Loading...
64-43 - 60 Grove Street - CONSERVATION COMMISSION Ot C t Conservation Commission Salem, Massaelmsetts 01970 Telephone )617) 745-5056 �essnc June 6, 1979 Salem Oil & Grease 60 Grove Street Salem, Mass. 01970 Gentlemen: Enclosed please find the Order of Conditions that were issued to you from the Salem Conservation Commission. You are reminded at this time that there is a 10 day appeal period from the day you receive these Order of Conditions before you can begin any work. Very truly yours, Susan Madison Conservation Aide SM/sam Enc. n -n WETLANDS PROTECTION ACT 7 V 71/00 ij MASSACHUSETTS G.L. C.131 sec.40 7 1 S NOTICE OF INTENT ALL PARTS OF THIS FORM SHALL BE COMPLETED UNDER THE PAINS AND PENALTY OF PURJURY INCLUDING THE ENVIRONMENTAL DATA FORM ATTACHED HERETO AND MADE A PART HEREOF OR THE FILING MAY BE CONSIDERED INCOMPLETE. DATE: May 2 , 1979 1. Notice is hereby given in accordance with the provisions of G.L. C.131 s.40 that the proposed activity as submitted herein falls within the jurisdiction of said statute, and is located in the City/Town Salem, Mass. STREET 60 Grove St. Recorded at the Registry of Deeds , Book Page ' Plan registered 5/1/79. Book and Page # will be forwarded. Certificate (if registered) 2. The name(s) , address and telephone number of .owner(s) of the subject land are: NAME ADDRESS TELEPHONE NO. Blubber Hollow Realty Trust, 60 Grove St. , Salem, MA 745-0,585 3. I have filed identical Notices and plans by Certified Mail with the following: Conservation Commission (original) Date 23/79 Mass. Department of Environmental Quality Engineering c/o Tewksbury Hospital , Tewksbury., Massachusetts 01876 Date 5/3/79 ATT' N: APPLICATIONS (3 COPIES) ( 4. Have all permits, variances and approvals as required by C.131 s.40 been obtained ? NO ( yes or no ) . Attach copies to original Notice of Intent. 5. Enclosed is Statutory Filing Fee of $25.00, Payable to City or Town. 6. The name, address and telephone number of the owner's representatives (if any) are as follows: NAME ADDRESS TELEPHONE NO. Attorney Hale & Dorr 60 State St. Boston, MA 742-9100, 8 Marblehead St. ENGINEER Gallagher Engineering, Inc. N. Andover, MA - 373-1228 AGENT 7. The purpose of the project is: (Us " addition she is if necessary) *See refer- ence on last page 8. Owner's (or agents) signature nBn WETLANDS PROTECTION ACT i i Environmental Data Form 1. All parts of this form are to be filled out by the applicant or his agent under the provisions of G.L. C.131 s.40. 2. Where a section is not relevant to the application in question, the words "NOT APPLICABLE" should be entered on the appropriate line. NAME OF APPLICANT SALEM OIL & GREASE CO. ADDRESS OF APPLICANT 60 GROVE ST. , SALEM, MA MUNICIPALITIES WHERE ACTIVITY IS PROPOSED AND NOTICE IS FILED. SATFM _ MARS_ DESCRIPTION OF PROPERTY INVOLVED IN APPLICATION (including the ,dimensions of any existing buildings,decks,marinas, existing cesspools) . See Site Drawing L-1 in attached plan Within the area of 641X72 ' building DESCRIPTION OF MODIFICATIONS PROPOSED 1.Excavate to elevation 61o" @ pipe ON THE SITE, including grading, dredging, tunnel and sump tank. removal of vegetation, ect. 2.Auger and drive foundation pile. 3 .Construct a 64 ' X72 ' X32 ' high, steel, and concrete industrial building. A. SOILS 1. United States Department of Agriculture Soil Types ( show on map ) See attachments 2. Permeability of soil on the site. (dates of testing) Not applicable 3. Rate of percolation of water through the soil. (Dates of testing) Not applicable B. SURFACE WATERS 1. Distance of site from nearest surface water ( Date of measurement ) 10 ' 0" (See Site Drawing L1) (September, 1978) From residential lots on embankment above 2. Sources of runoff water. proposed site , from the embankment itself, from several rooftops and from the driveway adjacent to the new Building. Rate of runoff into the proposed storm 3. Rate of runoff from the site draim iS, calculated to be approximately 770 qpm. based on a 50-year storm( 3'.' of rainfall/hr) 4. Destination of runoff water Proposed storm drain shown on Drawing L-1 5. Chemical additives to runoff water on site. None C. GROUND COVER None on the portion of the site. -con- .'. 1. Extent of existing impervious tributing runoff to the proposed ground cover on site storm drain. 