP 22, 31, & 35 multiple lots Assessors Map/Plat Number Parcel/Lot Number the final Order of Condition was recorded at the Registry of Deeds for: Salem Acres, Inc. Property Owner(if different)_ Essex 6523 376 County Book Page Certificate 4. A site inspection was made in the presence of the applicant, or the applicant's agent, on: Date WPA Form BB,Certificate of Compliance•Page 1 of 3 wpafrmBodoc•rev.1 n3/09 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 64-32 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Certification Check all that apply: ® Complete Certification: It is hereby certified that the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the above-referenced Order of Conditions have been satisfactorily completed.The project areas or work subject to this partial certification that have been completed and are released from this Order are: ❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Wetlands Protection Act may commence without filing a new Notice of Intent and receiving a new Order of Conditions. ❑ Ongoing Conditions: The following conditions of the Order shall continue: (Include any conditions contained in the Final Order, such as maintenance or monitoring, that should continue for a longer period). Condition Numbers: C. Authorization Issued by: Salem 5/23/2013 Conservation Commission Date of Issuance _ This Certificate must be signed by a majority of the Conservat o ission and a __copy_sent.to.the applicant-and-appropriate DEP Regional O ce_(Se_e__ hftp'//www.mass.gov/dep-/about/region/findvour.htm). ig tufes: 6 W wpatrm8b.tloc•rev.12123/09 WPA Farm 8B,Certrrcate of Compliance•Page 2 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 64-32 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP D. Recording Confirmation The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation Commission. To: ------------ --------- -- ----------------------------------------------- Salem Conservation Commission Please be advised that the Certificate of Compliance for the project at: Pickman Park Condos- Pickman Road 64-32 Project Location DEP File Number Has been recorded at the Registry of Deeds of: Essex County for: Pickman Park Board of Trustees Property Owner and has been noted in the chain of title of the affected property on: Date Book Page If recorded land, the instrument number which identifies this transaction is: If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant wpaf=Bb.dcc•rev.12I23109 WPA Fonn 8B,Certificate of Compliance-Page 3 of 3 ® � p,� • w Engineering Alliance, Inc. Civil Engineering&Land Planning Consultants May 3, 2013 d`"'' J~ 194 Central Street 1950 Lafayette Road �u. Saugus,MA 01906 Portsmouth,NH 03801 Tel:(781)231-1349 Tel:(603)610-7100 Fax:(781)417-0020 Fax:(603)610-7101 Salem Conservation Commission Re: EAI Project#: 10-31901 City of Salem Pickman Park Condominium 120 Washington Street, 4th Floor DEP File No. 64-32 Salem, MA 01970 Dear Members of the Commission: On behalf of our client, Pickman Park Condominium, Engineering Alliance, Inc. (EAI) is pleased to submit the following for your review regarding the above referenced project: • Three (3)copies of Form 8A Request for Certificate of Compliance • Three (3)copies of Aerial Photos of the Subject Property circa 2008 obtained by MassGIS and prepared by Engineering Alliance, Inc. • Three (3) copies of plans entitled "Revised Subdivision Plan" prepared by Parsons and Faia, Inc. and dated December 27, 1985. The Order of Conditions for this project was issued by the Salem Conservation Commission under DEP File No. 64-32 in 1978. Subsequent to that time, the Pickman Park Condominium was constructed over three phases. Construction was completed and the project was turned over from the developer to the board of trustees in June of 1985. Since 1985, the areas that were under the jurisdiction of the Order of Conditions, have been stabilized with vegetation and are thriving. Engineering Alliance, Inc. has performed a walking survey of the development and a review of available subdivision plans (attached). Based on our review, Engineering Alliance, Inc. hereby certifies that the development was constructed in substantial compliance with the Order of Conditions. The subdivision plans were utilized as a basis for our review as the file at the Conservation Commission did not include any design drawings from the 1980's. We are hopeful that the Commission will consider issuing a Certificate of Compliance for this project in order to properly close this project and complete the chain of title. Should you have any questions or require additional information, please feel free to contact me. Very Truly Yours, �jNOF c_ ENGINEERING ALLIANCE, INC. Z` RICHA A. u' SALVO CIVIL m No. 41851 Richard A. Salvo, P.E. q�oF Principal FSS/ONALE��� Copy to: Pickman Park Condominium Board of Trustees EAI File#: 12-39501 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8A — Request for Certificate of Compliance 64-32 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information Important: When filling out 1. This request is being made by: forms on the Pickman Park Board of Trustees computer,use Name only the tab key to move c%American Properties Team - 500 West Cummings Park Suite 6050 your cursor. Mailing Address do not use the . Woburn MA 01801 return key. Cilyrrown State Zip Code (781)569-2626 ab Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: "e' Salem Acres, Inc. Applicant October 3, 1978 64-32 Dated DEP File Number Upon completion of the work 3. The project site is located at: authorized in Pickman Park Condominiums-Pickman Road Salem an Order of Street Address City/rown Conditions,the Tax Maps 22, 31, 35 property owner Multiple Parcels must request a Assessors Map/Plat Number Parcel/Lot Number Certificate of 4. The final Order of was recorded at the Registry Compliance f Conditions e9 trY of Deeds for: from the issuing Salem Acres, Inc. authority stating Property Owner(if different) that the work or portion of the Essex 6523 376 work has been County Book Page satisfactorily completed. Certificate(If registered land) 5. This request is for certification that(check one): ® the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above-referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wparormaa.dx••rev.7113104 aaea i or 