64-4 - Highland Avenue #114-116 - CONSERVATION COMMISSION NAUMKEAG REALTY MANAGEMENT
CORPORATION DNR 64-4 -
K�
r
4
azx�,l��a eat }Ly (7�a na errn�n 1 ' 0�2r
-rZv�cZ ���s tLnc�er;
����n• C.hi��ren>S Me�zca� RSsoci�l�.s,.1.nc.
116 �}i �av, Rue
lq ,-7o
�oo�{esman� �oc'l2�
' 14S - 08o0
�-o �sl�buya,n��ace
�os�sn, 1`1ass
�5ober�` csurrnan '-744 - 3010
�rsZ� dwa-ceness �� .
� � � �
(EII115P6atinn TIIi nii5sion
n R�� i
or �S 2 p 2ilEItt, C•��ISSc�C�t1I8Eff8
December 27, 1974
Mr. Ronald W. Keefe
Crane, Inker & Oteri
20 Ashburton Place
Boston, Mass. 02108
Re: Naumkeag Realty Management
Corporation DNR 64-4
Dear Mr. Keefe :
We are pleased to enclose our order of the conditions to
be followed by your above client at 114-116 Highland Avenue ,
Salem, Pass , so that Increased parking facilities may be con-
structed.
Conditions 1 through 11 are standard,and are imposed by
statute: G. L. c. 131, section 40. The Salem Conservation
Commission has listed additional conditions (a, through h. ) .
We believe you will find these conditions to be reasonable
safeguards, for the mutual benefit of Naumkeag Realty and the
City Of Salem.
The reason we require copies of statements dealing with
permits in condition h, is that no documentation of permits
was presented at the hearing on 12/10/74. If no permit is
necessary simple statements to this effect should be mailed to
me by the responsible authorities . Perhaps this can be accom-
plished in the 10 day appeal period during which no work can
commence, said appeal period to begin on 12/31/74.
Thank you very much for your cooperation in this matter.
Orders of conditions have been mailed to the below parties.
Sine ely,
4t-
on d F.` _unt
Cha4rman
138 tderal Street
Salem, Mass. 01970
DFH:esh =
enc
9
"`� ��' �l1.II1�SeX�T�tttaYT �IITIImifiSiIIkT
>, �2 Salem, �'��I55ML��LI5Pt�8�CGNt'F.�
act Department Of Natural Resources
Mr. Leo. J. Thornton, Division Of Waterways,
Department Of Public Works
Mr. John B. Powers, Zoning Officer
5 Broad Street, Salem, Mass. 01970
Mr. Ralph W. Tedford, City Engineer
Dr. John J. Toomey, Health Agent
5 Broad St. , Salem, Mass. 01970
Essex Survey Service , Inc. , Salem, Mass.
Herbert C. Hegele , Jr. , M. D.
Gerald T. McCarthy, Chairman, Planning Board
John M. Gray, Sr. , Chairman, Appeal Board
THE COMMONWEALTH OF. MASSACHUSETTS
E ORDER
WETLAND PROTECTION ACT
G.L.c. 131 s.40
FILE NUMBER: 64- PROJECT LOCATION: 114-116 Highland
Naumkeag Realty
ty Management Corp, Avenue, Salem, Mass,
TO: Mail to: Crane Inker & Oteri (Mr, CERT. ��,pp L NO:
Ronald W. Keefe ) , Boston, Mass, ' Teli 227-48 2
RE: NOTICE OF INTENT AND PLANS DATED: 11/19/74DATE 'OF RECEIPT BY 11/20/74
DATE OF PUBLIC HEARING: Tuesday, CONSERVATION COMMISSION:
December 10, 1974
Pursuant to the authority of G.L. c. 131 s. 40, the Salem Conserva on
Commission has considered your notice of intent and plans
submitted therewith, and has determined that the area on which the
proposed work is to be done is significant to one or more of the interests
described in the said act. The Salem Conservation Commission
hereby orders that the following conditions are necessary and all work
must be performed in strict conformance therewith:
CONDITIONS
1. Failure to comply with all conditions stated herein, and with all
related statutes and other regulatory measures, shall be deemed cause
to revoke or modify this order.
2. . This order does not grant any property rights or any exclusive
privileges; it does not authorize any injury to private property or
invasion of private rights.
3. This order does not relieve the permittee or any other person of the
necessity of complying with all other applicable federal, state, or
local statutes, ordinances, by-laws and/or regulations.
4. The work authorized hereunder shall be completed within one (1) year
from the date of this order. The order may be extended by the
issuing authority for one or more additional one-year periods upon
application to the said issuing authority at least thirty days prior
to the expiration date of the order or its extension.
5. Any fill used in connection with this project shall be clean fill,
containing no trash, refuse, rubbish or debris, including, without
limiting the generality of the foregoing, lumber, bricks, plaster,
wire, lath, paper, cardboard, pipe, .tires, ashes, refrigerators,
motor vehicles or parts of any of the foregoing.
6. No work may be commenced until all appeal periods have elapsed from
the order of the Conservation Commission or from a final order by
the Department of Natural Resources has elapsed.
I,D,1
30 -
64-4
CONDITIONS CONTINUED PAGE 2 FILE NO.
3
7. No work shall be undertaken until the final Order, with respect
to the proposed project, has been recorded in the Registry of
Deeds for the district in which the land is located. Copy to
be furnished to issuer of this Order showing book and page.
S. Upon completion of the work described herein, the applicant
shall forthwith request, in writing, that a Certificate of
Compliance be issued stating that the work has been satisfactorily
completed.
9. . A sign shall be displayed at the site not less than two square
'@ feet or more than three square feet bearing the words,
"Massachusettg Department of Natural Resources, File
Number 4 4
10. Where the Department of Natural Resources is requested to make a
determination and to issue a superseding order, the Conservation
Commission shall be a party to all agency proceedings and hearings
before the Department of Natural Resources.
11. The work shall conform to the following described plans and
additional conditions :
a. The proposed grading and culvert construction shall be done in
accordance with the drawing prepared by Essex Survey Service, Inc. ,
dated Sept. 13, 1974 and titled "Plan Accompanying Petition of
Naumkeag Realty Corporation To Regrade Lot and Extend Drain,
Salem, mass. "
b. Inorder to maintain the capcity of the culvert the following
precautions shall be met: the soil and organic material beneath
the proposed culvert shall be removed and a suitable foundation
shall be prepared in order to prevent the culvert from settling
unevenly due to the rock overburden; furthermore, the culvert
shall be sufficiently protected from being crushed or misaligned
by the rockfilling operation,
c. The slope of the rockfill bank shall be covered only with rock
fragments or soil.
d. The flow of water shall not be stopped during the construction
of the proposed culvert.
e. A rack (or screen) shall not be placed at the entrance to the
proposed culvert.
f. No material shall be dumped onto adjacent wetlands not involved
In the activity nor on any adjacent property.
g. The installation of the proposed culvert shall be supervised by a
registered professional engineer in order to insure that the culvert
Is constructed in accordance with these conditions
31 -
h. No work shall start until the applicant provides the Salem Con-
servation Commission with a copy of letters from the Salem Health
officer & the Salem Zoning Officer stating that Permits are not
required to undertake the planned activity.
CONDITIONS CONTINUED PAGE 3 FILE NO. 64-4
The applicant, any person aggrieved by this order, any owner of
land abutting the land upon which the proposed work is to be done, or
any ten residents of the city or town in which such land is located,
are hereby notified of their right to appeal this order to the
Department of Natural Resources, provided the request is made in writing
and by certified mail to the Department of Natural Resources within
ten (10) days from the issuance of this order.
ISSUED BY , y '
hairman
On this 261th. day of' December 1974, before me personally
appeared
to me known to be the person described in and who executed the foregoing
instrument and acknowledged that he executed the same as his free act
and deed.
XARQH 7e 1030
My commission expires:
32 -
Y
(wonser�a Yon �ommrssion
November 26,1974
Mr. Ronald W. Keefe
Crane Inker & Oteri
Attorneys At Law, Inc.
