64-106 - Kernwood Avenue - CONSERVATION COMMISSIONr� �d � �,
Form 8 - - DEOE File No. 64-106
(To be provided by DEDE)
- Commonwealth
cityrrown Salem
of Massachusetts Applicant Kernwood Country Club
Certificate of Compliance
Massachusetts Wetlands Protection Act, G.L. c. 131, §40
From Salem Conservation Commission Issuing Authority
To Kernwood Country Club, Kernwood.Avenue
(Name) (Address)
Date of Issuance June 27, 1985
This Certificate is issued for work regulated by an Order of Conditions'.issued to the above named
dated 9-27-84 andissuedbythe Conservation Commission
1. n' It is hereby certified that the work regulated by the above-referenced Order of Conditions has
been satisfactorily completed.
2. O It is hereby certified that only the following portions of the work regulated by the above-refer-
enced Order of Conditions have been satisfactorily completed: (If the Certificate o'r Compliance
does not include the entire project,specify what portions are included.)
3. 0 It is hereby certified that the work regulated by the above-referenced Order of Conditions was
never commenced.The Order of Conditions has lapsed and is therefore no longer valid. No future
work subject to regulation under the Act maybe commenced without filing anew Notice of Intent
and receiving a new Order of Conditions.
...................................................................................................................._........................._..............................__..
(Leave Space Blank)
8-1
4. ❑ This certificate shall be recorded in the Registry of Deeds or the Land Court for the district in )
which the land is located.The Order was originally recorded on (date)
at the Registry of Book ,Page
5. ❑ The following conditions of the Order shall continue:(Set forth any conditions contained in the
Final Order,such as maintenance or monito(ng,which are to continue for a longer period.)
1 .
i
Issued by Salem Conservation Commission
Signature(s).
"m
IWA—i
If
When issued by the nservation Commisio this Certificate must be signed by a�ority of is members.
On this a / day of ' r l 9 before me
personally appeared to me known to be the
person de bed in and who executed the foregoing instrument and acknowledged that he/she executed
the sam as his/her free act and de
1 . Notary Public My commission expires
Detach on dotted line and submitto the Salem Conservation Commission
To Issuing Authority
Please be advised that the Certificate of Compliance for the project at
File Number 'has been recorded at the Registry of
and has been noted in the chain of title of the affected property on , 1 g
If recorded land,the instrument number which identifies this transaction is
11 re 3istered land,the document number which identifies this transaction is _
Signature Applicant
8-2
T & M ENGINEERING ASSOCIATES INC.
22 WILLOW AVENUE - SALEM, MASSACHUSETTS 01970 - (617) 744-3782
June 10, 1985
Salem Conservation Commission
One Salem Green
Salem, MA 01970
RE: DEQE file #64-106 - Kernwood Country Club
Commission Members :
In accordance with the requirements chapter 131 Mass. General
Laws section 10 . 05 paragraph 9 , we hereby request that the
Commission conduct their final inspections of the work under
the above Title number and, if satisfactory, issue a Certi-
ficate of Compliance.
We, T & M Engineering Associates Inc. , have conducted an in-
spection of the above contruction and find it to be in sub-
stantial compliance with the record plans .
-�RRe]spectfully bm' tted,
Erland S. Tow send, Jr. , E.
