Loading...
64-83 - 200 Canal Street - CONSERVATION COMMISSION ti 1� 4' 1 FORK 4 ORDEK OF CONDITIONS W li T L A N D S P R 0 T E C T 1 0 N A C T G.L. C. 131, s. 40 ------------------------------------------------------------------- CITY/TOWN Salem, T,"A . FILE :LUMBER 64-83 To: NAM Bursaw Oil Co . ADDRESS 27 Cherry St. , Danvers , CERTIFIED MAIL NUMBER PROJECT LOCATION: Address 200 Canal Street, Salem, MA . 01970 Recorded at Registry of Deeds Book 6813, Page 137 Certificate (if registered) REGARDING: 1 Notice of Intent dated September"'23 , '1982 and plans titled and dated Proposed Tank Installation-20OCanal Street Aug. and Sept. 1982 am-d- Typical UndergroundStorage System THIS ORDER. IS ISSUED ON (date) October 114, 1982 B-190 & B0191 -------------------------------------------------------------------- Pursuant to the authority of G.L. C. 131., s. 40, the Salem_ _Conservation Commi_siCn has reviewed your Notice of Intent and plans identified above, and has determined that the area on which the proposed work is to be done is sign_ficant to one or more of the interests listed in G.L. c. 131, S. 40. The Salem Conservation Commission hereby orders that the following conditions are necessary to protect s,-,id interests and all N,='.-; shall be performed in strict accordance with them and with the Notice of Intent and plans identified above except where such plans are modified by said conditions. --------------------------------------------------------------------- CONDITIONS 1 . Failurt,, to comp',: -.;ith all condi.tions stated herein, and with all related sta: uses and other regulatory measures, shell be deemed cause to revoke or modify this order. �L. -1- FORM 4 ORDER OF— — 0O2DLTIONS CONKNEILE MME64-83 -------------------- 2. E This order does not grant any property rights or any exclu- sive privileges; :it does not authorizeany injury to private property or invasion of private rights. 3. This order does not relieve the permittee or any other- per- son of the necessity of complying with all other applicable federal, state or .local statutes, ordinances, by-laws and/ or regulatic ns. 4. The work authorized hereunder shall be completed within one (1) year from the date of this order unless it is .for a maintenance dredging project subject to Section 5(9) . The order way be extended by the Issuing authority for one or more additional one--year perLods upon application to the said issuing authority at least thirty (30) days prior to the expiration dntc of the order or its extension. 5. Any f.-t1.1. used in connection with this project shall be clean fill, containing no trash, refuse, rubbish or debris, includ- ing, without limiting the generality of the foregoing, lunber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators , motor vehicles or parts of any of the foregoing. 6. No work r..ay be commenced untill: all,,app.ea`,,periods have elapsed from the order of the Conservation Commission or from a final order by the Department of. Environmental. Quality Engineering. 7. No wort: shall be undertaken until the final order, with - respect to the proposed project, has been recorded in the Registry of Deeds for the district in which the land is Located within the chain or title of the affected property. The Document number indicating such recording shall be sub- mitted or, the form at the end of this order to the issuer of this order prior to commencement of work. 8. A sign shall be displayed at the site not less than two square feet or more than three square feet bearing the words, "Massachusetts Depar tuent of Environmental Quality ., Engineeri , _.,bee 64-83 9. Where the Department: of Environmental Quality Engineering is requested to make a determination and to issue a super- seding order, the Conservation Commission shall be a party to all agency proceedings and hearings before the Depart- ment. 1 ORDER OF COI]DITIONS, CONTINUED FILE NO. 64-83 { - 10. tlpo-, cc .t.i. ll on a, r. the work deccibed hc.reiu, .the applicant shall cc n:;a-t _. luest im c rf tin,,, that a Certificate of Cosplc ,ue be i,, ,uc.d ,tOLi.nJ; that the workh been satis factorily comp]Ctod. 1 .L. The wort: shnll conform to the fol]owing described plans and addi.t:i-onn] conditions. a)All work shall be done in compliance with plans entitled "Proposed Tank Installation at 200 ,,Canal Street, Salem, IMA ." dated August 1982 , and numbered B-i�90; and "'Typical Underground Storage System" dated Syptemter , 1982 and numbered B-191. e -3- i 030E,RS OF COAUI.1'lONS - coutinue:d The applicant, any person aggrieved by this o -` r any owner -- of land abutting the land upon whLch the propo •ul work is to be Bonn, or any ten residents of the city or tone i,{,i which such land is located, are hereby notified of their rightt'P appeal this order to the Department of Environmental. Quality Engin���^_eri.ng provided the request is made in writing and by certified mail to the Department within ten (10) days from the. :issuance of this order. ISSUED BY Salem Conservation_ Commission f+ - � .c.��: SSL✓_ - — — i I On this 14th da} of October 1982 before me persorrz0._1y,.,_ appeared @ to_ne-,` . known to he the person descri �•d in, and who executed, the foregoing, instrument and acknowledged that he executed the same as his free act and deed. _ Diy Commission expires DETACH ON DOT'T'ED LINE AND SUBMFT TO THE ISSUER OF THIS ORDER PRIOR TO ,,EN COAV�.Ent.Lr.n..1' OF WORK. TO (Issain4 Authority) PLEASE BE ADVISED SE.D Til`. TIM ORDER OF CONDl7-'ONS FOR TUE `rROj ECT AT FILE NUMBE6; , HAS BEEN RECORDED AT THE REGISTaY OF ON (DATE) If recorded land, tho instrument number which identifies this trans- action is If t'e,;isCtre: land, tiie docuns:nt number .;ir .c > identifies this trans-. action is SiE;ucl _ Applicant C C7ielli7 Cffl:. zcl�zr eA#s �"�� ��IcttUtilt� �Uar1 (ane �nlem Green REQUEST FOR REVIEW CO?TENTS SPECIAL PERMIT DATE: T0: ( ) Building Inspector ( � Conservation Commission ( ) City Engineer ( ) Other: ( )- Board of Health Attached please find the application referenced below. The Planning Board requests that you review this application relative to Section VTI of' the Zon' rdinance." We would appreciate your completing the form below and ffii CITY OF SALEM, MASSACHUSETTS APPLICATION RECEIVED SPECIAL PERMIT • WETLANDS AND FLOOD HAZARD DISTRICTS *82 SEP 30 PI2 :59 CITY CLERK'S OFFICE Applicant: Bursaw Oil Corp. L c'i' Address: 27 Cherry St. , Danvers , MA 01923 City Clerk Stamp Telephone: 617-744-4200 Owner: Same Address Same Location of Property: 200 Canal St. , Salem, MA Replace 3 old underground gasoline storage tanks, capacity Project Description: g6nnn tt1 c•+!*h fnnr riew mansion protected tallkg, capacity 40,000 gals. with 20 year guarantee/warranty. ' I. It has been determined by the Building Inspector that the above property 4 lies in the following area(s) : A. Wetlands District Wetlands ( ) Buffer Zone ( ) B.