20 Ashburton Place
Boston, Mass, 02108
Rec Naumkeag Realty Management Corp.
DNR Project Number 64-4
Dear Mr. Keefer
I write to inform you that the additional information
listed on the enclosed copy of a letter has been requested
from Essex Survey Service, Inc. It is hecessary to obtain
more information since computer output data 1s most diffi-
cult to comprehend without supporting documentation.
Yours sincerely,
Brian E. French, P.E .
26 Pickman Road
Salem, Mass. 01970
Crnse6a iau Commission
November 26, 1974
Mr, Hobert B. Bowman
Essex Survey Service, Inc,
47 Federal Street
Salem, Mass. 01970
Res Naumkeag Realty Management Corp,
114-116 Higland Ave. , Salem, Mass,
DNR Project Number 64-4
Dear Mr. Bowmans
Naumkeag Realty Management Corporation has filed a notice
of intent to fill a wetland and included in its supporting
data is a nomputer print-out of a drainage study prepared by
Essex Survey Service, Inc. In order to make a judgement of the
effects of the planned activity, based on the data provided,
I would be most grateful to receive the following informations
a. An explanation of the algorithm used and the notation
and units used for the variables;
b, A delineation of the drainage areas- area 1 and area 2
both have a size of 100 units;
c, Please supply the bases for the selection of the times
of concentration and the runoff coeffielents;
d. Please supply the source of the rainfall intensities;
e. Are flow conditions in the pipe based on pressure
flow or free surface flow?
f. What is the relationship of the City Of Salem datum
to the mean sea level datum used by the U.S,G.S?
uses mean Z010 cuter
I would greatly appreciate an early reply as the Conser-
vation Commission wishes to arrange a hearing on this project
In the very near future.
Yours sincerely,
Brian E. French, P.E ,
26 Pickman Road
Salem, Mass.
BEFsesh
Cat Ronald W. Keefe, Crane Inker & Oterl
Dept; Of Natural Resources r
Ralph W. Tedford, City Engineer
.. r
1911nserfra ian Commission
�T����� p FI�Pltt� �'�ZI85ZCC�LtbPf�S
October 17, 1974
No._ 3933
Mr. Ronald W. KeefetZ(Y1q
Crane, Inker & Oteri
20 Ashburton Place '
Boston, Mass. 02108 P W11 x
Res Naumkeag Realty Management
Dear Mr. Keefes
We are returning all material recently mailed to us
because we feel the information is insufficient for us to
write an order of conditions under the Wetlands Act,
Chapter 1319 Section 40.
Please provide the following information$
1. Dimensions of the total area owned by Naumkeag Realty
Management at this site.
2. Dimensions of the area to be filled. You may wish to
superimpose or outline the area to be filled on the total
site map.
3. What materials do you intend to use on the new slope?
4. Provide calculations to justify the size of the concrete
pipe (36" ) and the effect the filling might have on the
natural drainage area above construction based on 100 year
storm calculations. Perhaps the Division of Waterways, Depart-
ment of Public Works can help you in this matter. Telephone
Mr. Leo Andronico or John Piaseczny at 727-4793.
As the local authority we must judge the construction in
terms of its effect on the environment and the possibility of
flooding due to excessive water flow or a stoppage in the 36"
pipe. It is the responsibility of your client to supply us
with sufficient hydi4hogic data upon which'we may so inform
the Department of Natural Resources and Division of Waterways
of the impact of this project on the environment.
' Sincerely,
Donald_ F:,.Hunt
Chairman ., "
138 Federal St.
DFHsesh Salem, Mass. 01970
enc
ces Dept. of Natural Resources (64-4)
Division of Waterways, D. P. W.
Ralph W. Tedford, City Engineer
t ,
F
•�x
� _ a
/0I�7"l S�l�/
coin
i� �IInserfttt#iIIxC �IImmi�siu�t
m
�;r ..;,p,YS,/ � �ttlPm, �'�I2I882TcI(uSEtts
August 8. 1974
Herbert C. Hegele, Jr., M. D.
Naumkeag Realty management Corporation
116 Highland Avenue
Salem, Mass, 01970
Dear Dr. Regeles
Enclosed is a set of Guidelines For The Conservation Com-
missions which describes the more salient points of the Wetlands
Protection Act (Chapter 131. Section 40) and outlines the pro-
oedure to be followed. In addition I enclose three Notices Of
Intent which must be filed as noted under item 4 on said form,
For our determination of the proposed project it is neoes-
eery that the notice of intent include descriptive plans*
specifically showing the project superimposed over the land area
with elevations and dimensions, We respectfully insist that
the project plan be approved by a registered .professionai
engineer,
I promise you a hearing as soon as possible: If the other
commission members agree it is my intention to consult directly
with both the City Engineer and the Department Of Natural He-
sources,
Please send your filing to me .by registered mail accompanied
by a check in the amount of $25.00 payable to the City Of Salem,
Thank you very much.
sin erely,
D� ald F. Runt
C irman
138 Federal Street
Salem. Mass, 01970
e
December 27, 1974
Mr, Ronald W, 'Keefe
Crane. Inker & Oter_ 1
20 Ashburton Place
Boston, Mass, 02108 w
Res Naumkeag Realty Management "
Corporation DNR 64=4
Dear Mr, Keefe
We are pleased to enclose our order of the conditions. to
be followed by your above client''at 114-116 Highland Avenue,
Salem, Mass, so that increased parking facilities may be con-
structed.
C_ r
Conditions l through 11 are -'standard and are imposed by
statutes G; L. •e, 131, section"40. The Salem Conservation
Commission has listed additional conditions (a, through h.') .
We believe you will find these conditions to be reasonable '
safeguards; for the mutual benefit of Naumkeag Realty and the,
City Of Salem,
The reason we require copies of statements dealing with
permit's in condition h,- is that no documentation of permits
was presented at the hearing on 12/10/74. If no permit `is
necessary simple'statements 'to this effect should be mailed to
me by the responsible authorities. Perhaps this can. be accom-
plished in the 10 day appeal period during which no work can
commence', said appeal period to begin on 12/31/74.
Thank you very much for your cooperation in this matter.
* Orders • ofaconditions have been mailed to the below parties.
Sine ely,
jo ld F. n
Cha rman
138 Federal Street
Salem, Mass, 01970
DFHsesh
enc .
. •
,
Y t }
` d s
♦ M.:
{
cosy Department Of'Natural Resources '
Mr. Leo, J. --Thornton, Division Of Waterways,
s
Department Of Public Works
Mr. John B. Powers, Zoning Officer
5 Broad"Street, Salem-
,,Mass. 01970
Mr. Ralph -W. Tedford-, 'City Engineer
' Dr., John J. Toomey, Health Agent
5 'Broad St. ,' Salem;' Mass. 01970
Essex 'Survey Service, Inc`. , Salem, yMass} '
Herbert 'C. ,Hegele, 'Jr. ,• M. D. ;
Gerald T. .McCarthy, Chairman, Planning Board
John M. Gray'," Sr. , Chairman, Appeal Board
r
f Y r
♦ I Y ' a � s I. l i+ y t
E ,
/OS 7 A. '
4n y
6nu.
APP
BL
lk
tisa �-
'�4\SSERHD R +'.' e' r / Plan .o
B /��►nv
g 'No.1391 3 6ALEM. N- /7 O./�, 7/V-171
Z
y�l�� SSQ4 t .a.•: j r $� i .�;' �i �'.r1r• �t', ./Gr /?L,7
-------. .._ --:Nvmfvtttrr nr I nrnrr-nr I ------ -<_--- --- ---------- -
CRANE, INKER & OTERI
JOSEPH G.CRANE _ ATTORNEYS AT LAW, INC. HARRY L. ROSE
MONROE L. INKER 20 ASHBURTON PLACE
JOSEPH S. OTERI SOLOMON FRIEND
ROBERT F. MCGRATH BOSTON, MASSACHUSETTS 02108 NEW YORK. NEW YORK
MARTIN L.ARONSON (617) ZZ�J-4BBZ
EDMUND M. HURLEY
JOHN P.WHITE.JR.