EST/saa
cc Atty. Harry Ankeles
27 Lowell Street
Peabody, MA 01960
�4
Form 5 - DEQERerio- 64-106 -
- (Ta be provided by DEQE)
(�- Commonwealth atylTown Salem
Wk Kernwood Country Club
of Massachusetts Ap
y
Order of Conditions
Massachusetts Wetlands Protection Act
G.L c. 131, §40
Fro Salem Conservation Commission
To Kernwood Country Club sama
(Name of Applicant) (Name of property owner)
Kernwood Avenue, Salem same
Adg
Address
This Order is issued and delivered as follows:
❑ lby hand delivery to applicant or representative on (date)
xa by certified mail,return receipt requested on (date)
This project is located ,+Kernwood Avenue, Salem -
The property is recorded at the Registry of Essex South
2268 459
Book Page
Certificate(if registered)
The Notice of Intent for this project was filed on August 24, 1984 (date)
1984 September 27,
The public hearing was closed on Sep (date)
Findings
The Salem Conservation Commission has reviewed the above-referenced Notice of
Intent and plans and has held a public hearing on the project-Based on the information available to the
Commission at this time,the Cormi GG;on has determined that
the area on which the proposed work is to be done is significant to the following interests in accordance with
the Presumptions of Significance set forth in the regulations for each Area Subject to Protection Under the
Act(check as appropriate):
❑ Public water supply x>0 Storm damage prevention
❑ Private water supply ❑ Prevention of pollution
❑ Ground water supply >0 Land containing shellfish
❑ Flood control ❑ Fsheries
5-1
9s
Therefore,the Salem Conservation Comm" -' hereby finds that the following conditions are
he regulations,to protect those inter-
necessary,in accordance with the Performance Standards set forth in to dens that all work shall be performed
ests checked above.The C
in accordance with said conditions and with the Notice of Intent referenced above.su the extent that thebmitted with the Notice
lowing conditions modify or differ from the plans,specifications or other proposals su
of Intent,the conditions shall control
General Conditions
1. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory meal .
urea,shall be deemed cause to revoke or modify this Order.
2. This Order does not grant any property rights or any exclusive privileges:it does not authorize any injury
to private property or invasion of private rights
ith all
3. This Order does not relieve the permittee or any other person of the necessity of comPh M9 w
other applicable federal,state or local statutes,ordinances,by-laws or regulations-
4. The work authorized hereunder shall be completed within three years from the date of this Order unless
either of the following apply.
(a) the work is a maintenance dredging project as Provided for in the Act; ears but less than
(b) the time for completion has been extended to a specified date more than three Winces warranting
years,from the date of issuance and both that date and the special circums
the extended time period are set forth in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing°authority at least 30 days prior to the expiration date of the Order_
6. Any fill used in connection with this project shall l lean fie. o lath,paper,o trash,
r refuse,
PiP rubbi,tire .ashes,
de-
bris,including but not limited to lumber,bricks,plaster.
refrigerators, motor vehicles or parts of any of the foregoing.
7. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or,if
such an appeal has been filed,until all proceedings before the Department have been completed.
8: No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or ne Lan
d
Court for the district in which the land is located,within the chain of title of the affected property
case of recorded land,the Final Order shall also be noted in the Registry's Grantor Index under the name
of the owner of the land upon which the proposed work is to be done.in the case of registered land,the
Final Order shall also be noted on the land Court Certificate of Title of the owner of the land uponwhich
the proposed work is to be done.The recording information shall be submitted to the
on the forth at the end of this Order prior to commencement of the work. feet in size
9. A sign shall be displayed at the site not less than two square feet or more than`ttsquare
bearing the words "Massachusetts Department of Environmental Quality Engineering,
Fie Number 6a-106
10.Where the Department of Environmental Quality Engineering is requested to oalea determination
fermlionand
to issue a Superseding Order, the Conservation Commission shall be a party g cy proceedings
and hearings before the Department.
1 1. Upon completion of the work described herein,the applicant shall forthwith request in writing that a
Certificate of Compliance be issued stating that the work has been satisfactorily completed.
12.The work shall conform to the following plans and special conditions_
5-2
96
Plans:
Title Dated Signed and Stamped by: On Fite with:
"Repairs to retaining walls--
6th fairway and the Danvers River--
.. ."Reconstruction--Retaining"Reconstruction--Retaining Wall--
, 7th tee and the Danvers River--
- Kernwood Country Club" Mav 24 iaaa Conservation Commission
Erland S. Townsend, P. E.
Special Conditions(Use additional paper 4 necessary)
1. Work on the 6th fairway shall conform to plans entitled, "Repairs to
retaining walls--6th fairway and the Danvers River--Kernwood Country Club," .
dated May .24, 1984, by T & M Engineering Associates, Inc.
2. Work on the 7th tee shall conform to plans entitled, "Reconstruction--
retaining wall--7th tee and the Danvers River--Kernwood Country Club," dated
May 24, 1984 by T & M Engineering Associates, Inc.
3. All work shall conform to a report entitle, "Appendix: Soil Erosion and
Control Plan,-- included in the Notice of Intent dated 8/24/84 by T & M
Engineering Associates.
