Loading...
FIELD REPORTS (1987) LANG ASSOCIATES, ARCHITECTS LEVVEQ OF 150 Lincoln Street BOSTON, MASSACHUSETTS 02111 DATE JOB NO. (617) 423-5807 ATTENTION TO '"rkl oz RA20 J RE: Math V G LVO (4?AND f�AhAIO A% t jim MID WE ARE SENDING YOU )( Attached ❑ Under separate cover via ►,1� a /�- the following items: ❑ Shop drawings ❑ Prints ❑ Plans ,p El Samples ❑ Specifications ❑ Copy of letter ❑ Change order !MOD111wxIbf1\/ COPIES DATE NO. DESCRIPTION ftw t THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval KFor your use ❑ Approved as noted ❑ Submit copies for distribution KAs requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS KIM OWW&W ('Z rAffil M?_ COPY TO a"IA1WA SIGNED: PROW 2143 �kx,Q01A 14a 0147 1. If enclosures are not as noted, kindly notify us at once. �fsr3lliJ ttr]L��L�7luJl t�[�]l�L 7 L�]1�5 9!!l Z4i l�Qr7 23 MMUM 150 LINCOLN STREET, BOSTON, MASSSACHUSEITS 02111 617-423-5807 PROJECT: The Cogswell Condominium [Renovations to Five School Street, Salem, MA) DATE: 7/20/87 ATTENDING: Jessica Herbert - Loring Development Corp. Steve Gauthier- Licensed Builder Colin Simson - Structural Engineer Peter Turowski & Roger Lang - Lang Associates Weather: Fair & Clear Project Status: Rough construction well underway, including: o Roofing: 2 0% o Interior Framing: 40% o Wiring: 10 o HVAC: 0% o Skylights stored on site; openings being framed Discussion Summary: Structural issues: refer to CGS Field Report Architectural issues: o Locus of trash storage under review o Detail requested for heat pump screens Code Items: None Issuances Made: CGS sketches (SK-FS I thru 3) to Gauthier Attachments: CGS Field Report of 7/20/88 U page) Prepared by: Nav (awz Rog P. Lang, g tered Architect [Mass. No. 3317] RPL/PJT;rI Encl. as noted CGS Colin G Simson Consulting Engineer, Inc, 968 Main Street, Winchester, MA 01890 Telephone 617-721-7212 CONSTRUCTION FIELD IJISPECTION REPORT Project : Cogswell School Condominium Conversion 2 4 687 Location: Salem, MA j�J Date: July 20 , 1937 By: C. G. Simson 1 . I met with Jessica Herbert , Steven Gauthier , Roger Lang and Peter Turowski on the site to discuss construction details and answer questions now that construction is proceeding. 2 . Steve Gauthier prefers to use the 2 X 4 stud partitions at the exterior side walls as the primary support for the new third floor framing. This is acceptable provided that , at approximately 3 ft. on center, floor framing is also cut into the masonry wall for stability. 3 . The 5-2 X 12 beams in the third floor framing toward the rear cf the building will bear directly above the brick arch window openings in the side masonry walls . There is no room above these openings to properly spread these concentrated loads . Therefore , 2-2 X 12 lintels :rust be added on the properly reinforced stud walls into which these beams and the floor joists will be flush framed. Enclosed is SK-FSl to further describe this detail . 4 . The remaining 7 ft. of center brick wall in the front portion c_ the building, between the second and third floors may be re.r;oved and replaced with a 2 X 6 stud bearing wail under the center reef truss . This roof truss has also been supported down onto the remaining portion of the center masonry wall . 5. In the basement , the installation of underground plumbing lines will interfere with the proper installation of the new fcotings for the new bearing walls . SK-FS2 is enclosed to show the relationship between the plumbing lines and footings . Where plumbing lines are parallel with the footing, drop the footing elevation and extend the bearing line with grouted masonry. Where the plumbing line crosses the footing, locally step tha footing under the pipe . Under all conditions , footings must nct be installed over plumbing lines and plumbing lines :oust not be allowed to penetrate footings . 