RONALD W. KEEFE
KEVINBARR M. KEATING
ONNEL November 19, 1974
BARRY J. CONNELLY
CHARLOTTE ANNE PERRETTA
JOHN J. NORTON
PAUL K. CONNOLLV, JR.
RUDOLPH F. PIERCE D
MARTIN G.WEINBERG
ANTHONY
DOUGLAS . MARTIA 3 3 4 2
STEPHE S A. MARTIN
STEPHEN R. KATZ ��m�� '
Mr. F. Hunt, Chairman MOL
Conservation Commission
138 Federal Street
Salem, Massachusetts 01970
Re: Naumkeag Realty Management Corporation
114-116 Highland Avenue, Salem
Dear Mr. Hunt:
Enclosed please find resubmission of materials
pertinent to the above referenced subject property in
accordance with your request. Please advise.
Very truly yours,
Ronald W. Keefe
RWK/je
Enclosures
u
Clu of �*Utrllt, witittrfIttt,rtul
� �';, d t�naril of 1_Frttltil
I Kt}Ilan, M. +13., (IT flit irmau
{ '�t�,K.�;v+'• 1 L,rnCtl -`�trert
iH. Muria (nnuntir, K N.
Julln �1. �nnnteg, 5�. .C�.
1 3lntie},ll E. iRirllarl
i J. 1�nl,rrt �(lang(lnrre;y. �i. +3•.
f{iillreil (II. {i{nultan. A. W.
Et,hert 11lrnlillorn
January 13, 1975 ffir -a-IrJunalb
,I
1
Richard E. McKeage, M.D.
116 Highland Avenue
Salem, Mass. 01970
Dear Dr. McKeage: -- —
Pursuant to our telephone conversation relative to the extension of .your
I parking lot at 116 Highland Avenue, please be advised that I havpe caused
an investigation to be made of the area and feel that no health problems
i
will arise as the result of this work.
Very truly yours,
FOR THE BOARD OF HEALTH
oa �
J TO S.C.JOHN . ,
HEALTH AGENT
JJT/g
---�� cc: Mr. Donald Hunt, Chairman Conservation Commission
138 Federal St. , Salem, Mass. 01970
I
I
,
I
Mahn P- ?Pofoers
S �rnsD �#reef
January 13, 1975
Donald F. Hunt , Chairman
Salem Conservation Commission
138 Federal Street Re: Naumkeag Realty Management
Salem, MA 01970 Corporation DNR 64-4
Dear Mr. Hunt:
Please be advised that no permit is required for
the planned expansion of the parking facilities
at the doctors offices located at 114-116 Highland
Avenue.
Very truly yours,
Salem Zoning Officer
JBP:tc
1 5 1
THE SALEM,,MASS.. EVENING NEWS — THURSDAY. DECEMBER 5, 1974 r
r'
A �
y $ »
1
Looking ahead to season
right, meets with returning and Mike Chitro during practice Wednesday.
Paul Hickey, Fred Theriault (Dave Matt)
strengthen pennant hopes
irever the However, they did have to surrender franchise back in Washington, D.C.
iext year, left-handed hurler Dave McNally,a clutch There's a possibility that Baltimore may,
appear to performer who posted 181 victories over play_some of its games in Washington to'
r a sixth 12-plus seasons at Baltimore. Rich alleviate pressure from the nation's
onship in Goggins, who was platooned in right field capital.
last season,and minor4ague pitcher Bill i Dele gates from Seattle, Denver,
ieals this Kirkpatrick'alsomove Montreal in the
is winter _day's key transaction. Honolulu,Toronto and this host city of the
eral man- convention are on hand,hopeful of landing
are four Meanwhile,expansion wa:son the agen- the four new franchises which are .
da for the National Leamiofi5dav and the - orrortad in ha added h� IQ79
y 1.
40 THE SALEM,MASS., EVENING NEWS —THURSDAY. DECFMBER 5. 1974
W Schedules n u R�M
Thursday 7-Sunriso Semester 56-UnderA ge
EVENING 6:Y5 3:30
6oW 5-Nows for the Deaf 2-Maggie&the Machine
2-Zoom 6:30 4-140w To Survive a Marriage
4.5-7-Nows - 5-News 5-One Life to Live
38-Dick Van Dyke 6AS - 7-Match Game
56-Star Trek 4-Daily Almanac - - "38-Superman
6:30 .6:50 - 56-Banana Splits
2-Villa Alegre S-.News for the Deaf 4;00
$-ABC News - - 7-Las Noticias de May 2-Sesame Street
7-CBS News 7:00 4-Mike Douglas
38-Bewitched 4-Today - S-Bonanza -
7°� S-.Jabberwocky 7-Mary Griffin
2-Woman 7-CBS News - - 38-Three Stooges -
4-14BC News 7:J0 56-Little Rascals
5-To Tell the Truth -7-811ly Grahams a0e 56-Batman
S-Leave it to Beaver 4:30.
- -
-38-Mogan' Heroes,. - 5-Father Knows Best 5:00 .
56-Unfouchahlei,7:JO 7-Captain Kangaroo 2-Misterogers 8:30 38-F Troop- - -
2-Evening Compass- S-Romper Room - 56-Flinistones
4-$25,000 Pyramid . 9:00- - - S:30
5-House Call 4-Sonya Hamlin 2-Electric.Company
38-NHL hockey - 5-Good-Morning- 4-Family Affair
.8:00 7-12aul Benzaquin - 7-Candlepins for Cash
2-The Way It Was. - - - - 10:00 38-1 Dream of Jeannie
4-Sierra 4-Name That Tuna - 56-Gllligan's Island
5-Santa Claus Is Coming - ]_Joker's Wild
to Town 10:30 -
7-Walfons 4-Winning Streak
56-Dealer's Choice Game 5-Password Legal Notices
- 8:30 7-Gambit
S6-Danah America 56-Not for Woman Only NOTICE-0F
56-Dianah 10:50
9:00 3e-News PUBLIC HEARING
2-Masterpiece Theater 11:00
4-Irenside 2-Electric Co. Subject: Naumkeag Realty
5-Streets'of'San Francisco -11:00. - Management Corporation, 114-
7-American Parade _ 4-High Rollers 116 Highland Avenue, Salem.10:00 5—s10,000 Pyramid Date: Tuesday, December 10,
2-Soul 7-Tattletales
4-Harry-Movin OO 1974.
-5- R - 3a-Tom.Larson -
7-CBS BS Reports 56-New.England Newscene Time: 7;00 P;M.
38-13ruins.Wrap-Up . 11:30- Location: North Branch
56-WFL- Football 2-Sesame St. Library, corner Of North Street
4-Hollywood Squares
10;15 5—Brady Bunch - and Liberty Hill Avenue,.Salem.
38-Film,"cry of the 7—Love of Life - Dept. of Nautral Resources
-
Wild Geese"11:00 56-New Zoo Revue File No. 64.4.4.5.7-News 7-cos Hews 11:55 The Salem Conservation.Com-.
11:30 AFTERNOON mission in accordance with the
4-Johnny Carson 12:00 rovisions of 'The Wetlands
5-Mission Impossible - - - P
7-Film,-"The Swimmer" -4-57-News Protection Act (Mass. General
38-Land and Seas
56-Banana Splits Laws, Chapter 131, .Section 40
36-Laugh,Classics 12:30 - and amended by Chapter-769 of
'12;00 4-Celebr6 Sweepstakes
38-News $-Split Second 1973) will hold a public hearing
. -
12:30 7-search for Tomorrow- at the above time and place for
S-Wlde World Special 56-Film,"Lightning the purpose of informing the
1:00 Strikes Twice" - public concerning plans to add
4-Tomorrow - 20 4-NBC new: 12:55 parking facilities for doctors'
7-Paul Benzaquin 1;00 professional building.
