Loading...
64-28 - 16 Glover Street - CONSERVATION COMMISSION `1 r. Andrew GINKUSr ; 16 Glover Street Salem 1 _ I W—C�'m m.�udyao � ivico Oc q ,., 0 m 1 e F r r s L ��a f PAL`7 4bx�j J' �w�r far)a l � a 7 t - i t } f t 1 lj fo �I ttr O c u 5 P L . - � .. �. ' .. F S CAL$ 1 2000 �) � , 1 J � �•' I FIB LY 1 Qi I '1 �EPL�c � D i 1 . r , ! I 6 ' r T- i2 rn ,a � t2 {CLAN — s � ,.Lf + _ , o' � � L� r.1 4 � F �`.d•. I1._ t .. � ' 4 i e T L 7—e> 4.. � C l.A S S �� �•• ��o N C� ET F_ +'" '''.; A 1�+—� 1� � ��✓ �'+ I !ti LT l.J j r � 'F F t All 7�� ]''' '"T ^ y_'C• �n7 Ge I � 1 r.,.rr.�,w ' I f CONDITION-- C^?d T_hU=D PAGE 2 FILE NO. 64-28 6• No work may be commenced until all appeal periods have elapsed from the order of the Conservation Commission or from a final order by the Department of Environmental Quality Engineering.. 7. No work . shall .be undertaken until the final Order, with respect to the proposed project, has been recorded in the Registry of Deeds for the district in which the land is located within the chain of title of the affected property. Copy to be furnished to issuer of this Order showing book and page prior to commencement of work. S. Upon completion of the work described herein, - the applicant shall forthwith request, in writing, that a Certificate of Compliance be issued stating that the work has been satisfactorily completed. 9. A sign shall be displayed at the site not less than two square feet or more than three square feet bearing the words, "Massachusetts Department of Environmental Quality Engineering. Number 64-28 10. Where the Department of Environmental Quality Engineering is requested: to make a determination and to issue a superseding order, the Conservation Commission shall be a party to all agency pro= ceedings and hearings before the Department. 11. The work shall conform to the following described plans and additional conditions. a. All work shall be in accordance with the drawing submitted to the Conservation Commission prepared by registered engineer Mr. John F. - —Burns, Jr. of Northeast Engineering & Survey Inc-. , of 15 Chestnut Street, Peabody ,Massachusetts. These plans have been stamped and dated. b. All debris from the collapsed wall and all construction material for the new wall shall be removed from the tidal flats adjacent to the property. c. The new wall shall not extend beyond the line of the previously existing wall. d. Stability calculations and elevation of the top wall shall be submitted to the Conservation Commission prior to the start of construction at the site (16 Glover Street, Salem ,Ma. ) N.B.--e. As of the meeting ,August 1 , 1978, the stability calculations were reviewed and found to have several discrepancies, including the width of the wall , the material to be used, and the solidness of the wall . Mr. Ken Bouffard"has been called*a'nd asked to respond to these questions by the Commission (by letter) clarifying these problems. Until these are addressed the Commission does not concur completely. . *-N.E. Eng'g.& Survey -by phone 8/3/78 to his office with a message to his j" receptionists -27- JOB A NDR wr G 1 tV �{�3 Northeast Engineering & Survey Inc. SHEET NO. OF 15 Chestnut St. PEABODY, MASS. CALCULATED By 4Q DATE Phone 532-0028 CHECKED BY DATE SCALE WALL � . No Ae n C.U. h�3 . i AS,S.yMa-i' o-JS :.. 11 FSTIn -VLIE so AL �Ar+IP .._ . i � r'� '• C •F A1`-+G L'� 1S 360. 21 �QFPQED _ SASE �02 ';TLIF ! �/vntl e T1?6V1DFS .... ..... !. CO„F•,•�1L Ei. 'T of _... < SL1 6 . �Q1C.T10_U . �l ,ems �S1vJ 1 ��aex o 7 �F S .IaI ,�G w�Q.oE CaLcyLA TNT o� IZa^rTn 1. TI C. ?l �oe cF Coror gti S op Tl �2. s7 _ _ � IA6e � , 3�co u FORM 204 AVY ko.? B ,W,TOWNen ,M 0140 In r \ JOB A tl '7 ZFW �a' 1iJ 1<US Northeast Engineering & Survey Inc. SHEET NO. Z- OF 15 Chestnut St. PEABODY, MASS. - CALCULATED BY DATE Phone 532.0028 CHECKED BY DATE SCALE \ 00 i 51 . QJ•QO.� .. .. .. C : 00 �I A g, 50 o ° �Z..... S4= Zoo ...... 4.£ O F' 1r`�SOCa� = �U + Z1� = �n�� Q� LALcyL.atlti_G 171rHFSio �� . ° IvEOCE 0 ....... � NO LF ._. ...... :.. ............. SIDF c- b °� = In lo r ..... /Gos c /,0oilo� `1F12ty<A� GCn. ,zy Ax,S n .. 5� CALC..LA?=. T'H T T 14jr L-ALL- 4, r Zo, c,s +isl Z3� G09M 204 Aw&4 Whom /VE95 iwjowneeW,Ww01489 JOB ANOQE..y G iNK VS Northeast Engineering & Survey Inc. SHEET HO. 3 DF 15 Chestnut St. 94R PEABODY, MASS. CALCULATED BY DATE Phone 532-0028 CHECKED BY DATE SCALE wnl_� D�slo,� 37 �1 �E2Pltch @2fF SIL; lip"0 ( 'FoCF..c �3 Igtl �o ec E.. PAZA 5\.oPF a NG > c o F . 