2. Extent of proposed impervious Roof of new building 64 'X72 ' = 4608 ft ground cover on site 3. Extent of existing vegetative Only. on the aforementioned embankment. cover on the site 4. Extent of proposed vegetative cover on site No change D. TOPOGRAPHY 11. 5 feet M.S.L. @ New Building 1. Maximum existing elevation on site 2. Minimum existing elevation on site 9. 0 feet M.S.L. @ New. Building 3. Maximum proposed elevation on site 11. 5 feet M.S .L. @ New Building 4. Minimum proposed elevation on site 6 . 0 feet M.S.L. @ Sump tank andpipe tunnel of New building Site planned to be @ 5. Description of proposed change in topography existing elevation except @ locations of sump tank and pine t„nnel which are at elevation 610" . No change beyone limits of Bldg. E. GROUND WATER 1. Minimum depth to water table on site (at time of filing) 5 feet 2. Maximum depth to water table on site (at time of filing) 6 feet 3. Seasonal maximum ground water elevation 8 . 5 feet M.S .L. F. WATER SUPPLY 1. The source-of the water to be provided to the site Existing 8" water main already on site 2. The expected water requirements (g.p.d.) for the site 8588 gal./day average with 1, 350 , 000 gal. /year maximum 3. _ The uses to which will be put production and human needs Sewage disposal is to be an on- G. SEWAGE DISPOSAL site effluent pre-treatment system designed to remove excessive hydro- 1. Sewer disposal system (description carbon contaminants. Its effluent and location on the site, of system empties into the South Essex Sewage n; ci-rinfc Grplza c+ Line . See Site Drawing L-1. 2. Expected content of the .sewage effluents (human waste, pesticides, Treated effluent will stil contain detergents, oils, heavy metals, other chemicals) some hydrocarbons and all untreated human waste. . 3. Erected daily volumes of sewage 53 , 000 g.p.d. average H. SOLID WASTE 1. Estimated quantity of solid waste Not applicable to be developed on the site 2. Method for disposal of solid waste Not applicable 3. Plans for recycling of solid waste Not applicable I. BOAT YARDS,DOCKS AND MARINAS 1. Capacity of marina, (number of boats running feet) Not applicable 2. Description of docks and floats (site, dimensions) Not applicable 3. Description of sewage pumpout facilities (type of waste disposal) Not applicable 4. Description of fuelling facilities and fuel storage tanks Not applicable 5. Description of fuel spill prevention measures and equipment Not applicable J. IMPACT OF PROPOSED ACTION APPLIED FOR 1. Effects on plant species ( upland and marine ) None presently exists at the proposed site. 2. Effects on marine species (shellfish, finfish) Not applicable 3. Effects on drainage and runoff Construction of building causes need for storm drain to carry away 4. Effects on siltation of surface waters None 5. Effects on groundwater quality I None 6. Effects on surface water quality Eliminates present leakages and prevents future ones from entering raterways or ground urface. K. ALTERNATIVES TO PROPOSED ACTION As this ' building 'is designed to.contain . 1. Discribe alternatives to the possible spill events (SPCC Plan) , requested action eliminate leakages , prevent contamination be energy efficient, and to improve pro- duction efficiency, there really is no other alternative. 2. Describe the benefits of the requested action over the alternatives Not applicable. *7. The project is the construction of a new sulfonation building built of cast-in-place concrete, steel framing, and masonry block. The purpose of the project is to house production facilities that are presently located in two other existing structures that are in need of extensive renovation. t' ea E- NOTICE OF INTENT ( PROJECT Construction of a new industrial building. • „ OWNER: Salem Oil & Grease Co. , 60 Grove St. , Salem, Mass. ps,_ LOCATION: Salem, Mass. Refer to the following Locus Map and the re' reproduction of part of the U.S.G.S. Quadrangle Sheet. Site Drawing Ll shows the .names of the surrounding streets , z: Drawing Al shows additional grade elevations. '" USE: This new building, to be known as the Sulfonation Building, sh611 be used to house production facilities presently contained in the existing Tobin and Sulfonation Buildings . Thus , all production will be abandoned in those two existing buildings . REASONS FOR CONSTRUCTION : There are two basic reasons for construction of the new building: 1. The existing buildings cannot be economically modified to confine both actual leakages