2:00 4—Somerset DONALD F. HUNT
5-News 5-All My Children Chairman
5:10. 7-Truth or Consequences
5-Hollywood and the Stars 38-Jack La Lanne - Salem.Conservation
2:20 - 1:30 - y Commission
�,\ j 7—News 4—Jeopardy. — Dec. 5, 1974. IJ
. f m Salem, h
� '�IliI88MC LISPffS
NOTICE OF PUBLIC HEARING
Subjects PTaumkeag Realty management Corporation
114-116 Highland Avenue, Salem
Dates Tuesday, December 10, 1974
Times 7s00 P.M.
Locations North Branch Library,
Corner Of liorth St. & Liberty Hill Avenue, Salem
Dept. Of Natural Resources File Nos 64-4
The Salem Conservation Commission in accordance with the
provisions of The Wetlands Protection Act - (Mass. Geberal Laws,
Chapter 131, Section 40 and amended by Chapter 769 of 1973)
will hold a public hearing at the above time & place for the
purpose of informing the public concerning plans to add parking
facilities for doctors' professional building.
lDon ld F. Hunt
Ch irman
Salem Conservation Commission
Hearing Notice mailed tot
i
7 members
Atty. Ronald W. Keefe representing applicant
Ward 4 Councillor Michael E. O'Brien
John M. Gray, Sr. , Chairman, Board Of Appeals
Gerald T. McCarthy, Chairman, Planning Board
Ralph W. Tedford, City Engineer
Health Agent, Dr. John J. Toomey & Board Of Health
Secretary, Conservation Comm. , Mary E. Pelletier
Associate Paul J. D'Amour (Planning Board )
1 DNR
DPW
MASSACHUSETTS' G.L. C.131 §40
NOTICE OF INTENT
DATE November 19 . 1974
1. Notice is hereby given in accordance with the provisions of G.L. c. 131
§40, that the undersigned intends to remove, fill, dredge, or alter land
which falls within the jurisdiction of said statute. The land is located
In the City/vbiA of Salem
114-116 Highland Avenue Street. Recorded at the Registry of
Essex County Book 5913/5567 Page 645/34' If
ae�ptsBEtxBiBlc�rtcix�4rS �pcx
2. Included in this Notice are such plans as are necessary to describe the
proposed activity and its effect on the environment filed herewith -and
made part hereof. (A locus map consisting of an 8 1/2 x 11" section of
a United States Geological Survey Quadrangle indicating. the project . site
and four sets of the aforementioned plans must be filed with the Depart-
ment of Natural Resources. )
3.. The name (s) , addresses and telephone number(s) of owner(s) of the subject
land are:
NAME ADDRESS TELEPHONE NO.
_Naumkeag Realty Management 116 Hig•hland'Avenue 745-2251
Corporation Salem
4. I have filed identical Notices and plans. with the following:
Mass. Department of Public Works ® Date November 19 , 1974
Conservation Commission U Date November 1 . 1 74
Mayor/Selectmen . 0 Date nofreouired
Mass. Dept.' of Natural Resources Q Date November 19 , 1974
5. Have all permits, variances, and approvals required by local by-law with
respect to the proposed activity been obtained? Yes (yes or no)
6. • The name, address and telephone number of the owner' s representative (if
any) are as follows:
NAME ADDRESS TELEPHONE N0.
Attorney Ronald W. 'Keefe 20 Ashburton Place, Boston 227-4882
Engineer Robert Bowman Essex Survey , 47 Federal St. . Bos. 744-3010
Agent Ronald W. Keefe
7. The purpose of the project is: ' (describe in detail)
To add parking facilities for doctors' professional building
which is required for patient and staff parking.
8. owner' s (oF 'agent's) signature
9. Has the twenty-five dollar ($25.00) filing fee been pai ?
Yes (yes or no)
* Submit 4 Copies of Everything to Dept. of Natural Resources
1 copy plus $ 25.00 check to Town/City Conservation Commission
1 copy to Dept. of Public Works
��iv�d �u man sewel�an �qmmi�sl�.
1 ,
� ,r „� L F2► �r�`\y_. .[.R. �e� � i' `fa"+fLi' �G -.-
Jw
.r.•. c ,��►. "4 ::.�. as. _. sL "lt$'�. +. ��5 ti� yr 1�
nil���� +4 �-.• Tf ec.
�(C +� h ♦� `R .� # kF Nil
k-1 K
,,.y aa., ,�. �'•-�, ^�- .PVC� 1
�� . 10/7/Vi �I
THE COMMONWEALTH OF MASSACHUSETTS
DEPARTMENT OF PUBLIC WORKS
DIVISION OF WATETK. YS
100 NASHUA STREET, BOSTON
fttoo as i
y
0 at Vatot 7o Au ow
This will acknowledge receipt of your Notice of
Intent to perform work subject to Chapter 131, Section 40
of the General Laws (as amended by Chapter 784 of the Acts
of 1972).
From your plan, Notice of Intent and investigation
by this .Department, a license will not be required at this
time under the provisions-.of ;Chapter 91 of the General Laws.
All work shall be subject to all other related
provisions of law, by-laws, ordinances and regulations that
may pertain.
Very truly.yours,
U NORMAN L. DIEGOLI, P. E.
PGM/erin Acting Deputy Chief E-iginee.r
cc, 1 , ,
REMARKS:
r
�ec . to%/94
t G����
DEPARTMENT OF NATURAL RESOURCES
,r
LEVERETT SALTONSTALL BUILDING
100 CAMBRIDGE STREET
BOSTON, MASSACHUSETTS .02202
October 2, 1974
This Department is in receipt of an application under
General Laws Chapter 131, Section 40, filed in the
name of . Naumkeag ite8ltp Management . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Owner of Land . . 5P. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Salem
This project is in the Town/City of . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
and is located . . . Highland Avemm
This project has been designated by the number 54-4
ARTHUR W. BROWNELL
COMMISSIONER
# r fff
k# - •l' i . �\2 :,f ��,4a ""r*ttb„Ji �' ,J�, 1 � � ° 6 a 1 'k'7i'LL.'a'1
��,,y,� Cf v � 11naf*rrMet4 • s3' _ x~ _�, * .
l./' N 9J� � •.' I �'F'� �� -� „� � .fir' � + wt }{„�a
RClukNGE }� '� � "L%DngvS� '�� � uF� �a R.R '• �t �`"P ' �-I
Lit
► l±, l e r� Svc 3 \� c � * r:rp acJ�$
Y' tN7 � QE V' � iJ / � [ � ♦�
y„i Jr.c N af�,�,J`F�.O r•� 7�4�` 1i'�IMV I�I Y'� �\ f •Tpy � ,�i L
4 S vv tV.•7
ieo a�Llbr ♦ .+r a; �._� ' / �' �f '' �°/. V. µµ \ `-:..
n
OaiaiM' k
,- .. � lr-� • ` �"�" �/ * //, ,/', �,r*. i- 'i `°'4,p \ ,o I• •r�. '1. f:'Y�, q•�
/p x /• rj, `�µm, .. Jla /''ah. 'o h... y.\ ¢ r t y ,J F Ci ryl.• MWK Ji,
N
` �1: • .,,,.• pyoe Y L. S ,a-qw. n. u \ A ►y,,,.