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: WPA Form 8A — Request for Certificate of Compliance 64-32 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions(OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office(see http://www.mass.gov/dei)/about/region/findVour.htm . vrpaform8e.dx••rev.7/13M4 Page 2 of 2 BK6523 PG316 ;; j.. ORDERS WEPLAND PROTECTION ACT G.L. C. 131 s. 40 ,c • « A 64 FILE NUMBER: PROJECT LOCATION: Jefferson Ave. , Pre9- t -32 ton Road, Pickman Rd. , B. & M. R.R. �`:;, TO: ., Attorney Peter Beatrice' CERT. MAIL NO: 755757 ry S b Beacon St. , Suite 800 ` Boston, MA 02108 i RE: NOTICE OF INTENT AND PLANS DATED: DATE OF RECEIPT BY 6/19/78 CONSERVATION COMMISSION: 7/5_/78 �� • DATE OF PUBLIC HEARING: 7/18/78,8/l/78 8/15/78, 9/5/78 �. Pursuant to the authority of G.L. C. 131 .s.. 40, the. Salem Conservation Commission has considered your notice of intent and plans submitted therewith, and has determined t!tat. the area on 'which the 'pro- ' posed work is .to be done is significant to one or more of the interests i described in the said act. The Salem Conservation Commission �k hereby orders that the following conditions are necessary and all workxk. must be performed in strict accordance with said conditions and with the _Y! Notice of Intent andPlans, unless modified by said conditions. ;.. CONDITIONS 1 . Failure to comply with all conditions stated herein, .and with all related statutes and other regulatory measures, shall be deemed �a cause to revoke or modify this order. ' 2. This order does not grant any property rights or any exclusive , : �. privileges; it does not authorize any injury to private property:, or ' invasion' of private rights. 3. This order does not relieve the permittee or any other person' o,f . the necessity of complying with all other applicable. federal, state or A ' local statutes, .ordinances, by-laws and/or regulations. ' 4. The work authorized hereunder shall be completed within one (1) • year " ' from the date of this order unless otherwise stated beloia pursuant to Regulation 6.7. The order. may; be ex- s.f tended by the issuing authority for one or more additional one-year ' periods upon application to the said issuing authority at least thirty days prior to the expiration date of the order or its extension 5. Any fill used in connection with this project shall be clean fill, _ containing no .trash, refuse, rubbish or debris, including, without limiting the generality of the foregoing, lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles or, paits of any, of the foregoing. _ 26 _ BK6523 PG377; CONDITIONZ C^N^_ ?;.UED PAGE 2 FILE NO. 64-32 6. . No .work"may.lbe` commenced until all appeal .per.iods have elapsed from the order' of the Conservation Commission or from a final ,order by ,., . the Department, of Environmental Quality. Engineering. 7. No work .shali be undertaken ,until the final Order, with respect to the proposed project, has been recorded in the Registry of. Deeds for the district. in which the land is located within the chain of title of the affected property. Copy to. be furnished -to issuer of this Order showing book and page prior to commencement of work. 8. Upon completion of the work described herein, - the applicant shall forthwith request, in writing, that a Certificate of Compliance be issued stating that the work has been satisfactorily completed. : p 9.. A sign shall be displayed at the site not less than two square feet or more than three square feet bearing the words, "Massachusetts Department of Environmental Quality Engineering Number 64-32 10. Where the Department of Environmental Quality Engineering is requested to make a determination and to issue a superseding order, ' { the Conservation Commission shall be a party to all agency pro- ceedings and hearings before the Department. 11. The work shall conform to the following described, plans and : °. additional conditions. See "Attachment for Section 11 of the Order of Conditions on the Development a`# of Pickman Park in Salem, Massachusetts for Salem Acres, Inc. of 71 Hancock St. , Everett, Massachusetts, DEQE File No. 64-32". , ti (I L. I , i. 11, -27 8K6523 PG378 ,MIDITIONS CC 1T7,TJF PAGE 3 FILE NO. 64-32 1 The applicant, �anp person aggrieved by this order, any owner of ,-. land abutting the. land upon which the proposed work is to be done;, or *. t ' any ten residents of the -city or town in which such, 'Iand is located,- V are hereby notified of -their right to appeal this order to the Depart- °. ment of Environmentai .ouality Engineering provided the 'request -is lWe- in a writing and by certified mail "to the Department within ten (10) days from the issuance . G' of this order. ' ISSUID BY Salem Cons bu'ervat� Commission CoptPmhor 26 197R i'' Date of Issuance On this day of 19 7F before me �.. personally appeared to me known to be the person described in and who executed the foregoing instrument and acknow- ledged that he executed; the same as his free..act and deed. My Commission expires f ' f , BK6523 PG379 Attachment for Section 11 of the Order of Conditions on the Development of Pickman J Park in Salem, Massachusetts for Salem Acres, Inc. of 71 Hancock St. , Everett,, Massachusetts, DEQE. File' No. 64-32 11. The Salem Conservation Commission has determined that the Wetlands Pro- tection Act is :applicable to the work proposed by Salem Acres, Inc. 'for the proposed development known as Pickman Park. in Salem, Massachusetts.'', The following orders are issued to protect the public interest by con- trolling the direct effects of construction and alteration by sedimenta- } r tion from land erosion on wetlands important to the South River Flood Control Area and on other wetland areas on and contiguous to the devel- opment. General Orders 11-1. .All work shall be done in accordance, with the plans and documents accompanying ; the Notice of Intent prepared by Carter and Towers Engineering Corporation , of 6 Fairview Avenue, Swampscott, Massachusetts, except as modified by these Order of Conditions. ' X s' 11-2. All erosion control and sedimentation control plans shall be, developed .in accordance with Guidelines for Soil and Water Conservation ip Urbanizing f; Areas of Massachusetts, USDA Soil Conservation, Amherst, Massachusetts, i": April 1975. 