• Flood Hazard District Zone A ( ) Zone A3 (� Zone V3 ( ) II. Information required includes this application and the following additional information (file one copy of everything with the City Clerk and five copies with the Planning Board ; all copies must be stamped by the City Clerk) : A. A site plait at a scale of 1" equals 20' prepared by a registered land surveyor or registered professional engineer and showing at least the following: 1. Lot lines within which the development is proposed and the tie- in to the nearest road intersection; 2. The location, boundaries, and dimensions of each lot in question; 3. Two-foot contours of the existing and proposed land surface; 4. Location of existing and proposed structures, water-courses, drainage and drainage easements, means of access, utilities, and sewer disposal facilities including leaching fields, if any. Proposed elevations should be noted. 5. Boundaries of all districts, areas and zones as noted in Section I. B. In the Wetlands District, a determination by a qualified engineer • of the seasonal high water table, performed during the last two weeks of March or the first three weeks of April. A minimum of two percolation tests for each leaching area shall be performed. C. In cases of flood-proofing or pile construction, certification by a registered professional engineer or architect as to the elevation of flood-proofing measures and as to compliance with the applicable sections of the Massachusetts State Building Code concerned with flood depths, pressures, velocities, impact and uplift forces, and other factors associated with the base flood. Where specific methods or techniques have been previously certi- fied, the Planning Board may waive this requirement. D. A list of Federal, State, and other local permits required by the applicant. E. Descriptions relative to all conditions applicable in Section III below. III. Conditions (Complete those sections indicated (x) by the Building Inspector) In the Wetlands and Flood Hazard Districts no structure or building, including pipes and wells, shall be erected, constructed, substantially improved, enlarged, or otherwise created or moved; no area shall be paved; no earth or other material shall be stored, dumped, used as fill, excavated, or transferred; and no pediment shall be caused to be discharged from or onto a wetland, unless all the following condi- tions are found to exist as part of the granting of a Special Permit by the Planning Board (Use additional pages if necessary) • A. All Districts: (X) 1. The proposed use will comply in all respects to the uses and provisions of the underlying District in which the land is located. les X No (X) 2. There is adequate convenience and safety of vehicular and pedes- trian movement within the site, and in relation to adjacent streets and property, particularly in the event of flooding of the lot(s) or adjacent lot(s) caused by either overspill from water bodies or high runoff. The existing service station was constructed approximately 28 years ago and has been in continuous use with no problems . h -3- (X) 3. Utilities, including gas, electrictity, fuel, water, and sewage disposal, shall be located and constructed so as to protect against breaking, leaking, shortcircuiting, grounding or igniting or any other damage due to flooding. (Provide details) No changes proposed (X) 4. The cumulative effect of the proposed development or use, when combined with all other existing and anticipated development and uses will not obstruct or divert flood flow; substantially reduce natural flood-water storage capacity in the local drainage area; destroy valuable habitat for wildlife including fisheries or shellfisheries; adversely affect groundwater resources or increase storm water run-off velocity so that water levels on other land are substantially raised or the danger from flooding