• R AS
�� � ��' fj.1. � F o �rr' � � r V� li ` , m.nf� ,y� �tii t. +— �"iN4' `' •-• 9
9�. owrnJ y t_
�}�� � S $ / 11 � � "i r � ::`tad u.�� Q�°'+► Et�a\, 1 i .�Y� ., J ,.,NrN F Y', .7
.o,,, M,•N.;w'A":i4an
b• / / ` M `r j•It 11 y � r }
a.:,S, a.. t• ♦ . , ¢u1�'�'� \', �I ( lw e7,. .. t j:, ^ j
47 Fcdarn/ Yn IZAXN�
' PARCEL NO = 2 c� rah, g
Sea/p..•., Moaa , d/97o ; ,f ,_
`LINE NO
AREA SIZE = 100
SOLUTION 1 OR 2 = 1
RUNOFF COEF = .35
CONC. TIME = 90 — M%n.• s,
STORM FREQ = 6
{` RAINFALL INTENSITY = 2.063
a QUANTITY = 72.22 * }
CHANGE VALUES ( 1=YES, 2=NO) 2 `
ROUGH COEF = .015
SLOPE = .0047t,
DIAMETER = 45.05 — PIP& edym,�ec/
CHANGE VALUES ( I=YES, 2=NO) 1
'. DIAMETER = 36 — PipC EItiJ7Fir,y f4' +- ''d
ti RECALCULATE ( 1=YES, 2=NO) 1
SOLUTION 2 OR 3 = 3
�y < PIPE QUANTUTY = 39.70
It "CHANGE VALUES ( 1=YES.2=N0) 2
s
RECALCULATE C 1=YE5, 2=NO) 2
�AJEL OR CAPACITY ( I OR 2) = i
+F VELOCITY = 5.616 <•: S _* ��`
y' r
CHANGE. VALUES' ( I=YESj 2=No) 2
' RECALCULATE ( 1=YES,2=NO) 1Af ``
+t * VEL OR CAPACITY ( 1 OR 2) = 2
VELOCITY 5. 616 yr <tRa�`Ftr� , s'
z`^DISCHARGE CAPACITY = 39.697
n .. .CHANGE VALUES C 1=YES, 2=NO) 2 �
-RECALCULATE ( 1=YE5,2=N0) 2 rt#
,. LENGTH = 42 v `
F
^4NVERT = 47.8 k a1'
THIS LINE AGAIN ( 1=YM 2=NO) 2
r ..MQRE LINES ( 1=YES, 2=NO) 2
DRAINAGE SYSTEM 2
i�er�rSi vExi� rivq GONG/7'/O./s P4 7"4f*: i��t s✓ „" 41
f I F" " MMr t
+` LN INC. INC. TOT COMP CONC QT P CAP VE'L SL91'E
AREA C AREA C TIME SIB
J '' 4 S•�J - 1.
1 100.0 0. 35 100.0 0.35 90.0 39.70 36 39 .69 5.61000
ks
TYPE 1 TO CONTINUE, 2 TO STOP 1
ag.
9 , •eA
y
Af Y5
" PARCEL NO = 2 { 6, {
e . ..... .
`., LINE NO = 1t "I
AREA SIZE = 100 ' t3 '
SOLUTION 1 OR 2
RUNOFF COEF = . 35 frL ,
CONC- TIME = 90 - N-ri.
STORM FREQ = 4 - PO S�Cor .37�7r n TTM
r RAINFALL INTEN7SITY = 1 . 578
i QUANTITY = 55.24 "y
CHANGE VALUES ( 1=YES, 2=N0) 2 t
. ROULGH COEr = .015
-. SLOPE = . 0047 �r
I)I AA7 ETER = 40.7/i - P.e Regw..-eol
w. CHANGE VALUES ( 1=YES, 2=N0) 1 =
DIAMETER' = 36 — Lt�c,3�in5i Pi/aC `#
RECALCULATE ( 1=YES, 2=NO) 1
�`..� SOLUTION 2 OR 3 = 3 r•` ,, ,'.
PIPE QUANTUTY = 39,70
CHANGE VALUES C 1=YES, 2=NO) 2 ;
RECALCULATE ( 1=YES, 2=N0) 2
1 VEL OR CAPACITY ( 1 OR 2) = 1
VELOCITY = 5. 616
CHANGE VALUES ( 1=YES, 2=N0) 2 ;
RECALCULATE ( 1=YES, 2=NO) I y
VEL OR CAPACITY ( 1 OR 2) = 2 � ^
'
VELOCITY = 5. 616
`G. DISCHARGE CAPACITY 39.697 s . -
�y CHANGE VALUES ( 1=YES, 2=NO) 2 w
}ts Y #
x RECALCULATE ( 1=YES,,2=N10) 2 of
LENGTH = 42 i t :
INVERT = 47.8 J. x ~ * 4u ,
;T F THIS LINE AGAIN ( 1=YES, 2=N0) 2
MORE LINES ( 1=YES, 2=NO) 2r,' j � ^:
rJ ` DRAINAGE SYSTEM 2 0
LN INC- INC. TOT COMP CONC . QT P CAP VEL SLOPE IUD S v
AREA C AREA C TIME SIZj
1 100.0 0. 35 100.0 0.3.5 90.0 39.70 36 39. 69 5. 61 .0047 47.80 A7Ct
' err
S P ,
yt cf
0
i,.
s
TYPE 1 TO CONTINUE, 2 TO STOP 1
i y`7o B¢
E33Bfc Suruec, •�er✓ICa h c.
WTI F�, �2at
PARCEL NO = 2
LINE PJ0 = 1
AREA SIZE = 100
SOLUTIO>J 1 OR 2 = 1
RUNOFF COFF
STOTIN F3EQ = 3 - /o S�eor .S�or,n
�6
RF,I^IFALL I`;TEIdSITY = 1 . 375
QUAPJTITY
CHANCE VALUES ( 1=YES, 2=7JO) 2
207;11 COEF = .015 -
SLOPE = -06147 P
DIMETWF. = 33 .7n —wipe eew,rcc/ a M
CHANGE VALUES 2= JO) 1
DIAMETEIA
RECALCULATE ( 1=YES, 2=[JO) 1
SOLUTION 2 OR 3 = 3 ,
PIPE QUANTUTY = 39.70
a
CHANGE VALUES ( 1=YES, 2=NO) 2 {"
RECALCULATE ( 1=YES, 2=1JO) 2 .
VEL OR CAPACITY ( 1 On 2)
-VELOCITY •_ 5. 016 s
CHAN3E V,'.LUES C1=YES, 2=PJO) 2 r .
RECALCULATE ( 1=YES, 2=PJO) 1
VEL OR CAPACITY < 1 OR 2) = 2 a. ...
a VELOCITY = 5. 616 „•„
. DISCHAY.GE GA ACI TY = 39 . 697
�.CHAME VALUES ( 1=YES, 2=110) 2
RECALCULATE ( 1=YE3, 2=NC) 2
LLIJ Tti = 42rr
INVERT= 47 .3'
THIS LI'JE AGAIN ( 1=YE3, 2='JO) 2
AO E LINES ( 1=YES, 2=NO) 2 §
4p 1
Txrtl
DRAINAGE SYSTEM 2
/ t R
/D 1�eor 3�8rin� 6WIC /rsy CanC/, Yia,-.s Al
Lid I:JC. IPJC. TOT COMP CONC QT P CAP VEL SLOPE IUP I130t�({�3
A:2EA C AREA C TIME SIZ se
0. 35 1010. 0 0. 35 90. 0 39 .70 36 39 . 69 5. 61 .0047 47.80 47 .76
iZ
4 ��4
TYPE 1 TO COi1TINUE, 2 TO STOP 2
STOW
�4
e. 4
•: Eaa ex Sur✓ey S�rV i c,e , /n c ;
a
sF PARCEL NO
LINE• NO = 1 &
AREA SI?E = 100 `
SOLUTION 1 OR 2 = 1 .
�S _. RUNOFF COEF = . 35
CONC. TIME = 90 —H,n-
s ' STORM FREO = 6 — 106 tom,
t .