6 . Also enclosed is SK-FS3 , the steel lintel schedule for masonry cpenings . Ln]L*JC7LJlh�lie3!��? Ln]I�SI��tti C►3 l►�lwJl�liJ�4J��4 L�r3!!il�4� 150 LINCOLN STREET, BOSTON, MASSSACHUSETTS 02111 617-423-5807 WE= a °4 Lie. a PROJECT: The Cogswell Condominium [Renovations to Five School Street, Salem, MAI DATE: 8/5/87 ATTENDING: Jessica Herbert - Loring Development Corp. Steve Gauthier - Licensed Builder Colin Simson - Structural Engineer Weather: Warm & Cloudy Project Status: Rough framing continuing: foundations completed. Discussion Summary: See attached CGS Report of 8/5/87 Code Items: None Issuances Made: None Attachments: See attached CGS Report of 8/5/87 Prepared by: 6Nfo Wz Roge . Lang, Re s ered Architect [Mass. No. 33171 RPL/PJT;rI Encl. as noted CGS Colin G. Simson Consulting Engineer, Inc. 968 Main Street, Winchester, MA 01890 Telephone 617-721-7212 IJ.TSr DTTCM7 nla r ^Ti .r."7Y rTi�1Ti ?"'D�`�D^+ -' T, aus - sem ��- /'^r,c�?e1i S' C'Jj COna:�i0-4r-1 i` �CnverSiOn J ..... . ...'. - Cat10 n. � r n n S'atc : nuguSt � , _� � ; BY : .. . 's. l:''sOna Gauthier on the site. to _ `.v_ew Cl'nst::u- _- _C' �greSS --ni -o a .s-qer any Structurally related cSt1 wc:.: �cr the ne3 lnt r ed:atc stud >vTaii and Steve Gauthier e:plained _.aat the _nfor-ratior cr S. 'aa zarefuli_- follcwed in completing this work. S-r- of the third floor framing :cork , including z.he ` c7--',, on SK-FS1 has been cc_Tpleted. This work also appears to d Properly, including the proper framing anchors for the = �� beams . Fra-ing anchors for the thir3 Floor .i 12 jest= . :•7hich ar- flu_h-franed to beams at the stair openings , are~2 X E: joist ,angers . Steve will. have these replaced with 31S X 12 joist-C . Thi stud *.aalis on eacl-. side which support =bird floe separate secorld floor .:_tChenis -from hallways are CC nSt_Ctcd � _.. X :Z4 �6 iia. _tud wall instead cf. 2 X 6 � , 6 studs . �.. these walls ale also 4-2 k 6 posts tc support the third fl.^.._ beams abc,e . Ste-:e and I discu-ssed this and deciw=d best solution to this probler was to add the 4-2 .. c oosr_ i.. =.:1 tlnag ;call and to double-up the 2 4 studs Ana 4 nail . This 6Ja:1 would tiacn be a 2-2 :1 tl ' 16 in stud wall witht"I 1-2 X 6 post protruding on the kite hen side . HAM MMEAUIR &MCMUMM 91 QU 150 LINCOLN STREET, BOSTON, MASSSACHUSETTS 02111 617-423-5807 YH= MOM mcg. Is PROJECT: The Cogswell Condominium (Renovations to Five School Street, Salem, MA] DATE: 8/14/87 ATTENDING: Jessica Herbert - Loring Development Corp. Steven Gauthier - Licensed Builder Peter Turowski, Tom Mullane & Roger Lang - Lang Assoc. Weather: Warm & Sunny Project Status: Rough construction proceeding smoothly, including: o Roofing: 50% o Interior Framing: 60% o Deck Framing: 20% o Rough Plumbing: 30% o Wiring: 30% o HVAC: 20% o Skylights: 70% Architects measured framed areas for condominium documents. Discussion Summary: Architects to study several potential design modifications: o Alternative configurations for Kitchens in Units 5 & 8, to avoid loss of space at window; o Alternative circulation from Units 5 & 8 to Solariums/Dining Areas in ells above entrance lobbies; o Design for heat pump screen (similar to One Broad Street?); o Method of getting natural light into Kitchens adjacent to corridor in Units 6 & 7. (Continued) Cogswell Field Report No. 3 8/14/87 Page Two (Discussion, cont'd) Trash storage concept alternatives reviewed and discussed, in anticipation of forthcoming meeting with. Bob Blankhorn; agreed to pursue exterior holding area with deposit from within building. Agreed to add additional skylights as follows: o Above stair at Units 6 & 7 (one each); o Above stair at Units 5 & 8 (one each); o Above baths at Units 6 & 7 (one each). Architects to investigate electricial subcontractor's request for larger service and panel area. Code Items: Field conditions necessitated corridor width at Level 3 to be built 36" wide, rather