increased. • - _ No changes proposed B. Wetlands District: ( ) 1. The proposed development or use shall not include the storage of salt, chemicals, petroleum products or other contaminating substances or discharge of any polluting liquids or materials into streams, brooks or wetlands. (The polluting effects of substances on the Wetlands are to be gauged by the "Rules and Regulations for the Establishment of Minimum Water Quality Standards and for the Protection of the Quality and Value of Water Resources" of the Commonwealth of Massachusetts.) N/A v _4- f r ( ) 2. The floor level of areas to be occupied by human beings as living or work space shall be four (4) feet or more above .' the seasonal high water table. N/A ( ) 3. If the basement floor level is below the seasonal high water table and affords the possibility of human occupancy at some future date, although not originally intended, adequate perimeter drainage and foundation shall be installed to with- stand the effect of pressure and seepage. Furnace and utilities are to be protected from the effects of leaching. (Provide details) Applies ( ) Does not Apply ( ) N/A ( ) 4. If the lot is to be served by an on lot septic system, the leaching area designed for use, as well as a reserved area for future expansion or total future use, shall be plotted with dimensions on the site plan, and the leaching areas shall not be constructed where the seasonal high water table is less than 4 feet below the bottom of. the leaching areas. Applies ( ) See site plan Does not apply ( X ) C. Flood Hazard District (all zones) • (� 1. The floor of the basement, or if none, the lowest floor of new construction or substantial improvement of structures for residential uses shall be at or above the 100 year flood level. No changes proposed to the existing building Elev. 8.54 1"SL Office Top of Tanks Elev. 5.00 MSL Bot. of Tanks Elev.-3.00 MSL (� 2. The floor of the basement, or if none, the lowest floor of new construction or substantial improvement of structures for non- residential uses shall be at or above the 100 year flood level or the structures shall be flood-proofed to that level in compliance with the applicable requirements of the Massachusetts State Building Code. Flood-proofing measures shall insure that the structure is watertight and that structural components have the capability of resisting hydrostatic and hydrodynamic loads and the effects of bouyancy. Tanks will be anchored: See attached plans and _ _ calculations showing factor of safety . if -5- D. Flood Hazard District, Coastal P:ikh Hazard Area (Zone V3) : . ( ) 1. New structures or substantial improvements shall be located landward of the reach of Mean High Tide. N/A ( ) 2. New structures or substantial improvements shall be elevated on adequately anchored pilings or columns, and securely anchored to such pilings or columns so that the lowest portion of the structural members of the lowest floor (ex- cluding the pilings or colu-ns) is elevated to or above the 100 year flood level. Space below the lowest floor shall be free of fixed obstruction. (Provide details) N/A ( ) 3. The support of new structures or substantial improvements shall not be, in whole or in part, by the use of fill. (Provide details) N/A IV. Procedure The Planning Board shall, within 7 days after the filing of this application, transmit one copy of said application, plans and all other submitted information to the Inspector of Buildings, City Engineer, Board of Health and Conservation Commission who may, at their discretion, investigate the application and report in