11-3. A detailed plan and specification shall be prepared 'for erosion control' and sedimentation control for each phase of the development in accordance "` . with this Order of Conditions shall contain detailed procedures for im- R , plementation of the plan. A copy of the plan, specification and all necessary calculations shall be submitted to the Salem Conservation Com- mission .for 'approval at least six weeks prior to the start of work in each phase. A.copy of the approved plan and specification shall be kept;on site , at all times`and, shall be used in the implementation of erosion control and " sedimentation control plan for each phase of the development. The imple- mentation of the plans during construction shall be subject to inspection by the Salem Conservation Commission. 11-4. As work progresses in any area erosion and sedimentation shall be controlled by only disturbing areas required for grading and construction, by the use of straw bale check dams and bench terraces on the slopes of disturbed areas . by filter 'strips ,and by stabilizing disturbed areas as the work progresses. "+{^ Areas shall he permently stabilized as follows: (i) if, the season, is suitable for growing at least 6 inches' of topsoil shall be, placed and treated after the surface has been scari'fied: and the topsoil shall be seeded without undue delay. The seeded surface shall have mulch applied, and netting as required. yRk (ii) :'If the 'season is unsuitable for growing, the surface shall have y ` mulch applied and netting as required. In the next growing season , the surface ahall be scarified and, shall be treated as in (i) above. q-u BK6523 ,. PG380 -2- (b) Every effort shall be made to phase the work in order to have developed vegetation on:'disturbed areas at the onset of the winter season. : (c) Runoff flow shall be diverted from unvegetated areas, and diverted to 4 installed 'st'dfm drains.or grade stabilizing structures as required. i x (d) No soil slopes shall be greater than 2 horizontal to 1 vertical. 1 (e) All storm drain inlets shall be protected with gravel filters or straw bale kheck dams. ,: (f) All stockpiles of sand and soil, other than stone and rock, 'shall be stored within bulkheads which are drained so as 'to minimize the removal f of particles by runoff, or shall be stored and covered in a location 'where the topography and the use of straw bale check dams mininize the removal of particles.' g' (g) The binder course shall be installed on all roads or sections of road within a reasonable time and without undue delay upon completion of grading and initial compaction. (h) No wetland areas shall be used as sedimentation ponds. All dredging a shall be done behind straw bale check dams. (i) . All straw bale check dams shall have the bales butted together and laid �e in a trench at least 6 inches deep with soil compacted at the base on each face of the bales. Each bale shall be anchored by two stakes. (j) The erosion control measures shall be inspected by the Applicant at least three times each week and each day during periods of precipita- tion or snow melt. (k) Sediment removed from check dams or sedimentation ponds shall be ,removed' ! ' MA and stockpiled as in (f) or used in suitable areas ,for grading. : rb° (1) Displaced storage in the wetland between proposed Fillmore Road and Jefferson Avenue shall be compensated for by dredging in areas approvedr by the Salem Conservation Commission prior to any work in the wetland. A* C (m) Upon completion of work in wetland areas, the areas shall be cleaned and restored without undue delay. Specific Orders 11-5. The sewer pipe cradles shall be constructed in concrete. 11-6. Detailed construction drawings for the sanitary sewer crossing over a , the South River and the sewer and embankment in the wetland, the tem- porary diversion system, the river channel and the Fillmore embankment.shall ` be submitted to the Salem Conservation Commission for approval at least six (6) weeks ,prior to the start of work in the wetland between proposed Fillmore Road and, Jefferson Avenue. 11-7. The order of construction shall be as follows: (a) Sanitary sewer crossing and river channel. ' (b) Fillmore Road embankment. ° (c) Sanitary -sewer and embankment to Parallel Street. : BK6523 PG381Ai -3- Dredging, for compensation storage shall be done prior to construction of the sewer embankment and Fillmore Road embankment or it may be done to compensate for storage as filling progresses. # ; All work in the wetland shall be completed before any upland grading or . construction is started. As 11-8. Construction of Sanitary Sewer Crossing and South River Diversion The South River shall be temporarily diverted through a pipe for the ° construction of the sewer crossing and a permanent concrete river channel. a" The diversion pipe shall contain the river from the exit of the existing ' culverts under the railroad embankment, across the location of the pro- posed Fillmore Road embankment and shall discharge into the marsh downstreama a of the end of the. concrete river channel. The pipe shall be of a size sufficient to pass the 10 year flood without increasing the water elevation on the west side of the railroad embankment. A straw bale check dam shall be suitably installed prior to the installation of the diversion pipe. ' Upon diversion of the river the check dam shall be altered to prevent siltation in the marsh due to construction of the sewer crossing and: the river channel. All Water pumped from excavations shall be discharged' ,into a suitable sedimentation pond formed by rock filled timber or concrete ' cribs or gabions. The soft organic soil shall be removed from the site S of the structures after installation of the check dam. When 'work begins ' on the sewer crossing culverts and the river diversion it. shall continue without interruption until complete. Upon completion, the wetland shall be cleaned and the river shall be diverted to the concrete channel and then; temporary diversion pipe shall be removed. Design of the sanitar ' sewer crossing and South River diversion may be revised and detailed plans and specifications shall be submitted to the Salem Conservation Commission`, for approval at feast six (6) weeks prior to construction. ` (a) ' Sanitary Sewer Crossing kk+ The sewer culverts shall be constructed around the temporary diversion pipe, or that section of the diversion pipe shall be designed. to be ` incorporated into the permanent culverts. (b) .Permanent River Channel A reinforced concrete river bed and retaining wall on the side of the river adjacent to the proposed Fillmore Road embankment shall be `if constructed on the line of the river diversion from the exits of ' the ', ' existing culverts, for a distance required for the river to clear ,the toe of the embankment. The retaining wall shall be verticallto an f ,Aiz;'• elevation of at least 15 feet mean low water and shall be designed to kf withstand the' loads imposed by construction and use of the road. The headwaal •for ':the 24 inch storm drain shall. be formed in the retaining wall. ar :r l j BK6523 PG382 # —4— ras 11-9. Construction of' Proposed Fillmore Road Embankment' Construction of the embankment shall commence only upon completion^ of the a ; sewer crossing and the concrete river channel.' 