64-43 - 60 Grove Street - CONSERVATION COMMISSION Ot C
t
Conservation Commission
Salem, Massaelmsetts 01970
Telephone )617) 745-5056
�essnc
June 6, 1979
Salem Oil & Grease
60 Grove Street
Salem, Mass. 01970
Gentlemen:
Enclosed please find the Order of Conditions that were issued to you
from the Salem Conservation Commission.
You are reminded at this time that there is a 10 day appeal period
from the day you receive these Order of Conditions before you can begin
any work.
Very truly yours,
Susan Madison
Conservation Aide
SM/sam
Enc.
n -n
WETLANDS PROTECTION ACT 7 V 71/00
ij MASSACHUSETTS G.L. C.131 sec.40 7 1
S
NOTICE OF INTENT
ALL PARTS OF THIS FORM SHALL BE COMPLETED UNDER THE PAINS AND PENALTY OF PURJURY INCLUDING
THE ENVIRONMENTAL DATA FORM ATTACHED HERETO AND MADE A PART HEREOF OR THE FILING MAY BE
CONSIDERED INCOMPLETE.
DATE: May 2 , 1979
1. Notice is hereby given in accordance with the provisions of G.L. C.131 s.40 that the
proposed activity as submitted herein falls within the jurisdiction of said statute,
and is located in the
City/Town Salem, Mass. STREET 60 Grove St.
Recorded at the Registry of Deeds , Book Page '
Plan registered 5/1/79. Book and Page # will be forwarded.
Certificate (if registered)
2. The name(s) , address and telephone number of .owner(s) of the subject land are:
NAME ADDRESS TELEPHONE NO.
Blubber Hollow Realty Trust, 60 Grove St. , Salem, MA 745-0,585
3. I have filed identical Notices and plans by Certified Mail with the following:
Conservation Commission (original) Date 23/79
Mass. Department of Environmental Quality Engineering
c/o Tewksbury Hospital , Tewksbury., Massachusetts 01876 Date 5/3/79
ATT' N: APPLICATIONS (3 COPIES)
(
4. Have all permits, variances and approvals as required by C.131 s.40 been obtained ?
NO ( yes or no ) . Attach copies to original Notice of Intent.
5. Enclosed is Statutory Filing Fee of $25.00, Payable to City or Town.
6. The name, address and telephone number of the owner's representatives (if any) are
as follows:
NAME ADDRESS TELEPHONE NO.
Attorney Hale & Dorr 60 State St. Boston, MA 742-9100,
8 Marblehead St.
ENGINEER Gallagher Engineering, Inc. N. Andover, MA - 373-1228
AGENT
7. The purpose of the project is: (Us " addition she is if necessary) *See refer-
ence on last page
8. Owner's (or agents) signature
nBn
WETLANDS PROTECTION ACT i
i
Environmental Data Form
1. All parts of this form are to be filled out by the applicant or
his agent under the provisions of G.L. C.131 s.40.
2. Where a section is not relevant to the application in question,
the words "NOT APPLICABLE" should be entered on the appropriate
line.
NAME OF APPLICANT
SALEM OIL & GREASE CO.
ADDRESS OF APPLICANT
60 GROVE ST. , SALEM, MA
MUNICIPALITIES WHERE ACTIVITY IS PROPOSED AND NOTICE IS FILED.
SATFM _ MARS_
DESCRIPTION OF PROPERTY INVOLVED
IN APPLICATION (including the ,dimensions
of any existing buildings,decks,marinas,
existing cesspools) .
See Site Drawing L-1 in attached plan
Within the area of 641X72 ' building
DESCRIPTION OF MODIFICATIONS PROPOSED 1.Excavate to elevation 61o" @ pipe
ON THE SITE, including grading, dredging, tunnel and sump tank.
removal of vegetation, ect. 2.Auger and drive foundation pile.
3 .Construct a 64 ' X72 ' X32 ' high, steel,
and concrete industrial building.
A. SOILS
1. United States Department of
Agriculture Soil Types ( show on map ) See attachments
2. Permeability of soil on the site. (dates of testing)
Not applicable
3. Rate of percolation of water through
the soil. (Dates of testing)
Not applicable
B. SURFACE WATERS
1. Distance of site from nearest
surface water ( Date of measurement )
10 ' 0" (See Site Drawing L1) (September, 1978)
From residential lots on embankment above
2. Sources of runoff water. proposed site , from the embankment itself,
from several rooftops and from the driveway adjacent to the
new Building.
Rate of runoff into the proposed storm
3. Rate of runoff from the site draim iS, calculated to be approximately
770 qpm. based on a 50-year storm( 3'.' of rainfall/hr)
4. Destination of runoff water Proposed storm drain shown on Drawing
L-1
5. Chemical additives to runoff
water on site. None
C. GROUND COVER
None on the portion of the site. -con- .'.