RAINFALL INTENSITY = 2.063 nI -
S QUANTITY - 72 . 22
CHADIG£ J LUES ( 1=YE•S, 2=NO) 2 a
S
ROUGH COEF = .015 g
.. \ SLOPE _ . 0065 E:.
v DIAMETER = 42. 39
CHANGE VALUES ( 1=Y P, 2=NO) 1
�p DIAMETIFF. = 36 — Pi a Pro✓�
RECALCULATE ( 1=YES, 2=NO) 1
SOLUTION 2 OR 3 = 3
PIPE QUANTUTY = 46.69 '
CHANGE VALUES ( 1=YES, 2=NO) 2 "
RECALCULATE ( 1=YES, 2=NO) 2
' .. VEL OR CAPACITY ( I OR 2) = 1 tr 4
` VELOCITYC = 6. 605
CHANGE VAL?I'IES ( 1=YE"_, 2=NO) 2
RECALCULATE ( 1=YES, 2=NO) 1
VEL OR CAPACITY Cl OR 2) = 2
1` VELOCITY = 6. 605
-
s DISCHAR;E CAPACITY = /16.63u "' Y
' CHANGE VALUES ( 1=YES, 2=N0) 2
RECALCULATE C1=YES, 2=;70> 2
LENGTH = 155 m> '
INVERT = 50
THIS LINE AGAI1u C1=YES, 2=NO) 2
DRAINAGE SYSTE. 1 , d
ProPosee/ Pipe CJnc% FA
j Li3 I?dC. INC- TOT COMP CO2;C Q P CAP VEL SLOPE IUP IDtfltit
AREA C AREA C TI.IE SIZ
1 10w.0 0. 35 100.0 0. 35 90 .0 46. 69 36 46. 68 6. 60 .0065 50.00 48.49 x
� w
{,w
ham. Y.
K ,w
TYPE 1 TO CONTINUE, .2 TO STOP 1
Y
;'7a e¢
37377e r `.
01 TAPES
-EXEC-? DRAINS
PARCEL NO = 1
i
LINE N0
AREA SIFE = 100 k a,.
SOLUTION 1 OR 2 = 1 ` x
RUNOFF CO — = . 35 r
CONC. TI'IE
Yea STOR
f ':L,I = [} - 20 r S�n9
RAINFALL INTENSITY = 1 . 573 -
QUANTITY = 55.24
( ;
CHANGE VALUES ( 1= i ES, 2=N0) 2
ROUGH COEF = .31S r sT
\ SLOPE = .0065 M
) DIAMETER = 33 . 34 --
CHANGE VALUES ( 1=YES, 2=NO) 1
DIAMETER = 36 - Pipe �ro✓�d�d
RECALCULATE ( 1=YES, 2=NO) 1
• SOLUTIOi'I 2 0:1 3 = 3 '
PIPE OUANTUTY = 46. 69 4,
-CHANGE VALUES ( 1=YES, 2=NO) 2 n
RECALCULATE ( 1=YES, 2=NO) 2 x
VEL OR CAPACITY ( 1 OR 2) = 1 , ,� .
VELOCITY = 6. 605 ;
CHANGE VALUES ( 1=YES, 2=10) 2
.RECALCULATE ( 1=YES, 2=NO) I
VEL OR CAPACITY ( I OR 2) = 2y
VELOCITY = 6. 605
DISCHARGE CAPACITY = 46. 633
CHANGE VALUES ( 1=YES, 2=NO) 2
RECALCULATE C 1=YES, 2=NO) 2
LENGTH = 155 it oil
INVERT = 50
THIS LINE AGAIN C1=YES, 2=NO) 2
,MORE LINES ( 1=YES, 2=NO) 2
I10. , t
DRAINAGE SYSTEM 1 3
20 Year �>6•-m - Proposes/ P�Pefill .: � •
LN INC. INC. TOT COMP CONC OT P CAP VEL SLOPE IUP
AREA C AREA C TIME SI3 CC M1yN\
1 100 .0 0 . 35 100.0 0. 35 90.0 46. 69 36 46. 63 6. 60 .0065 50.00
NN�%� �n
i
TYPE i TO CONTINUE, 2 TO STOP 1 w
,Sµ
t
y +�7as¢
y ff�SaL .fir-�ey SGs-vccC y/x.
PA CL. `G = 2
row
w.
..z' LINE NO
AREA SI7-E = 1 69
wY
-r� SOLUTION 1 OR c = 1
.. , CONC. T1 7 - = 9,1 - HY,n
ST0 1 F:. '
sAI17FAL I']?-'i I ' ✓ _ 2. 053
QUANTI ' 7 '2 •J `s�t
J i ' Quan�% >� f�.,-r �.o�o3rd Net,. niF�E. (/DO yGLr :54n^V1 "t
y;tii✓+
SLOPE _ . t Ci':7 F s
gyp ' DI 1ET 36 - 152,lve
RECALC`':_i',T_
SOLUTIO'i 2 0" 3 = 3
PIPE QUPJNTUTY = 39 .70 '
CHANGE VALUES ( 1=YES, 2=140) 2
RECALCULATE ( 1=YES, 2=NO) 2
VEL OR CAi'ACIT'f ( 1. OR 2) = 1
VELOCITY = 5. 616
CHANGE VALUES C 1=YES, 2=NO) 2
3ECALCULATE ( 1=:'ES, 2=.40) 1 +
a:
VEL Ois CA i Ci?'i ( 1 OR 2) = 2 t �
e VELOCITY 5. 615
DI SCJ4A ,L C,,"i.0 IT
= 39 . 697
CHANGE x'��UJia ( 1 YE5, 2-.:-,0) 2
RECALCULATE ( I=YESi 2=iiO) 2 �`LE
LEE-,TH = L12
1NJERT = L.7 .5
?' THIS :.1*jE A,AI 1 ( 1=YES, 2=7.10) 2 k "
PIORE LIN S C1='i ES, 2=PJr)) 2 <vw.
DFAI"JA^,E � .'STE'-i 2 ,4
11tyh/4*cd e. Ab Aov
/GO yCur SjorM — �,XiS i/►S.
Ld I?JCL I;JC. TOT C01P CO'IC CAP VEL SLOPE IUP IImm'.
SI7t . .^
EA C A3EA C 'r1:1E c T
.a
1 12 .-6 0 . 35 1C1^. + 0. 35 97 .0 39 .70 36 39 . 69 5. 61 .0047 47 .80 47 .60s7!
,.y
TYPE 1 TO CONTIY•JUE, 2 TO STOP 1
r
♦ t 'i
#vs
7OB4
- � E�sac 3u,-ve� Scr✓ice , /r,c . a
PARCEL NO = ] x
a c ^ ,
LINE NO = 1
AREA SIZE = 100 {tip Li
SOLUTION 1 0= 2 = 1 01{L1
RUNOFF COEF = . 35 7.
GONG. TIME = 12G — M,17
STORA F".E� 5-
RAINFALL INTENSITY = 1 .717
QUANTITYI = 50 ..I1
CHA[JiL '•1F?.UE° ( I=YES, 2=NO) kv x
37377 ,
91 TAT'ZS, " c
LINE N0
AREA SIZE = Iviv v
SOLUTION 1 a 2 = 1
RUNOFF COEF = . 35
CONC. TIME = 15'd — N,r�
< STOR:•1 FFtEQ = 5 — /oo
RAINFALL i;ITEJSITY = 1 .488
QUANTITY = 52. 11 ';, n "
CHANGE VALUES C1=YES, 2=NO)
t
. '37377
01 TAPES
-EXEC- ? E':AI'JS
PARCEL NO = 1
" LINE NO = i
I,
AREA SI7_-E = I00
SOLUTION ! OR ?_ = 1 v �
RUNOFF COEF = . 35
CONC. TIME = 183 �•n . ;° `�s
STORt2 F RED Y�Car S�+ornq
RAINFALL INTENSITY = 1 . 32!1
QUANTITY = 4 0. 3 S _.�_ A-o�o sed/S/eu Per C/ne�er fi// 4:2,aa4. 4A
CHANGE VALUES ( 1=YES, 2=NO)
r �
4!' 4
ESSEX SURVEY SRRVICE0- INC.
' 4T Federal Street
Salem, Mass . 01970
To: �iA�.c-M Co�7��e VaTio� Cr�v�r�,S�,�o.� Date: cj pSc. 1d�n4
C�
Re : Q,,s i r tNc,1 2��
C�4 -4
Explanation of Computor Program "DRAINS"
"DRAINS" is an Engineeringg program developed for Essex Survey
Services Inc . to be used on their Data General .NOVA 1210 computor.
The program is written in FORTRAN IV, extended.
The "DRAINS" Program has been designed to allow the operator to
perform computations in a con :,�rsational mode on the computor system,
with Questions asked of the operator, responses indicated (in most
instances) and answer:• or erro. me=sa?eS typed out . *1oz of the nec-
essar in^ut is indicated by the program itself. Furthermore
,there is Extensive checking to insure that required values fall with-
in specific ranges .