'Prior to the ,start. of, construction of the embankment a straw bale check dam shall be installed at least six (6) feet from the toe of the slope to prevent siltation in z� the marsh. The soft organic soil shall be removed from the site of the embankment and placing and compacting the embankment shall continue with- out interruption until at least the binder course is installed on the ; road. As work progresses on the embankment all completed sections shall have riprap placed on the slope. 11-10. Constiuction, of the Sewer and Sewer Embankment Prior to the ,start' of construction of the sewer and embankment in 'the ' area between the proposed Fillmore Road and Parallel Street, a straw bale check dam shall be installed at least six (6) feet from the toe, of the embankment slope after which the soft organic soil shall be removed ~' from the site',of 'the embankment. Water pumped from excavations shall be a . discharged into a suitable sedimentation pond formed by rock filled timber t, or concrete cribs or by gabions. When work starts it shall continue with- M out interruption until completed. As work progresses completed sections shall have erosion controlled in accordance with the General ,Orders Sec- M tion 11-4(a) . 11-11. Construction of t ' Storm Drain Under Railroad Embankment (opposite rear of Lot 70) . ,. The storm drain shall be constructed through the railroad embankment with a sedimentation pond constructed between the embankment and the road. t' The pog4. 'shall be constructed prior to installation of upstream storm •drains and shall intercept water which will drain to the wetland on the west " of the' embankment' and it shall be kept in operation until all land which drains, to it ,is permanently stabilized against erosion, at which time the storm drain system shall be connected to the pipe under the embankment , and the sedimentation pond shall be removed and the area prepared and seeded. :The storm drain outlet in the wetland on the west of the railroad embankment shall', bave a stone apron installed to spread the discharge to prevent scouring. `- 11-12. Construction of Proposed Drainage Ditch (rear of Lots 76 through 121 to Forest River) This ditch and headwalls shall be constructed 2 years in advance of h disturbance of the land which will drain to it to allow time for seeding and plant growth ;prior to its use. When construction of the ditch starts ;, it shall continue without interruption until seeding is complete and shall . be timed to permit seeding in the growing season. It shall be seeded with suitable vegetation. A concrete or rock channel section shall be installed in the ditch from the headwall to a point 15 feet from it at the rear of lots 76 and 77. A concrete or rock channel section shall be installed in the ditch for a length of, a ix (6) feet on each side of the headwall at the rear of lot 123. A straw bale check dam shall be installed at the exit of the ditch prior to the start of the ditch construction and shall remain in place until vegetation is established. When the storm drains connecting w to the ditch are being constructed straw bale check dams shall be installed in the ditch downstream of each pipe exit. -s- BKb5Z3 fG383 11-13. Construction of Pickman Road and Adjoining Drives and Avenues , (a) When construction of Pickman Road begins all work shall continue with- out interruption until at least the binder course is installed and the cuts and fills have been stabilized in accordance with General Order ; 11-4(a) ' .The road shall be laid out and its alignment shall be reviewed by the Salem Conservation Commission prior to the start of construction. Construction plans of the portion of the road traversing the l conservation area shall be submitted to the Salem Conservation' Commission for' approval at least six (6) weeks prior to the start of construction. s (b) The line of Pickman Road shall be altered such that the north edge of the right of way is at least 20 feet from the large maple tree on -fA the south side of the pond. This tree shall be undisturbed .during construction. During construction of the road and storm drains '` and the growth of planted vegetation the pond and-land on the aouth side of the road shall be protected by straw bale check dams. ,The headwall shall not be constructed in the pond'but shall be built". adjacent to the edge of the right of way at the end of a short open channel. The invert elevation of the channel and pipe shall be 42 feet, mean low water. No water shall be discharged into -the pond during construction and the drainage system shall be constructed such that the surface runoff does not enter the pond through the storm drains from Pickman Road. The outlet of the storm drain on the south side of the road shall have a stone apron installed to spread the discharge to prevent scouring. (c) During construction of the storm drain from Pickman Road between` the , , pond and Arnold Drive and growth of stabilizing vegetation the surrounding land shall be protected by straw bale check dams. A .'stone ,' apron shall, be installed at the outlet to spread the discharge ,to prevent ,scourin _ PsLX �5. 10-0i .)EDOc��19� b Pt�ST���R:. L��T. V Wy>�t .. 