to the adjacent river and potential oil spills in accordance with the Federal Guidelines for the Preparation and Implementation of a Spill Prevention K Control and Countermeasure Plan. 2. The physical " condition of the two buildings ,is such that their maintenance costs are escalating and becoming very expensive . Costs for their rehabilitation exceed the cost for a new single structure to house the processes from both. r. A spinoff effect of this new facility- will be its greater efficiency for production and its energy conservation. .a; OTHER RELATED ON-GOING PROJECTS FOR SALEM OIL & GREASE: 1. We are finalizing a Spill Prevention Control and Countermeasure Plan for all areas onsite subjected to a possible "spill event" . This includes the new building. 2 . We and Sea Plantations are developing the waste collection system And waste treatment facility respectively for treating all industrial wastes that are delivered to the sewer. The waste discharges from the new building will be tied directly into these other projects and will result in a spill-free , pollution-free system that cannont and will not contribute pollutants to the ground;,, and/or the adjacent North River. ha'g0 2 '3 WATERSHED AREA: In the 'immedrate are; a' of this `proposed construction' (South E . of the North River 'Carn1) the land is below the 100-year + ' . .' flood level of elevation 11. 00 ' . See the Site Plan, L1 ; However , within 100 feet further south, the land, risesi' sharply out of this flood plain up to Beaver Street. The storm runoff contributions from this land and some existing", 3 +�. buildings thereon percolate into the sandy hillside or follow the sloping grades of the unpaved roadway to the North River. 'yf' Because the new building will block the pathway of some of - p� • the runoff, a storm drain system shall be put into the ' ground to carry storm water westerly to a manhold approximately 110' west of the existing Finishing Building' , and thence northerly to the river. e ; WATER QUALITY: Effluents from! the existing Sulfonation System are presently traveling through the ground and through the river wall from inside the building and from the sewer line into the river. ` . The new building ,and its new sewer will eliminate this con- P tamination. The tightness and materials used in the new building will eliminate future problems. The roof dra'ins 'for storm water on the new building will be the only direct connection to the river. There won' t be any e r` contaminated water in the discharge. Th South Essex Sewe District does not want uncontaminated water dumped into their " sewer. . Pollutants , from this site , entering the river upstream will be eliminatedwhen the other projects are built. 4,oll Fresh water for fire protection and production will come from the existing 8-inch main that is on site. See Drawing"L1?. The construction of this building will not cause any problem to the river.., Piles will be driven into the ground to support the building. Concrete pile caps , at and above grade , will support cast-in-place concrete grade beams and floor slab which, ,.in turn, support the rest of the building. The floor slab, at elevation 13. 00, will be two feet higher than the 100-year flood elevation of 11. 00 feet. Only the sump tank , , which is a fiberglass-lined, cast-in-place concrete , totally tight structure , and pipe tunnel -which is water tight, cast in place concrete , will extend below flood plain to elevation 6. 0 . See Drawings A-3 , S-3 , S-.4 , and S-6 . Therefore this new building will be a totally, non-polluting...., structure designed to efficiently serve the Owner, Salem 011 and Grease Co. K R•, SECTION OK i w DRAWINGS INDEX No. of Dwg. Dwa. No. Discipline Description 1. Title Drawing 2. L1 Site Plan and Borings 3. Al Architectural Existing Conditions/Abb- reviations and Symbols 4. A2 Existing Conditions/Photos 5. A3 " � Floor Plans/Tank Schedule G. A4 " - - - Roof Plan and Ddtails " m 7. A5 " Elevations B. A6 ". Building Sections 9. A7 " Wall Sections 10. A8. " Wall Sections . 