120 WASHINGTON, CONSTRUCTION OBSERVATION #10 PITMAN & WARDLEY A s s o C t A T E Architecture & Design 32 Church Street • Salem. MA 978.744.8982 CONSTRUCTION OBSERVATION# 10 February 15,2019 Tom St.Pierre Inspectional Services Director City of Salem Inspectional Services Salem,Massachusetts 01970 Project: RCG 120 Washington Street Re: Construction Observation Dear Tom, The following observations are based on a periotic site visits by Michel Beheshti,of my staff. Observation: General areas: • All sprinkler systems are in place per new layout. Lobby Area: • All security system and life safety done. • The Mail boxes are operational. 2°d floor: • The 2nd Floor roof deck is in place. • All steel components of the new deck are completed. • The rough ramp structure is in place,need finishing and railing. • The newel post is in progress. 31 floor south: • All 3rd floor rough inspections are done. • All walls have sheet rock and tapping 90%done,need sanding. • The doors and window trims in units 301, 305 are 90%done. • The units 301 and 305 have completed the rough inspection for electrical and plumbing. • The unit 301 bath room tile work has started. • The unit 301 the tub is installed most doors are installed the tile work at shower/tub is in progress,the individual shower needs the work. • The unit 302 drywall is 100%done and tapping is 90%done. • The unit 302,25%of floor levelling is done. • The HVAC is in progress throughout the floor. • All corridor ceiling grids are complete. • The unit 305 doors are being installed. • The unit 305 fire caulking on the existing shaft yet to be done and inspected by the 31 party inspector. • Window trims and sills yet to be finished. M 4"floor: • All HVAC is completed. • All rough inspections are done. • All units firestopping in units 401,402,403 and 405 ready for Yd party inspection after that. • The unit 401 rough studs are done. • The unit 401 tub is in place,need fire caulking and to be inspected by 31 party inspector. • The unit 402 the sheet rock is about 95%done the doors to be installed. • The unit 402 the window trims are not done. • The unit 402 the tub is installed,rough plumbing at sink and toilet is done. • The unit 403 all sheet rocks to be done.The rough plumbing is done.The window trims are done. • The unit 404 heater is installed above ceiling level,the ceiling is not finished yet. • The unit 405 rough studs are done,insulation has started. Recommendations or Actions: 1-The Structural Engineer will be submitting independent reports. 2-The MEP, fire protection,civil reports are not part of this report. Please do not hesitate to be in touch with this office should you have any further questions and or concerns. Respect , eer F.Pitman,Architect Massachusetts Registration No.8749 No -74 BOSTG,1t UA NOF