1CTrr ,J .... Is ... Us�'T�c.�� 1 _. 23 -IS x 1 1zZ3 . 266.E LBS z C SiN A 2VCS x0A 94) I IIZ t_ 6S 0 -V —rwe '(YlorYlEu'T �RoOvG.PD 'b� DeCFi �r o f T i ?P:i u c, pa, ...... 'rt.I%-r.A +LX... O bV Ti'e-'("�QN aL II � pM6r.T'f r Cur C— Zr c. nl /#.SS.. wT 1D Fa^ aAgT j w'=P..`'F5_.00 _. Ibbg 7A_LTo2 .... ��_ Ns'r ovfr¢TiRwr.q _ 1 3b16 ©{ 11 , .. FORM 204 AVAMbW om NEBS '.C.7.wFxl.m..0r469 JOB Northeast Engineering & Survey Inc. SHEET NO. `} OF 15 Chestnut St. PEABODY, MASS. CALCULATED BY DATE Phone 532.0028 CHECKED BY DATE SCALE Toe CE , . IS 140eIZq...NT4I L_8S 77. ._.. FSIS TA.,CE IP.... S...L1 o rnTI M FS ,...,., Co 5- F F 1 C i F,�T . Cs �Q,iGTi,o l ! W Flc k-1...T 01.1 SO �C �a21NG = z9�o LRS + 1.55 Z 4,3 Z � �—D!S ........ SL � p� 1S(� ,.......... 7e 1GT1 uJ 2F.Y.)TANCE; -- �I CJ ZZ %i(ob`t- 7- ..... S L1D IN Z.1 tii� 1 \1 FORM 204 AvasaO18 hOm /v 8 IHC.TOvnNM.M080 O1669 4 s• /,wf , 7 CaNlep � � �v � �_ �r��' �-� � �6 � ���� y/t � � i I eve � � sv .ry EaEcuTl�E o:rzcE oP LNVT-CO i_NTAt AFFAIRS DEPAWIMENT OF EN VI:ONc:ENTe1I QUALITY ENGINEEIRING DIVISION Oz w_A-L RwAYs 100 Nashua Street Eoston, 11A 02114 July 28, 1978 Notice of Intent Andrew Ginkus Northeast Engineering & Survey Inc. maintaiu seawall and fill 15 Chestnut Street Salem Harbor Peabody, MA Glover St. Salem Gentlemen: This will acknowledge receipt of your Notice of Intent to perform work subject to Chapter 131; Section 40 of the General Laws (as amended by Chapter SIB of the Acts of 1974) . From your plan, Notice of Intent and investigation by this Division, it has been determined that: ( ) Additional information .will be required before a proper determination can be made_ Please submit asub-sketch on a small scale showing the general location of the proposed woek, names of the pond or stream and roads in the area, etc_, in order that we can properly orient the location of the project. A: United States Geological Map is ideal for this purpose. ( ) A license will not be required at this time under the provisions of Chapter 91 of the General Laws; however, a permit-may be necessary from the local Conservation Commission subject to Chaptcr ill, Section 40; also, if a United States Army,, Corps of Engineers permit is required, the applicant must apply to the Division of Water Pollution Control for a Witer Quality Certificate. ( g ) A license -will be required at this time under the provisi.onsc•of Chapter 91. of the General. Laws_ Enclosed are rules and regulations for filing under said provisions. License applications twill not be accepted unless accompanied by an Order of Conditions issued by your local Conservation Commission. All work shall be subject to all other related provisions of law; by-lzws, ordinances and regulations that may pertain. - Very truly yours &H�n JOHN J. HANNON, Y.E. Chief Engineer cc: Division of Wetlands D Conservation Commission for Salem 1AUG 41978 SALEM CORSERVATIOR COMM. Conservation Commission tialem, Massachusetts 01970 Telephone )617) 745.50.36 April 13, 1978 _r Andrew Ginkus ;.5 Glover St. Salem, MA. 01970 Pair Mr . Ginkus : '.f.ter viewing your property on April 2, 1978, the Commission has determined that the work you propose is applicable to the .'_Hands Protection Act. icicsed you will :find a Notice of Intent .as-well as "Guide- '.ines for filing .Notice Of Intent" . If you .have any questions elevant to this please contact Joseph Antonelli, Conservation .Aide, at 745-5056 . T'nank you for your cooperation in this matter Sincerely, Bradford Northrup Chairman SM/sm encl . J�ie ZJa�mm�n�e�crfiLfi ��%La4dar.�u�l�i�dd Tel.'617-851-7 et aaaac/u�aatta 0�896 I%MAY 19 1978 SALEM CONSERVATION COMM. Date: pygy iII, 199E Re: File No. 64-28 Y This Department is in receipt of an application under General Laws, Chapter 131, Section 40, filed in the name of: Andrew Ginkus 16 Glover Street Salem, Massachusetts Owner of Land (if different) This project is in the City/Town of Salem and is located 16 Glover Street g ) This project has been assigned the File Number shown above. ( ) No File Number has been assigned, since the filing as received is considered incomplete. To complete requirements for filing, please submit the following: Notice of Intent ( ) Plans ( ) Locus Map ( ) Thomas F. McLoughlin Regional Environmental Engineer Metropolitan Boston-Northeast Region TFM/Ekat/plv cc: Conservation Commission City