than 44" required by Code. Lang & Gauthier called Building Inspector Jim Santo for interpretation; he agreed that 36" corridor was adequate, as it serves for egress from two units only Issuances Made: Trash Disposal Studies (SK's Bl thru 3) Heat Pump Screen; Deck Access to Solarium; Glass Block Details; Units 5&8 Kitchen (SK C3) Attachments: (None) nn Il Prepared by: Roger . Lang, R t red Architect [Mass. No. 33171 RFL/FJT;rI Encl. as noted AMCMUMM21 CaRNMU&M 150 LINCOLN STREET, BOSTON, MASSSACHUSETTS 02111 617-423-5807 PROJECT: The Cogswell Condominium [Renovations to Five School Street, Salem, MA] DATE: 8/18/87 ATTENDING: Jessica Herbert - Loring Development Corp. Steve Gauthier - Licensed Builder Colin Simson - Structural Engineer Peter Turowski - Lang Associates Bob Blankhorn - Board of Health Weather: Fair & Mild Project Status: [See Field Report No. 2 for 8/14/871 Discussion Summary: Blankhorn approved external trash holding concept with chute accessible from inside; requested research into availability and feasibility of automated compaction systems. Follow-Up: Herbert and Turowski researched automated compaction systems through B.F.I. and Research Technology Group; obtained copies of pertinent literature and budget cost estimates. Both companies indicated that such a system for an 8 unit building would be highly unusual and prohibitively expensive. Herbert presented final conclusions to Blankhorn. Agreed to add individual trash compaction units in each Kitchen. Code Items: None Issuances Made: SK's B 1-3 to Blankhorn (Continued) Cogswell Field Report No. 4 8/18/87 Page Two Attachments: None Prepared by: GaOAAI 64,"� RPL/PJT;rI Roge . Lang, R t ed Architect [Mass. No. 33171 Encl. as noted 150 LINCOLN STREET, BOSTON, MASSSACHUSETTS 02111 617-423-5807 WE= D D Dir IN. 3 PROJECT: The Cogswell Condominium [Renovations to Five School Street, Salem, MA] DATE: 8/21/87 ATTENDING: Jessica Herbert - Loring Development Corp. Steve Gauthier - Licensed Builder Peter Turowski - Lang Associates Weather: Hot & Clear Project Status: Rough construction within building nearing completion: o Roofing: 90% o Skylights: 100% (including units added) o Interior Framing: 80% o Insulation: 50 % o Deck Framing: 50% o Rough Plumbing: 50% o Wiring: 50% o HVAC: 40% o Fireplaces/Flues: 30% o Windows: 0% (on order) o Landscaping: 0% o Site Drainage: 40% Discussion Summary: Discussed SK's C1-3 regarding ell access and glass block panels. Code Items: Architects to verify glass block rating; Gauthier to review concept with Jim Santo before proceeding. Issuances Made: None Attachments: Ae Prepared by: Roger P. Legis re Architect [Mass. No. 33171 aII� &=gum= Q � 150 LINCOLN STREET, BOSTON, MASSSACHUSETTS 02111 617-423-5807 WE= ° ° ZL Rb. it PROJECT: The Cogswell Condominium [Renovations to Five School Street, Salem, MAI DATE: 9/3-4/87 ATTENDING: Jessica Herbert - Loring Development Corp. Steve Gauthier - Licensed Builder Peter Turowski, Jon Ladner, Tom Mullane, Roger Lang - Lang Associates Fred (Senior Electrician) Weather: Warm & Clear Project Status: Approximate status of major construction underway was: o Roofing: 10 0% o Skylights: 100 o Interior Framing: 85% o Insulation: 65% o Rough Plumbing: 60% o Rough Wiring: 60% o HVAC: 50% o Fireplaces/Flues: 90% o Windows: 0% (on order; late) o Landscaping: 10% o Site Drainage: 40% Discussion Summary: Note: This report reflects discussion on successive days, 9/3/87 and 9/4/87. On the first day, the Architects were present to measure the site of 141 R North Street and resolve site planning goals for both properties: on the second day, a regular job meeting was held at the Cogswell. Reviewed space needs for electrical/telephone/CATV closets; agreed to enlarge closets at present location, after considering and rejecting several relocation options. (Continued) Cogswell Field Report No. 6 9/3-4/87 