4 If} k i M i r€ b 9 r'V Ira - . r\J a :r I � b< J � f y' Mail To; Peter R. Beatrice, Jr., Esquire 6 Beacon St., Suite 800 Boston, Mass., 02108 Tel: 227-6060 CCNpITq Vti� q0 o z QQm R �9`nplMINE ppNPY (fitg of "Sttlem, CMUSBUC41tsetts rparrtnunt of jJublir Porks one "3nlem Green ANTHONY V. FLETCHER, R.P.E. RICHARD P. SWENSON, C.E. CITY ENGINEER Assisian4 Engineer December 7, 1978 Salem Planning Board One Salem Green Salem, MA. 01970 RE: Drainage - Pickman Park Subdivision Ladies and Gentlemen: All requirements of my letter dated 5 December 1978 to the Planning Board have now been satisfied with the exception of drainage calculations. We have requested additional plans from the Engineer due to an inconsis- tency between the calculations received and sub-division plans previously sub- mitted. Very trul Vyours, A. V. Fletcher, P.E. City Engineer Director of Public Services AVF/cc cc: Conservation Commission 1 _ . /� m? 10 c� l F fyi T �S q (�i#� n# �tttextt, ttssttct�use##s 11rparfntent of jJublir Parks (One 5nlcm (Grern ANTHONY V. FLETCHER, R.P.E. RICHARD P. SWENSON, C.E. CITY ENGINirR Assisfa ni Engineer September 5, 1978 Salem Conservation Commission One Salem Green Salem, MA. 01970 Mr. B. Northrup, Chairman RE: Pickman Park Dear Mr. Northrup: The following changes or revisions are required for final engineering approval : 1. Guard rail or approved barrier at Fillmore Road embankment. 2. Rebuild M.H. at Jefferson Ave. interceptor to receive new sewerage line. 3. Submit drainage calculations and depict drainage areas. 4. Cradle(s) for sewerage line crossing at South River to be constructed of concrete. 5. Side slopes noted as 2:1 are unacceptable. Suggested, but not required, is that the drain swale along the railroad be culvertized. There are no other requirements of the engineering department outstanding. Very truly yours, A. V. Fletcher, PE City Engineer Director of Public Services AVF/cc cc: Planning Board/Dept. Carter & Towers 4rr CITY OF WWI M W- 14'{�7 U " ASS PLANNING QEPAIITM�ppT" ocamw's WILLIAy E. LUSTEROIVES�1LEM GNEEN Ci Planner1970 (5o8j 745 9595 EXT 311 ,IJ '�5�18) 744-5;�j ,x:. , N'' Dece be£ 29, 199 Attorney Carolyn McAboy Doonan and Graves 60 Washington Street ¢ Salem, MA 01970 Dear Attorney McAboy: a; I am writing to you with regard to an Order of Conditions (64-32�Issµed ky thr'$al@ Conservation Commission for the Pickman Park Condotrulunm Projecttu . , This project is being developed in three (3) phases Phases 1 and t7r hayg.been colnA�eted . to the satisfaction of the Conservation Commission. Phase, 3 is currently �lte ponj� ryctlon and is in compliance with the Order of Conditions. h r In addition, on May 15, 1986, the Salem Planning Board approve lnodsi�ci �iiiadyijon plan for the Pickman Park development The work has been completed t l onlgrrjtance`lvkth{tjte approved plan. b , aY,J If you have a4?Y filrtper y}eStl9 are, s i hesitate to contact me at (50$) 715�954; t11 ° al l [[� l` F' Gi�. �� Ott "1! k ,r. Ah� �.- 9 reh Gylr a1�1'Aw I, l l�I. I � F Bi1Zezbskt • b I l . Assi;tig��(1n+t+t Ci+ty i'zanner+ I , i11.4._yl r.. a ' 1 �y it ri i.U[vLlG.utl1:6htiv:.us..L..:.n1>BL:SYLuC{fa:.... u ``S\ON COI! 7 F Salem. Massachusetts 01970 W Fl� \�ASSDta February 17, 1989 Mr. Edward Flaherty, Esq. Doonan and Flaherty 60 Washington Street Salem, MA 01970 Dear Mr. Flaherty: I am writing to you with regard to an Order of Conditions (64-32) issued by the Salem Conservation Commission for the Pickman Park Condominium Project . As you know, this project is being developed in three (3) phases. Phases 1 and 2 have been completed to the satisfaction of the Conservation Commission. Phase 3 is currently under construction and is in compliance with the Order of Conditions. If you have any further questions , please do not hesitate to contact me at (508) 745-9595, ext. 301. Sincerely,C -fin C owe(./`/ . Kathleen Winn Conservation Administrator J2020 J _ t Conservation Commission \ f ' F Salem. Massachusetts 1 September 28, 1984 Attorney Peter Beatrice Suite 400 44 School Street Boston, MA. 02108 RE: Pickman Park/Salem Acres Inc. Order of Conditions Dear Mr. Beatrice: Enclosed is the Extension Permit for the Order of Conditions on Pickman Park as requested. The Order of Conditions has been extended for six months only as part of a recently-instituted policy for the Conservation Commission. This allows the Commission to be kept apprised of the progress on proposals under construction. �< The Commission wishes particularly to call your attention to condition. 11-3 of the original Order. Since your client's excavation work on Marion Road is now encroaching upon the 100' buffer area of the designated wetland adjacent to the Boston and Maine railroad, we expect this report to be forth- coming. We further require that no further alteration of any kind be conducted in that wetland or any other prior to the submission and approval of that report by the Conservation Commission. - Please feel free to contact Charles Frederiksen at 744-4580 if you wish --o' dicuss this mhtter further. Sincerely yours, Philip D. Moran Chairman dey cc Ron Tiberi, Clerk of the Works law C7((icee of Ozat7IcE, a2. '&UE 500 - a4 c&4001'Skedf RECOVER .Sualun, Aaaaacfius fls 02,o8 9 1983 DEC 1 9Ef. z27-6o6o SALEM PLANNING DEPT. J efea �. DEafeiec, a2. .V!.fiacc a. Aa¢tin. Aic`sacf a. O'eNeitt Mr. Charles Frederickson Planning Board Aide. December 15, 1983 Salem Planning Board 1 Salem Green Salem, Ma. 01970 Dear Mr. Frederickson : Enclosed .please find a copy of the orignal order of conditions for the Pickman Park Subdivision. Also enclosed , one year extension permits. If you need any further information, do not hesitate to call me. Very truly yours , Peter R. ce, i; ON Ca.y �'n <{ Salem. ilassachusetts 01970 DEQE File 64-32 Date: 7/5/78 PROPOSED PROJECT SUM1%1ARY Applicant : Atty. Peter Beatrice for Salem Acres, Inc. Address: 44 School Street, Boston" Phone : 227-6700 Location of Property: Jefferson ave. , B & M Railroad Line, Forest River Project Description: 304 Condominium Units-Duplex & Quadraplex I. Type of Action: _ Determination of Applicability _ Modification of Order Notice of Intent XX Extension of Order Abbreviated Notice of Intent Certificate of Compliance II. Interest(s) in the Wetlands Protection Act, M.G.L. c. 131, s. 40 affected: Public or private water supply XX Ground water supply XX Storm damage prevention XX Prevention of pollution Protection of land containing shellfish Protection of fisheries III. Resource areas subject to protection: XX Bank Ocean XX Fresh water wetland — Estuary _ Coastal wetland Creek Beach XX River — bordering on: XX Stream Dune — XX Pond _ Flat — XX Marsh — Lake XX Swamp XX Land under any of the water bodies listed above Land subject to tidal action Land subject to coastal storm flowage XX Land subject to flooding IV. Comments: This project was originally approved in 1978 and has been extended each year since that time. Construction has begun .in the last 6 months. Since this project is so large and since it falls under the old regulations, I recommend that the proponent be given extensions at 6 months intervals until completion. The Planning Department by using the Clerk of the Works and the Conservation Aide can closely monitor the construction and provide the Commission with biannual report. If the proponent does not follow the restrictions imposed on the development, then the Commission could refuse to extend his Order 6 months from now, forcing him to comply with the new regulations under a new Order of Conditions. (conditions attached) V. Proposed conditions: 6 month extensions only. Conservation Aide September 25, 1984 Date J EtE2 '::R. BEAt2LCE1 a2. d{ttomay and eouns tos at Lnw 'Suite 400 ¢q cSCAOOf cStceet Boston, AassacAusctts, 02109 gel. (617) 227-6o6o September 7, 1984 - Conservation Commission One Salem Green Salem, MA 01970 RE: Order of Conditions Pickman Park Salem, MA Salem Acres, Inc. File No. 64-32 Gentlemen : On behalf of Salem Acres, Inc. , I respectfully request an extension to the Order of Conditions relative to the above entitled matter. Kindly inform me as to when the extension may be granted. Thank you . Enclosed please find a copy of the Extension Permit. Very .truly yours, Peter Beatrice, J PRB/jae Enclosure rr.'P.w.' m-njG r.tachment for Section 11 of the Order of Conditions on the Development of Pickman / Park in Salem, Massachusetts for Salem Acres, Inc. of 71 Hancock St. , Everett, w lassachusetts, DEOE File No. 64-32 11. 'The -Salem Conservation Commission has determined that the Wetlands Pro- tection Act is applicable to the work proposed by Salem Acres; Inc. for the proposed development kno.✓n as Pickman Park in Salem, Massachusetts. The following orders are issued to protect the public interest by con- trolling the direct effects of construction and alteration by sedimenta- tion from land erosion on wetlands important to the South River Flood Control Area and on other wetland areas on and contiguous to the devel- opment. General Orders 3-1-1. All work shall be done in accordance with the plans and documents accompanying the Notice of intent prepared by Carter and Towers Engineering Corporation of 6 Fairview.Avenue, Swampscott, Massachusetts, except as modified by these Order of Conditions. 11-2. All erosion control and sedimentation control plans shall be developed in accordance with Guidelines for Soil and [dater Conservation in Urbanizing Areas of Massachusetts, USDA Soil Conservation, Amherst, Massachusetts, April 1975. 1-3 A detailed plan and specification shall be prepared for erosion control and sedimentation control for each phase of the development in accordance _ with this Order of Conditions shall contain detailed procedures for im- plementation of the plan. A copy of the plan, specification and all necessary calculations shall be submitted to the Salem Conservation Com- mission for approval at least six weeks prior to the start of work in each phase. A copy of the approved plan and specification shall be kept on site at all times and shall be used in the implementation of erosion control and sedimentation control plan for each phase of the development. The imple- mentation of the plans during construction shall be subject to inspection by the Salem Conservation Commission. 11-4. As work progresses in any area erosion and sedimentation shall be controlled by only disturbing areas required for grading and construction, by the use of straw bale check dams and bench terraces on the slopes of disturbed areas by filter strips and by stabilizing disturbed areas as the work progresses. Areas shall be permently stabilized as follows: (i) if the season is suitable for growing at least 6 inches of topsoil shall be placed and treated after the surface has been scarified and the topsoil shall be seeded without undue delay. The seeded surface shall have mulch applied, and netting as required. (ii) If the season is unsuitable for growing, the surface shall have mulch applied and netting as required. In the next growing season the surface shall be scarified and shall be treated as in (i) above. -2 S (b) Every effort shall be made to phase the work in order to have developed vegetation on disturbed areas at the onset of the winter season. �. i, (c) Runoff flow shall be diverted from unvegetated areas, and diverted to installed storm drains or grade stabilizing structures as required. I (d) 1vo soil slopes shall be greater than 2 horizontal to 1 vertical. is is (e) All storm drain inlets shall be protected with gravel filters or straw bale check dams. i (f) All stockpiles of sand and soil, other than stone and rock, shall be stored within bulkheads which are drained so as to minimize the removal of particles by runoff, or shall be stored and covered in a location where the topography and the use of straw bale check dams mininize the removal of particles. (g) The binder course shall be installed on all roads or sections of road within a reasonable time and without undue delay upon completion of grading and initial compaction. (h) No wetland areas shall be used as sedimentation ponds. All dredging shall be done behind straw bale check dams. (i) All straw bale check dams shall have the bales butted together and laid in a trench at least 6 inches deep with soil compacted at the base on each face of the bales. Each bale shall be anchored by two stakes. (j) The erosion control measures shall be inspected by the Applicant at least three times each week and each day during periods of precipita- tion or snow melt. (k) Sediment removed from check dams or sedimentation ponds shall be removed and stockpiled as in (f) or used in suitable areas for grading. (1) Displaced storage in the wetland between proposed Fillmore Road and Jefferson Avenue shall be compensated for by dredging in areas approved by the Salem Conservation Commission prior to any work in the wetland. (m) Upon completion of work in wetland areas, the areas shall be cleaned and restored without undue delay. Specific Orders 11-5. The sewer pipe cradles shall be constructed in concrete. 