........................................................................................................................_..._...................-....�.
(Leave Space Blank)
5-3A
9(
Issued By SALEM Conservation Commission
V, \
Signattue(s)
C)
This Order must be signed by a majority of the Conservation Commission.
Ont 27 day of seotember 19 84 before me
pezonally appeared the above-named persons to me known to be the
person described in and who executed the foregoing Instrument and acknowledged that he/she executed
the same-as his/her free act and deed
i QQ
�, � . Il�� 9-9-88
Notary Public My commission expires
The applicant,the owner.any person aggrieved by this Order,any owner of land abutting the land upon which the proposed work is to
be done or any ten residents of the city or town in which such land is located are hereby notified of their right to request the Geparbnent
. - of Envircnmental Quality Engineering to issue a Superseding Order.providing the request is made by certified mail or hand delivery to
trio Deparbnent.withm ten days from the date of issuance of this Order.A copy of the request shal at the same time be sent by certified -
maa or hand delivery to the Conservation Commmum and the applicant
4
Salem Conservation Commission
0etach on dotted Iine and submit to the prior to commencement of work
To Issuing Authority
Please be advised Nat the Order of Conditions for the project at
Fte Number has been recorded at the Registry of and
has been noted in the chain of title of the affected property in accordance with General Condition a on 19—
II recorded land, the instrument number which identifies this transaction is
If registered land, the document number which identifies this transaction is
Signature Applicant _
5-4A
• kti
86
Form 3 DEQE F No.
(To b&provided by DEdE)
Commonwealth c tyrr n
of Massachusetts Aod�n i[Fut.►wooc> t.�t�Lu6
Notice of Intent
Under the
Massachusetts Wetlands Protection Act, G.L C. 131, §40
and
Application for a Department of the Army Permit
Pat k General Information
1. Lccatlon:.StreetAddress kE04\40010 &JENUE
Lot Number
VC-Fk 1 rz t1
2. Project:TypeCnrl'31RUGTIt�+Jpey�lptlort EPA 1� �inIJSTW�TIOfJ
t >? rblN)NG �YAt� 5 Waicu U&ter=
3. Registry:County Current gook Q2 S Page 4
Certificate(If Registered Land)
4. Applicant EX9 -VODD (fOQN 9-q CL_(-)g _Tel,'745-1z1z00
Address IC>rRtji��IOOD Adr-=MOE 70
(GI 1)
1/r .vcaoo C60W-rfz`1 Gw�s Tel.24rJ- IZOO
5. Property Owner �--
Address V-Ey-gw000 0&'(aw0E. - SA1->~//5 � ��. . ot9-►C�
e. Representative ANY "J& Tel. '5'5(--7CQQ
Address
2 7 L -gn�\V 6 L..L S'C- - t l,P�oDY I -. 0 19�0
7. Have the Conservation Commission and the DEOE Regional Office each been sent, by certified mail or
hand delivery;2 copies of completed Notice of Intent,with supporting plans and documents?
Yes 5( No ❑
3.1
S7
8. Have all obtainable-permits.variances and approvals required by local by-law been obtained?
Yes ❑ No
Applied For. Not Applied For.
. ... ._ Obtained: CITY dr-
g. Is any portion of the site subject to a Wetlands Restriction Order Pursuant to G.L.c. 131, §40A or G.L.
a 130, §1065 Yes ❑ No D� C ' ' " '
10. List all plena and supporting documents submitted with this Notfee of Intent
identifying
Number/Letter ' Title.Date
i' '
Req-4rt�i To �04b4l%°101 \PALLS. - GT~ IWAv�n`j
A 2rV7• kEIZ.N\YG1OD C •- LL` ,
2 I E1/�l. 1 �ESL� SFiet.� I NL .
frEcoNs+7R�LT p ,iMr>J6 We.1L -7114-TE^-
G• U361,45
(.�• �p1L.EQA'S1oN �.. S�(l�r/a'florl �►-1TR�1-�a�
11.Check those resource areas within which work Is proposed:
(a)1A Butter Zone
(b)Inland:
';6. Bank' land Subject to Flooding,
.❑ Bordering Vegetated Weiland* ❑ Bordering
?. Land Under Water Body 6 Waterway' ❑ Isolated
(c)Coastal:
❑ Land Under the Ocean• ❑ Designated Port Area*
❑ Coastal Beach• ❑ Coastal Dune
❑ Barrier Beach , Coastal Bank
❑ Rocky Intertidal Shore' ❑ Salt Marsh*
❑ Land Under Salt Pond' ❑ Land Containing Shellfish'
u
❑ Fish Run!