Hall Salem, Massachusetts flit JUL, 1 '? � : _ j S�L.EiA COi��ER�lAilOiy C0��1iN. _ juEST FOR REVIE74 CO'•L�[ENT.S _ SPECIAL PEP-1T DATE: TO: ( ) Building Inspector Conservation Commission ( ) City Engineer ( ) Other: ( ) Board of Health Attached please find the application referenced below. The Planning Board requests that you review this application relative to Section VII of the Zoning Ordinance. We would appreciate your completing the form below and returning it to us. Notice of the public hearing for this application will be forwarded to you. ( DC) WETLANDS & FLOOD HAZARD DISTRICTS ( ) CLUSTER DEVELMZENT y(� ) PLANNED UNIT DEVEL02_-C-:NT APPLICANT: PROJECT NAi E & ADRESS: C-�Lf a)e� CONTACT PERSONS AND PHONE: 79s--6 I l Lf CN's c�-�G"n Applicant: r� 9�f� 3q-) _ City: MLMENTS DUE BY: (Failure to comment within 35 days shall be deemed lack, of opposition.) (� Concur with proposal (Explain on reverse side) ( ) Need more information (Explain on reverse side) ( ) Cannot concur with proposal (Explain on reverse side) Comments included 77U REVI�IJER'S S GNATU4 ORDER WETLAND PROTECTIO_•i ACT G.L. C. 131 s. 40 TILE NUMBER : 64_28 PROJECT LOCATION: 16 Glover Street Mr. and Mrs. Andrew Ginkus CERT. MAIL NO: Salem ,Ma. 01970 16 Glover Street REGISTERED MAIL 304 . Salem ,Massachusetts 01970 30 9 RE: NOTICE OF INTENT AND PLANS DATED: DATE OF RECEIPT BY 11'ay 16, 1978 CONSE3VATION COyMISSION:May 18, 1978 DATE OF PUBLIC FEARING: June 6, 1978 and a continuation to June 20 1978 Pursuant to the authority of G.L. C. 131 s. 40, the SALEM CONSERVATION COMMISSION has considered your notice of intent and plans submitted therewith, and has determined tnzt the area on, which the pro- posed work is `:to be done is significant to one or more of the interests. described in the said act. The SALEM CONSERVATION COMMISSION hereby orders that the following conditions are necessary and all work must be performed in strict accordance with said conditions and with the. Notice of Intent and Plans, unless modified by said conditions; CONGITTCNS 1 . Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this order. 2 . This order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion: of private . rights. 3. This order does not relieve the permittee or any other person_ of the necessity of complying with all other applicable federal, state or local statutes, ordinances, by-laws and/or regulations. 4 . The work authorized hereunder shall be completed within one (1) year from the date of this order unless otherwise stated below oursuant to Regulation 6.7. The order may be ex- tended by the issuing authority for one or mo-re additional one-year periods upon application to the said issuing authority at least thirty days prior to the expiration date of the order or its extension. 5 . Any fill used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris, including, without limiting the generality of the foregoing, lum:ar, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, as1les, re`_rigerators , motor vehicles or parts of any of the foregoing. „D" _ 26 _ ( CONDITIOv.,; C), 7:3li D PAGE 2 FILE NO. 64-28 6 . No work may be commenced until all appeal periods have elapsed from the order of the Conservation Commission ar. from a final order by the Department of Environmental Quality Engineering.. 7. No work . shall be undertaken until the final Order, with respect to the proposed project, has been recorded in the Registry of Deeds for the district in which the land is located within the chain of title of the affected property. Copy to be furnished to issuer of this Order showing book and page prior to cw ,encement of work. 8. Upon completion of the work described herein, - the applicant shall forthwith request, in writing, that a Certificate of Compliance be issued stating that the work has been satisfactorily completed. R. A sign shall be displayed at the site not less than two square feet or more than three square feet bearing the words, "Massachusetts Department of Environmental Quality Engineering. Number 64-28 , 10. - Where the Department of Envircn.,,ental Quality. Enginee ring is requested to make a determination and to issue a superseding order, the Conservation Commission shall be a party to all agency pro= ceedings and hearings before the Department. 