Computations are performed based on the input data and the format
of --out . 'Provisions have been made for adjustment of data at certain
points , Xhen all work has been completed a listing is typed shoeing
the pesults of computations , accumulated values and totals.
Amac. io 19114
��LLered �, reSid�nc�� `�
�. �•ru �ria��.re�c� t' �.
111e�nb�r/�altam �J
CpriSeY'oallo-n �,qmm .
DRAINS is a program to determine storm runoff, pipe size and
related information.
Storm runoff is comrvt+od by the Rational Formula (Q-cIA)
Q - Discharge in cubic feet per second
C - Coefficient of runoff for drainage area
I - rainfall intensity in inches per hour
A 4 Drainage area in acres '
The design engineer must make the basic decisions an4 defermind• ' �
tions of:
1 . Tributary area (A) - A
2 . Storm return period
a. 205 ,10,20 , S0 and 100 year curves for the Greater Boston`
area are stored in the program. Digital numbers l through
6 are used to indicate storm return periods of 2 through
100 respectively.
3. Coefficient of runoff - C - for the tributary area (s)
a. Based on the Engineer' s judgement ' gnd knowledge, of the
area(s) involved and the use of Standard Tables.
4 . Concentration time (inlet time ) for each tributary area
a. Based on standard formula, and graphs ,for overland flow
time.
S. Initial pipe slope(s) and length(s) fr0in point of point in
system.
6 . Manning roughness coefficient based on type of pipe and
and condition .
With these decisions made the computor will Cdiepute the rainfail
intensity at the time of concentrationi the rate of runoff, the required'
diameter of the pipe (with slope given) or the required slope (with
the diameter given) and the invert downstream with the invert upstream
given . (Solution (1) is for pipe diameter, Solution (2) is for pipe
i slope, Solution (3) is for pipe capacity. )
v3 -
When the second or later parcels are added to the drainage system
the computor will make the necessary compilations for composite
coefficient of runoff, concentration time (including in channel flow
time) and cumulative area.
Provision has been made for the designer to change pipe sizes
to conform with standard manufacturer' s sizes at each point in the com-
putations . It should be noted that the storm return period selection
is made only once; however, differences in type and condition of- pipe
can be allowed for in a given system.
i
i
`1
� Y
C
All eb adouts are is standard terms :
Quantity (^ate) in CFS (Cubic feet per second)
Diameters in inches
Lengths in feet
Inverts in feet, -tenths and hundredths
Area(s) in acres
Time in minutes
Slopes in feet per foot of leng ',
Velocities in feet per second
Capacities in CFS (Cubic feet per second)
All hydraulic comYutations are based on the Manning Formula and the
continuity equation , with full pipe flow. This combined formula is
expressed as follows :
.t
Q - Capacity (quantity)
r - radius of pipe in inches
n a Mann fl.i ` z coefficient of ttotighftess
S - slopc of pipe The followi_tg inpl:t data were dbe4 the, analysis of this storm
drainage syster.:.
1. Storm years. ( )
2. Miniuri Fz-3e Size 3 � zc•
3. Manning "n" Value o,oi ,5
4. Ra n;,e o'F Velocities Co•cco to 5.to 1
5 . Relzs:ionship of Datum use e to U.S.C.5: Daten
The cor.•�entration times and runoff ebefficients used for design
are indicative of conditions which would be likely to exist
Eo.3L�t Sc%Qve Y �'c4✓/cc %c.
47 FEOEegL .5r. z-,ff M9s3, dg7a
D�'T��2M//�/AT/�N OF COt'FF/C/GNT OF .PUNOFF C
F0,e (/.St //Y THG P9T/ON4G FOPMUL9 FaQ STO2H OQq/NgCie COMP,
TABLE �I - lJrfxan Ar¢aa C(vo/uc)
fG.gT .PC'.�/G�nTiq� .�� /mhYi'✓io�o 0.40
.3'TEEP�e PEa/d r/7�in� Sp% /m/ocrvroc o O.G5
SJEEa 6411171 74X /mperviou� 0.80
TPI�CE fj - .2uro/Ar`coo
ToPoc,.eFlPHY � 3GDae �i�,G�r m.% C / ✓o/u¢
' FLgr Lq.vo / �a 3 O.3o
�O[.0 NG� /5�a 20 D• 20
c`7 TEEP, y/GLy /J�O �o 2.r70 D•/D
2. �oic 3
7/c,v7- CG.gy D./o
CL Y 47 LoaM D• e0
JQVO)/ LOaM O.40
3. covet
CULT/'✓gTCO O•/O
IY000eO o ep
To oblo/il ;,41/e Coe��%c¢ /� C�or eurra/greoa
c/dd -/h¢ ✓o/u¢s o� C/{ar etacfi o� �h� obt�✓e
fh/�n �oe�ors and 3ub�rve�fh¢ se/m �rn/s, u.�ify.
TA6e-e C- 5u,-1oc¢s 0/-Coo
Q4/NFdGIL
Tqa�� OF ,QuNOFF C'p@FF. �.4LUca.S •QuNo.>F
Sur�iic¢s Min, Mcsu.
20o a _ s/ay fa ,.,c%/. ' D.9d led
CoNcoerm a.e .4.lPN4Gr D• 90 /.00
pgvE yE/�rs 6/r.M4l404M revc v F. ccaaco> e.7e 10.9d
6"e4vea.- C-4&,Q dr zoaea 7
10 Cc4yEy fr COMR9GT 0.25 417.0 _
.Pq/� eoao A•POJ o./d O.3d
43 G o a L a
E9.2rN S4N0 d./5 d./d D•OS 40•50 d.40 D.34
SuQF4YEs La4r! 0.2o d./4 O.OS Aea o.45 0.35
�•z,Chb/e/J C¢4✓ec e.e5 0./5 O./o n.65 0.50 0.¢o
Cam✓ 0,9,7 e.00 d./5 d•75 0.6o e.5a
C�7/' - BUJ/9CJ0 4rcos D•GD 0.7.5
CoMoa.�/r C' - Dtnsc Paa/can/ro/ O.Sd O.6 5
H•P�i¢S .$cbu.�an - .Pes/den�/a/ 0.35 d.55
.Pores/ Oia brie/s O•/d D,25
147145 <a/FCOu1-jt55 c/r.
Nare /. d. flare VagelOba/! - L. L/9f.1 'Vde?OA/ian -O. Oen3e+ l/ /a4i'm
a -
EJJPJC .TUQ✓GY 3•CR✓icC�/NC � ,
¢7 fGOEr2r4G .3'r. --S4LEM�,M93J. O/97a
TADLE OF y.9CUzmJ O.0 n
MgN!'�''iNG �EFF/C/Gh'T OF .POUCNNE�3,T.