•Likely to involve U.S.Army Corps of Engineers concurrent Jurisdiction.See General Instructions for
Completing Notice of Intent. 3 2
88
t Part It:Slta Description
Indicate which of the following Information has been provided (on a plan.In narrative description or calcula-
tions)to dearly,completely and accurately describe existing site conditions.
Identifying
Number/Letter
(of plan,narrative
or calculatkxu)
Natural Features-
E4 P2 Sofia
A & l3 vegetation
A)D &C Topography
A 4' 4 C- Open water bodies(including ponds and lakes)
&'P'Eft Flowing water bodies(Including streams and rivers)
W.A. Public and private surface water and ground water supplies on or within 100 feet of site
N•A• Maximum annual ground water elevations with dates and ktcatlon of test
b E 8• Boundaries of resource areas checked under Pat I,Item 11 above
Other
Manmade Features:
A-P'E4 C Structures(such as buildings,piers,towers and headwalls)
A EA 6 Drainage and flood control facilities at the site and immediately off the site, Including
culverts and open channels (with Inverts),dams and dikes
N•A• Subsurface sewage disposal systems
+� Underground utiltles
A?�f4G Roadways and parking areas
A F4 12-'? Property boundaries,easements and rights-of-way
Other
Pert Ill.Work Description
Indicate which of the following information has been provided(on a plan,in narrative description or calcula-
tions)to dearly,completely and accurately describe work proposed within each of the resource areas
checked in Part 1,item 11 above.
Identifying
NumbedLetter
(of plan,narrative
or calculations)
Plainview and Cross Section of:
A Ft$ Structures(such as buildings, lifers, towers and headwalls)
A Fl PJ Drainage and flood control facilities,including culverts and open channels(with inverts),
dams and dikes
N•A• Subsurface sewage disposal systems d underground utilities
Q 6 YY Filling, dredging and excavating, indicating volume and composition of material
N,A.• Compensatory storage areas,where required in accordance with Part III,Section 10:57
(4)of the regulations
Other
y Point Souice Discharge
�M Description of characteristics of discharge from point source(both closed and open
channel),when point of discharge falls within resource area checked under Part I,item
11 above,as supported by standard engineering calculations, data and plans, including
but not limited to the following:
3.3
89
1. Delineation of the drainage area contributing to the point of discharge;
2. Pre-and post-development peak run-off from the drainage area,at the point of discharge,for at least the
10-year and 100-year frequency storm;
3. Pro-and post-development rate of Infiltration contributing to the resource area checked under Part I, item
11 above;
4. Estimated water quality eheracteristk:s of pre-and post-development runoff at the point of discharge.
Part IV:MlUgsting Measures
1. pearly,completely and accurately describe,with reference to supporting plans and calculations where
necessary:
(a) AA measures and designs proposed to meet the performance standards set forth under each re-
sourc'e area specHled in Part 11 or Part 111 of the regulations;or
(b) why the presumptions set forth under each resource area specified to Part 11 or Part Ill of the regula-
do ns do not apply. .
0 cosatm Raaouca Area Tye Wendfying number or Sett«
19- N1in4 US-WO L)W rwlZ. P 00q {G7 L14 F ANPW,,� or au'do's
No DEsTiw�T.lou of .�v�rw�+D R�soc�etrr ll ,�
,&V4q& WI L.L.. O GGV2 t7c�1c To T]�E
orr S+►evt.-L� �N,= 'i='La6� o F Ti-« t�>�Q
ONG� fiz�vey� sc1 PL1�nsJ6
o //Cs•.i�'i sl a,l �I-L E �t nJ t�i�-►t=v 6rtZtaflE
0 ccaalel Resource Ana Type: Wwfting number or letter
0 Wmd of support documents
3:4
90
' ( Coaatd RMarea Am Type: . kWndtyiM mm%bw or Ions
O Hrd - C"� 1 �� d nrn
r+oo«t aoaxta
�.Jb{JIL
No p2aaGTto.1 01= �Ytcc"tlJ�tatT� Aio��a�Ej t T:::>
�R-E�,,,w-�Z\l(A.ti. IS PrZo rS�Eta To es�
�,.a�a-�c.:�v 4t3oJ� T+►e -4i1�+�\vb-t�ti
L O&- &ts0 1`� \f�TE11t7EP io PR�ft3-T
�cIST\wNC.L ez>"t 5TOJJcT10�S — 7o'S toy
Co OTez>v PP��T"-�y bed P�'Pos�t� To
FSE �i�btrJT'i't r�� d�ovAO TI-�B foys�2�-'cTto,�
�et� �"o PQoTOC-: TI-►� QtJc-R- �1 F5r►e�K-.