11. , The work shall conform to the following described plans and , ( additional conditions. a. All work shall be in accordance with the drawing submitted to the Conservation Commission prepared by registered engineer Mr. John F. Burns, Jr. of Northeast Engineering & Survey Inc'. , of 15 Chestnut Street, Peabody ,Massachusetts. These plans have been stamped and dated. b. All debris from the collapsed wall and all construction material for the new wall shall be removed from the tidal flats adjacent .to the property. c. The new wall shall not extend beyond the line of the previously existing. wall. d. Stability calculations and elevation of the topathe wall shall be submitted to the Conservation Commission prior to the start of construction at the site (16 Glover Street, Salem ,Ma. ) _ N.B.--e. As of the meeting ,August 1 , 1978, the stability calculations were reviewed , and found to have several discrepancies, including the width of the wall the material to be used, and the solidness o'f the wall . Mr. Ken Bouffard''has been called*and asked to respond to these questions by the Commission (by letter) clarifying these problems. Until these are addressed the Commission does not concur completely. *-N.E. Eng'g.& Survey -by phone 8/3/78 to his office with a message to his / receptionist! -27- : M CO'iTT?iJ.^.D PAGE 3 r.L D. 61-28 l she applicant, any person aggrieved by this order, any o*+mer of land abutting the land upon which the proposed work is to be done, or nv ten residents of the city or town in which such land is .located, ''re hereby notified of their right to appeal this order to the Depart- -Zent of Environmental Quality Engineering provided the request is made in wri- ing and by certified mail to ther Department within ten (10) days from the issuance i` ahis order. :SZ-U.FD BY SALEM CONSERVATION CObIMISSION Pto A n L 4- JULY 5, 1978' Date of Issuance On this sixth day of July 1978 , before me personally appeared the above named persons to me known to be the person described in and who executed the foregoing instrument and acknow— ledged that he. executed the same as his free act and deed. tdy Commission expires /° II C -28- } CITY OF SALE:`! MASSACRUSETTS APPLICATION SPECIAL PERMIT f{ECEIvEg WETLANDS AND FLOOD FUZARD DISTRICTS J" i(j J 09 78 CITY CLERK'S OFFICE SALEM.-.MASS. Applicant: Mg. Atiws-0,V 61 ,4 u3 Address: ��� ' GLOVf,? IsT. City Clerk Stapp. Telephone: -1 45- l641_4 Owner: A 09-F--J S Address Location of Property: 1(, GLO V 5 e- 5 _T ` Project Description: ?'E -Tituc,Tio 4EA- I. It has been determined by the Building Inspector that the above property lies in the following area(s) : A. Wetlands District Wetlands ( ) Buffer Zone ( ) B. Flood Hazard District Zone A ( ) Zone A3 ( X) Zone V3 ( )- II. Information required includes this application and the following additional information (file one copy of everything with the City Clerk an five eUiesJ�with t e Planning Board ; all co_oiies must be stamped by the City Clerk) : 0F40J 60 -- A. A site plan at a scale of V equals 20' prepared by a registered land .surveyor or registered professional engineer and showing at least the following: 1. Lot lines within which the development is proposed and the tie- in to the nearest road intersection; 2. The location, boundaries, and dimensions of each lot in question; 3. Two-foot contours of the existing and proposed land surface; 4. Location of existing and proposed structure§, water-courses, drainage and drainage easements, means of access, utilities, _and ewer disposal facilities including leaching fields, if any. Proposed elevations should be noted. ndaries of all districts, areas and zones as noted in lion I. JUL 1719;: SALEM CONSERVATION COMM. ' Y � _2- . i1 B. In the Wetlands District, a determination by a qualified engineer of the seasonal high water table, performed during the last two weeks of March or the first three weeks of April. A minimum of two percolation tests for each leaching area shall be performed. C. In cases of flood-proofing or pile construction, certification by a registered professional engineer or architect as to the elevation of flood-proofing measures and as to compliance with the applicable sections of the Massachusetts State Building Code concerned with flood depths, pressures, velocities, impact and uplift forces, and other factors associated with the base flood. Where specific methods or techniques have been previously certi- fied, the Planning Board may waive this requirement. D. A list of Federal, State, and other local permits required by the