Loading...
0042 MEMORIAL DRIVE - LVL Boise Cascade Nffi Double 1-3/4" X 11-7/8" VERSA-LAM® 2.0 3100 SP PASSED RB01(1) (Roof Beam) BC CALCO Member Report Dry 11 span I No cant. March 7,2019 10:10:07 Build 7133 Job name: SMITH File name: Address: Description: I 1 I"):irYi�'/�Li4L l��✓ City, State,Zip: SALEM, MA Specifier: Customer: Designer: Code reports: ESR-1040 Company: MOYNIHAN LUMBER BEVERLY �0 12 t 0 B1 14-00-00 132 Total Horizontal Product Length=14-00-00 Reaction Summary (Down / Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B1, 3-1/2" 1134/0 3150/0 B2, 3-1/2" 1134/0 3150/0 Load Summary Live Dead Snow Wind Roof Tributary Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 1.60% 125% 0 Self-Weight Unf. Lin. (Ib/ft) L 00-00-00 14-00-00 Top 12 00-00-00 1 Unf.Area(Ib/ft2) L 00-00-00 14-00-00 Back 15 45 10-00-00 Controls Summary Value %Allowable Duration Case Location Pos. Moment 14029 ft-lbs 57.3% 115% 4 07-00-00 End Shear 3500 lbs 38.5% 115% 4 01-03-06 Total Load Deflection L/343(0.474") 52.5% n\a 4 07-00-00 Live Load Deflection L/466(0.349") 51.5% n\a 5 07-00-00 Max Defl. 0.474" 47.4% n\a 4 07-00-00 Span/Depth 13.7 %Allow %Allow Bearing Supports Dim (LxW) Value Support Member Material B1 Wall/Plate 3-1/2"x 3-1/2" 4284 lbs n\a 46.6% Unspecified B2 Wall/Plate 3-1/2"x 3-1/2" 4284 lbs n\a 46.6% Unspecified Cautions For roof members with slope(1/4)/12 or less final design must ensure that ponding instability will not occur. For roof members with slope (1/2)/12 or less final design must account for Rain-on-Snow surcharge load. Notes Design meets Code minimum (L/180)Total load deflection criteria. Design meets Code minimum (U240)Live load deflection criteria. Design meets arbitrary(1")Maximum Total load deflection criteria. Calculations assume member is fully braced. BC CALCO analysis is based on IBC 2009. Design based on Dry Service Condition. All FastenMaster screws may be installed from one side of multiply Versa-Lam beams. Page 1 of 2 Boise Cascade MEN, Single 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP PASSED RB03 (Roof Beam) BC CALCO Member Report Dry 11 span I No cant. March 7, 2019 11:44:34 Build 7133 Job name: SMITH File name: j ,\ Address: Description: �/ EJ'hO2L L Vim` City, State,Zip: SALEM, MA Specifier: Customer: Designer: Code reports: ESR-1040 Company: MOYNIHAN LUMBER BEVERLY �0 12 1 o __ 131 13-06-00 B2 Total Horizontal Product Length=14-01-00 Reaction Summary (Down / Uplift) (lbs) Bearing Live Dead Snow Wind Roof Live B1, 3-1/2" 940/0 2693/0 B2, 3-1/2" 940/0 2693/0 Load Summary Live Dead Snow Wind Roof Tributary Live Tag Description Load Type Ref. Start End Loc. 100% 90% 115% 160% 125% 0 Self-Weight Unf. Lin. (Ib/ft) L 00-00-00 14-01-00 Top 6 00-00-00 1 Unf.Area(lb/ft ) L 00-00-00 14-01-00 Front 15 45 08-06-00 Controls Summary Value %Allowable Duration Case Location Pos. Moment 11974 ft-lbs 97.9% 115% 4 07-00-08 End Shear 2972 lbs 65.5% 115% 4 01-03-06 Total Load Deflection L/200 (0.819") 90.2% n\a 4 07-00-08 Live Load Deflection L/269(0.607') 89.1% n\a 5 07-00-08 Max Defl. 0.819" 81.9% n\a 4 07-00-08 Span/Depth 13.8 %Allow %Allow Bearing Supports Dim (LxW) Value Support Member Material B1 Wall/Plate 3-1/2"x 1-3/4" 3634 lbs n\a 79.1% Unspecified B2 Wall/Plate 3-1/2"x 1-3/4" 3634 lbs n\a 79.1% Unspecified Cautions Disclosure For roof members with slope(1/4)/12 or less final design must ensure that ponding instability will not Use of the Boise Cascade Software is occur. subject to the terms of the End User For roof members with slope(1/2)/12 or less final design must account for Rain-on-Snow surcharge License Agreement(EULA). Completeness and accuracy of input load. must be reviewed and verified by a qualified engineer or other appropriate expert to assure its adequacy,prior to Notes anyone relying on such output as Design meets Code minimum (U180)Total load deflection criteria. evidence of suitability for a particular Design meets Code minimum (U240)Live load deflection criteria. application.The output here is based on building code-accepted design Design meets arbitrary(1")Maximum Total load deflection criteria. properties and analysis methods. Calculations assume member is fully braced. Installation of Boise Cascade BC CALCO analysis is based on IBC 2009. engineered wood products must be in accordance with current Installation Design based on Dry Service Condition. Guide and applicable building codes.To obtain Installation Guide or ask questions,please call(800)232-0788 before installation. BC CALCO,BC FRAMER@,AJS-, ALLJOIST@,BC RIM BOARD TM,BCI@, BOISE GLULAMTM,BC FloorValue@, VERSA-LAM@,VERSA-RIM PLUS@, Page 1 of 1