11. A9 Wall Sections and Details 12. A10 Opening Schedules and Details 13. All Stair Details 14. Al2 Stair Details 15. A13 " Details/Enclosed Bridge +^ 16. A14 Details/Building and Catwalk .. OK-1 9408 No of Dwq. , Dwg. _ No. Discipline Description wM. 17 S1 Structural Pile Foundation Plan & Details is S2 Pile Cap Drainage Details 19 S3 First Floor Plan & Sections 20 S4 Cast-In-Place Beam Schedule 21 S5 Steel Framing Plans & Details 22 S6' " Steel Framing Details & Pri-Formed Sections s 23 P1 Mechanical Floor Plane ,• Plumbing 24 HV1 Heating & Floor Plans 3 Ventilating , 25 HV2 Details ' 26 Ei Ele6trical Electrical'Power/Plans & Details 27 E2 Lighting Plans and Details 28 E3 " Electrical Details END OF SECTION c OK-2 IIS $ 9405 r d rplb li fj w BY..6rr-WA.........DATE4-la.-3? SUBJECT....UPLIFT CALCULATIONS SHEET NO. --/AOF /A CHKD. BY..............I DATE- .-........ 1�e.....F776-7'0.iU ... .............. JOB NO..:... ....................... ............................................................... ..... .......................................................... ... PrP:, -Too4r-Lo, Irk 4evn� Ii. co ;UNNPL r33 (; 1 1� v I j� , vi -7 20 s P:r. P—t 00 '4 x,20 x s- SOmip 5dacsj RZe 0 9? = zjd, b A- T, F.. 4 ToTL p Fr : 40 '2. 4 -t -e, 4 4S X2,4 A 1, 2 Z', 44 6, � or 6-0 t CPE7'F :aFl0VJ 11,06' /sG 45. �'-1 4, r, V)61 F+r C;r cc 06. S6$, 54 � 8--7.G v l 3 '9', 40 -rqrkL GF OF CUplaQtl his*vve 11 ,00 = 0S6' 6 V,6-V'X�- cr eb Vic, -zr eip,le 2 )( Mlb -= -�17 k 7-OTP�L 51* Of CDh1C. RLDCr, nOVEF 11,CO ' � 745-,C. '7,r eK4ericremo? co0c, ?l0(,k zr -34r,& )45-T;rc =. Mook walls) TOTAL Coy; 1).L.s From ZN"Fl � kooF s-, @ COL L i m r-- D. TOTAL vffl6t4T or FIPE"TOUPS% I '5014f L=Wa-05Ll2E PARTIAL 51.Di .AEOYF-=3 T 1, 5-5 7-07r,AcL UP1.1 FVr Yeo ecr 5 , 44't W11 $-5-k ?/r, 11 DUB TO 1&e1,V19Z-1e J . n }] 3 'tiw, :� ; g �, l�uitittg �uarl (One Tatem (6reen June 22, 1979 SPECIAL PERMIT WETLANDS AND FLOOD HAZARD DISTRICT SALEM OIL & GREASE COMPANY 60 GROVE STREET SALEM, MASSACHUSETTS 01970 On Thursday, June 21, 1979, the Planning Board of the City of Salem held a public hearing regarding the application of Salem Oil & Grease Company, for a Special Permit under Section P, Wetlands and Flood Hazard Districts of the Salem Zoning Ordinance, with respect to the construction of a new sulphonation building for Salem Oil & Grease Company, 60 Grove Street, Salem, Massachusetts.. At a regularly scheduled meeting of the Planning Board on June 21, 1979, the Board voted, by a vote of six in favor, none opposed, to approve the application as complying with the requirements for the issuance of the permit with the following condition: 1. The work shall be done in accordance with the site plan prepared by Frank E. Gallagher Engineering, Inc. , 8 Marblehead St. , N. Andover, Mass, entitled New Sulfonation Building for Salem Oil & Grease Company, Salem, Mass. , L-1, A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8, A-9, A-10, A-11, A-12, A-13, A-14, S-1, S-2, S-3, S-4, S-5, S-6, E-1, E-2, E-3, P-1, H-1, H-2. I hereby certify that a copy of this decision has been filed with the City Clerk, and a copy is on file with the Planning Board. This Special Permit shall not take effect until a copy of the decision bearing the certification of the City Clerk that twenty days have elapsed and no appeal has been filed or that if such appeal has been filed, and it has been dismissed on denied, is recorded in the Essex County Registry of Deeds and is indexed in the grantor index under the name of the owner of record or is recorded and noted on the owner's certificate of title. The fee for recording or regis- tering shall be paid by the owner or applicant. �J ,oa,q z /(moi WALTER POWER, III Chairman, Planning Board WP/jar THE COMMONWEALTH OF MASSACHUSETTS Department of Environmental .Quality Engineering Metrespo.l_itan_.Bo-sf uzr--x zr Ucsr_.aeg Lona1 Office Tewksbury Hospital Tewksbury, Massachusetts 01876 Date : May Zia 1979 Re : SALMI VILE# 64-43 This Department is in receipt of an application under General Laws , Chapter 131, Section 40, filed in the name of: Salem Oil 6 Grease Co. 60 Grove St. Salem, MIA Owner of Land (if different) : This project is in the City/Town of SAM and is located Cro0e Street ( ) This project has been assigned the File Number shown above . ( ) No File Number has been assigned, since the filing as received is considered-in,aomplete. To complete requirements for filing, please submit the following : Notice of Intent ( ) Plans ( ) Locus Map ( ) Thomas F. McLoughlin Regional Environmental Engineer Metropolitan Boston-Northeast Region TFM/Ekat/mmr cc : Conservation Commission �,_. . . . ,,; . . . � �� e. i. 11 r� � t Y� ?• ( � � v 7 p. _ _. � . .. � 1 7,. { ni �r - y iL