applicant. E. Descriptions relative to all conditions applicable in Section III below. III. Conditions (Complete those sections indicated (x) by the Building Inspector) In the Wetlands and Flood Hazard Districts no structure or building, including pipes and wells, shall be erected, constructed, substantially improved, enlarged, or otherwise created or moved; no area shall be paved; no earth or other material shall be stored, dumped, used as fill, excavated, or transferred; and no sediment shall be caused to be discharged from or onto a wetland, unless all the following condi- tions are found to exist as part of the granting of a Special Permit by the Planning Board (Use additional pages if necessary) : A. All Districts: ( } 1. The proposed use will comply in all respects to the uses and provisions of the erlying District in which the land is Yad located. Yes V No 2. There is adequate convenience and safety of vehicular and pedes- trian movement within the site, and in relation to adjacent streets and property, particularly in the event of flooding of the lot(s) or adjacent lot(s) caused by either overspill from water bodies or high runoff. 'EXtS-r. 3c -Dw E Lei P (A1 I-T AC(FPS 2vr ,�, .� — As _3_ 3. Utilities, including gas, electrictity, fuel, water, and sewage disposal, shall be located and constructed so as to protect agal..nst breaking, leaking, shortcircuiting, grounding or igniting or any other damage due to flooding. (Provide details) CX%5-%Io 6 5-7Ruc_'T Q7 No N_ VT�L�T�ES �t- 4 � � 2�0 7\ 4. The cumulative effect of the proposed development or use, when combined with all other existing and anticipated development and uses will not obstruct or divert flood flow; substantially reduce natural flood-water storage capacity in the local drainage area; destroy valuable habitat for wildlife including fisheries or shellfisheries; adversely affect groundwater resources or increase storm water run-off velocity so that water levels on other land are substantially raised or the danger from flooding increased. S72uL1u2F t-CtSTED Na � 6YFLoFlr/\FrI4 'Pe 07.St9_ ?e0-7 7- Ta reE`B-IL_? T FX ,S—k Q)V > /aND SEA - waLL_. B. Wetlands District: ( ) 1. The proposed development or use shall not include the storage of salt, chemicals, petroleum products or other contarinating substances or discharge of any polluting liquids or materials into streams, brooks or wetlands. (The polluting effects of substances on the Wetlands are to be gauged by the "Rules and Regulations for the Establishment. of Minimum Vater Quality Standards and for the Protection of the Quality and Value of [dater Resources" of the C07 onwealth of Massachusetts, ( ) 2. The floor level of areas to be occupied by human beings as living or work space shall be four (4) feet or more above the seasonal high water table. ( ) 3. If the basement floor level is below the seasonal high eater table and affords the possibility of human occupancy at some future date, although not originally intended, adequate perimeter drainage and foundation shall be installed to with- stand the effect of pressure and seepage. Furnace and utilities are to be protected from the effects of leaching. (Provide details) Applies ( ) Does not Apply ( ) ( ) 4. If the lot is to be served by an on lot septic system, the leaching area designed for use, as well as a reserved area for future expansion or total future use, shall be plotted with dimensions on the site plan, and the leaching areas shall not be constructed where the seasonal high water table is less than 4 feet below the bottom of the leaching areas. i Applies ( ) See site plan Does not apply ( } C. Flood Hazard District (all zones) : (� 1. The floor of the basement, or if none, the lowest floor of new construction or substantial improvement of structures for residential uses shall be at or above the 100 year flood level. 