2. Clearty,completely and accurately describe,with reference to supporting plans and calculations where
necessary.
(a) an measures and designs to regulate work within the Buffer Zone so as to insure that said work does
not alter an area specifled In Part I,Section 10.02(1)(a)of these regulations;or
(b) If work in the Buffer Zone w10 after such an area,all measures and designs proposed to meet
the performance standards established for the adjacent resource area specified In Part II or
Part III of these regtdattons.
vt CoaaW l Reem=a Ar"Type eordared By I00-Foot Olaarraorrry ZMW Idwtd"number w Mdw
O Wartd �jla>,.11L — Co TM FA1R�lOs`� of wopert doamanta
p(o (71"1R�•P.�ANGE O� T1.lE ARC^ o1J TiJC
TZ�JEtz. Sltoc oP i�c �utsTt.�re \Yaw 1� >
P�y�OS1W � TN.� �aY1i1tS!o \YbLL lei �S.t.'�
To REiMI*� IJ P �V�TI' I�+E 1Jg�v 15P�a7'S t o t.i La
?¢ot��� �e[x�rJt�T}�E Ga�sT2Jc-Tton�
wit (� f o PRoT>«-T /&w 2c��D�sE
3.5
i
91
Part V:Additional Information for a Department of the Army Permit
1. COE Application No. 2•
(to be provided by COE) (Name of waterway)
3. Names and addresses of property owners adjoining Your Prop":
4. Document other protect altemadves 0.e.,other locations and/or construction methods, particularly those
that would eliminate the discharge of dredged or fill material Into waters or wetlands).
S. 8'h' x 11' drawings in plarnAew and cross-section,showing the resource area and the proposed activ-
ity within the resource area.Drawings must be to scale and should be clear enough for photocopying.
Catdcaoon is required film the D'Nsion d Water PuEuton Control before the Federal permi can be sued.
Cert{raton may be cbtared by contactrtg the Dwsm of Water Poluton Control 1 Water Street Boston,
Massaaxisetts 02108.
Where the activity will-take place wehin the area trtder the Massachusetts approved Coastal Zone
Management Program the appicatt cerdies that his proposed acl7* carte w4i and will'be cor ed
in a manner that is corsistiant w th fie approved pograin
Warraton puAded wilt be used n evaluaong the application for a permit and is made a matter of pubri:
record through issuance of a public notice. Disclosure of this information is vokinta y hanever if necessary
nformatm s not povided. the application cannot be pmessed nor can a permit be issued.
I hereby cartlfy under the pains and penalties of perjury that the foregoing Notice of Intent and accompanying
plans,documents and supporting data are true and complete,to the best of my knowledge.
Z7/ivy
S turei of Applicant Date
Signature of Appll is Representative Date
FO RM -t.s.pti.. to Lno To,. 4046 .Pp's1.4 by aQUSACL, d M.y t989".
N E D 10 0 (T E S T)-ni, d.s..e.t t..,.ie. . ).is, D.p.r,...t .f I%. Ar.y sod St.,. of M.....h...w epp0utlse
1 MAY 82 for a permit to obbie Pr.Ini.0 to perfom activities is Upit•d Star. .ton. Th• true..
of M...P.... lid ildret (OMa) he. rArovd these tPuli.e. r"sired by the US Army Corp.
.( Le(Lrrn. OMa M.wber 0702-0006 red npiraci.e dot. of 00 S•pb.b•r 1983 :.nl{e.". This
es.,e.eet .ill be lit IN d poles type.
