Loading...
FINAL CONST CONT DOCS 11/30/17 Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Thermal Circuits Date:1 1/30/2017 Permit No. Property Address: 1 Technology Way, Salem MA 01970 Project: Check(x)one or both as applicable: New Construction X Existing Construction Project description:New addition onto existing building I Stanley Chamrin MA Registration Number: 34938 Expiration date: 6/30/2018 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural X Mechanical X Fire Protection Electrical X Other: Plumbing for the above named project. I, or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Note 1:The original registered design professional on the project has since left the company.Although I have not been involved from the start,I have reviewed with designers under my charge,all documents,calculations and construction progress. Sign off of this affidavit is contigent on the contractor's delivery of the following documents; including but not limited to certification letter stating that the job has been completed and tested in accordance with applicable codes,all testing reports(e.g.HVAC system balancing,sprinkler system,Fire alarm system,life safety egress,plumbing)as required by the specifications and applicable codes. It is also contigent on the contractor's successful completion and proof thereof, of the punchlist items on the attached document. ��IN OF Mgssgo Enter in the space to the right a"wet"or o� s1ANt�v electronic signature and seal: CHAMRIN v MECHANICAL y Na 34938 1-k- Phone number: 603-319-8244 Email: schamrin@CSI-Engineers.com Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional gyp` for work per the 8`h edition of the Y Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Thermal Circuits Date:1 1/30/2017 Permit No. Property Address: 1 Technology Way, Salem MA 01970 Project: Check(x)one or both as applicable: New Construction X Existing Construction Project description:New addition onto existing building I Stanley Chamrin MA Registration Number: 34938 Expiration date: 6/30/2018 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural Structural X Mechanical Fire Protection Electrical X Other: Plumbing for the above named project. I, or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Note 1:The original registered design professional on the project has since left the company.Although I have not been involved from the start,I have reviewed with designers under my charge, all documents,calculations and construction progress. Sign off of this affidavit is contigent on the contractor's delivery of the following documents;including but not limited to certification letter stating that the job has been completed and tested in accordance with applicable codes,all testing reports(e.g.HVAC system balancing,sprinkler system,Fire alarm system,life safety egress,plumbing)as required by the specifications and applicable codes. It is also contigent on the contractor's successful completion and proof thereof, of the punchlist items on the attached document. ���ti of�Ss9� Enter in the space to the right a"wet"or o� sTANLV electronic signature and seal: CHAMRIN v WtECHANICAL y Na 34939 Phone number: 603-319-8244 Email: schamrin@CSI-Engineers.com Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Thermal Circuits Date:11/30/2017 Permit No. Property Address: 1 Technology Way, Salem MA 01970 Project: Check(x) one or both as applicable: New Construction X Existing Construction Project description:New addition to existing building I Charles E. Mace MA Registration Number: 46492 Expiration date: 6/30/2018 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Architectural Structural Mechanical Fire Protection X Electrical X Other: Fire Alarm for the above named project. I,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Sign off of this affidavit is contigent on the contractor's delivery of the following documents; including but not limited to certification letter stating that the job has been completed and tested in accordance with applicable codes, all testing reports(e.g. HVAC system balancing, sprinkler system,Fire alarm system, life safety egress,plumbing) as required by the specifications and applicable codes. It is also contigent on the contractor's successful completion and proof thereof,of the punchlist items on the attached document. �N 0- MqS Enter in the space to the right a"wet"or S9oy electronic signature and seal: CHARLES E. G� g MACE o ELECTRICAL cn N0.46492 �Q A9 9FGIs EP arc. O,c FSS! E Phone number: 603-319-8244 Email: cmace@CSI-Engineers.com Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the 8t`edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Thermal Curcuits Assoc. Date: 11/29/2017 Permit No. B-17-548 Property Address: 1 Technology Way,Salem MA 01917 Project: Check(x)one or both as applicable: X New construction Existing Construction Project description:New 32,800 square foot 2-story building. I,Jeffrey S.Nawrocki MA Registration Number: 34168 Expiration date: 06/30/2018,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural X Structural Mechanical Fire Protection Electrical Other: for the above named project. I,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge,information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of responsi ility regarding a rov'sions of 780 CMR 107. N Of JEFF 3. WROC:KI r STRUCTURAL No.34168 Phone number:603-433-8639 Email:jell@jsneng.com Building Official use Only Building Official Name: Permit No.: Date: Version 06 11 2013 Final Construction Control Document H To be submitted at completion of construction by a Registered Design Professional for work per the 8t" edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Tech Way Associates Addition Date:November 28, 2017 Permit No. Property Address: One Technology Way Salem, MA 01970 Project: Check(x) one or both as applicable: X New construction X Existing Construction Project description: 33,125 square foot one story plus mezzanine manufacturing and office addition to existing 60,013 square foot IIB fully sprinklered building. 1, Richard Griffin, MA Registration Number: 7814 Expiration date: 8-31-2018, am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: X Architectural Structural Mechanical Fire Protection Electrical Other: Describe for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar withthe progress and quality of the work and to determine if the work was performed in a manner consistentwith the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 7&8--,GW 107. Enter in the space to the right a"wet"orl; electronic signature and seal• ��.. "t. <<P C " Phone number:978-740-9979 Email: richard@rgriffinarchitects.com Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013