11-6. Detailed construction drawings for the sanitary sewer crossing over the South River and the sewer and embankment in the wetland, the tem- porary diversion system, the river channel and the Fillmore embankment shall be submitted to the Salem Conservation Commission for approval at least sip: (6) weeks prior to the start of work in the wetland between proposed Fillmore Road and Jefferson Avenue. 11-7. The order of construction shall be as follows: (a) Sanitary sewer crossing and river channel. 'Y -3- Dredging for compensation storage shall be done prior to construction of the sewer embankment and Fillmore Road embankment or it may be done to compensate for storage as filling progresses. All work in the wetland shall be completed before any upland grading or construction is started. 11-5. Construction of Sanitary Sewer Crossing and South River Diversion The South River shall be temporarily diverted through a pipe for the construction of the sewer crossing and a permanent concrete river channel. The diversion pipe shall contain the river from the exit of the existing culverts under the railroad embankment, across the location of the pro- posed Fillmore Road embankment and shall discharge into the marsh dcwnstrea« of the end of the concrete river channel. The pipe shall be of a size sufficient to pass the 10 year flood without increasing the water elevation on the west side of the railroad embankment. A straw bale check dam shall be suitably installed prior to the installation of the diversion pipe. Upon diversion of the river the check dam shall be altered to prevent siltation in the marsh due to construction of the sewer crossing and the river channel. All water pumped from excavations shall be discharged into a suitable sedimentation pond formed by rock filled timber or concrete cribs or gabions. The soft organic soil shall be removed from the site of the structures after installation of the check dam. When work begins on the sewer crossing culverts and the river diversion it shall continue without interruption until complete. Upon completion, the wetland shall be cleaned and the river shall be diverted to the concrete channel and the temporary diversion pipe shall be removed. Design of the sanitary sewer crossing and South River diversion may be revised and detailed plans and specifications shall be submitted to the Salem Conservation Commission for approval at least six (6) weeks prior to construction. (a) Sanitary Sewer Crossing The sewer culverts shall be constructed around the temporary diversion pipe, or that section of the diversion pipe shall be designed to be incorporated into the permanent culverts. (b) Permanent River Channel A reinforced concrete river bed and retaining wall on the side of the river adjacent to the proposed Fillmore Road embankment shall be constructed on the line of the river diversion from the exits of the existing culverts, for a distance required for the river to clear the toe of the embankment. The retaining wall shall be vertical to an elevation of at least 15 feet mean low water and shall be designed to withstand the loads imposed by construction and use of the road. The headwall for the 24 inch storm drain shall be formed in the retaining wall. S -4- ( 11-9. Construction of Proposed Fillmore Road Embankment Construction of the embankment shall commence only upon completion of the sewer crossing and the concrete river channel. Prior to the start of construction of the embankment a straw bale check dam shall be installed at least six (6) feet from the toe of the slope to prevent siltation in the marsh. The soft organic soil shall be -removed from the site of the embankment and placing and compacting the embankment shall continue with- out interruption until at least the binder course is installed on the road. As work progresses on the embankment all completed sections shall have riprap placed on the slope. 11-10. Construction of the Sewer and Sewer Embankment Prior to the start of construction of the sewer and embankment in the area between the proposed Fillmore Road and Parallel Street, a straw bale check dam shall be installed at least six (6) feet from the toe of the embankment slope after which the soft organic soil shall be removed from the site of the embankment. [pater pumped from excavations shall be discharged into a suitable sedimentation pond formed by rock filled timber or concrete cribs or by gabions. [then work starts it shall continue v ith- out interruption until completed. As work progresses completed sections shall have erosion controlled in accordance with the General Orders Sec- tion 11-4(a) . 11-11. Construction of the Storm Drain Under Railroad Embankment (opposite rear of Lot 70) The storm drain shall be constructed through the railroad embankment with a sedimentation pond constructed between the embankment and the road. The pond shall be constructed prior to installation of upstream storm drains and shall intercept water which will drain to the wetland on the west of the embankment and it shall be kept in operation until all land which drains to it is permanently stabilized against erosion, at which time the storm drain system shall be connected to the pipe under the embankment and the sedimentation pond shall be removed and the area prepared and seeded. The storm drain outlet in the wetland on the west of the railroad embankment shall have a stone apron installed to spread the discharge to prevent scouring. 