FROM TO UJE
C,4aJT /QON OO/Q O.O/5 O.O/S
, • .CONC.QGTe' 0.0/L O.O/5 OO/5
/I'F3E•�TOJ CEMENT . .D•O/O O.O/Z 0.0//
COzz. UPJCOHTEp (Ae"CORr2) 0.024 0.02(0
He q Ca reofr2S.pgvco o•OP/ 0.023
3iNOOT/'/ ,Q.?PN�LT G/N/Nrq O:O/2 - O•o/S
CEMENT-G/NGp GHnh/.EL.� O.Ole O.O/B .0.0/¢
CEMENT- E�UBBLE 0.0/7 0.036
O�Y- 2uf36Ge- - D•o25 D.035
La4QTN- STPU/<i!✓TEUN/FOAM O-a/7 O.o25 0.023
Cq'WO POCK CUT• JTQ�7/G7NTEC/hVr04 O.025 0.035 O.033
qN0
p/TCNG`J IOWWC7E40 CA1Q-YI'/ELO 0.025 0.0.93 0.0ea
Eg2TN BOTTOM RUBBLE J/OdJ '0,029 0,030 - O. e33
' /'/gTU,2gG CLL*gN ST.2q/G�F/T ffq�/KS O.OQS 0r 038
7rea4M /y/NO/NC7 PooGa q 3s�ogt s ` 0.033
' .. GN,4KNL'LS
o,oso e.oBo
\ r
n4
. b
• y.
a
PLAN OF L.4/VO
.5AL EA11
Property of
NAWKEAG RE4LTY
MANAGEMENT CORP
Scale: /in. = SOf'f June 7. 1974
V I OF A- ;
O� ROBERT
JAMES
v SOTIROS y
,p No.26094
�Q/STERN �F
GNU Sum�-�O
�vo,Pry G
JET ,
�RRy A
G� R-168.43 Noob HI L L
4=44L20 .... - 915'54.1 w R:237.50
2
A = AREA= o AREA
th i% /l, /$Z S.F. t a o
N � �
D
93.09 120.22
�-909°12 48•E'
f A� �R53� g,k ±
�o
z
�AO �T�I ca
REA ,+
20,
-1 o 5,4
aser�e /
��f 611e� Go• �
f
ho F
_Lw
T(, u P rAL
/
I
9B ' i )
1jQUM1<LAUC, RZ-41.TY CORP,
if TO
l // / � h ,Q�Ia,P.4D� LDT f �X TeNO D,ZAIN
/
i I E x Sur(/e y 6e/'vlC2, /r7C.
1 )
�.�'.G7/¢•.. /inch Of fee/
1 I /
c•Oi72pt//;3.
�� �� 1 t 2 /ndicafes /vvr2s�a c/ cor,fou/-n.
Goa/err,
fiJfi�.g Mo��riai'-
C✓eo; � 65717A Run male-/a/ e�,gruke/7 Ledl�e -
\ I ' i�/v iYoa�; Tr4.3h o/-/�Crr/o%i�ror� Ax
ofe�io/s.
1 \ 1 1 1 � J
1 i I Oibp./nr✓. se.0
i9tpoae-d
1 1 1 \ -•PAP D.M N. f
oil
bp
-
I
\l\ �1
T TAG A.eE.9 D�F/GG/Nh�SO j X.9LYJ•�J=�.'J' DDD�.�IFT. \ I 1 1 � • ' \
1 I I 1
i Ot ' 1
I �
• 1 1 1 t ....'I. xc� Cane.�/¢+�er
1 1
.1 1
1
- i
22• a.
of n;gss s
EIILA14D \S�'
S.
.� ���?O�h'P ND
11709
COirllr/° 7676¢
by F
AN �
4
i
r 1 I I I I I
V I I I I I I
1
r / r
TO
QECgPA0,E— LOT 47 E97-Zf
/ 1 /
S'A[-eM, MAss.
/3 /.974
1 i j 1 I
I I I I E.3.�x Surve y Services, /roc.
47 Fjc%za/Sf— 5a/1/r�,
I \ 11 I I
top
1 I
\ \ \\ I\ I � ��/Q • . , /inch = 2D f�df
\ , 1 NOTAf.S:
\ I
-
`\ It it i I 4. fi%/ii�g Mnfci
\
No hoar, T�a.5h
1 \
1 \ I 1
\
I I 1 I I j PrnP./-v✓ SO.D
r I I I Pia/oos�o' Comma. /i'car/.,in//
I I 1 It
U�
&PIt
It
It
\ y I
� o�hl 11 J I
\ ,
t It
\
I
\ \\\ I I I I
C x
t a"
w
117
s
a
222 A J a .
LAIM. sos 'o �y
POvi scc/ - Z9 oclabee !97¢
COMMONWEALTH OF MASSACHUSETTSSALEM CONSERVATION- COMMISSION
ONE SALEM GREEN.
CITY/$ft3t�Fx&R Salem UK MAS& 01970
APPLICATION FOR CERTIFICATE OF INSPECTION
Date ( ) Fee Required (Amount )
( ) No Fee Required
In accordance with the provisions of the Massachusetts State Building
Code , Section 108 ,15 , I hereby apply for a Certificate of Inspection for
the below-named premises located at the following address :
Street and Number 116 R. Highland Avenue
Name of Premises
Purpose for Which Premises is Used Medical Office Bldg.
License( s ) or Permit ( s ) Required for the Premises by Other Governmental
Agencies :
License or Permit Agency
Certificate to be Issued to Naurnkeag RPaI y Managlement Corporation
Address 116 Highland Ave .
Owner of Record of Building As Above
Address
Name of Present Holder of Certificate
Name of Agent , if any =a r!• �,paj vo ,,,
G9IGN-ATURE
TITLE OF PERSON 0 TITLE HOM
CERTIFICATE IS ISSUED OR HIS
AUTHORIZED AGENT xz - /
AST E
INSTRUCTIONS :
1 ) Make check payable to :
2) Return this application with your check to :
PLEASE NOTE :
1 ) Application form with accompanying fee must be submitted for each build-
ing or structure or part thereof to be certified .
2 ) Application and fee must be received before the certificate will be issued.
3) The building official shall be notified within ten ( 10) days of any change
in the above information.
CERTIFICATE # EXPIRATION DATE :
FORM SBCC-3-74
SALEM CONSERVATION COMMISSIOR
ONE SALEM GREEN
SALEM,, WSS,_ 01910
9 A.
� 7 'I
Jux i 3 !2 �� ; 9
71
CITY
MAY 17, 1977 SALE, , ASS�-iC�
DECISION ON THE PETITION OF NAUMKEAG REALTY MANAGEMENT FOR A SPECIAL PERMIT TO
CONSTRUCT A BRICK MEDICAL OFFICE BUILDING AT THE REAR OF 116 HIGHLAND AVENUE.
A hearing on this Petition was held Tuesday, May 17, 1977 with members Jane
Lundregan, Arthur Labrecque, Pulliam Abbott and Associate Members James Boulger and
Douglas Hopper as voting members present. Notices were sent to abutters and others
in accordance with Mass. General Laws, Chapter 808.
Richard E. McKeage represented the Petitioners before the Board. The Petitioners
wish to construct a two story medical office building 76 x 28 feet. Said building
would contain two medical office suites on each floor. The building falls within 1500
feet of Salem Hospital. The Petitioner stated that he has been at his present location
for nine years and has developed the land in back of the existing building at considerable
expense and has complied with all the requirements of the Conservation Commission. The
Petitioner stated that the land was not suitable for single family dwellings and that if
they are unable to build on it they would suffer financial hardship as the land would be
useless for any other purpose.
�- The plan presented for the building showed that there will be 30 parking spaces to.
service the building.
Several abutters appeared in opposition to the granting of the Petition. The
abutters objected to further commercial activity in an R-1 Zone and felt that the permit,
if granted, would adversely affect their property values.
The Board voted to grant the Special Permit requested with conditions, to wit, the
Board"will allow the construction of a two story brick medical office building, 76 ft x 28 fl
with parking for 30 cars. The entrance way to the property will be 24 feet wide with granitf
curb cuts and the sidewalk must be level right to the drive way entrance. The Board .found
that the property could not be suitable for a single family dwelling and that the construc-
tion of the medical office building would be the best use for the property., The Board found
that it could grant the Special Permit requested without substantial detriment to the
surrounding neighborhood and without derogating from the intent of the Salem Zoning by-law.
GRANTED
Appeal from this Decision, if any, shall be made pursuant to Section 17 of the Mass-Gen.
Laws, Chapter 808, and shall be filed within 20 days after the date of filing of this
Decision in the office of the City Clerk.
Pursuant to Mass. General Laws, Chapter 808, Section 11, the variance or Special Permit
granted herein, shall not take effect until a copy of the Decision, bearing the certifica-
tion of the City Clerk that 20 days have elapsed and no appeal has been filed or that, if
such an appeal has been filed, that it has been dismissed or denied, is recorded in the
South Essex Registry of Deeds and indexed under the nam=_ of the owner of record or is
recorded and noted on the oemer's Certificate of Title. Copies of this Decision have been
filed with the Planning Board and the City Clerk.
BOARD OF APPEAL. .