Loading...
ARCH. FIELD RPT 01/08/2018 the architectural ARCHITECT'S FIELD REPORT tatteam PROJECT NAME: Pequot Highlands Interior Mod-Rehab PROJECT LOCATION: 12 First Street Salem,MA United States ARCHITECT'S PROJECT#: 16068.00 FIELD REPORT: 00018 DATE: 1/8/2018 WEATHER DESCRIPTION: TIME TEMP WIND SPEED HUMIDITY REMARKS 11:00 AM 28°F 13.8 mph 47% Overcast EST.%COMPLETION&CONFORMANCE WITH SCHEDULE:60%Complete PRESENT ON-SITE: Michelle King The Silver Street Group,LLC Eric Clory The Silver Street Group,LLC Carpenters,Plumbers,Electricians,Elevator Techs Chris Poulin Silver Street Development Mike Swiatek Port Harbor Construction, INC. Brenda Paradis The Silver Street Group Joan Russell WinnCompanies TOTAL: 7 OBSERVATIONS: ITEM CATEGORY REMARKS PHOTOS 1 Work in Unit punchlist work is ongoing in North and South Progress buildings. 2 Work in Fire Alarm installation testing in the South building is Progress waiting for fire department scheduling after the recent holiday season. 3 Work in Corridor scope of work is ongoing. Progress 4 Work in South Building roof replacement ongoing.90% Progress complete.Roof parapet installation is on hold until temperatures allow work to continue. 5 Work in North Building roof replacement is ongoing.90% Progress complete.Cell phone equipment relocation is ongoing. 6 Work in Elevator#2&#3 scope of work is ongoing. Progress The Architectural Team, Inc, 50 Commandants Way at Admiral's Hill Chelsea MA 02150 T 617.889.4402 F 617.884.4329 W"."v.architecturalteam.com Page 1 of 4 ARCHITECT'S FIELD REPORT a DATE: 1/8/2018 FR: 00018 ITEM CATEGORY REMARKS PHOTOS 7 Work in Brick demolition on the building link between North Progress and South buildings. 8 Work in Old boiler room insulation installation is ongoing in Progress North building. 9 Work in South building lobby work is ongoing. Progress 10 Observations Unit work in the South building is complete. 11 Observations ADA and AV unit work is complete. 12 Observations Panel installation on South building is complete. Trim and parapet outstanding. 13 Observations Window installation on South building is complete. Trim outstanding. 14 Observations New Cogen unit installation is complete.Overflow valve repairs are complete. 15 Observations Swingstage work on 12 story building is on hold due to cell antennae coordination.Work will begin when temperatures allow. 16 Items to Verify PHC must verify CoGen exhaust location complies with engineer's response to RFI#30. 17 Observations Photos m 2 s I he Architectural Team, Inc, 50 Commandants Way at Admiral s Hill Chelsea NIA 02150 T 617.880.4402 F 617.884.4520 ivww.architecturaiteam.ccrn Page 2 of 4 ARCHITECT'S FIELD REPORT DT: 1mm8 F: «@a EE CATEGORY RMRS PHOTOS : » . / ~ The Architectural Teas Inc. w Commandant Way at gnaw Hill Chelsea v;mly lezam*m: Feza+ga w waw.umltea»om Page 3¥4 � f ARCHITECT'S FIELD REPORT DATE: 1/8/2018 FR: 00018 ITEM CATEGORY REMARKS PHOTOS i fl i 1 ATTACHMENTS: Report By: The Architectural Team,Inc./Lamarr Rollins II Distribution: Phil Renzi The Architectural Team,Inc. prenzi@architecturalteam.com Chris Poulin Silver Street Development cpoulin@thesilverstreetgroup.com Eric Clory The Silver Street Group,LLC eclory@thesilverstreetgroup.com Mike Swiatek Port Harbor Construction, INC. mswiatek@portharborconstruction.co m The Architectural team, Inc. 50 Commandants Way at Admiral's Hi Chelsea MA 02150 T 617.889.4402 F 617.884.4329 arch itecturaltearn.com Page 4 of 4