3.6
r �p�t�.n m Gree
➢l ' \'• \:�iL G.,Y l ♦ •� 't. IHIILu SM
p1 1 � 1
o Lt
DanOrSPOrt l l �,., '� >`.�`,��' - ✓yY+�... ,-:, •r., ' g ;r l
IF
'- �.•tt •? i Fos u . ,,. I, •;II
' a fern T � u e r O,�I >i ` �� ` • P;'^ 'gB 0b',...�a r
enaf eme \ Rtiyer / v
����
... t Oleena6dl _-� c Salter ��� 1 I /lo
col he
Nc
rth Shore\� .;�1 ,1 r9\ i1./ice �oRONI �fJ./1
f;Co s .�l`
I
3 /• / 60 ( L'Y 2
J v ••0`Cq -
Se s 1.
6c1t,
,p
o )
l? ti a: 41,
9 GSand
l� PTAf
',L•
_ •O q Pa,KH 1 i' Cymmo SalewNA n
• IPtR
r S
x-
I , ,1- -;�( p 0 - t -.c•.AY ' �' \1 { �/ p.�� Palmer ��/✓
a1s
/ l 4� I Po . "�\ � I ems• 1 ` \ e' :t�, osoLLal l,l Z , /� /y-,! Q'/ q( '.
.(% f',, _ \ is . .J e 'w .r •_ O ;r•: /x / 1 GJ I��
1' rrt / 1 \ �\ w� ��, 1 `r\��.�4�1a 9M E � • 1 \ (x7
• �'� _ �x 7017
.r r i V t\.L. i �• 1 Park• Piake6hg ..
t�
r
Y /i'. p � �,1 �'��• douras� � -K'..`�a ro JeH81t �6 • �• l
�.o 1 /�" '• I land s \
APPENDIX
SOIL EROSION AND SEDIWNTATION CONTROL PROGRAM
introduction
The Soil Erosion and Sedimentation Control Plan is designed primarily
to provide specific control measures for the construction phase of
the project. However, certain portions of the Control Plan and
some of the specific structurers may and should stay in place
until the establishment of final grouth.
The general patern of construction will be the establishment of
control structurers prior to the actual construction of or the
stripping of soils prior to the construction of any of the work
contemplated herein.
In as much as these constructions will be phased so will the
Sedimentation Control Plan be phased in it's implimentation.
General Principles
The following is a summary of the general principles which are to
be incorporated in the Soil Erosion and Sedimentation Control Plan.
1. Construction of required control structurers
(see attached details)
2. Stripping of vegetative cover and excavation of
excess materials. (see attached Site Plans)
3. where ever feasible, natural vegetative cover
shall be retained and protected.
4. The extent of the disturbed area shall be kept to
a minimum , limits to be as shown on the plans or
as defined by the Conservation Commission.
5. Temporary seeding, mulching, or other approved
methods of stabilization shall be employed, to
protect critical exposed areas, during prolonged
periods of construction.
5. water runoff shall be contained, as much as practical,
within the confines of the construction area, and
controled at other times to facilitate ground water
recharge.
7. All sediment is to be retained on the site as much
as practicable.
Construction Sequence
The following construction sequence is recommended to minimize
potential sediment losses and to prevent the siltation of wetlands,
brooks, streams and drainage structurers ( existing and/or new) .
At no time will excessively large areas be allowed to be disturbed.
All control measurers and structurers are shown in the Soil
Erosion and Sedimentation Control Plan.
Construction Sequence (Cont. )
1 . Construct all Haybale Chech Dams at all pionts as
indicated or directed.
2 . Strip and stock pile all top siols,as directed,
from areas as indicated to be stripped on the
Site Plan.
3. Excavate and grade areas indicated on the Site Plan
to approximate sub grade levels.
4. Construct finish surface(s) as indicated on the Site Plan
and immediately seed and / or protect all areas
by temporary vegetation or permanent planting.
5 . Stabilize all cut and/or fill slopes immediately
after seeding to curtail erosion while plantings
become established.