writing their recommendation to the Planning Board. The Plannin.g Board shall not take final action on such application until it has received a report thereon from the Inspector of Buildings, City Engineer, Board of Health and Conservation Commission or until thirty-five (35) days have elapsed after dis- tribution of such application without a submission of a report. The Planning Board Shall hold a Public Hearing on said application as soon as possible after receiving the above reports, in accordance with Chapter 40A of the Massachusetts General Taws. The Planning Board shall notify the applicant in writing of its decision on the special permit. The decision shall documeni the proposed development or use and the grounds for granting or re=using the special permit. The r � f -6- Planning Board may, as a condition of approval, require that the appli- cant give effective notice to prospective purchasers, by signs or Eby recording the special permit at the Registry of Deeds, of the wet- land or flood hazard conditions associated with said premises and the steps undertaken by the petitioner or his successor in title to alleviate the effects of same. Bursaw Oil Corporation Signed By: William J . Bursaw, �r. Title President Date September 23, 1982 ti- Form 3 WETLANDS PROTECTION ACT MASSACHUSETTS G.L. C. 131 s. 40 NOTICE OF INTENT All parts of this form and the attache3 Environmental Data Form shall be completed under the pains and penalties of perjury. Incomplete filings may be rejected. DATE: Septenber 23, 1982 Conservation Commission of (City/Town) : Salem, MA 1. Notice is hereby given in accordance with the provi- sions of Massachusetts G.L. c. 131, s. 40 that the proposed activity described herein is within the juris- diction of City/Town Salah _, at 200 Canal Street. Most recent recording at the Registry of Deeds_, Salem, MA Book6813 , page 137 , Certificate (if registered) N/A 2. The land on which the work is proposed to be done is owned by: NAIME(s) Brag Oil_Corp. ADDRESS 27 Cherry St. ,Danvers, MA 01923 3. The applicant submitting this Notice is: NAME _ Same , ADDRESS Sae_ TELEPHONE 617-744-4200 (Optional) The following person is hereby designated to represent the applicant in matters arising hereunder: NAME William J. Bursaw, Jr. ADDRESS Sane TELEPHONE 627-744-4200 �.i -1- Form 3 continued 4. Plans describing and defining the work, included herewith and rude a part hereof are titled and dated: - 1. Proposed Tank Installation August 1982 2. Typical Underground Storage System Sept. 1982 3. Survey-- -- March-29-,_]..982 5. Identical material has been submitted by certified mail as follows: a Original to Conservation Commission (DATE) Sept. 23, 1982 Three copies to appropriate regional office of the Depart- ment of Environmental Quality Engineering (see map for reg' ns and addresses). Date September 23, 1982 NORTHEAST SOUTHEAST CENTRAL WESTERN 6. Has the required $25.00 filing fee, payable to the city or town, been included with the submission to the Conservation Comm issIon? Yes . 7. Has the EnvironmP-gal Data Form been completed and submitted with each copy? Yes 8. Has a locus map (8' " x 11" copy of USGS topographic sheet with the site marked) been included with each copy? Yes 9A. Have all obtainable permits, variances, and approvals required by local by-law been obtained? _ -Nn B. If they have not been obtained, have they been applied for? Yes - If yes, include with the Notice of Intent any information which has been submitted with such applications which is necessary to describe the effect of the proposed activity on the environment. 