00 NFvy Cbr,s7eucl, o �j S�2vcTuQE EX�sTS OO 2. The floor of the basement, or if none, the lowest floor of 11 new construction or substantial improvecnant of structures for non- residential uses shall be at or above the 100 year flood level or the structures shall be flood-proofed to that level in compliance with the applicable requirements of the Massachusetts State Building Code. rloai-proofing measures shall insure that the structure is watertight and that structural components have the capability of resisting hydrostatic and hydrodynamic loads and the effects of bouyancy. No I'� Fv.1 -- Co N5 -r2uC 1 (-O_ SZ"2uc`TvQE —_ z -T S_ D. Mond Hazard District, Coastal High Hazard Area ('Lone V3) : ( ) 1. New structures or substantial improvements shall be located landward of the reach of Mean High Tide. ( ) 2. New structures or substantial improvements shall be elevated on adequately anchored pilings or columns, and securely anchored to such pilings or columns so that the lowest portion of the structural members of the lowest floor (ex- eluding the pilings or columns) is elevated to or above the 100 year flood level. Space below the lowest floor shall be free of fixed obstruction. (Provide details) ( ) 3. The support of new structures or substantial improvements shall not be, in whole or in part, by the,use of fill. (Provide details) IV. Procedure The Planning Board shall, within 7 days after the filing of this application, transmit one copy of said application, plans and all other submitted information to the Inspector of Buildings, City Engineer, Board of Health and Conservation Commission who may, at their discretion, investigate the application and report in writing their recommendation to the Planning Board. The Planning Board shall not take final action on such application until it has received a report thereon from the Inspector of Buildings, City Engineer, Board of Health and Conservation Commission or until thirty-five (35) days have elapsed after dis- . tribut.ion of such application without a submission of a report. The Plannin_ Board Shall hold a Public Bearing on said application as soon as possible after receiving the above reports, in accordance with Chapt-r 40A of the Mass.nchusetts Ceneral Laws. Site Planning Board shall notif, the applicant in writing of its d.ecisic on the special permit. The decision shall documE:nt the proposad development or use and the groitads for granting or refusing the s^eci_nl permit. The -b- Planning Board may, as a condition of approval, require that the appli- cant give effective notice to prospective purchasers, by signs or by recording the special permit at the Registry of Deed! , of the wet- land or flood hazard conditions associated with said premises and the steps undertaken by the petitioner or his successor in title to alleviate the effects of same. Signed Title lVFS. \"c.z: /k E v4 Date i JOB A wrO4Evr G 1 >V KuS Northeast Engineering & Survey Inc. SHEET NO. { of 15 Chestnut St. PEABODY, MASS. CALCULATED By ' s DATE Phone 532.0028 CHECKED BY DATE SCALE WA S 17�S1GN 'No l 1V JUL UE 1978 c C, p hl ... SALEM CONSZRVA I. 0MMr IL, 1 -'S T1F1 �TKt) - tA.JFIGHT oV "ic F-V-CA L L IED SoI: ..... ........ .._ ..... ..... .. . ...... T7gf+�P I { S . G•F �-. Ati6Lr-r of 2EP0SF 1S 36. 21 ,......�Q FP,zQED .......... BASE 'F02 `TuF CO_F 'Sr'ICEt.+'T ....or � L!10,N 6 ,. F21 C-r) 0`4 op O. bo•} , 077 Z it 5 41a! aS� ce r p� T f+lGv SAT TNF ' ! . ... .�oR ZaNT'A L..... F t . V _e. .Tl C o� I� ,AGeAre 3��o._u T� le�s�- F FORM 204 A"=Rom lV6- S �xC.TRW W.Me.01489 JOB A0Desw GI>JI< uS Northeast Engineering & Survey Inc. SHEET NO. Z of 15 Chestnut St. c PEABODY, MASS. CALCULATED BY onre Phone 532.0028 CHECKED 2V _ ^c r "SCALE r_ _._ ... LVp.,LL 1�ES16N I ' { _ 4 /Y 40 41 -- _ 3L ( A g, Soo ....{� NCat_£ o F \'„SpC-� '�v'+ Z1� = � 3� 41 �ALCOLATI-N6 V11M FP+S 14r>5 /� or. TA ,.. d C3 ltA..E Cos.. C. /,0ci10'7 \IE -T«AV. Gtn.,lz�,/ dxlg '' '� .. C3) �. 3 _ t Ir T 1 11 t....A CA LC� �q'T= -T'.L(R.�s-r ACC F.,,'T r _. _ _.. .OPM IO. AwYti han Ar--S iFC.Towlwid.W 014W Joe Northeast Engineering & Survey Inc. SHEET NO.— of 15 Chestnut St. PEABODY, MASS CALCULATED BY�' 1 UB_T.E,_ Phone 532.0028 CHECKED BY i L �A e� — SCALE -i aJ tmS IG.J A! , s ! l N AilN'Ipio:o .5� �IFQTl cn IOQ cF 4, T'...... oi' Sl 1. Ib 1.JC aNG Lf of Na. Ct:C7' R b SsC = 23 � 5 X 1 , t223 ? 6ld5 LBS - S1N A = -Z Ko,a39 � _ I IlZ gas �100. ._. 9 3 ... . ...... ... ....... ......... . .. }. � TA9IL-T/_ _ . ..... . OVFt-r1.Jq Ji..a:C. rnornv., T CRoD�CF9 b..y. �gPG6 ..�1 1'oIVT n3 T ;?�77 1 -ToTn, BIG �IT1.. C 'T .... f3cfz 44 w __._... ..__.. _..:.. . .__. / q ....... . , .... ... .... ._.__ QM; L - Zg to 11 .6 �,= ..... . `�81 1 SA-t E 't- TALTbe AG,OA7. w"..` 4•l . 3. � �t o: u VOFY;04 AwGe°41min NEBS ixC.TwmMM.Nw Oltei fJOB /LNt) w-,f �i{. • ' Northeast Engineering Bring & Survey Inc. SHEET NO. � OF 15 Chestnut St. CALCULATE BY R 0 6 I V PEABODY, MASS. Phone 532-0028 CHECKED 8Y ; j DATE .) SCALE I4 `�14y P'mT Sri Efel k�Lrl _ _. _ .�� SLR QI1.16 S .1_Ay1-31,L7—% .. ro2cE 15 140V Izo NJ TA .. _.... QFS,STA, CE '� i SL1 p�NU. = W EiC�':_I-IT _._ . ..... ^..... ..._.. . _..._ C3..TTo 1 F.-7 .. F' S t_I D 1 L [55 N _.. � 55Z 45 Z2_ ZS __ - . O n{(� SL,q.�'�.V_ . fA 702 a SA'FFT� . ..... -- - — .. . IOBY204 01� Be AbQ `;;,on 0 SIP, J, O ed b9 5 i�i' ' S66 Qo °•'A C 4`1 cly SO .4,( 56 ❑565 5r.0 553 qS/ P�AL NI E R CD 4 00- POINT 7'50 -;��"O bbt5 559 0 -rn 54 OP.80 ,4,500 K�-- I 60'� *9 15 - 0 so 569 5 5 1199Sg+ 0 0 4 0 5.000 4,80(l 00 90 -)oj 2Z06 .51000 0()0 50 2r 4,500 5, S It-------- 500 4 96 r. 5 000 00 4,450 -4 4, ) 1 5,0011 0" F)96 en 591 � . t),7 4 5L4 2 61 0- r1l v 599 0611 r4 22000 Cp) e 3,760 )09 610 E (or, 3 926 F— p M '00 ;o 000SS'(. A4 k4 50 5 6 616 616 5 0 Ssl in et 618 L ruin) 'o 3 -,oU 3 5C'C 3,470, FLAT . (A (A 2C) 5,)0 0 750 369060 ?2000 "50 627 50 -31500 4 7 50 22 ENU 20%B 199 WETLAND PROTECTION ACT h1ASSACHUSETTS G.L. C. 131 s. 40 � AY 181978 0' NOTICE OF INTENT SALEM CONSERVATION C1M� �.. c rrulf cc�& �C S, ALL PARTS OF THIS FORM SHALL BE COMPLETED UNDER THE PAINS AND PENALTY OF PERJURY INCLUDING THE ENVIRONMENTAL DATA FORM ATTACHED HERETO AND MADEJA PART HEREOE�b THE FILING MAY BE CONSIDERED INCOMPLETE DATE _M AY 1. Notice is hereby given in accordance with the provisions of G.L. C. 131 s. 40, that the proposed activity as submitted herein falls within the jurisdiction of said statute, and is located in the . City/Town _ SALEcY-N yo GLobr=Q S7 , Street. Recorded at the Registry of'EsSEu 50U-r Book —�tco 'Z Page`*G0 Certificate (if registered) 2. The name(s), address and telephone number of owner(s) of the subject land are: NAME ADDRESS TELEPHONE NO. _ ANPREW rINKu5 .6 GLoyfe Sli —iA5` (o41.4 3. I have filed identical Notices and plans by Certified Mail with the following: Conservation Commission (original) Date — 1l—-r8 c/o Mass. Department of Environmental Quality rfjo Engineering, yAAWaC4't'dQlg►4ftW, N•E. 2EWtoN 1p4ft1, MIA (R copies) T6c^>KS0u42Y NosP IrAL- Date T£W KSAuRy, t•4 S• 018�G 4. Have all permits, variances and approvals as required by C. 131 -s. 40 been obtained? VIV (yes or no). Attach copies to original Notice of Intent. ie—Q`uq—u'N.N6 `$oP¢.O Al Tloti 5. Enclosed is Statutory .Filing Fee of $25.00, payable to City or Town. 6. The name, address and telephone number of the owner's representatives (if any) are as follows: NAME ADDRESS TELEPHONE NO. At e torney o-T A `t P LI CA 8 1— E { Engineer _ Noe-To FAST F+J6LN i0ZItjG SvleVi; C, 1 5 c 14iaS-TNv"T 5\. -PFA13o0-/ Agent 7. The purpose of the project is: (Use additional sheets if necessary) 'v 8. Owner's (or agent's signature) .•;, Q B l -20- _ 1 _ WETLAND PROTECTION ACT { ENVIRONMENTAL DATA FORM 1 . All parts of this form are to be filled out by the appl4cant or his agent under the provisions of G.L. C. 131 s. 40. 2. Where a section is not relevant to the application in question, the words "Not Applicable" should be entgred on the appropriate line. NAME OF APPLICANT AN�2cw G� N l�� S ADDRESS OF APPLICANT 'b G L o V Erz- j MUNICIPALITIES WF.ERE A4CTIVITY IS PROPOSED AND NOTICE IS FILED A t Srv-N DESCRIPTION OF PROPERTY INVOLVED IN APPLICATION (including the dimensions of any existing buildings, decks, marinas, existing cesspools) _ (� WALL A�oN (CrrCoNST2�c�iod nF StA- C� DESCRIPTION OF MODIFICATIONS PROPOSED ON THE SITE, including grading, dredging, removal of vegetation, etc. �FSToen 770,-1 of A. SOILS 1. United States 'Department of Agriculture Soil Types (show on map) NOT A ?Lic/aq La 2. Permeability of soil on the site. (Dates of testing) NoT A?PL% cneL E 3. Rate of percolation of water through the soil. (Dates of testing) 1� 6- AP-PL-1CAl3L r B. SURFACE WATERS 1 . Distance of site from nearest ( surface water (Date of measurement) -21- 2 2. Sources of runoff water SUa �AcE �uWot 7 3. Rate of runoff from the site .CA 05 L E 4. Destination of runoff water O CFRrJ 5. Chemical additives to runoff - water on the site No N L C. GROUND COVER 1. Extent of existing impervious ground cover on the site NO► q?PL LA � L- 'F— 2. Extent of proposed impervious, ground cover on the site M0*T (1?PLccA � �� 3. Extent of existing vegetative cover on the site NOT A?? LIC AIiV+- F_ 4. Extent of proposed vegetative cover on the site MAT A P L i CA 53I- D. TOPOGRAPHY 1. Maximum existing elevation on site � 2 Z. Minimum existing elevation on site O i 3. Maximum proposed elevation of site ` 4. Minimum proposed elevation of site 8 5. Description of proposed change in opography IF .o�+SCpc E. -GROUND WATER 1. Minimum depth to water table on site (at time of filing) No'T APIPLLC^gSLF 2. Maximum depth to water table on site (at time of filing) No'T APPLILAsiLQ 3. Seasonal maximum ground water elevation No A?'PL1cA.TL'!= k• 3 _ F. WATER SUPPLY 1. The source of the water to be provided to the site 'Dorn Es `T'1L 2. The expected water requirements (g.p.d. ) for the site NoT A'P? ?lens 3. The uses to which water will be Eut �d�+aG�TIC_ G. SEWAGE DISPOSAL 1. Sewage disposal system (description. and location on the site, of system) 2. Expected content of the sewage effluents (human waste, pesticides; detergents, oils, heavy metals, other chemicals) 3. Expected daily volume of sewage 1-10 A P L ICA,9 L 14. SOLID WASTE 1. "Estimated quantity of solid waste to be developed on the site N>7 rl� .2. Method for disposal of solid waste Note 3. Plans !for recycling of solid waste NoN t I. BOAT YARDS, DOCKS, MARINAS 1. Capacity of marina (number of boats, running feet) - N c7r �i`��L � c A G3z, F 2. Description of docks and floats (site, dimensions) 3. Description of sewage pumpout facilities (type of waste disposal) �a-T APQ)..ICA LT 4. Description of fueling facilities and fuel storage tanks .NaT A? I7L%cn�3LV- -23- a '1 q 4 _ 5. Description of fuel spill prevention measures and equipment NOT APP L,1CAi3Le- J. IMPACT OF PROPOSED ACTION APPLIED FOR 1. Effects on plant species (upland and marine) 2. Effects on marine species (shellfish, finfish) 3. Effects on drainage and runoff Nor, 4. Effects on siltation of surface waters NONE 5. Effects, on groundwater quality Nor,, r 6. Effects on surface water. quality N p N E K. ALTERNATIVES TO PROPOSED ACTION L. Describe alternatives to the requested action �a C0 t'. u c�t oj 2. Describe the benefits of the requested action over the alternatives --� ALL oWS Ac(in S FV,fo� G, GAQP6'F— -24- //ort4ea3E engineering and Survey Co.,. gnc. AYNOMMMMM PEABODY, MASSACHUSETTS 01960 PRES IUENT 13 Wally Stree 17) 532.0028 REAL ESTATE DESIGN KENNETH J. BOUFFARD UTILITY & HIGHWAY DESIGN SURVEY SERVICE SANITARY SYSTEMS ENVIRONMENTAL STUDIES CONSTRUCTION MANAGEMENT August 9, 1978 Mr. Bradford C. Northrup, Chairman Salem Conservation Commission One Salem Green Salem, Ma. 01970 Re: Ginkus Residence Glover Street Reconstruction of Wall Dear Sir: With respect to the above referenced project please be advised that the wall as depicted on the plans and the sketch is to be a solid mass of either concrete of' field stone grouted with concrete . Very truly yours, L� Kenneth J. Bouffard President KJB: jec Enclosures CAllQ 14 197c SALE1,d CONSERVATION comm. i ltlCS�ES�h �IIC£aL7C �J��a�A1 C i�ar� n � ���ttliitt� IIarl AUG fG i [ ;'�� '7$ .fwCti-4�i (rJne Salem Green ctrY c-ri.•.i :; rICE SALEM, MASS. August 18, 1978 SPECIAL PERMIT WETLANDS AND FLOOD HAZARD DISTRICT MR. ANDREW GINKUS 16 GLOVER ST. SALEM, MA 01970 On Thursday; August 17, 1978, the Planning Board of the City of Salem held a public hearing regarding the application of Mr. Andrew Ginkus, for a Special Permit under Section P, Wetlands and Flood Hazard Districts, of the Salem Zoning Ordinance, with respect to the reconstruction of •a seawall on the property located at 16 Glover St. , Salem, Massachusetts. At a regularly scheduled meeting of the Planning Board on August 17; 1978 the Board voted, by a vote of seven in favor, non opposed, to approve the application as complying with the requirements for the issuance of the permit with the following condition: 1. The work shall be done in accordance with the site plan prepared by John Barnes , entitled "Plan & Detail for Wall Construction owner Andrew Ginkus in Salem, Mass." I hereby certify that a copy of this decision has been filed with the City Clerk, and a copy is on file with the Planning Board. This special permit shall not take effect until a copy- of the decision bearing the certification of the City Clerk that twenty days have elapsed and no appeal has been filed or that if such appeal has been filed, and it has been dismissed or denied, is recorded in the Essex County Registry of Deeds and is indexed in the grantor index under the name of the owner of record or is recorded and noted on the owner's certificate of title. The fee for recording or registering shall be paid by the owner or applicant. Walter Power III Chairman, Planning Board 14P/sm