11-12. Construction of Proposed Drainage Ditch (rear of Lots 76 through 121 to Forest River) This ditch and headwalls shall be constructed 2 years in advance of disturbance of the land which will drain to it to allow time for seeding and plant growth prior to its use. When construction of the ditch starts it shall continue without interruption until seeding is complete and shall be timed to permit seeding in the growing season. It shall be seeded with suitable vegetation. A concrete or rock channel section shall be installed in the ditch from the headwall to a point 15 feet from it at the rear of lots 76 and 77. A concrete or rock channel section shall be installed in the ditch for a length of six (6) feet on each side of the headwall at the rear of lot 123. A straw bale check dam shall be installed at the exit of the ditch prior to the start of the ditch construction and shall remain in place until vegetation is established. when the storm drains connecting { n 5 �ti i -5- Construction of Pickman Road and Adjoining Drives and Avenues ( (a) When construction of Pickman Road begins all work shall continue with- out interruption until at least the binder course is installed and the cuts and fills have been stabilized in accordance with General Order 11-4(a) . The road shall be laid out and its alignment shall be reviewed by the Salem Conservation Commission prior to the -start of construction. Construction plans of the portion of the road traversing the conservation area shall be sub.^..itted to the Salem Conservation Commission for approval at least six (6) weeks prior to the start of construction. (b) The line of Pickman Road shall be altered such that the north edge of the right of stay is at least 20 feet from the. large maple tree on the south side of the pond. This tree shall be undisturbed during construction. During construction of the road and storm drains and the growth of planted vegetation the pond and land on the south side of the road shall be protected by straw bale check dams. The headwall shall not be constructed in the pond but shall be built adjacent to the edge of the right of way at the end of a short open channel. The invert elevation of the channel and pipe shall be 42 feet, mean low water. Yo water shall be discharged into the t; pond during construction and the drainage system shall be constructed such that the surface runoff does not enter the pond through the storm drains from Pickman Road. The outlet of the storm drain on the _ south side of the road shall have a stone apron installed to spread the discharge to prevent scouring. (c) During construction of the storm drain from Pickman Road between the pond and Arnold Drive and growth of stabilizing vegetation the surrounding land shall be protected by straw bale check dams. A stone apron shall be installed at the outlet to spread the discharge to prevent scouring. { 9' q 4 < Litg ofIQm, s �riiurtt Dpparlmenf of Pubkc Narks @nr Salem (Srr?n ANTHONY V. FLETCHER. R.P.E. WILLIAM F. HAIGHT. JR'. D:RECTOR C= PJ3LIC SERVICES ASSISTANT DIRECTOR OF PUBLIC SERVICES CIT1 ENGINEER January 26, 1984 TO: SALEM PLANNING BOARD SALEM CONSERVATION CO`uIISSION SALEM HEALTH DEP4RTY.'NT FROM: A. V. FLETCHER DIRECTOR OF PUBLIC SERVICES SUBJECT: SALEM ACRES, INC. - I am advised that there has been criticism of my terse approval of the recent Salem .Acres request. Please be advised that this department, and me personally, spent many, many hours in consultation with the Conservation Commission, the Planning Board, the developers, the developer's Engineers, and the Courts of Massachusetts in estab- lishing all the conditions the developers are required to meet in order to satisfy the requests and demands of City Boards and most citizens. All this took place in 1977. I stated then, and I repeat now; complete drainage has been provided (something the adjoining neighborhood does not have) , a well designed water system (which, unlike the adjacent neighborhood, is properly looped) , has been furnished, and an excellent sewerage system has been designed. All of these were approved in 1977 . In the area of sewers, a significant improvement has occurred in the City system in that Phase I provided new trunk lines to service the possibility of growth in this area. NO City services are required for this project, in that all water, sewer, drain and street systems are private, not public. In accordance with 1976-77 hearings and my statements at that time, this project still meets all the requirements of the department in respect to design of water, sewer, streets and drains. ANTHO%Y V. FLETC1R, P_F_ .`1pV fp��r �2 Con-s ervation Commission \\ ti r, Salem, tllassachusetts 01970 October 3, 1984 Attorney Peter Beatrice Suite 500. 44 School Street Boston, MA. 02108 Bear Peter: Pursuant to our telephone conversation yesterday, I realize that work on the Pickman Park project has not encroached on any wetlands; however, they have come within the buffer zone on Marion Road as shown on the plans. The purpose of my previous letter was simply to remind you early of condition 11-3 of the original Order of Conditions so that you can prepare to submit the report as required. I have scheduled you on the agenda for the October 11, 1984, meeting of the Commission so you can bring the Commission up to date on the project. If I can be of any assistance to you prior to that time, please do not hesitate to call. Sincerely yours, Charles Frederiksen Conservation Aide dey cc Ron Tiberi �1 IV PQ.IJ T f�i z Conservation Commission Salt-m. iINlassuchuscus 01970 F IJ.V-Assf.���. July 21 . 1988 Mr. Scott Sinrich Talimo, Phillips , Silver and Talman Suite 900 340 Main Street Worcester. MA 01608 Dear Mr. Sinrich: I am writing to you with regard to an Order of Conditionsfi(64=32-)y issued by the Salem Conservation Commission for the Pickman Park Condominium Project . As you know, this project is being developed in three (3) phases. Phases I and 2 have been completed to the satisfaction of the Conservation Commission. Phase 3 is currently under construction and is in compliance with the Order of Conditions. if you have any further questions , please do not hesitate to contact me at "508) 745--9595, ext . 311 . Sincerely, Beth Debski Conservation Administrator J2020 f� Conservati®n Commission r. Salem. :Massachusetts 01070 June 13 , 1988 Mr. Frank Frisoli 801 Cambridge Street Cambridge, Ma 02141 Dear Mr. Frisoli: I am writing to you with regard to ari Order_ of 6nditions. (64-32) issued by the Salem Conservation Commission for the Pickman Park Condominium Project . As you know, this project is being developed in three (3) phases. Phases I and 2 have been completed to the satisfaction of the Conservation Commission. Phase 3 is currently under construction and is in compliance with the Order of Conditions. If you have any further questions, please do not hesitate to contact me at 745-9595, ext. 311 . Sincerely, Beth Debski Conservation Administrator J2020