10A. Ts the site of the proposed work subject to a wetland rostrlctlon order revordcd pursuant to G.L. c. 131, s. 40A, or G.L. c. 130, s. 105, by the Department of Environmental Management? YES ; NO - X ; Do Not Know B. Is the site of the proposed work in. or within 100 feet of: a coastal dune No ; coastal bank No _; coastal beach No ; salt marsh No land under the ocean No z. salt pond No ; anadromous/catadromous fish run No ; do not know ? 11. Signature(s) of owner(s) of the land (if by agent or option holder, written authorization must be attached) -2- (Form 3 continued) 12. What is the purpose of the proposed project? To replace three old underground gasoline storage tanks, two of which are 15-17 years old, which we feel are not anchored, with four new 10,000 gal, corrosion protected and anchored tanks. This will eliminate the possibility of leaks and require less frequent truck deliveries. New tanks will have. a 20 year guarantee/warranty. 13. T HEREBY CERTIFY UNDER THE PAINS AND PENALTIES OF PERJURY THAT THE FOREGOING NOTICE OF INTENT AAID ACCOMPANYING ENVIRONMENTAL DATA FORM ARE TRUE AND COMPLETE. Bursaw 01 Qrati By J.; p��z Pres. Septeirber 23, 1982 Sigf ature of Appl4c nt Date u -3- Form 3 continued WETLANDS PROTECTION ACT ENVIRONMENTAL DATA FORM 1. All parts of this form are to be filled out by the applicant or his agent under the provisions of G.L. C. 131, s. 40. 2. Where a section is not relevant to the application in ques- tion, the words "Not Applicable" should be entered on the appropriate line. NAME OF APPLICANT Bursaw Oil Corporation ADDRESS OF APPLICANT 27 Cherry St. , Danvers , MA 01923 200 CO anal St. MUNICIPALITIES WHERE ACTIVITY IS PROPOSED AND NOTICE IS FILED Salem, MA DESCRIPTION OF PROPERTY INVOLVED IN APPLICATION (including the dimensions of any existing buildings, decks, marinas, existing cesspools) Existing gasoline servige station DESCRIPTION OF MODIFICATIONS PROPOSED ON THE SITE, including grading, dredging, removal of vegetation, etc. Replace three old underground gasoline storage tanks, capacity 8,000 gals. , with our new corrosion protected tanks, capacity 40,000 gals. with 20 year guarantee/ A. SOILS warranty N/A I.. United States Department of Aerinolture Soil. Types (show on map) 2. Perm—bility of soil on the site. (Dates of testing.) 3. Rate of percolation of water through_ the soil. (Dates of testing.) B. SURFACE WATERS 1. Distance of site from nearest surface water. (Date of measurement.) N/A -4- (Form 3, continued) 2. Sourcgs of runoff water. Normal Precipitation 3. Rate offrunoff from the site. N/A 4. Destination of runoff water. N/A 5. Chemical additives to runoff water o- `r.6 site. None C. GROUND COVER N/A 1. Extent of existing impervious ground rover on the site. 2. Extent of proposed impervious ground cover on the site. . 3. Extent of existing vegetative _. cover on phe site. i 4. Extent of proposed vegetative cover or. tke site. D. TOPOGRAPHY 1. Maximum existing elevation on site. 13.6 M.S.L. 2. Minimum existing elevation on site. 6.2 M.S.L. 3. Maximum proposed elevation of site. No Change 4. Minimum proposed elevation of site. No Change 5. Descriptio.-+ of proposed change in topography. Concxete slab over tanks in existing areas that are presently bituminous pavement and gravel. _5_ • (Form 3, continued) E. GROUND WATER N/A 1. Minimum depth to water table on site (at time of filing) - _, _, 2. Maximum depth to water table on site (at time of filing) F. WATER SUPPLY N/A 1. The source of the water to be provided to the site. 2. The expected rater requirements (g.p:d.) for the site. 3. The uses to which water will be put. G. SEWAGE DISPOSAL N/A t 1. Sewage disposal system (description and location on the site, of system) 2. Expected content of the sewage effluents (human waste, pesticides, detergents, oils, heavy metals,. other chemicals) 3. Expected daily volume of sewage. B. SOLID WASTE N/A 1. Estimated quantity of solid waste to be developed on the site. ' 2. Method for disposal of solid waste. 