Loading...
64-106 - Kernwood Avenue - CONSERVATION COMMISSIONr� �d � �, Form 8 - - DEOE File No. 64-106 (To be provided by DEDE) - Commonwealth cityrrown Salem of Massachusetts Applicant Kernwood Country Club Certificate of Compliance Massachusetts Wetlands Protection Act, G.L. c. 131, §40 From Salem Conservation Commission Issuing Authority To Kernwood Country Club, Kernwood.Avenue (Name) (Address) Date of Issuance June 27, 1985 This Certificate is issued for work regulated by an Order of Conditions'.issued to the above named dated 9-27-84 andissuedbythe Conservation Commission 1. n' It is hereby certified that the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. 2. O It is hereby certified that only the following portions of the work regulated by the above-refer- enced Order of Conditions have been satisfactorily completed: (If the Certificate o'r Compliance does not include the entire project,specify what portions are included.) 3. 0 It is hereby certified that the work regulated by the above-referenced Order of Conditions was never commenced.The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Act maybe commenced without filing anew Notice of Intent and receiving a new Order of Conditions. ...................................................................................................................._........................._..............................__.. (Leave Space Blank) 8-1 4. ❑ This certificate shall be recorded in the Registry of Deeds or the Land Court for the district in ) which the land is located.The Order was originally recorded on (date) at the Registry of Book ,Page 5. ❑ The following conditions of the Order shall continue:(Set forth any conditions contained in the Final Order,such as maintenance or monito(ng,which are to continue for a longer period.) 1 . i Issued by Salem Conservation Commission Signature(s). "m IWA—i If When issued by the nservation Commisio this Certificate must be signed by a�ority of is members. On this a / day of ' r l 9 before me personally appeared to me known to be the person de bed in and who executed the foregoing instrument and acknowledged that he/she executed the sam as his/her free act and de 1 . Notary Public My commission expires Detach on dotted line and submitto the Salem Conservation Commission To Issuing Authority Please be advised that the Certificate of Compliance for the project at File Number 'has been recorded at the Registry of and has been noted in the chain of title of the affected property on , 1 g If recorded land,the instrument number which identifies this transaction is 11 re 3istered land,the document number which identifies this transaction is _ Signature Applicant 8-2 T & M ENGINEERING ASSOCIATES INC. 22 WILLOW AVENUE - SALEM, MASSACHUSETTS 01970 - (617) 744-3782 June 10, 1985 Salem Conservation Commission One Salem Green Salem, MA 01970 RE: DEQE file #64-106 - Kernwood Country Club Commission Members : In accordance with the requirements chapter 131 Mass. General Laws section 10 . 05 paragraph 9 , we hereby request that the Commission conduct their final inspections of the work under the above Title number and, if satisfactory, issue a Certi- ficate of Compliance. We, T & M Engineering Associates Inc. , have conducted an in- spection of the above contruction and find it to be in sub- stantial compliance with the record plans . -�RRe]spectfully bm' tted, Erland S. Tow send, Jr. , E. EST/saa cc Atty. Harry Ankeles 27 Lowell Street Peabody, MA 01960 �4 Form 5 - DEQERerio- 64-106 - - (Ta be provided by DEQE) (�- Commonwealth atylTown Salem Wk Kernwood Country Club of Massachusetts Ap y Order of Conditions Massachusetts Wetlands Protection Act G.L c. 131, §40 Fro Salem Conservation Commission To Kernwood Country Club sama (Name of Applicant) (Name of property owner) Kernwood Avenue, Salem same Adg Address This Order is issued and delivered as follows: ❑ lby hand delivery to applicant