1. Extent of existing impervious tributing runoff to the proposed
ground cover on site
storm drain.
2. Extent of proposed impervious Roof of new building 64 'X72 ' = 4608 ft
ground cover on site
3. Extent of existing vegetative Only. on the aforementioned embankment.
cover on the site
4. Extent of proposed vegetative
cover on site No change
D. TOPOGRAPHY
11. 5 feet M.S.L. @ New Building
1. Maximum existing elevation on site
2. Minimum existing elevation on site 9. 0 feet M.S.L. @ New. Building
3. Maximum proposed elevation on site 11. 5 feet M.S .L. @ New Building
4. Minimum proposed elevation on site 6 . 0 feet M.S.L. @ Sump tank andpipe tunnel of New building
Site planned to be @
5. Description of proposed change in topography existing elevation except
@ locations of sump tank and pine t„nnel which are at elevation
610" . No change beyone limits of Bldg.
E. GROUND WATER
1. Minimum depth to water table on site (at time of filing) 5 feet
2. Maximum depth to water table on site (at time of filing) 6 feet
3. Seasonal maximum ground water elevation 8 . 5 feet M.S .L.
F. WATER SUPPLY
1. The source-of the water to be provided to the site
Existing 8" water main already on site
2. The expected water requirements (g.p.d.) for the site
8588 gal./day average with 1, 350 , 000 gal. /year maximum
3. _ The uses to which will be put
production and human needs
Sewage disposal is to be an on-
G. SEWAGE DISPOSAL site effluent pre-treatment system
designed to remove excessive hydro-
1. Sewer disposal system (description carbon contaminants. Its effluent
and location on the site, of system empties into the South Essex Sewage
n; ci-rinfc Grplza c+ Line . See Site
Drawing L-1.
2. Expected content of the .sewage
effluents (human waste, pesticides, Treated effluent will stil contain
detergents, oils, heavy metals, other chemicals) some hydrocarbons and
all untreated human waste. .
3. Erected daily volumes of sewage 53 , 000 g.p.d. average
H. SOLID WASTE
1. Estimated quantity of solid waste Not applicable
to be developed on the site
2. Method for disposal of solid waste Not applicable
3. Plans for recycling of solid waste
Not applicable
I. BOAT YARDS,DOCKS AND MARINAS
1. Capacity of marina, (number of boats running feet) Not applicable
2. Description of docks and floats
(site, dimensions)
Not applicable
3. Description of sewage pumpout
facilities (type of waste disposal)
Not applicable
4. Description of fuelling facilities
and fuel storage tanks
Not applicable
5. Description of fuel spill prevention
measures and equipment Not applicable
J. IMPACT OF PROPOSED ACTION APPLIED FOR
1. Effects on plant species
( upland and marine ) None presently exists at the proposed site.
2. Effects on marine species (shellfish, finfish)
Not applicable
3. Effects on drainage and runoff Construction of building causes
need for storm drain to carry away
4. Effects on siltation of surface waters
None
5. Effects on groundwater quality I
None
6. Effects on surface water quality Eliminates present leakages and
prevents future ones from entering
raterways or ground urface.
K. ALTERNATIVES TO PROPOSED ACTION As this ' building 'is designed to.contain .
1. Discribe alternatives to the possible spill events (SPCC Plan) ,
requested action eliminate leakages , prevent contamination
be energy efficient, and to improve pro-
duction efficiency, there really is no
other alternative.
2. Describe the benefits of the requested
action over the alternatives Not applicable.
*7. The project is the construction of a new sulfonation building built
of cast-in-place concrete, steel framing, and masonry block.
The purpose of the project is to house production facilities that are
presently located in two other existing structures that are in need
of extensive renovation.
t'
ea E- NOTICE OF INTENT
( PROJECT Construction of a new industrial building. • „
OWNER: Salem Oil & Grease Co. , 60 Grove St. , Salem, Mass. ps,_
LOCATION: Salem, Mass. Refer to the following Locus Map and the re'
reproduction of part of the U.S.G.S. Quadrangle Sheet.
Site Drawing Ll shows the .names of the surrounding streets , z:
Drawing Al shows additional grade elevations. '"
USE: This new building, to be known as the Sulfonation Building, sh611
be used to house production facilities presently contained in the
existing Tobin and Sulfonation Buildings . Thus , all production
will be abandoned in those two existing buildings .
REASONS FOR CONSTRUCTION :
There are two basic reasons for construction of the new building:
1. The existing buildings cannot be economically modified to
confine both actual leakages to the adjacent river and
potential oil spills in accordance with the Federal Guidelines
for the Preparation and Implementation of a Spill Prevention K
Control and Countermeasure Plan.