Page Two (Discussion, cont'd) Herbert still working with B.F.I. on response to Blankhorn Architects to prepare layout drawings for sales brochure. Code Items: Gauthier & Lang to investigate requirements for fire pump; location alternatives. Issuances Made: None Attachments: None Prepared by: do RPL/P,JT;rI Roge P. Lang, Re st ed Architect [Mass. No. 33171 Encl. as noted i i a 150 LINCOLN STREET, BOSTON, MASSSACHUSETTS 02111 617-423-5807 WE= mmmir ft. 7 PROJECT: The Cogswell Condominium [Renovations to Five School Street, Salem, MA) DATE: 9/11/87 ATTENDING: Roger Lang - Lang Associates Foremen of Framing Crew & Electrical Subcontractors Weather: Rain & Overcast Project Status: Rough construction nearing completion: o Roofing & Skylights: 100% o Interior Framing: 90% o Insulation: 75% o Rough Plumbing: 70% o Rough Wiring: 70% o HVAC: 60% o Deck Framing: 60% o Landscaping: 60% o Doors stored on site o Not yet started: windows; heat pumps; deciban; drywall; appliances; kitchen cabinets & counters. Discussion Summary: Reviewed enlarged electrical closet area; U.K. Reviewed areas of potential upgrades for subsequent discussions with Herbert and lender. Code Items: None Issuances Made: Delivered copies of studies of 3 solarium link alternatives (SK's Dl-7) at Loring Development for later Herbert review and comment. Attachments: None Prepared by: 11 bl& Roger P. Lang egistere A hitect [Mass. No. 33171 &@=EAU= A=Mrama, 150 LINCOLN STREET, BOSTON, MASSSACHUSETTS 02111 617-423-5807 gIIM a o o ir Me. a PROJECT: The Cogswell Condominium [Renovations to Five School Street, Salem, MA[ DATE: 9/30/87 ATTENDING: Jessica Herbert - Loring Development Corp. Steve Gauthier - Licensed Builder Roger Lang - Lang Associates Weather: Cloudy, Windy, Mild Project Status: Interior rough construction substantially completed. No problems noted. Discussion Summary: [Site visit by Lang was brief, in late afternoon, after work had stopped for the day, prior to evening appearance before Board of Appeal regarding Carlyle Place ( 141 R North Street). Lang reviewed CGS deck framing instructions with Gauthier (refer to phone notes of 9/15/87. Agreed that recent code interpretation enabled deletion of standpipe and fire pump; Gauthier to review with Cpt. Turner. Code Items: Lang transmitted letter dated 9/30/87 to Santo confirmig his code interpretation regarding number of stories (3+B) per meeting with Gauthier. Issuances Made: As above. Attachments: CGSp ne not re oriel framing (9/15/87) Prepared by: Roger P. ng, egis ed rchitect [Mass. No. 33171 RPL/PJT;rI Encl. as noted s/mSo4l lAih,illAll. ABX 0 ��/2"`O.� . ,Z —�`XG �' /f��O.G• _ _ ._ G d'le?wPiS 4ao b II� MCK a, UMU 150 LINCOLN STREET, BOSTON, MASSSACHUSETPS 02111 617-423-5907 N MOM Me. 19 PROJECT: The Cogswell Condominium [Renovations to Five School Street, Salem, MA[ DATE: 10/21/87 ATTENDING: Jessica Herbert - Loring Development Corp. Steve Gauthier - Licensed Builder Roger Lang - Lang Associates Weather: Overcast, Cool Project Status: Roughing complete; all rough inspections satisfactory; o Roofing & Skylights: 100% o Interior Framing: 100% o Rough Plumbing, Wiring & HVAC: 100% o Doors & Windows: 80% o Decks: 90% o Drywall: 30% o Landscaping & Site Drainage: 70% Discussion Summary: Extensive review with Herbert of all costs in preparation of discussions with lender. Lang to write Stan Dodge at BNE re/ current requisition. Reviewed electrical extras with Herbert & Gauthier. Code Items: Lang letter to Santo regarding standpipe deletion given to Gauthier for delivery. Issuances Made: Letters as above. Attachments: None Prepared by: Roger P. LaItR egister Ar hitect [Mass. No. 33171 RAL/FJT;rI Encl. as noted JWiiYlt�Vf AMCENM= I OMEMIMM 150 LINCOLN STREET, BOSTON, MASSSACHUSETTS 02111 617-423-5807 gIIM D D u Me. n Q PROJECT: The Cogswell Condominium [Renovations to Five School Street, Salem, MAI