A. Straw Mulch ( 70-90 lbs . per. square yard)
B. Jute mesh (see detail)
C. Wood chips ( 275 lbs. per 1000 square feet)
Upon completion of construction, and earlier as required, silt
and sediment, that has been trapped in control devises, shall
be removed and disposed of in an approit!d manor and in an approved
location. All control structures shall be inspected weekly and
after all storm occurances and cleaned and repaired as directed
or required.
Description of Sediment Control Structures
Haybale Dams
These structures are to be placed in existing and proposed drainage
ways to serve as sediment traps to prevent the sediment from leaving
the site and entering the existing drainage system(s) .
Haybales will allow the water to pass through and leave the site
but will retain and trap the sediment on the upstream side.
These are constructed of standard baled hay staked in position
with two (2) min. steel stakes per bale.
Haybale Diversion
Similar in construction to tye "Dam" this structure is used to
• divert runoff flows away from disturbed slopes and to controled
areas as overland flow.
e
16 /A. �WGIHNaING
A550GIA'(�57 I NC.
'IZ \V I"O\V AVEHUI� - SAL.EJA, /A&. 01970
' GY.�1F;�U �TOF-iG o2
f./ABbDDING Di%TAIL
�I.1.GEo oti C1�+�ITou2
2 -„4 �A zz z-o" Low
1i.�1-IGLLO�It-}G T�T�11L
QA/A ov,
G01i nT1L UG'fl O F4 4H oTi%n
I. $dLli� 51lALL i'S� LCID It
�hfD �
A�V"T`f I+�1G PEA I Lam.
2. a3ALti S1lALI- � infT /Altil/AO/A � ¢" INTO AIL .
3. FSAL� �LI�Lt, PSS 5]`LCJ��LY A-L4<= o OV 1+-i Pl-GC-fo-
V1ZjVJ�H T4P-00044
�+-IGLLP 1'O\ Ae
'( !�J< PRFi�/IOtJ7L1� '51r ��Y �i ��L11�YIt ICo I del/.5
4.. {c�1No►�G�flot-►g
1id Pelt e44r,>100 A-3
ft 5TArlGEt> --=>14.6" > 2-EM \\/4F-H The-
t4E�� -fIOV- -'
LConsekr r��Sb
r I Salem. Massachusetts 01970
DEQE File
Date: 8/24/84
PROPOSED PROJECT SUMMARY
Applicant: Kernwood Country Club
Address: Kernwood Avenue
Phone : Atty. Harry Ankeles--531-7000
Location of Property: Danvers River
Project Description: R_pairJrProncr r' of rora;..;ng 1;211.q
I. T�-pe of Action:
Determination of Applicability Modification of Order
XXX Notice of Intent Extension of Order
Abbreviated Notice of Intent Certificate of Compliance
II. Interest(s) in the Wetlands Protection Act, M.G.L. c. 131, s. 40 affected:
Public or private water supply
Ground water supply
XXX Storm damage prevention
Prevention of pollution
XXX Protection of land containing shellfish
Protection of fisheries
III. Resource areas subject to protection:
XXX Bank Ocean
_ Fresh water wetland XXX Estuary
XXX Coastal wetland Creek
XXX Beach XXX River—
bordering on: Stream
_ Dune —
_ Flat _ Pond
Marsh — Lake
Swamp
XXX Land under any of the water bodies listed above
XXX Land subject to tidal action
XXX Land subject to coastal storm flowage
XXX Land subject to flooding
IV. Comments :.
Both wall proposed to be replaced and/or repaired are existing. Both are
adjacent to the Danvers River and experience tidal action. There is wetlands
vegetation (not much) between each wall and the river. Mr. Townsend came
before the Commission in July to discuss this project. I recommend it be
approved with the following conditions:
V. Proposed conditions:
1. Work on the 6th fairway shall conform to plans entitled "Repairs to retain-
ing walls-6th fairway and the Danvers River-Kernwood Country Club," dated
May 24, 1984 by T & M Engineering Associates, Inc. d
2. Work on the 7th tee shall conform to plans entitled "Reconstruction-
Retaining Wall-7th Tee and the Danvers River-Kernwood Country Club," dated
May 24, 1984 by T & M Engineering Associates, Inc.
3. All work shall conform to a report entitled "Appendix: Soil Erosion and
Control Plan," included in the Notice of Intent dated 8/24/84 by T & M Engineer-
ing'Associares. °
Conservation Aide