2. The physical " condition of the two buildings ,is such that their
maintenance costs are escalating and becoming very expensive .
Costs for their rehabilitation exceed the cost for a new single
structure to house the processes from both.
r.
A spinoff effect of this new facility- will be its greater efficiency
for production and its energy conservation.
.a;
OTHER RELATED ON-GOING PROJECTS FOR SALEM OIL & GREASE:
1. We are finalizing a Spill Prevention Control and Countermeasure
Plan for all areas onsite subjected to a possible "spill event" .
This includes the new building.
2 . We and Sea Plantations are developing the waste collection system
And waste treatment facility respectively for treating all
industrial wastes that are delivered to the sewer.
The waste discharges from the new building will be tied directly into
these other projects and will result in a spill-free , pollution-free
system that cannont and will not contribute pollutants to the ground;,,
and/or the adjacent North River.
ha'g0 2 '3
WATERSHED AREA: In the 'immedrate are; a' of this `proposed construction' (South E .
of the North River 'Carn1) the land is below the 100-year + ' . .'
flood level of elevation 11. 00 ' . See the Site Plan, L1 ;
However , within 100 feet further south, the land, risesi'
sharply out of this flood plain up to Beaver Street. The
storm runoff contributions from this land and some existing", 3 +�.
buildings thereon percolate into the sandy hillside or
follow the sloping grades of the unpaved roadway to the
North River. 'yf'
Because the new building will block the pathway of some of - p� •
the runoff, a storm drain system shall be put into the '
ground to carry storm water westerly to a manhold
approximately 110' west of the existing Finishing Building' ,
and thence northerly to the river. e ;
WATER QUALITY: Effluents from! the existing Sulfonation System are presently
traveling through the ground and through the river wall from
inside the building and from the sewer line into the river. ` .
The new building ,and its new sewer will eliminate this con-
P
tamination. The tightness and materials used in the new
building will eliminate future problems.
The roof dra'ins 'for storm water on the new building will be
the only direct connection to the river. There won' t be any
e r`
contaminated water in the discharge. Th South Essex Sewe
District does not want uncontaminated water dumped into their "
sewer. .
Pollutants , from this site , entering the river upstream will
be eliminatedwhen the other projects are built. 4,oll
Fresh water for fire protection and production will come
from the existing 8-inch main that is on site. See Drawing"L1?.
The construction of this building will not cause any problem
to the river.., Piles will be driven into the ground to
support the building. Concrete pile caps , at and above grade ,
will support cast-in-place concrete grade beams and floor slab
which, ,.in turn, support the rest of the building. The floor
slab, at elevation 13. 00, will be two feet higher than the
100-year flood elevation of 11. 00 feet. Only the sump tank , ,
which is a fiberglass-lined, cast-in-place concrete , totally
tight structure , and pipe tunnel -which is water tight, cast
in place concrete , will extend below flood plain to elevation
6. 0 . See Drawings A-3 , S-3 , S-.4 , and S-6 .
Therefore this new building will be a totally, non-polluting....,
structure designed to efficiently serve the Owner, Salem 011
and Grease Co.
K R•,
SECTION OK i
w
DRAWINGS INDEX
No. of Dwg.
Dwa. No. Discipline Description
1. Title Drawing
2. L1 Site Plan and Borings
3. Al Architectural Existing Conditions/Abb-
reviations and Symbols
4. A2 Existing Conditions/Photos
5. A3 " � Floor Plans/Tank Schedule
G. A4 " - - - Roof Plan and Ddtails
" m
7. A5 " Elevations
B. A6 ". Building Sections
9. A7 " Wall Sections
10. A8. " Wall Sections .
11. A9 Wall Sections and Details
12. A10 Opening Schedules and
Details
13. All Stair Details
14. Al2 Stair Details
15. A13 " Details/Enclosed Bridge
+^ 16. A14 Details/Building and
Catwalk
.. OK-1
9408
No of Dwq. ,
Dwg. _ No. Discipline Description
wM.
17 S1 Structural Pile Foundation Plan & Details
is S2 Pile Cap Drainage Details
19 S3 First Floor Plan & Sections
20 S4 Cast-In-Place Beam Schedule
21 S5 Steel Framing Plans & Details
22 S6' " Steel Framing Details & Pri-Formed
Sections s
23 P1 Mechanical Floor Plane ,•
Plumbing
24 HV1 Heating & Floor Plans 3
Ventilating
,
25 HV2 Details
' 26 Ei Ele6trical Electrical'Power/Plans
& Details
27 E2 Lighting Plans and Details
28 E3 " Electrical Details
END OF SECTION
c
OK-2
IIS
$ 9405
r
d
rplb
li fj w
BY..6rr-WA.........DATE4-la.-3? SUBJECT....UPLIFT CALCULATIONS SHEET NO. --/AOF /A
CHKD. BY..............I DATE- .-........ 1�e.....F776-7'0.iU ... .............. JOB NO..:... .......................
............................................................... ..... .......................................................... ...
PrP:, -Too4r-Lo, Irk 4evn� Ii. co
;UNNPL r33
(; 1 1� v I j� , vi -7 20 s P:r. P—t 00
'4
x,20 x s-
SOmip 5dacsj RZe 0
9? = zjd, b A- T, F..
4
ToTL
p Fr :
40 '2. 4 -t -e, 4 4S X2,4 A 1, 2 Z', 44
6, � or 6-0 t CPE7'F :aFl0VJ 11,06' /sG 45. �'-1 4, r,
V)61 F+r C;r cc 06. S6$, 54 � 8--7.G v l 3 '9', 40
-rqrkL GF OF CUplaQtl his*vve 11 ,00 = 0S6' 6
V,6-V'X�- cr eb Vic, -zr eip,le 2 )( Mlb -= -�17 k
7-OTP�L 51* Of CDh1C. RLDCr, nOVEF 11,CO ' � 745-,C. '7,r eK4ericremo?
co0c, ?l0(,k zr -34r,& )45-T;rc =. Mook walls)
TOTAL Coy; 1).L.s From ZN"Fl � kooF s-,
@ COL L i m r-- D.
TOTAL vffl6t4T or FIPE"TOUPS% I '5014f L=Wa-05Ll2E PARTIAL 51.Di .AEOYF-=3 T 1, 5-5
7-07r,AcL UP1.1 FVr Yeo ecr 5 , 44't W11 $-5-k ?/r, 11
DUB TO 1&e1,V19Z-1e
J .
n }]
3 'tiw, :� ; g �, l�uitittg �uarl
(One Tatem (6reen
June 22, 1979
SPECIAL PERMIT
WETLANDS AND FLOOD HAZARD DISTRICT
SALEM OIL & GREASE COMPANY
60 GROVE STREET
SALEM, MASSACHUSETTS 01970
On Thursday, June 21, 1979, the Planning Board of the City of Salem
held a public hearing regarding the application of Salem Oil & Grease
Company, for a Special Permit under Section P, Wetlands and Flood Hazard
Districts of the Salem Zoning Ordinance, with respect to the construction
of a new sulphonation building for Salem Oil & Grease Company, 60 Grove
Street, Salem, Massachusetts..
At a regularly scheduled meeting of the Planning Board on June 21, 1979,
the Board voted, by a vote of six in favor, none opposed, to approve the
application as complying with the requirements for the issuance of the permit
with the following condition:
1. The work shall be done in accordance with the site plan prepared by
Frank E. Gallagher Engineering, Inc. , 8 Marblehead St. , N. Andover,
Mass, entitled New Sulfonation Building for Salem Oil & Grease Company,
Salem, Mass. , L-1, A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8, A-9, A-10,
A-11, A-12, A-13, A-14, S-1, S-2, S-3, S-4, S-5, S-6, E-1, E-2, E-3, P-1,
H-1, H-2.
I hereby certify that a copy of this decision has been filed with the
City Clerk, and a copy is on file with the Planning Board.
This Special Permit shall not take effect until a copy of the decision
bearing the certification of the City Clerk that twenty days have elapsed and
no appeal has been filed or that if such appeal has been filed, and it has been
dismissed on denied, is recorded in the Essex County Registry of Deeds and is
indexed in the grantor index under the name of the owner of record or is recorded
and noted on the owner's certificate of title. The fee for recording or regis-
tering shall be paid by the owner or applicant. �J
,oa,q z /(moi
WALTER POWER, III
Chairman, Planning Board
WP/jar
THE COMMONWEALTH OF MASSACHUSETTS
Department of Environmental .Quality Engineering
Metrespo.l_itan_.Bo-sf uzr--x zr Ucsr_.aeg Lona1 Office
Tewksbury Hospital
Tewksbury, Massachusetts 01876
Date : May Zia 1979
Re : SALMI
VILE# 64-43
This Department is in receipt of an application under General Laws ,
Chapter 131, Section 40, filed in the name of:
Salem Oil 6 Grease Co.
60 Grove St.
Salem, MIA
Owner of Land (if different) :
This project is in the City/Town of SAM and
is located Cro0e Street
( ) This project has been assigned the
File Number shown above .
( ) No File Number has been assigned, since
the filing as received is considered-in,aomplete.
To complete requirements for filing, please
submit the following :
Notice of Intent ( )
Plans ( )
Locus Map ( )
Thomas F. McLoughlin
Regional Environmental Engineer
Metropolitan Boston-Northeast Region
TFM/Ekat/mmr
cc : Conservation Commission