Subject: ROUGH & FINISH INSPECTION: Unit #8; Cogswell
Condominium, 5 School Street, Salem, MA.
-------------------------------
I am the Licensed Builde=r on the project at the Cogswell
Condominium. I was The Superintendent of the project from
start to finish . It is my professional opinion that Unit #8
was constructed in accordance with the current Massachusetts
State Building Code and in compliance with my best
understanding of the requirements of the City of Salem.
Sincerely,
Stevan J. Gauthier
Vice President
Builders License #501.)
State Superintendents License #020450
UM &NMHAUN Ami Q
150 LINCOLN STREET, BOSTON, MASSACHUSETTS 02111 617-423-5807
23 February 1988
Office of the Inspector of Buildings
City of Salem
One Salem Green r d�
Salem, Massachusetts 01970
Attention of: Mr. James Santo
Subject: Final Inspection: Unit No. 8
The Cogswell Condominium
Five School Street, Salem, MA
Ladies and Gentlemen:
I am the Architect of Record for the above-noted project. With the assistance
of my staff and consulting structural engineer, Colin G. Simson, P.E., I directly
supervised the preparation of design plans and construction documents for
The Cogswell Condominium; in addition, we observed the construction in
progress at regular periodic intervals, from July 1987 through January 1988.
This letter is to certify that we made our final inspection of Unit No. 8 of the
above-referenced project upon the substantial completion of its construction.
It is my professional opinion that Unit No. 8 was built in accordance with our
construction documents. Moreover, I find that the unit was constructed in
accordance with the current Mass. State Building Code and in compliance
with our best understanding of the requirements of the City of Salem.
Very truly yours, \��REo aP.
cy�T
��N4. 3317 do '
D o -BOSTON,
WAM
Rog P. Lang, in ipal (Registered Architect, Mass.#33171
LA G ASSOC AT ARCHITECTS & CONSULTANTS
XC: Loring Development Corporation (Ms. Jessica B. Herbert)
Steven Gauthier, Licensed Builder
Colin G. Simson Consulting Engineer, Inc.
&U0
150 LINCOLN STREET, BOSTON, MASSACHUSETTS 02111 617-423-5807
23 February 1988
Office of the Inspector of Buildings
City of Salem _
One Salem Green
Salem, Massachusetts 01970 '
Attention of: Mr. James Santo
Subject: Rough Inspection: Unit No. 8
The Cogswell Condominium
Five School Street, Salem, MA
Ladies and Gentlemen:
I am the Architect of Record for the above-noted project. With the assistance
of my staff and consulting structural engineer, Colin G. Simson, P.E., I directly
supervised the preparation of design plans and construction documents for
The Cogswell Condominium; in addition, we observed the construction in
progress at regular periodic intervals, from July 1987 through January 1988.
This letter is to certify that we made our rough inspection of Unit No. 8 of
the above-referenced project at the appropriate time during its construction.
It is my professional opinion that the rough framing was satisfactorily
completed in accordance with our construction documents. Moreover, I find
that Unit No. 8 was constructed in accordance with the current Mass. State
Building Code and in compliance with our best understanding of the
requirements of the City of Salem.
Very trul yours, GER P.
�ONo, 8311
BOSTON,
6 MASS.
0 P`
Ro r P. Lang, ri cipal [Registered Architect, Mass.#33171 F'�rrrkA
P�S
LANG ASSOC S, ARCHITECTS & CONSULTANTS
XC: Loring Development Corporation (Ms. Jessica B. Herbert)
Steven Gauthier, Licensed Builder
Colin G. Simson Consulting Engineer, Inc.