or representative on (date) xa by certified mail,return receipt requested on (date) This project is located ,+Kernwood Avenue, Salem - The property is recorded at the Registry of Essex South 2268 459 Book Page Certificate(if registered) The Notice of Intent for this project was filed on August 24, 1984 (date) 1984 September 27, The public hearing was closed on Sep (date) Findings The Salem Conservation Commission has reviewed the above-referenced Notice of Intent and plans and has held a public hearing on the project-Based on the information available to the Commission at this time,the Cormi GG;on has determined that the area on which the proposed work is to be done is significant to the following interests in accordance with the Presumptions of Significance set forth in the regulations for each Area Subject to Protection Under the Act(check as appropriate): ❑ Public water supply x>0 Storm damage prevention ❑ Private water supply ❑ Prevention of pollution ❑ Ground water supply >0 Land containing shellfish ❑ Flood control ❑ Fsheries 5-1 9s Therefore,the Salem Conservation Comm" -' hereby finds that the following conditions are he regulations,to protect those inter- necessary,in accordance with the Performance Standards set forth in to dens that all work shall be performed ests checked above.The C in accordance with said conditions and with the Notice of Intent referenced above.su the extent that thebmitted with the Notice lowing conditions modify or differ from the plans,specifications or other proposals su of Intent,the conditions shall control General Conditions 1. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory meal . urea,shall be deemed cause to revoke or modify this Order. 2. This Order does not grant any property rights or any exclusive privileges:it does not authorize any injury to private property or invasion of private rights ith all 3. This Order does not relieve the permittee or any other person of the necessity of comPh M9 w other applicable federal,state or local statutes,ordinances,by-laws or regulations- 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply. (a) the work is a maintenance dredging project as Provided for in the Act; ears but less than (b) the time for completion has been extended to a specified date more than three Winces warranting years,from the date of issuance and both that date and the special circums the extended time period are set forth in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing°authority at least 30 days prior to the expiration date of the Order_ 6. Any fill used in connection with this project shall l lean fie. o lath,paper,o trash, r refuse, PiP rubbi,tire .ashes, de- bris,including but not limited to lumber,bricks,plaster. refrigerators, motor vehicles or parts of any of the foregoing. 7. No work shall be undertaken until all administrative appeal periods from this Order have elapsed or,if such an appeal has been filed,until all proceedings before the Department have been completed. 8: No work shall be undertaken until the Final Order has been recorded in the Registry of Deeds or ne Lan d Court for the district in which the land is located,within the chain of title of the affected property case of recorded land,the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done.in the case of registered land,the Final Order shall also be noted on the land Court Certificate of Title of the owner of the land uponwhich the proposed work is to be done.The recording information shall be submitted to the on the forth at the end of this Order prior to commencement of the work. feet in size 9. A sign shall be displayed at the site not less than two square feet or more than`ttsquare bearing the words "Massachusetts Department of Environmental Quality Engineering, Fie Number 6a-106 10.Where the Department of Environmental Quality Engineering is requested to oalea determination fermlionand to issue a Superseding Order, the Conservation Commission shall be a party g cy proceedings and hearings before the Department. 