DATE: 10/29/87 ATTENDING: Jessica Herbert - Loring Development Corp. Steve Gauthier - Licensed Builder Roger Lang & Peter Turowski - Lang Associates Weather: Sunny & Cool Project Status: Interior finish work proceeding smoothly: o Drywall: 50% o Priming & Painting: 30% o Oriels Framing: 50% o Fences: 75% o Decks: 90% Discussion Summary: Discussed color scheme for exterior trim with Herbert. Herbert following-up with Blankhorn re/ trash solution. Lang & Gauthier agreed to have Ray Noyes test HVAC distribution and balance ASAP. Catch basins installed over drywells; site drainage functioning properly. Code Items: Gauthier agreed to rate stairwell opening at Units 5&8 as 2 hrs at infill locations. Issuances Made: Draft condo. documents to Serafini. Attachments: None Prepared by: &Nlin W 1__*' Roger P. La , Registered itect [Mass. No. 33171 RPL/PJT;rI Encl. as noted UAW &ffimna= 93 1gkQJgJJJQLIP 150 LINCOLN STREET, BOSTON, MASSSACHUSETTS 02111 617-423-5807 W= D D D 4 Me. n n PROJECT: The Cogswell Condominium [Renovations to Five School Street, Salem, MAI DATE: 11/9&10/87 ATTENDING: Jessica Herbert - Loring Development Corp. Steve Gauthier - Licensed Builder Roger Lang - Lang Associates Weather: Windy & Cool, both days Project Status: Interior finish work proceeding: o Drywall: 80% o Painting: 50% o Model Unit nearly ready o Oriel framing: 90% Discussion Summary: Reviewed condominium documents with Herbert and Darling. Reviewed fence installation: O.K. Code Items: None Issuances Made: None Attachments: None OM9 Prepared by: 0 Roge . Lang, Rist red Architect [Mass. No. 3317 RPL/PJT;rI Encl. as noted 150 LINCOLN STREET, BOSTON, MASSSACHUSETTS 02111 617-423-5807 EPYiOL1dJp/ MV=Me. n a PROJECT: The Cogswell Condominium [Renovations to Five School Street, Salem, MAI DATE: 12/9/87 ATTENDING: Jessica Herbert - Loring Development Corp. Steve Gauthier - Licensed Builder Roger Lang - Lang Associates Weather: Light snow Project Status: Interior finish work at overall 85%. Discussion Summary: Reviewed privacy screen deck detail with Gauthier. Noted several minor latout revisions for condo. docs. Reviewed upgrades budget with Herbert. Code Items: None Issuances Made: None Attachments: None Prepared by: N�f4o Roge P. Lang, Re tered Architect [Mass. No. 33171 RPL/PJT;rI Encl. as noted �� LfF]ll5f�l�LS!�!��L*� C*.3 �MlJL�?lJl�lS f�]!!►!!!L*7 150 LINCOLN STREET, BOSTON, MASSSACHUSETTS 02111 617-423-5807 IFEM D D M 4 Ifta a go PROJECT: The Cogswell Condominium (Renovations to Five School Street, Salem, MAI DATE: 2/24/88 ATTENDING: Jessica Herbert - Loring Development Corp. Steve Gauthier - Licensed Builder Roger Lang - Lang Associates Weather: Sunny & Mild Project Status: Punch List stage; trimming out, painting, ready for carpet. Overall completion approximately 98%. Discussion Summary: Reviewed several minor outstanding items with Gauthier required for Certificate of Occupancy. Gauthier to have manufacturer inpect fire brick in fireplace boxes; replace as required where cracked. Code Items: Recent letters submitted to Gauthier for Santo regarding carpet & glass block ratings, certify rough & final inspections, transmit Field Reports. Issuances Made: Letters as above. Attachments: None. Prepared by: NCA 0 Roger P ang, Regi ered rchitect (Mass. No. 33171 RPL/PJT;rl Encl. as noted y lam a= 93 f�ii ISL/ 150 LINCOLN STREET, BOSTON, MASSSACHUSETTS 02111 617-423-5807 PROJECT: The Cogswell Condominium [Renovations to Five School Street, Salem, MA) DATE: 12/20/87 ATTENDING: Jessica Herbert - Loring Development Corp. Roger Lang - Lang Associates Weather: Cold & Cloudy Project Status: Project is substantially complete; looks great! Discussion Summary: Reviewed several minor interior punch list items. Code Items: None Issuances Made: None Attachments: N;40 Prepared by: Roge Lang, Re . e d Architect [Mass. No. 33171 RPL/PJT;rl Encl. as noted