Loading...
20 FEDERAL STREET #8 BPA 17-118 14 The Commonwealth of Massachusetts = j N�p{�+aa+ ItIFF1 tAL k'## j Board of Building Regulations and Standards CliT OF 101 Massachusetts State Building Code, 780 CMR 10 j 1 �� SALEM 23 Building Permit Application To Construct, Repair,Renovate Or Demolish a One-or Two-Family Dwelling 1 This Section For Official Use Only Building Permit Number: Date Ap teAd: 1 Building Official(Print Name) Signature Date SECTION 1:SITE INFORMATION 1.1 Property Address: FR� Uh(�, 1.2 Assessors Map&Parcel Numbers ,0 4rA� Sk � 1.1 a Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public❑ Private❑ Zone: _ Outside Flood Zone? Municipal❑ On site disposal system ❑ Check if yes❑ SECTION 2: PROPERTY OWNERSHIP' 7- wner'of Record: �y13-�d"T Y� 1✓�� �\ `�Z 5 Name(Print) City,State,ZIP No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORKZ(check all that apply) New Construction❑ Existing Building❑ Owner-Occupied ❑ Repairs(s) ❑ Alteration(s) ❑ Addition ❑ Demolition ❑ Accessory Bldg. ❑ Number of Units Other 4 Specify: ,e �S Brief Description of Proposed Work 2: m aW S 4r cL O � n pcY SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only (Labor and Materials) 1. Building $ $ t4,19 00 1. Building Permit Fee:$ Indicate how fee is determined: ❑Standard City/Town Application Fee 2.Electrical $ ❑Total Project Costa(Item 6)x multiplier x 3.Plumbing $ 2. Other Fees: $ 4.Mechanical (HVAC) $ List: 5.Mechanical (Fire $ Suppression) Total All Fees:$ Check No. Check Amount: Cash Amount: 6.Total Project Cost: $ $ 00' ❑Paid in Full ❑Outstanding Balance Due: J (DtA —1� ( - 3Q,1 - I �kti 2-1 Z V M1:!�,t L-I✓-D G .0 .