1 1. Upon completion of the work described herein,the applicant shall forthwith request in writing that a Certificate of Compliance be issued stating that the work has been satisfactorily completed. 12.The work shall conform to the following plans and special conditions_ 5-2 96 Plans: Title Dated Signed and Stamped by: On Fite with: "Repairs to retaining walls-- 6th fairway and the Danvers River-- .. ."Reconstruction--Retaining"Reconstruction--Retaining Wall-- , 7th tee and the Danvers River-- - Kernwood Country Club" Mav 24 iaaa Conservation Commission Erland S. Townsend, P. E. Special Conditions(Use additional paper 4 necessary) 1. Work on the 6th fairway shall conform to plans entitled, "Repairs to retaining walls--6th fairway and the Danvers River--Kernwood Country Club," . dated May .24, 1984, by T & M Engineering Associates, Inc. 2. Work on the 7th tee shall conform to plans entitled, "Reconstruction-- retaining wall--7th tee and the Danvers River--Kernwood Country Club," dated May 24, 1984 by T & M Engineering Associates, Inc. 3. All work shall conform to a report entitle, "Appendix: Soil Erosion and Control Plan,-- included in the Notice of Intent dated 8/24/84 by T & M Engineering Associates. ........................................................................................................................_..._...................-....�. (Leave Space Blank) 5-3A 9( Issued By SALEM Conservation Commission V, \ Signattue(s) C) This Order must be signed by a majority of the Conservation Commission. Ont 27 day of seotember 19 84 before me pezonally appeared the above-named persons to me known to be the person described in and who executed the foregoing Instrument and acknowledged that he/she executed the same-as his/her free act and deed i QQ �, � . Il�� 9-9-88 Notary Public My commission expires The applicant,the owner.any person aggrieved by this Order,any owner of land abutting the land upon which the proposed work is to be done or any ten residents of the city or town in which such land is located are hereby notified of their right to request the Geparbnent . - of Envircnmental Quality Engineering to issue a Superseding Order.providing the request is made by certified mail or hand delivery to trio Deparbnent.withm ten days from the date of issuance of this Order.A copy of the request shal at the same time be sent by certified - maa or hand delivery to the Conservation Commmum and the applicant 4 Salem Conservation Commission 0etach on dotted Iine and submit to the prior to commencement of work To Issuing Authority Please be advised Nat the Order of Conditions for the project at Fte Number has been recorded at the Registry of and has been noted in the chain of title of the affected property in accordance with General Condition a on 19— II recorded land, the instrument number which identifies this transaction is If registered land, the document number which identifies this transaction is Signature Applicant _ 5-4A • kti 86 Form 3 DEQE F No. (To b&provided by DEdE) Commonwealth c tyrr n of Massachusetts Aod�n i[Fut.►wooc> t.�t�Lu6 Notice of Intent Under the Massachusetts Wetlands Protection Act, G.L C. 131, §40 and Application for a Department of the Army Permit Pat k General Information 1. Lccatlon:.StreetAddress kE04\40010 &JENUE Lot Number VC-Fk 1 rz t1 2. Project:TypeCnrl'31RUGTIt�+Jpey�lptlort EPA 1� �inIJSTW�TIOfJ t >? rblN)NG �YAt� 5 Waicu U&ter= 3. Registry:County Current gook Q2 S Page 4 Certificate(If Registered Land) 4. Applicant EX9 -VODD (fOQN 9-q CL_(-)g _Tel,'745-1z1z00 Address IC>rRtji��IOOD Adr-=MOE 70 (GI 1) 1/r .vcaoo C60W-rfz`1 Gw�s Tel.24rJ- IZOO 5. Property Owner �-- Address V-Ey-gw000 0&'(aw0E. - SA1->~//5 � ��. . ot9-►C� e. Representative ANY "J& Tel. '5'5(--7CQQ Address 2 7 L -gn�\V 6 L..L S'C- - t l,P�oDY I -. 0 19�0 7. Have the Conservation Commission and the DEOE Regional Office each been sent, by certified mail or hand delivery;2 copies of completed Notice of Intent,with supporting plans and documents? Yes 5( No ❑ 3.1 S7 8. Have all obtainable-permits.variances and approvals required by local by-law been obtained? Yes ❑ No Applied For. Not Applied For. . ... ._ Obtained: CITY dr- g. Is any portion of the site subject to a Wetlands Restriction Order Pursuant to G.L.c. 131, §40A or G.L. a 130, §1065 Yes ❑ No D� C ' ' " ' 10. List all plena and supporting documents submitted with this Notfee of Intent identifying Number/Letter ' Title.Date i' ' Req-4rt�i To �04b4l%°101 \PALLS. - GT~ IWAv�n`j A 2rV7• kEIZ.N\YG1OD C •- LL` , 2 I E1/�l. 1 �ESL� SFiet.� I NL . frEcoNs+7R�LT p ,iMr>J6 We.1L -7114-TE^- G• U361,45 (.�• �p1L.EQA'S1oN �.. S�(l�r/a'florl �►-1TR�1-�a� 11.Check those resource areas within which work Is proposed: (a)1A Butter Zone (b)Inland: ';6. Bank' land Subject to Flooding, .❑ Bordering Vegetated Weiland* ❑ Bordering ?. Land Under Water Body 6 Waterway' ❑ Isolated (c)Coastal: ❑ Land Under the Ocean• ❑ Designated Port Area* ❑ Coastal Beach• ❑ Coastal Dune ❑ Barrier Beach , Coastal Bank ❑ Rocky Intertidal Shore' ❑ Salt Marsh* ❑ Land Under Salt Pond' ❑ Land Containing Shellfish' u ❑ Fish Run! •Likely to involve U.S.Army Corps of Engineers concurrent Jurisdiction.See General Instructions for Completing Notice of Intent. 3 2 88 t Part It:Slta Description Indicate which of the following Information has been provided (on a plan.In narrative description or calcula- tions)to dearly,completely and accurately describe existing site conditions. Identifying Number/Letter (of plan,narrative or calculatkxu) Natural Features- E4 P2 Sofia A & l3 vegetation A)D &C Topography A 4' 4 C- Open water bodies(including ponds and lakes) &'P'Eft Flowing water bodies(Including streams and rivers) W.A. Public and private surface water and ground water supplies on or within 100 feet of site N•A• Maximum annual ground water elevations with dates and ktcatlon of test b E 8• Boundaries of resource areas checked under Pat I,Item 11 above Other Manmade Features: A-P'E4 C Structures(such as buildings,piers,towers and headwalls) A EA 6 Drainage and flood control facilities at the site and immediately off the site, Including culverts and open channels (with Inverts),dams and dikes N•A• Subsurface sewage disposal systems +� Underground utiltles A?�f4G Roadways and parking areas A F4 12-'? Property boundaries,easements and rights-of-way Other Pert Ill.Work Description Indicate which of the following information has been provided(on a plan,in narrative description or calcula- tions)to dearly,completely and accurately describe work proposed within each of the resource areas checked in Part 1,item 11 above. Identifying NumbedLetter (of plan,narrative or calculations) Plainview and Cross Section of: A Ft$ Structures(such as buildings, lifers, towers and headwalls) A Fl PJ Drainage and flood control facilities,including culverts and open channels(with inverts), dams and dikes N•A• Subsurface sewage disposal systems d underground utilities Q 6 YY Filling, dredging and excavating, indicating volume and composition of material N,A.• Compensatory storage areas,where required in accordance with Part III,Section 10:57 (4)of the regulations Other y Point Souice Discharge �M Description of characteristics of discharge from point source(both closed and open channel),when point of discharge falls within resource area checked under Part I,item 11 above,as supported by standard engineering calculations, data and plans, including but not limited to the following: 3.3 89 1. Delineation of the drainage area contributing to the point of discharge; 2. Pre-and post-development peak run-off from the drainage area,at the point of discharge,for at least the 10-year and 100-year frequency storm; 3. Pro-and post-development rate of Infiltration contributing to the resource area checked under Part I, item 11 above; 4. Estimated water quality eheracteristk:s of pre-and post-development runoff at the point of discharge. Part IV:MlUgsting Measures 1. pearly,completely and accurately describe,with reference to supporting plans and calculations where necessary: (a) AA measures and designs proposed to meet the performance standards set forth under each re- sourc'e area specHled in Part 11 or Part 111 of the regulations;or (b) why the presumptions set forth under each resource area specified to Part 11 or Part Ill of the regula- do ns do not apply. . 0 cosatm Raaouca Area Tye Wendfying number or Sett« 19- N1in4 US-WO L)W rwlZ. P 00q {G7 L14 F ANPW,,� or au'do's No DEsTiw�T.lou of .�v�rw�+D R�soc�etrr ll ,� ,&V4q& WI L.L.. O GGV2 t7c�1c To T]�E orr S+►evt.-L� �N,= 'i='La6� o F Ti-« t�>�Q ONG� fiz�vey� sc1 PL1�nsJ6 o //Cs•.i�'i sl a,l �I-L E �t nJ t�i�-►t=v 6rtZtaflE 0 ccaalel Resource Ana Type: Wwfting number or letter 0 Wmd of support documents 3:4 90 ' ( Coaatd RMarea Am Type: . kWndtyiM mm%bw or Ions O Hrd - C"� 1 �� d nrn r+oo«t aoaxta �.Jb{JIL No p2aaGTto.1 01= �Ytcc"tlJ�tatT� Aio��a�Ej t T:::> �R-E�,,,w-�Z\l(A.ti. IS PrZo rS�Eta To es� �,.a�a-�c.:�v 4t3oJ� T+►e -4i1�+�\vb-t�ti L O&- &ts0 1`� \f�TE11t7EP io PR�ft3-T �cIST\wNC.L ez>"t 5TOJJcT10�S — 7o'S toy Co OTez>v PP��T"-�y bed P�'Pos�t� To FSE �i�btrJT'i't r�� d�ovAO TI-�B foys�2�-'cTto,� �et� �"o PQoTOC-: TI-►� QtJc-R- �1 F5r►e�K-. 2. Clearty,completely and accurately describe,with reference to supporting plans and calculations where necessary. (a) an measures and designs to regulate work within the Buffer Zone so as to insure that said work does not alter an area specifled In Part I,Section 10.02(1)(a)of these regulations;or (b) If work in the Buffer Zone w10 after such an area,all measures and designs proposed to meet the performance standards established for the adjacent resource area specified In Part II or Part III of these regtdattons. vt CoaaW l Reem=a Ar"Type eordared By I00-Foot Olaarraorrry ZMW Idwtd"number w Mdw O Wartd �jla>,.11L — Co TM FA1R�lOs`� of wopert doamanta p(o (71"1R�•P.�ANGE O� T1.lE ARC^ o1J TiJC TZ�JEtz. Sltoc oP i�c �utsTt.�re \Yaw 1� > P�y�OS1W � TN.� �aY1i1tS!o \YbLL lei �S.t.'� To REiMI*� IJ P �V�TI' I�+E 1Jg�v 15P�a7'S t o t.i La ?¢ot��� �e[x�rJt�T}�E Ga�sT2Jc-Tton� wit (� f o PRoT>«-T /&w 2c��D�sE 3.5 i 91 Part V:Additional Information for a Department of the Army Permit 1. COE Application No. 2• (to be provided by COE) (Name of waterway) 3. Names and addresses of property owners adjoining Your Prop": 4. Document other protect altemadves 0.e.,other locations and/or construction methods, particularly those that would eliminate the discharge of dredged or fill material Into waters or wetlands). S. 8'h' x 11' drawings in plarnAew and cross-section,showing the resource area and the proposed activ- ity within the resource area.Drawings must be to scale and should be clear enough for photocopying. Catdcaoon is required film the D'Nsion d Water PuEuton Control before the Federal permi can be sued. Cert{raton may be cbtared by contactrtg the Dwsm of Water Poluton Control 1 Water Street Boston, Massaaxisetts 02108. Where the activity will-take place wehin the area trtder the Massachusetts approved Coastal Zone Management Program the appicatt cerdies that his proposed acl7* carte w4i and will'be cor ed in a manner that is corsistiant w th fie approved pograin Warraton puAded wilt be used n evaluaong the application for a permit and is made a matter of pubri: record through issuance of a public notice. Disclosure of this information is vokinta y hanever if necessary nformatm s not povided. the application cannot be pmessed nor can a permit be issued. I hereby cartlfy under the pains and penalties of perjury that the foregoing Notice of Intent and accompanying plans,documents and supporting data are true and complete,to the best of my knowledge. Z7/ivy S turei of Applicant Date Signature of Appll is Representative Date FO RM -t.s.pti.. to Lno To,. 