3. Plans for recycling of solid waste. j— I. BOAT YARDS, DOCKS, MARINAS N/A 1. Capacity of marina (number of boats„ running feet) -6- ♦ (Form 3, continued) r 2. Description of docks and flouts _- (site, Uingnsi.ons). 3. Description of sewage pumpout facilities (type of waste disposal). 4. Description of fueling facilities and fuel storage tanks. 5. Description of fuel spill prevention measures and equipment J. IMPACT OF PROPOSED ACTION APPLIED FOR None 1. Effects on plant species (upland and marine) . 2. Effects on marine species (shellfish, finfish) . 3. Effects on drainage and runoff::. 4. Effects on siltation of surface waters. 5. Effects on groundwater quality. 6. Effects on s,-rface water quality. K. ALTERNATIVES TO PROPOSED ACTION 1. Describe alternatives to the requested action Leave old tanks in ground until problems develop. 2. Describe the benefits of the requested action over the alternatives. Eliminate any,possibility of tank leaks Eliminate frequent truck deliveries-cue to larger sturage New gasoline piping; New electrical wiring New tanks will have a 2`0 year guarantee/warranty _ f E Strap t StraP I Tank i 4 Hoc. c Ta 1.1 _ Hex. Nut I t i Rod i —Pod Hook Hook Anchor Reim. RGd 6 y; t% r r 117 _/777--- 771 I ANCHOR DETAIL NOT TO SCALE i I 6 32'.0•, 10= 0" 8" Reinf0rCed Concrete Mat 4' R 4nf�oZc�dwt9cW_We5rMa't 4"k4" w Z.9xw2.9 W.W.p. t " Crown of CoRC �-'_' fie _. Slob e all Manholes Box I Fins h Grade / laCkt0 P EI. 13.00 p Pa I � � ap 3" B\oaktop Paving - '� I x --,t x x y x -x 12" M49 . Grovel Boce IZ" � � 12" I 12" I -o l2" • t 'v Anchor ShapAM ` I � aw ycandte dmatedtalf si-%all be hauled Welded Lugs SiropS t 10 $ockfill shalt b,e clean sharp gravel Tank I Furnished h� Wei hts : Tan Fc 9 ! I � with no Hocks larder thnna ris-1 or � TankMf9 • S, inert nnaterials . Material5 Sholl be Tonk Ho}ddowns per- tank ZSOLbs. 10,000 GAILs. I Placed along bottom side of tank. bul 01 o TanFe __ _ _ _ _ _ 6,30, Lbs- r hand 5iloveltn and well tam Ped 9 \� 10, 000 GALS J steel S ,i - P3 r t - - -4-- -. - - - N J ' ,i ---- li I II __ s II � - Ste e l_-} Sti- P3 L 2-0 Corrosion ControlLL II - � Hofddowtt Rods � Anchor5 I � . Tank 3uPcr�Tondkb 1 a-b Isideg— f n rEl. 3.00 u ro' Wos ed Sand N Wasaed Oand 2.. I 12' CottCr1'P ', • I ' - Ia ^fes' —Ti - -- I - \ 1 , 1 Q Eaoh Hotddown *4� IZ E:VJ.,T. C3. �- Bottoms of Excavation I -_.-- - - a4L12 E.W.,T.FB _� ttG REVISION RECORD Tanks Shol', be in,ta led in Strict Date By Description accordance with Monafaeturers 1n5t411ation InStruC'1'iOnS- SECTION "= I '—o'• BURSAW OIL CORP. SCALE : 1/2 27 CHERRY STREET DANVERS , MASS. i� ae&,,,,,, N. TYPICAL UNDERGROUND STORAGE SYSTEM , Fmoul \ _ DWN. BY: DATE: DRAWING NO. YANKEE ENG. INC. SEPT. 1982 APP'D. BY: SCALE: B _ 19 I W. J. B. Jr. AS NOTED 1 I i 3 . r G S.NJ3lG 1,11 65: Zld 0£ d3S Z8, 03A13038 I i 1 I� � < I t. - 5 A SOC. LAFAYETT E I.P, (Fnd.) % Gorccete e�olnll'9 Wd\ \ Top Wall l 3 .3n o e R ,. BROTHERS INC. i mance " JEFFREY r `bt 'Aire, �. � xs .•e ,IE _� ax;,t. wood Top wan t9.\ N 05'36 _:. 1 11 TOP Wall 52.8 - - - IO N o x SP K.(Fnd-) - x v r IIFIO rn ' "E oxg 3 . c _ PROPOSSD NEW SOLINE x lax? (-hoirt Ltn\` Fence N110-25 -01 �� in DIESEL ST S2A tATAtdK.S, A E x:5}. g F20T T l IRON ROD i� . 