4046 .Pp's1.4 by aQUSACL, d M.y t989". N E D 10 0 (T E S T)-ni, d.s..e.t t..,.ie. . ).is, D.p.r,...t .f I%. Ar.y sod St.,. of M.....h...w epp0utlse 1 MAY 82 for a permit to obbie Pr.Ini.0 to perfom activities is Upit•d Star. .ton. Th• true.. of M...P.... lid ildret (OMa) he. rArovd these tPuli.e. r"sired by the US Army Corp. .( Le(Lrrn. OMa M.wber 0702-0006 red npiraci.e dot. of 00 S•pb.b•r 1983 :.nl{e.". This es.,e.eet .ill be lit IN d poles type. 3.6 r �p�t�.n m Gree ➢l ' \'• \:�iL G.,Y l ♦ •� 't. IHIILu SM p1 1 � 1 o Lt DanOrSPOrt l l �,., '� >`.�`,��' - ✓yY+�... ,-:, •r., ' g ;r l IF '- �.•tt •? i Fos u . ,,. I, •;II ' a fern T � u e r O,�I >i ` �� ` • P;'^ 'gB 0b',...�a r enaf eme \ Rtiyer / v ���� ... t Oleena6dl _-� c Salter ��� 1 I /lo col he Nc rth Shore\� .;�1 ,1 r9\ i1./ice �oRONI �fJ./1 f;Co s .�l` I 3 /• / 60 ( L'Y 2 J v ••0`Cq - Se s 1. 6c1t, ,p o ) l? ti a: 41, 9 GSand l� PTAf ',L• _ •O q Pa,KH 1 i' Cymmo SalewNA n • IPtR r S x- I , ,1- -;�( p 0 - t -.c•.AY ' �' \1 { �/ p.�� Palmer ��/✓ a1s / l 4� I Po . "�\ � I ems• 1 ` \ e' :t�, osoLLal l,l Z , /� /y-,! Q'/ q( '. .(% f',, _ \ is . .J e 'w .r •_ O ;r•: /x / 1 GJ I�� 1' rrt / 1 \ �\ w� ��, 1 `r\��.�4�1a 9M E � • 1 \ (x7 • �'� _ �x 7017 .r r i V t\.L. i �• 1 Park• Piake6hg .. t� r Y /i'. p � �,1 �'��• douras� � -K'..`�a ro JeH81t �6 • �• l �.o 1 /�" '• I land s \ APPENDIX SOIL EROSION AND SEDIWNTATION CONTROL PROGRAM introduction The Soil Erosion and Sedimentation Control Plan is designed primarily to provide specific control measures for the construction phase of the project. However, certain portions of the Control Plan and some of the specific structurers may and should stay in place until the establishment of final grouth. The general patern of construction will be the establishment of control structurers prior to the actual construction of or the stripping of soils prior to the construction of any of the work contemplated herein. In as much as these constructions will be phased so will the Sedimentation Control Plan be phased in it's implimentation. General Principles The following is a summary of the general principles which are to be incorporated in the Soil Erosion and Sedimentation Control Plan. 1. Construction of required control structurers (see attached details) 2. Stripping of vegetative cover and excavation of excess materials. (see attached Site Plans) 3. where ever feasible, natural vegetative cover shall be retained and protected. 4. The extent of the disturbed area shall be kept to a minimum , limits to be as shown on the plans or as defined by the Conservation Commission. 5. Temporary seeding, mulching, or other approved methods of stabilization shall be employed, to protect critical exposed areas, during prolonged periods of construction. 5. water runoff shall be contained, as much as practical, within the confines of the construction area, and controled at other times to facilitate ground water recharge. 7. All sediment is to be retained on the site as much as practicable. Construction Sequence The following construction sequence is recommended to minimize potential sediment losses and to prevent the siltation of wetlands, brooks, streams and drainage structurers ( existing and/or new) . At no time will excessively large areas be allowed to be disturbed. All control measurers and structurers are shown in the Soil Erosion and Sedimentation Control Plan. Construction Sequence (Cont. ) 1 . Construct all Haybale Chech Dams at all pionts as indicated or directed. 2 . Strip and stock pile all top siols,as directed, from areas as indicated to be stripped on the Site Plan. 3. Excavate and grade areas indicated on the Site Plan to approximate sub grade levels. 4. Construct finish surface(s) as indicated on the Site Plan and immediately seed and / or protect all areas by temporary vegetation or permanent planting. 5 . Stabilize all cut and/or fill slopes immediately after seeding to curtail erosion while plantings become established. A. Straw Mulch ( 70-90 lbs . per. square yard) B. Jute mesh (see detail) C. Wood chips ( 275 lbs. per 1000 square feet) Upon completion of construction, and earlier as required, silt and sediment, that has been trapped in control devises, shall be removed and disposed of in an approit!d manor and in an approved location. All control structures shall be inspected weekly and after all storm occurances and cleaned and repaired as directed or required. Description of Sediment Control Structures Haybale Dams These structures are to be placed in existing and proposed drainage ways to serve as sediment traps to prevent the sediment from leaving the site and entering the existing drainage system(s) . Haybales will allow the water to pass through and leave the site but will retain and trap the sediment on the upstream side. These are constructed of standard baled hay staked in position with two (2) min. steel stakes per bale. Haybale Diversion Similar in construction to tye "Dam" this structure is used to • divert runoff flows away from disturbed slopes and to controled areas as overland flow. e 16 /A. �WGIHNaING A550GIA'(�57 I NC. 'IZ \V I"O\V AVEHUI� - SAL.EJA, /A&. 01970 ' GY.�1F;�U �TOF-iG o2 f./ABbDDING Di%TAIL �I.1.GEo oti C1�+�ITou2 2 -„4 �A zz z-o" Low 1i.�1-IGLLO�It-}G T�T�11L QA/A ov, G01i nT1L UG'fl O F4 4H oTi%n I. $dLli� 51lALL i'S� LCID It �hfD � A�V"T`f I+�1G PEA I Lam. 2. a3ALti S1lALI- � infT /Altil/AO/A � ¢" INTO AIL . 3. FSAL� �LI�Lt, PSS 5]`LCJ��LY A-L4<= o OV 1+-i Pl-GC-fo- V1ZjVJ�H T4P-00044 �+-IGLLP 1'O\ Ae '( !�J< PRFi�/IOtJ7L1� '51r ��Y �i ��L11�YIt ICo I del/.5 4.. {c�1No►�G�flot-►g 1id Pelt e44r,>100 A-3 ft 5TArlGEt> --=>14.6" > 2-EM \\/4F-H The- t4E�� -fIOV- -' LConsekr r��Sb r I Salem. Massachusetts 01970 DEQE File Date: 8/24/84 PROPOSED PROJECT SUMMARY Applicant: Kernwood Country Club Address: Kernwood Avenue Phone : Atty. Harry Ankeles--531-7000 Location of Property: Danvers River Project Description: R_pairJrProncr r' of rora;..;ng 1;211.q I. T�-pe of Action: Determination of Applicability Modification of Order XXX Notice of Intent Extension of Order Abbreviated Notice of Intent Certificate of Compliance II. Interest(s) in the Wetlands Protection Act, M.G.L. c. 131, s. 40 affected: Public or private water supply Ground water supply XXX Storm damage prevention Prevention of pollution XXX Protection of land containing shellfish Protection of fisheries III. Resource areas subject to protection: XXX Bank Ocean _ Fresh water wetland XXX Estuary XXX Coastal wetland Creek XXX Beach XXX River— bordering on: Stream _ Dune — _ Flat _ Pond Marsh — Lake Swamp XXX Land under any of the water bodies listed above XXX Land subject to tidal action XXX Land subject to coastal storm flowage XXX Land subject to flooding IV. Comments :. Both wall proposed to be replaced and/or repaired are existing. Both are adjacent to the Danvers River and experience tidal action. There is wetlands vegetation (not much) between each wall and the river. Mr. Townsend came before the Commission in July to discuss this project. I recommend it be approved with the following conditions: V. Proposed conditions: 1. Work on the 6th fairway shall conform to plans entitled "Repairs to retain- ing walls-6th fairway and the Danvers River-Kernwood Country Club," dated May 24, 1984 by T & M Engineering Associates, Inc. d 2. Work on the 7th tee shall conform to plans entitled "Reconstruction- Retaining Wall-7th Tee and the Danvers River-Kernwood Country Club," dated May 24, 1984 by T & M Engineering Associates, Inc. 3. All work shall conform to a report entitled "Appendix: Soil Erosion and Control Plan," included in the Notice of Intent dated 8/24/84 by T & M Engineer- ing'Associares. ° Conservation Aide September 27, 1984 Date