106.155` 1 ° E c (Frid.1 ANtCS TO BE ST�•EL S P'� OR20 l N P G E EKi3t. 500 Gal. O Vlaste 0'I Tank-__"1 1 9x3 01, FASTEN VENTS TO BLDG. a L_ -{ E S 2=0"Afl0 G O, O TEN _ _ Twin,Locust ROOFD - -- -- ---- ----- - -- - --- VENTS VE 3t - _� 32' _ 10 O" 10' 0" ri � - 8"REINFORCED CONC.SLAg 8" REIIVF. t2"Oak �e r_ 2"GALY. VENTS 8.50 � CONC.SLAB _ - - - 8.00 - -. I 8.56 %08 --��-- w1 (" O_, r O Sink ., `/o w ( `— fA 4 Veno i2"COLIC.ANCHORING MAT i a ( I w � J I x N a ( I o - - 32'x 29 IIKDES2 TAtiKS ' i � I 0 1 L Fu note PUMP TYP.M — - - a D ERSAPLIr I ( i I : s O r W I D xy Existing 3"VAPOR CONNECTION I 4 I ( (�1Q I IQ ( - LL I. _ . x . 3: : 5eYVice 5talforl .. 'I I I —� ( Xrn N- Wook S 6ulldin(j 4' FILL 7YF. I I ~o I l I� O O ( N m 2„VAPOR RE.'C'DRN LME5 O I I o I 10 I ° O Store 7x98 O _ � ( e t• ( £_3� i Z y 59V t2°xZ4"O PW �30ro ' — - I I . 0 x k n Room AO M.H. 5.00 I I O a I-- - --- _ JI �L J L -0_ s.00 IL x � o N O� I F.D-❑ I L" _ J pL W O j I i OOO I Z O w i I e.00 �PQp -so' - -1 n Oftice I I ( c D 8*`4- �1 I I I L NflS 1 O biSPFN aERS GUT OFF CORNERS OF ALL CO SLABS x I m - Sewer �JA.e.c_ Tropl { j Iz"CONC. ANCHORING MA-C i c 45 �� "9Crct Trap o`2 4 Yents -' -- EKist. Water Me r - I 10'x Z9 ` UtJOER TANK l; O , [.. -A,a 100 A. T `-- - REMOVE AND DISPOSE OF D 8x6 7t5 / 11 —_ ExIST ING TANKS AND PIPING ;D Exist. Tanks I 1 m z-B4O00 Gal- J �? Ow ellitlg' i`' I1II 6.5 •1$'''J5aW 3 4' aak N - - I ( S 5 0 — — --- IL NEW i M - - \ - DISPENSERS M Exist. Pim p island c N !O r~ LIE P. P L.F 0. ` R l F U (O x ' Cn � ' E><ist. 7' Internally C ncre+e l j Silumin aced Sign 193.08' t igh 9xi I i Exist. Conc . 5idewatk 150-17 5 7 a S '-00°W 6 Pole 3 "yd. Pole Tet P.Qr — i C.B. j to v 12"Drain B.M. U. 9,3? C.B. 8"Mater �7 Sewer - E 1 t _ 7.0 x = Existing Grades Dote a REVISION RECORD 1 c Description i CANAL V TRE ET ( Public —Variable Width Y Proposed Grade ` I .37 - t h Prick 9 - Bench Mark - Top Bol vdi-Y , , - punch Hole ;n Top. / 10 5 0 10 20 - 3 < _. S. evotions are Meon Sea level 1 _10 BURSAW OIL CORP. I scale feet Datum U. 3. G.S. - 27 CHERRY STREET DANVERS , MASS. 0 Survey Dated Morch 29, 1982 bc( Handcock urYe� ssociates , In G. I Blood I�aLOrC, Dfstrtc� A3 • " rn m GYM SALEM , MASS. 200 CANAL STREET PATCH ,R 4 PROPOSED TANK INSTALLATION - `n�2 . DWN.BY: GATE' DRAWING N0 YANKEE ENGANC. AUGUST 1982 APP D. BY: SCALE: B - 190 W.J. S. Jr, AS NOTED THE COrff R E fONAEAI3'H-OF`NASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL QUALITY ENGINE IN61CT 4 1982 METROPOLITAN BOSTON-NORTHEAST REGIO SALEM PLANNIING DEPT. • 323 New Boston Street, Woburn, MA 01801 Telephone No. 935-2160 DATE: September 30,_ 1982 TOWN: Salem ASSIGNED FILE NO.64-83 The Division of Wetlands is in receipt of an application filed under M.G.L. Chapter 131, Section 40, the application is in the name of: NOTE: PLAN INDICATES THAT SITE APPLICANT: BLrsaw Oil Corp. _ _ IS WITHIN FLOOD ZONE A3 97 Cherry Street Danvers, MA 01923 OWNER OF LAND: Ramp PROJECT.LOCATION: 200 Canal-Street, Salem,MA __:OJECY REVII U O The application is incomplete. No rile Number will be assigned until .material checked below is submitted to this office� ( ) Notice of Intent and Envi:,onmenial Data Form ( ) Plans ( ) Locus O Project may require a Chapter 91 ,icens2 - ^±oject inas been referred to Waterways. Project does not require a Chapter 91 Licenc«-. Issuance of a File Number indicates onlycompleteae s of the filing submitted, not approval of the application. Very truly yours, William J. St. Hilaire, P.E. Regional Environmental Engineer CC: